View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1 FOR SOLICITATION HC101320QA418

CIRCUIT SPECIFICATIONS: 1. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:

(A) FIBER TERMINATION: FRAME FORMAT: STS-12, 1310NM RATE: PLUS OR MINUS

20 PPM (B) GOVERNMENT PROPOSED CHANNELIZATION: 9 STS-1'S (TIMESLOTS 1-

9) 1 STS-3C (TIMESLOTS 10-12) (C) LINE MUST REMAIN FULLY OPERATIONAL AND

AVAILABLE TO USERS 24 HOURS A DAY, SEVEN DAYS PER WEEK, AT LEAST 99.5%

OR BETTER. (D) REQUEST ONE-HOUR RESPONSE TIME TURN-AROUND TO REPAIR

ONCE TROUBLE-CALL HAS BEEN REPORTED. (E) GFE CLOCKING: VENDOR ESFU

(OR EQUIVALENT) NOT TO BE ENGINEERED INTO CIRCUIT. (F) SINGLE MODE

FIBER TERMINATIONS SC/SC CONNECTORS (G) NO NETWORK INTERFACE UNIT.

(H) DEDICATED PATH. (I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO

ASSIST IN ANY CIRCUIT OUTAGES. (J) VENDOR MUST CONDUCT A SATISFACTORY

72 HOUR END TO END TEST UTILIZING A 2E23 TEST PATTERN IAW ANSI

STANDARD T1.514. ADDITIONALLY, VENDOR MUST CONDUCT SATISFACTORY

CONUTITY CHECKS AND INITIAL 15 MINUTE END TO END TEST ON EACH STS-1

AND STS-3C. AFTER COMPLETION OF CONUTITY CHECKS AND INITIAL TESTING,

VENDOR MUST COMPLETE A SATISFACTORY 72 HOUR END TO END TEST ON THE

FIRST STS-1 (TIME-SLOT NUMBER 1) END TO END PRIOR TO TURNING OVER THE

OC-12 TO THE ACCEPTING AUTHORITY. THE VENDOR TEST SET/SETS MUST HAVE

THE ABILITY TO PRINT THE TEST RESULTS AND THOSE RESULTS MUST BE E-

MAILED TO THE ACCEPTING AUTHORITY FOR REVIEW. (K) VENDOR MUST HAVE

A 24X7 NETWORK OPERATIONS CENTER. (L) THE COMMERCIAL CIRCUIT WILL BE

ACCEPTED ON BEHALF OF THE GOVERNMENT BY THE CONUS IP BACKBONE

ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL. (C) 618-418-8843 (D)

418-8843 (M) THE VENDOR MUST PROVIDE: 1) THE LONG HAUL CIRCUIT NUMBER;

2) THE 1-800 TROUBLE REPORT NUMBER; AND 3) THE LOCAL CIRCUIT IDENTIFIER

FOR EACH LOCATION TO THE ACCEPTING AUTHORITY PRIOR TO THE

GOVERNMENT ACCEPTING SERVICE. INSIDE WIRING MUST BE COMPLETED AND

TESTED PROPERLY PRIOR TO TURNUP TO THE GOVERNMENT. 2. VENDOR

WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF

OC-12 SERVICE IAW THE UNIQUE INSTALLATION FACTORS. 3. INSIDE WIRING IS

AUTHORIZED IAW WITH THE UNIQUE INSTALLATION FACTORS. 4. VENDOR MUST

COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO

REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS. 5. ALL

EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO THE

CONUS IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB,

IL. PRIMARY: (C) 618-418-9500(D) 418-9500 TOLL FREE: 855-868-9500 6. DD FORM 1368

WILL BE SUBMITTED ON THIS TRUNK IAW DISAC-DITCO 350-135-1 BY RNSOC,

SCOTT AFB, IL. GUIDANCE ON SUBMISSION IS AVAILABLE AT

HTTP://WWW.DITCO.DISA.MIL/ASP/PUBLICATIONS.ASP>. CLICK ON "DISA-DITCO

CIRCULAR, 350-135-1, DEFENSE COMMERCIAL COMMUNICATIONS ACQUISITION

PROCEDURES."

MINIMUM TECHNICAL SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE

RATE: 622.08MB/S 20 PPM. LINE CODE: OPTIC FRAME FORMAT: SONET/STS-12 1.

TEST AND ACCEPTANCE: FIBER OPTIC OC-12 CIRCUITS SHALL PASS A FULLY

DOCUMENTED SATISFACTORY 72 HOUR SOAK TEST BY THE CONUS AT SCOTT

AFB, IL. PRIMARY: (C) 618-418-8691 (D) 418-8691 2. TESTING PARAMETERS AND

THRESHOLDS: THE FOLLOWING TESTING PARAMETERS SHALL BE MEASURED

DURING TEST AND ACCEPTANCE TESTING. ERROR PERFORMANCE

(AVAILABILITY, SES, DM, EFS) AND LOSS OF BIT COUNT INTEGRITY SHALL BE

MEASURED AND RECORDED OVER THE DURATION OF THE CONTIGUOUS 72 HOUR

TESTING INTERVAL AND SHALL BE MEASURED AND RECORDED PER DEFINITION

IN ITU RECOMMENDATION G.826 AND M.2100. 3. ERROR PERFORMANCE: ERROR

PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING PARAMETER

THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN

99.5% SEVERELY ERRORED SECONDS (SES) SHALL BE LESS THAN 0.02%

DEGRADED MINUTES (DM) SHALL BE LESS THAN 0.2% ERROR FREE SECONDS

(EFS) SHALL BE GREATER THAN 99% 4. LOSS OF BIT COUNT INTEGRITY (LBCI):

LOSS OF BIT COUNT INTEGRITY SHALL BE MONITORED ONLY BY THE

FOLLOWING METHOD: USING TEST EQUIPMENT WHICH CAN DETECT AND

MEASURE THE OCCURRENCE OF THE INSERTION OR DELETION OF ONE OR MORE

BITS INTO THE DIGITAL BIT STREAM, ON MANY MANUFACTURERS BERT TEST

EQUIPMENT THIS IS MONITORED USING THE "PATTERN SLIP" PARAMETER

WHERE EVERY OCCURRENCE OF A PATTERN SLIP "EVENT" MARKS THE

OCCURRENCE OF A LBCI (RATHER THAN THE RAW TOTAL NUMBER OF PATTERN

SLIPS ACCUMULATED OVER A TESTING INTERVAL) 5. MEAN TIME TO LOSS OF

BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER THAN 24 HOURS. O.

ROUND TRIP DELAY (RTD) SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS

TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION. THE GOVERNMENT

ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-UP AND

TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS PROPOSAL,

DISA IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING. (**UNIQ INSTALL

FACTORS**) (SP A) 010) BLDG 7320, ROOM 116. ADDITIONALLY, VENDOR MUST

SHOW SITE PERSONNEL LISTED ON THIS ORDER THE EXACT TERMINATION POINT

WHEN SERVICE IS COMPLETE. E. 7CS CIRCUIT ACTIONS ARE RESPONSIBLE FOR

INSTALLATION AND MAINTENANCE OF SINGLE MODE FIBER FROM THE LINE

SIDE OF SITE PROVIDED FIBER TERMINATING PATCH PANEL BLDG 7320, ROOM

116 TO THE LINE SIDE OF THE SITE PROVIDED FIBER TERMINATING PATCH PANEL

BLDG 7318, AT&T DEMARC, USING EXISTING ON-BASE SINGLE-MODE FIBER.

File details come from the government source that posted it. Updated .