View the file

Other files

File Type Posted
HC101319QB231-0001.pdf PDF
HC101319QB231.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 for solicitation HC101319QB231

MINIMUM TECHNICAL SPECIFICATIONS:

1. MEASUREMENT INTERVAL (TEST PERIOD): 24 HOURS

2. 99 PERCENT ERROR FREE SECONDS OVER THE 24 HOUR TEST

PERIOD.

3. SEVERELY ERRORED SECONDS: LESS THAN 0.2 PERCENT OVER

THE 24 HOUR TEST PERIOD.

4. DEGRADED MINUTES: LESS THAN 0.4 PERCENT OVER THE 24

HOUR TEST PERIOD.

5. BIT ERROR RATE (BER): 1 TIMES 10 TO MINUS 9.

6. RESIDUAL BIT ERROR RATE (BER): 1 TIMES 10 TO MINUS 8.

7. AVAILABILITY: 99.95 PERCENT.

8. MTTLBCI (MEAN TIME TO LOSS OF BIT COUNT INTEGRITY):

MAXIMUM OCCURRENCES: 1 (4/24 HOURS)

9. THE ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK

WILL BE MEASURED IN MILLISECONDS FROM THE CUSTOMERS

SERVICE DELIVERY POINT (SDP) SITE-A TO THE CUSTOMERS

SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD SHALL BE

LESS THAN OR EQUAL TO 10 MILLISECONDS TO EFFECTIVELY

SUPPORT THE GOVERNMENT'S MISSION. THE GOVERNMENT

RESERVES THE RIGHT TO ACCEPT A HIGHER RTD ONLY IF

SUPPORTED BY ACTUAL PHYSICAL FIBER DISTANCE BETWEEN THE

TWO END LOCATIONS. ADDITIONALLY THE GOVERNMENT RESERVES

THE RIGHT TO REJECT A PROPOSED PATH IF DEEMED

EXCESSIVELY LONG WITHOUT WRITTEN JUSTIFICATION IN THE

PROPOSAL. JUSTIFICATION FOR EXCESSIVE FIBER MILEAGE

COULD BE DIVERSITY/AVOIDANCE REQUIREMENTS, LIMITED

INFRASTRUCTURE, AVAILABLE PROVIDERS, GEOGRAPHIC AND

PHYSICAL LIMITATION. THE GOVERNMENT ACCEPTING AUTHORITY

WILL CONFIRM THE RTD DURING THE TURN-UP AND TEST PHASE

AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS PROPOSAL

DISA IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING.

CIRCUIT SPECIFICATIONS: CONUS TERRESTRIAL - 44.736 MB, B3ZS/C-BIT - 28 CHANNELS

1) VENDOR TECHNICAL SPECIFICATIONS

LINE CODING: B3ZS

FRAME FORMAT: C-BIT PARITY

CHANNELIZATION: 28 CHANNELS

PHYSICAL TERMINATION: COAX, BNC CONNECTOR

TEST INTERVAL: 24 HOURS

AVAILABILITY: 99.5 %

% ERROR FREE SECONDS (EFS): 98.0 %

SEVERELY ERRORED SECONDS (SES): < 0.02 %

AVERAGE BIT ERROR RATE (BER): 5 X 10-9

RESIDUAL BIT ERROR RATE (RBER): 5 X 10-9

BIPOLAR VIOLATION (BPV): 0 ALLOWED

OUT OF FRAME: 0 ALLOWED

FRAME SLIP: < 1 IN 24 HOURS

DEGRADED MINUTES (DM): < 0.2 %

ROUND TRIP DELAY (RTD): < 10 MS FOR FIRST 620 MILE PLUS 1 MS FOR

EVERY 62 MILES THERE AFTER.

LOSS OF BIT COUNT INTEGRITY (LBCI): < 1 IN 24 HOURS

JITTER: ITU-T G.823 OR COMPARABLE U.S. COMMERCIAL INDUSTRY

STANDARD

TEST PATTERN: QRSS FOR DSN CIRCUITS; 2^23 FOR ALL OTHER SERVICE

TYPES

CIRCUIT SPECIFICATIONS CONTINUED: CONUS SECOND PART OF DS-3 CIRCUIT PARAMETERS

2) VENDOR WILL TEST COMMERCIAL END TO END, IF THE VENDOR EXTENDED

THE SERVICE THEN THE TEST MUST BE TO THE END OF THE EXTENSION.

TEST WILL NOT BE COMPLETED WITH LOOPS.

3) VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO

INSTALLATION AT ALL TERMINATING GOVERNMENT LOCATIONS IF A CIRCUIT

EXTENSION IS REQUIRED.

4) VENDOR MUST COORDINATE SITE VISIT WITH LOCATIONS POC 72 HOURS

IN ADVANCE PRIOR TO COORDINATE ACCESS TO FACILITIES.

5) VENDOR MUST CONTACT DISA IMPLEMENTATION ASSISTANCE TO

ESTABLISH THE COORDINATION AND ACTIVATION PROCESS FOR CIRCUIT

TURN-UP AND/OR ANY SITE CONTACT ISSUES.

6) VENDOR INSTALLATION AND MAINTENANCE INSTRUCTION: IAW THE

UNIQUE INSTALLATION FACTORS IN PARAGRAPH 3.

7) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY

CIRCUIT OUTAGES.

8) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER.

9) REQUEST ONE-HOUR RESPONSE TIME TURN-AROUND TO REPAIR ONCE

TROUBLE-CALL HAS BEEN REPORTED.

10) THE VENDOR TEST SET/SETS MUST HAVE THE ABILITY TO PRINT OR

ELECTRONICALLY OUTPUT THE TEST RESULTS AND THOSE RESULTS MUST BE

E-MAILED TO THE ACCEPTING AUTHORITY FOR REVIEW.

11) ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED TO DISA

CONUS: (C) 618-418-9950 TOLL FREE: 855-868-9950

12) VENDOR MUST PROVIDE THE LONG HAUL CIRCUIT NO. AND LEC CKT ID

PRIOR TO TURN UP TO THE GOVERNMENT.

13) CIRCUIT OPERATIONS: DEDICATED PATH - 24 HOURS A DAY, SEVEN

DAYS PER WEEK.

File details come from the government source that posted it. Updated .