ATTACHMENT 1 FOR SOLICITATION HC101320QA418
CIRCUIT SPECIFICATIONS: 1. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:
(A) FIBER TERMINATION: FRAME FORMAT: STS-12, 1310NM RATE: PLUS OR MINUS
20 PPM (B) GOVERNMENT PROPOSED CHANNELIZATION: 9 STS-1'S (TIMESLOTS 1-
9) 1 STS-3C (TIMESLOTS 10-12) (C) LINE MUST REMAIN FULLY OPERATIONAL AND
AVAILABLE TO USERS 24 HOURS A DAY, SEVEN DAYS PER WEEK, AT LEAST 99.5%
OR BETTER. (D) REQUEST ONE-HOUR RESPONSE TIME TURN-AROUND TO REPAIR
ONCE TROUBLE-CALL HAS BEEN REPORTED. (E) GFE CLOCKING: VENDOR ESFU
(OR EQUIVALENT) NOT TO BE ENGINEERED INTO CIRCUIT. (F) SINGLE MODE
FIBER TERMINATIONS SC/SC CONNECTORS (G) NO NETWORK INTERFACE UNIT.
(H) DEDICATED PATH. (I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO
ASSIST IN ANY CIRCUIT OUTAGES. (J) VENDOR MUST CONDUCT A SATISFACTORY
72 HOUR END TO END TEST UTILIZING A 2E23 TEST PATTERN IAW ANSI
STANDARD T1.514. ADDITIONALLY, VENDOR MUST CONDUCT SATISFACTORY
CONUTITY CHECKS AND INITIAL 15 MINUTE END TO END TEST ON EACH STS-1
AND STS-3C. AFTER COMPLETION OF CONUTITY CHECKS AND INITIAL TESTING,
VENDOR MUST COMPLETE A SATISFACTORY 72 HOUR END TO END TEST ON THE
FIRST STS-1 (TIME-SLOT NUMBER 1) END TO END PRIOR TO TURNING OVER THE
OC-12 TO THE ACCEPTING AUTHORITY. THE VENDOR TEST SET/SETS MUST HAVE
THE ABILITY TO PRINT THE TEST RESULTS AND THOSE RESULTS MUST BE E-
MAILED TO THE ACCEPTING AUTHORITY FOR REVIEW. (K) VENDOR MUST HAVE
A 24X7 NETWORK OPERATIONS CENTER. (L) THE COMMERCIAL CIRCUIT WILL BE
ACCEPTED ON BEHALF OF THE GOVERNMENT BY THE CONUS IP BACKBONE
ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL. (C) 618-418-8843 (D)
418-8843 (M) THE VENDOR MUST PROVIDE: 1) THE LONG HAUL CIRCUIT NUMBER;
2) THE 1-800 TROUBLE REPORT NUMBER; AND 3) THE LOCAL CIRCUIT IDENTIFIER
FOR EACH LOCATION TO THE ACCEPTING AUTHORITY PRIOR TO THE
GOVERNMENT ACCEPTING SERVICE. INSIDE WIRING MUST BE COMPLETED AND
TESTED PROPERLY PRIOR TO TURNUP TO THE GOVERNMENT. 2. VENDOR
WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF
OC-12 SERVICE IAW THE UNIQUE INSTALLATION FACTORS. 3. INSIDE WIRING IS
AUTHORIZED IAW WITH THE UNIQUE INSTALLATION FACTORS. 4. VENDOR MUST
COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO
REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS. 5. ALL
EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO THE
CONUS IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB,
IL. PRIMARY: (C) 618-418-9500(D) 418-9500 TOLL FREE: 855-868-9500 6. DD FORM 1368
WILL BE SUBMITTED ON THIS TRUNK IAW DISAC-DITCO 350-135-1 BY RNSOC,
SCOTT AFB, IL. GUIDANCE ON SUBMISSION IS AVAILABLE AT
HTTP://WWW.DITCO.DISA.MIL/ASP/PUBLICATIONS.ASP>. CLICK ON "DISA-DITCO
CIRCULAR, 350-135-1, DEFENSE COMMERCIAL COMMUNICATIONS ACQUISITION
PROCEDURES."
MINIMUM TECHNICAL SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE
RATE: 622.08MB/S 20 PPM. LINE CODE: OPTIC FRAME FORMAT: SONET/STS-12 1.
TEST AND ACCEPTANCE: FIBER OPTIC OC-12 CIRCUITS SHALL PASS A FULLY
DOCUMENTED SATISFACTORY 72 HOUR SOAK TEST BY THE CONUS AT SCOTT
AFB, IL. PRIMARY: (C) 618-418-8691 (D) 418-8691 2. TESTING PARAMETERS AND
THRESHOLDS: THE FOLLOWING TESTING PARAMETERS SHALL BE MEASURED
DURING TEST AND ACCEPTANCE TESTING. ERROR PERFORMANCE
(AVAILABILITY, SES, DM, EFS) AND LOSS OF BIT COUNT INTEGRITY SHALL BE
MEASURED AND RECORDED OVER THE DURATION OF THE CONTIGUOUS 72 HOUR
TESTING INTERVAL AND SHALL BE MEASURED AND RECORDED PER DEFINITION
IN ITU RECOMMENDATION G.826 AND M.2100. 3. ERROR PERFORMANCE: ERROR
PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING PARAMETER
THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN
99.5% SEVERELY ERRORED SECONDS (SES) SHALL BE LESS THAN 0.02%
DEGRADED MINUTES (DM) SHALL BE LESS THAN 0.2% ERROR FREE SECONDS
(EFS) SHALL BE GREATER THAN 99% 4. LOSS OF BIT COUNT INTEGRITY (LBCI):
LOSS OF BIT COUNT INTEGRITY SHALL BE MONITORED ONLY BY THE
FOLLOWING METHOD: USING TEST EQUIPMENT WHICH CAN DETECT AND
MEASURE THE OCCURRENCE OF THE INSERTION OR DELETION OF ONE OR MORE
BITS INTO THE DIGITAL BIT STREAM, ON MANY MANUFACTURERS BERT TEST
EQUIPMENT THIS IS MONITORED USING THE "PATTERN SLIP" PARAMETER
WHERE EVERY OCCURRENCE OF A PATTERN SLIP "EVENT" MARKS THE
OCCURRENCE OF A LBCI (RATHER THAN THE RAW TOTAL NUMBER OF PATTERN
SLIPS ACCUMULATED OVER A TESTING INTERVAL) 5. MEAN TIME TO LOSS OF
BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER THAN 24 HOURS. O.
ROUND TRIP DELAY (RTD) SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS
TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION. THE GOVERNMENT
ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-UP AND
TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS PROPOSAL,
DISA IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING. (**UNIQ INSTALL
FACTORS**) (SP A) 010) BLDG 7320, ROOM 116. ADDITIONALLY, VENDOR MUST
SHOW SITE PERSONNEL LISTED ON THIS ORDER THE EXACT TERMINATION POINT
WHEN SERVICE IS COMPLETE. E. 7CS CIRCUIT ACTIONS ARE RESPONSIBLE FOR
INSTALLATION AND MAINTENANCE OF SINGLE MODE FIBER FROM THE LINE
SIDE OF SITE PROVIDED FIBER TERMINATING PATCH PANEL BLDG 7320, ROOM
116 TO THE LINE SIDE OF THE SITE PROVIDED FIBER TERMINATING PATCH PANEL
BLDG 7318, AT&T DEMARC, USING EXISTING ON-BASE SINGLE-MODE FIBER.