ATTACHMENT 1 FirstArticle.pdf
PDF 91 KB Posted
- Solicitation number
- FD20602000110
- Issued by
-
Defense Logistics Agency Aviation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 01 _ REVISED First Article Test Requirement.pdf | ||
| AMENDMENT 01 SPRWA120R0014_______0001.pdf | ||
| ATTACHMENT 8 CDRLpackage.pdf | ||
| ATTACHMENT 4 EDL.pdf | ||
| ATTACHMENT 9 PricingMatrix.xlsx | XLSX spreadsheet | |
| ATTACHMENT 6 pkg.pdf | ||
| ATTACHMENT 2 ID.pdf | ||
| ATTACHMENT 7 trans.pdf | ||
| ATTACHMENT 5 SPI.pdf | ||
| ATTACHMENT 3 IUIDcklist.pdf | ||
| SPRWA1-20-R-0014_final.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST ARTICLE REQUIREMENTS 1. DATE
20 JUN 2019(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER
05606 / 211F329
4. NSN
1005011074755
5. FIRST ARTICLE QUANTITY
THE FIRST ARTICLE IS 2 UNIT(S) OF LOT / ITEM ea
AND WILL BE: PART OF PRODUCTION QUANTITY X IN ADDITION TO PRODUCTION QUANTITY
6. ARTICLES
WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD
7. LONG LEAD TIME ITEMS
X REQUIRED NOT REQUIRED
(See FAR 52.209-3 OR -4, alternate II)
8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)
X REQUIRED NOT REQUIRED
"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."
9. TEST / INSPECTION REQUIREMENTS
A.
X
CONTRACTOR TESTING
GOVERNMENT TESTING
Performance or other characteristics which the First Articles must meet are
100% dimensional check, material verification, penetrant testing, hardness
B. The detailed technical requirements for First Article approval tests are contained in
IAW drawing 211F329 rev F and associated drawings
(Cite Spec and Para number)
C. TEST PLAN REQUIRED
Number of days for government approval / disapproval days.
D. Contractor's notification to ACO and
(Requesting Activity) of test time and location due days prior to start of testing.
E. TEST REPORT REQUIRED
(1) Forwarded to
(2) Government written notice of approval / disapproval due days after receipt of contractor's report.
F. FIRST ARTICLE DELIVERY
(1) Due within 90 calendar days from date contract.
(2) Notify 30 calendar days prior to shipment.
(3) Delivered to government at
CODE:FD2060 Special Handling Unit, FA Test Unit, 455 Byron St., Bldg
376 Robin AFB, GA 31098-1887
Mark For: FA TEST DO NOT POST
(Set Forth Consignee and Address)
(4) Government written notice of approval / disapproval within 30 days after receipt of first article package.
G. Estimated cost of government testing / inspection evaluation.
$17,189.6800
Page 1 of 2AFMC IMT 260, 20020830, V-3 Version 2Generated by PRPS using Jasper Reports on 20 Jun 2019
FIRST ARTICLE REQUIREMENTS 1. DATE
20 JUN 2019(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
10. DISPOSITION OF FIRST ARTICLES
X Approved First Articles will be forwarded to
Air Supply
X 2 (insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor
X will be retained by WR-ALC pending disposition instructions from the contractor.
First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.
X Disapproved First Articles will be returned to the contractor
X will be retained by WR-ALC pending disposition instructions from the contractor.
On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).
a. Approved First Articles will be returned to the contractor for shipment with production item.
b. Disposition of disapproved First Articles will remain the same as marked above.
X Other Disposition:
Contractor will provide prepaid shipping label.
11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL
a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, Air Force.
b. X Offerors currently in production of the same or similar article for a Government, DoD, X Air Force contract and who have received First Article approval under the existing contract.
c. Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.
d. X Provided not more than 36 months have elapsed since completion of the contract.
e. First Article testing will not be waived.
f. X See Remarks in block 12 below.
NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:
A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION
F0960389G0056 31 MAY 1993 211F329 rev F
12. REMARKS
Moore, Rickey CNAME: 20 JUN 2019DATE:
Provide 2 exhibits, one unassembled and uncoated, the other assembled and coated.
Exhibit can be included in production quantity if approved and undamaged by testing.
First Article Package shall be marked for: "Armament Project" for FA Tests Note: Contractor shall mark exterior container with 2" Red Lettering as follows: "FIRST
ARTICLE".
ESA reserves the right to approve ANY test plans/reports for this first article generated for this contract.
Silver, DeanNAME: 16 OCT 2015DATE:
Provide 2 exhibits, one unassembled and uncoated, the other assembled and coated.
Exhibit can be included in production quantity if approved and undamaged by testing.
First Article Package shall be marked for: "Armament Project" for FA Tests Note: Contractor shall mark exterior container with 2" Red Lettering as follows: "FIRST
ARTICLE".
ESA reserves the right to approve ANY test plans/reports for this first article generated for this contract.
13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING TEST
(Name, Organization, Phone)
Moore, Rickey
409 SCMS/GUEA
478-327-2785
497-2785
14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING
TEST (Name, Organization, Phone)
Moore, Rickey
409 SCMS/GUEA
478-327-2785
497-2785
Page 2 of 2AFMC IMT 260, 20020830, V-3 Version 2Generated by PRPS using Jasper Reports on 20 Jun 2019
File details come from the government source that posted it. Updated .