This document is a set of drawings and specifications related to the repair and replacement of the wastewater treatment system at the sewage plant in Camp Carroll. The key details are:
The scope of work includes replacing various deteriorated parts of the existing oxidation ditches, clarification systems, and tertiary clarifier, as well as painting existing concrete structures. Specific requirements include replacing motors, gear reducers, piping, supports, and other accessories. The contractor must ensure the new wastewater treatment system is fully operational and functional. The project is classified as "Work Class: 'K' (Repair / Maintenance Work)" and has an estimated completion timeline. The contractor must follow all relevant federal regulations, codes, and standards, and submit shop drawings and material information for approval prior to commencing construction. The solicitation is limited to existing Area IV General Construction MAIDIQ local contractors, and a site visit is scheduled on June 10, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W90VN924R0119-0001.pdf | ||
| RFP-W90VN924R0119.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
R-11SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
APPROVED BY
PROJECT NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
O & M
HOUSING DIV.
REVIEWED BY
UNITED STATES ARMY GARRISON DAEGU
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
DIRECTORATE OF PUBLIC WORK
HGFEDCBA
D - 24 - 24
CHON, HYON TAE
DESIGN REVIEW SIGNATURE
ORGANIZATION
USING AGENCY
36TH SIGNAL
MASTER PLN.
ENVIRONMENTAL
NAME SIGNATURE
O&M DIV.
FIRE DEPT.
SAFETY OFFICE
DPTMS(AT/FP)
188TH MP COM.
IND. HYGENIST
UNIT #15746, APO AP 96218-5746
DRAWING NO.
CHIEF,
DESIGN & TECH. REVIEW Br.
AS SHOWN
1 1 OF 1R - 1
T I T L E S H E E T
TITLE SHEET
USING AGENCY
DATE:30 APR 24
HS-00092-3J
CIVIL
3 OF 25M - 2
9 8 OF 25
10 9 OF 25
M - 5
M - 6
M - 7
M - 8
11 10 OF 25M - 9
12 11 OF 25M - 10
13 12 OF 25M - 11
14 13 OF 25M - 12
19 18 OF 25
20 19 OF 25
M - 13
M - 14
M - 15
M - 16
M - 17
M - 18
21 20 OF 25
22 21 OF 25M - 20
23 22 OF 25M - 21
24 23 OF 25M - 22
E - 1
M - 3
M - 4
E - 2
ELECTRICAL
PROJECT NO. HS-00092-3J, CAMP CARROLL
CAMP CARROLL
G - 1 SITE LAYOUT PLAN
M - 1
M - 19
GENERAL NOTES AND SCOPE OF WORK
EQUIPMENT SCHEDULE
OVERALL SITE PLAN
NEW EQUIPMENT PLAN (TERTIARY CLARIFIER)
NEW SHAFT DETAIL (TERTIARY CLARIFIER)
NEW WEIR DETAIL (TERTIARY CLARIFIER)
LEGEND, NOTES AND SCOPE OF WORK
EXISTING / REMOVAL EQUIPMENT PLAN (OXIDATION DITCH #1 & #2)
NEW EQUIPMENT PLAN (OXIDATION DITCH #1 )
EXISTING / REMOVAL PLAN (SECONDARY #1, #2AND TERTIARY CLARIFIER)
NEW EQUIPMENT PLAN (SECONDARY CLARIFIER #1 & #2)
NEW SHAFT DETAIL (SECONDARY CLARIFIER #1 & #2)
NEW WEIR & WEIR TROUGH DETAIL (SECONDARY CLARIFIER #1 & #2)
NEW SCUM SKIMER & THOUGH DETAIL (SECONDARY CLARIFIER #1 & #2)
NEW WEIR DETAIL (SECONDARY CLARIFIER #1 & #2)
NEW SCRAPER ARM DETAIL (SECONDARY CLARIFIER #1 & #2)
NEW SCRAPER SIDE ARM DETAIL (SECONDARY CLARIFIER #1 & #2)
NEW ARM BRACE DETAIL (SECONDARY CLARIFIER #1 & #2)
NEW SPROCKET DETAIL (SECONDARY CLARIFIER #1 & #2)
NEW WEIR & WEIR TROUGH DETAIL (TERTIARY CLARIFIER)
NEW SCRAPER ARM DETAIL (TERTIARY CLARIFIER)
NEW SCRAPER SIDE ARM DETAIL (TERTIARY CLARIFIER)
NEW ARM BRACE DETAIL (TERTIARY CLARIFIER)
ELECTIRCAL SITE PLAN, "MCC" POWER SINGLE LINE DIAGRAM AND PANEL SCHEDULE
MECHANICAL
SYSTEM IN SEWAGE PLANT
REPAIR/REPLACE WASTEWATER TREATMENT
SYSTEM IN SEWAGE PLANT
REPAIR/REPLACE WASTEWATER TREATMENT
WORK PLAN SPECIAL REQUIREMENTS
DRAWINGS AND DETAIL DRAWINGS FOR CONSTRUCTION.
5. THE CONTRACTOR SHALL SUBMIT AND GET APPROVAL OF SHOP
SOLICITATION PHASE IS ENCOURAGED.
AND THEREFORE, ATTENDANCE AT SITE SURVEY DURING THE
LAYOUT PLAN MAY CHANGE DEPENDING ON THE SITE CONDITIONS
4. THE CONTRACTOR SHALL CONSIDER THAT THE PROPOSED SITE
BE ONGOING DURING THE DESIGN PHASE.
GOVERNMENT WHO MAY ALLOW CONCURRENT WORK SUCH AS DEMOLITION TO
OTHERWISE AT GOVERNMENT’S DISCRETION. IT WILL BE UP TO THE
QUANTITIES FOR APPROVAL PRIOR TO COMMENCING CONSTRUCTION UNLESS
BY REGISTERED AND CERTIFIED ENGINEER WITH BILL OF MATERIAL AND
THE PAC) AND 100% (THIRTY (30) CALENDAR DAYS AFTER THE PAC) DRAWINGS
3. THE CONTRACTOR SHALL SUBMIT 50% (TWENTY (20) CALENDAR DAYS AFTER
EVALUATION STAGE.
DRAWING WILL BE REVIEWED FOR ITS ACCEPTABILITY DURING THE TECHNICAL
SUPPORT BRIGADE (CSB) INCLUDED WITH THEIR PROPOSAL. THE CONCEPT
SCOPE OF WORK TO DPW, AREA IV, DESIGN BRANCH VIA 411TH CONTRACTING
2. THE CONTRACTOR SHALL SUBMIT CONCEPT DRAWINGS, INCLUDING
IMPACT DESIGN AND CONSTRUCTION.
GET A CLEAR UNDERSTANDING OF THE SITE OVERVIEW WHICH COULD
SITE ORIENTATION CONDUCTED BY CONTRACTING OFFICE AND DPW TO
1. IT IS HIGHLY RECOMMENDED FOR THE CONTRACTOR TO ATTEND THE
S-294 Court Tennis
S-296 Court Tennis
S-165 Volleyball Court
T-646
S -644
T-780
T-508
S-86
S -7
S -7
S -7
T -6
T -5
T -7
T -5
S-961
T-533
T -5
S-714
S -8
T-377
T-584
T -3
T-3
S-531
T-417
T-863
T-765
T-368
T-507
T-772
S-967
T-924
T-575
T-696S-603
T-928
T-691
S-102
T-521
T-558
T-989
T-681
T-343
S-965
T-116
T-504
T-315
T-385
T-617
T-661
T-693
T-766
T-764
T-768
T-769
T-271
T-763
T-160
T-299
T-414
T-413
T-104
T-120
S-954
S-860 Substation Electrical
S-360 Substation Electrical
S-576 Substation Electrical
S-133 bridge Foot
GATE 2
GATE 1
GATE 4
GATE 3
S-118 Electronic Sign
S-781
Flag Pole
S-390
DEAD MEMORIAL
KOREAN WAR
S-730
RANGE
QUALIFICATION
ZERO AND
25M RIFLE S-725
TESTING POND
BRIDGING BOAT
AMPITHEATRE
CAC
S-847
S-865 Bridge
Railroad
S-300 Road Bridge
T-534
T-677
T-659
T-311
T-386
T-700
T-619
T-376
S-114
T-519
T-625
S-983
S-984
S-387
T-509B
T-509-2
T-578 Vehicle Scales
T-509-1
S-284
T-115
S-401
S-383 Bus Stop 9
S-933 Bus Stop 6
S-621 Vehicle Scales
S-701
T-369
S-378
T-89
T-513
S-669 Station
Hunter Brake
S-328
S-329
T-509C
T-503 Bus Stop 1
T-624
S-639
T-416
S-350
T-415
T-979
S-667
S-705
T-926
T-577
T-720 Bus Stop 5
T-412
T-509D
T-509A
S-839
S-835
S-665
S-840
S-837
S-836
S-605
S-606
S-607
S-608
S-985
S-955
S-709
S-510
S-326
S-530
S-818
S-817
S-135
S-620
S-151
S-821
S-405
T-645
S-846
T -5
S-327
S -5
S-970
S-117
S-601
S-684
S-138
S-388
S-139
S-668
S-831
S-917
S-915
S -9
S-612
S -9
S-256
S-111
S-233
S-563
S-110
S-711
T-
S-231
S-396
S-230
S-100 S-235
S-375
S-136
S-403
T-565
S-253
S-250
S-977
S-676
S-254
S-573
S-946
S-998
S-203
S-841
S-123
S-938
S-914
T-516
S-911
S-113
T-520
S-913
S-141 S-143
S-142
S-264
S-731
S-101
S -309
S -2
S -7
S -9
T -9
T -9
S -9
S -2
S -9
S -6
S-675
S-320
S -8
S -8
T -5
S -9
S -3
T-318
S -4
S -6
S -3
S -8
S-9
S -6
S -8
S -8
T-126
S-121
T-125
T-127
T-207
S -1
T-236
S -9
S -6
T-206
S -3
S -9
T -3
S -3
S-154
S -9
S -8
S-974
S-321
S-
S-910S -4
S-340
S -6
S-349
S-301
S -611
T -3
S -6
S -7
S -7
S-140
S -6
S-718
S -7
S-137
S -6
S-842
S-351
S-512
S-205
S -5
S-336
S-239
S -9
S -3
S-267
S-509
T-359
S -3
S-532
S -9
S-655
S-208
T -7
S-702
S-163
S-304
T-515
S-733
S-732
S-627
T-384
S -3
T -5
T -3
S-312
S-666
S-420
S-973
T -3
T-580
S-679
T-996
S-925
T-997
S-931
T-631
T -2
S-131
S-919
T -3
T-521
S-395 S-918
S-944
T-195
T-196
T-198
T-197
T-194
T-199
S-119
S-739
S-3
S-647
T-261
S-164
T-130
S-717
S-402
T-189
T-406
T-193
T-958
S-88
S-348
T-581
S-265
S-640
S-953
S-411
S-664
S-654
S-344
S-511
S-982
S-968
S-929
T-155
S-972
T-582
S-95
T-409
S-916
S-947
S-957
S-956
S-719
S-770
S-162
S-161
T-317 Tower Cooling T-923
S-93
S-922
T-814
T-812
T-635
S-995
T-810
T-280
T-811
T-633
T-103
T-813
S-741
S-693 Washrack
S-404 Washrack
S-976 Washrack
S-939 Washrack
S-987 Washrack
S-927 Washrack
T-6
S-703
PLANT
TREATMENT
SEWAGE
S-87
S-150
S-144
WETLAND
CAMP CARROLL
S-978 Substation Electrical
S-870
CLINIC
HEALTH/DENTAL
S
DFAC
TEMF
S-719
T -9
Gate Access Farmer
S-894
S T O
R A G E
O R
G A N
IZ
A T
IO
N A L
GATE
SHED
SHED
T-
S/B
GATE
GATE
T R
A S
H
GATE
S-701
S-702
S-703
PLANT
TREATMENT
SEWAGE
DITCH
OXIDATION
CLARIFIER
TERTIARY
#2
#1
CLARIFIER
SECONDARY
#1 #2
P-1
SCALE : 1 / 5000
SITE LAYOUT PLAN
G-1
THIS PROJECT
G-1
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
E
AS SHOWN
DATE:
D - 24 - 24
A B C D F G H
CAMP CARROLL
30 APR 24
HS-00092-3J
0 50 100 200
(IN METERS)
GRAPHIC SCALE
SCALE: 1 : 5000
SITE LAYOUT PLAN
GENERAL
N
CHONG, CHANG NAK
NAM, TAE CHIN
1 25
SYSTEM IN SEWAGE PLANT
REPAIR/REPLACE WASTEWATER TREATMENT
SCOPE OF WORK
GENERAL NOTES
2 25
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
D - 24 - 24
G
CHONG, CHANG NAK
NAM, TAE CHIN
M-1
USFK REGULATION 201-1, ENVIRONMENTAL GOVERNING STANDARD(EGS) CHAPTER 5 & CHAPTER 6.
MUST BE STORED IN ACCORDANCE WITH THE CODE OF REGULATION 1910 SUBPART H AND
26. ALL HAZARDOUS MATERIAL AND HAZARDOUS WASTE USED/ CREATED DURING THE PROJECT
GENERAL NOTES AND SCOPE OF WORK
AS DIRECTED BY THE CONTRACTING OFFICER.
EXISTING AREAS CAUSED BY THIS PROJECT AND TO MATCH CONDITION TO ADJACENT AREAS
5. THE CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT OR REPAIR ALL DAMAGES TO
CONTRACTING OFFICER’S APPROVAL.
REPRESENTATIVE ATTENTION WITH RECOMMENDATIONS FOR PROPER CORRECTIONS FOR
IF ANY DISCREPANCY IS DETECTED, IT SHOULD BE BROUGHT TO THE CONTRACTING OFFICER’S
COMMENCING ANY CONSTRUCTION OR REPAIR.
EQUIPMENT, PIPING, DIMENSIONS AND ETC. UNDER THE SUPERVISION OF C.O.R PRIOR TO
1. THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION,
BE VERIFIED AT THE JOB SITE.
2. LOCATION AND SIZES OF EXISTING EQUIPMENT, PIPING, ETC, ARE APPROXIMATE AND SHALL
PATCHED OR RESTORED TO MATCH THE ADJACENT SURFACE OR AREA.
4. ALL OPENINGS RESULTING FROM THE REMOVAL OF PIPING AND EQUIPMENT SHALL BE
HANGERS, SUPPORTS, ETC.
6. ALL PIPES TO BE REMOVED SHALL INCLUDE ALL ITS ACCESSORIES SUCH AS ANCHORS,
PRIOR TO COMMENCING CONSTRUCTION FOR APPROVAL.
ACCORDING TO ACTUAL FIELD CONDITIONS AND SUBMITTED TO THE CONTRACTING OFFICER
FIELD CONDITIONS. SUCH DETAILS SHALL BE PREPARED IN THE FIELD BY THE CONTRACTOR
3. SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH EXACTLY TO THE
MANNER SUBJECT TO THE DPW’S APPROVAL.
7. PUMP STATION SHALL BE TESTED FOR LEAKAGE AND ALL LEAKS SHALL BE REPAIRED IN A
A SHOP DRAWING SHALL NOT BE THE EXACT DUPLICATION OF THE CONTRACT DRAWING.
8. NO MECHANICAL WORK CAN BE STARTED WITHOUT AN APPROVED SHOP DRAWING.
CONTRACTOR.
THE WORK PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED BY THIS
THE EXISTING EQUIPMENT, NEW EQUIPMENT, DUCT WORK, PIPING AND ETC. DAMAGES DUE TO
9. CONNECTIONS TO EXISTING SYSTEM SHALL BE DONE IN SUCH A MANNER AS NOT DAMAGE
FOR APPROVAL.
DESIGN & TECHNICAL REVIEW BRANCH VIA C.O.R. PRIOR TO COMMENCING CONSTRUCTION
10. THE CONTRACTOR SHALL SUBMIT MANUFACTURER’S INSTALLATION SHOP DRAWINGS TO THE
REVIEW BRANCH FOR APPROVAL BEFORE COMMENCING THE WORK.
11. THE CONTRACTOR SHALL SUBMIT ALL MATERIAL INFORMATION TO THE DESIGN & TECHNICAL
TO ENSURE PROPER OPERATION, AS ORIGINALLY INTENDED.
EQUIPMENT. THE CONTRACTOR SHALL TEST, ADJUST AND BALANCE EQUIPMENT AS REQUIRED
12. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY START-UP AND TESTING OF THE NEW
SPECIFICATIONS FOR O & MA PROJECTS, KOREA (REVISION 1 - 20151030)".
13. ALL EQUIPMENT AND MATERIALS SHALL MEET THE REQUIREMENTS OF "STANDARD TECHNICAL
ADDITIONAL COST TO THE PROJECT CONTRACT.
THE DETAILS WILL BE UTILIZED TO ACCOMPLISH THE MECHANICAL SCOPE OF WORK AT NO
O & MA PROJECTS, KOREA (NOVEMBER 30, 2015)" FORM AS A PART OF THIS PROJECT.
14. THE MECHANICAL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL DRAWINGS FOR
SPECIFICATIONS.
CONTRACT DRAWINGS SHALL BE SUBMITTED FOR APPROVAL AS REQUIRED BY THE CONTRACT
OF THE ACTUAL PROPOSED CONTROL SYSTEM WHICH MAY DEVIATE FROM THAT SHOWN ON
SYSTEM TO SATISFY ALL FUNCTIONAL REQUIREMENTS SHOWN ON DRAWING. SHOP DRAWINGS
15. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE AND WORKABLE CONTROL
CEILING, ROOF, EQUIPMENT, PIPE, DUCT AND ELECTRICAL ITEMS.
PREVENTION SYSTEM WITH NO ADDITIONAL COST TO THE GOVERNMENT SUCH AS WALLS,
ITEMS TO MAKE WAY FOR THE INSTALLATION AND REPLACEMENT OF MECHANICAL AND FIRE
16. THE CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE AND REINSTALL THE OBSTRUCTED
START OF CONSTRUCTION.
PLAN SHALL BE SUBMITTED TO AND APPROVED BY DPW AND THE USER, PRIOR TO THE
USER TO FULLY UTILIZE THE FACILITY DURING THE CONSTRUCTION PERIOD. THIS PHASING
SHALL PROVIDE A PHASING PLAN FOR CONSTRUCTION COMPLETION ALLOWING FOR THE
FACILITY BE FULLY OPERATIONAL DURING THE CONSTRUCTION PERIOD, THE CONTRACTOR
17. DUE TO THE CRITICAL NATURE OF THE FACILITY FUNCTION, IF IT IS REQUIRED THAT THE
CURBS, AND UTILITIES.
THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO, PAVEMENTS, CONCRETE SIDEWALKS AND
CONSTRUCTION, TO ITS ORIGINAL OR BETTER CONDITION, UNLESS OTHERWISE NOTED.
18. THE CONTRACTOR SHALL RESTORE ALL ITEMS, DAMAGED OR REMOVED AS A RESULT OF
SATISFACTION OF THE CONTRACTING OFFICE.
OPERATIONS, RESTORE THESE ITEMS TO THEIR ORIGINAL OR BETTER CONDITION TO THE AND
REMAIN IN GOOD CONDITION. SHOULD THESE ITEMS BECOME DAMAGED DUE TO CONSTRUCTION
19. THE CONTRACTOR SHALL MAINTAIN ALL UTILITIES, STRUCTURES AND/OR ITEMS IDENTIFIED TO
REQUIRED FOR ADJACENT FACILITIES.
OFFICER IN ORDER TO BE ASSURED THAT SUCH EXISTING UTILITIES ARE NO LONGER IN USE OR
20. THE CONTRACTOR SHALL COORDINATE DEMOLITION OF EXISTING UTILITIES WITH THE CONTRACTING
21. THE CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AT ALL TIMES.
TO VERIFY ITS LOCATION AND DEPTH PRIOR TO EXCAVATING TRENCHES FOR THE NEW UTILITY LINES.
UTILITIES ARE SHOWN, THE CONTRACTOR SHALL CAREFULLY EXPOSE THE UTILITY BY HAND EXCAVATION
22. WHENEVER CONNECTIONS TO EXISTING UTILITIES OR WHERE NEW UTILITIES CROSS EXISTING
FROM THE SITE EITHER BY VEHICULAR TRAFFIC OR RUNOFF.
24. PROPERTIES AND ROADS ADJACENT TO THE SITE SHALL BE KEPT CLEAN OF MUD AND SILT CARRIED
THE PROJECT LIMITS.
WORK AND DEPOSITED IN ALL EXISTING DRAINAGE LINES, SEWER LINES, ROADWAYS AND OTHER AREAS WITHIN
25. THE CONTRACTOR SHALL CLEAN AND REMOVE ALL SILT AND DEBRIS RESULTING FROM THE CONSTRUCTION
CONTRACTING OFFICER.
THE CONTRACTING OFFICER. NO INTERRUPTION SHALL BE MADE WITHOUT PRIOR APPROVAL FROM THE
FACILITIES TO A MINIMUM. COORDINATE ANY INTERRUPTION OF UTILITY SERVICE AND/OR OPERATIONS WITH
23. THE CONTRACTOR SHALL KEEP INTERRUPTION OF UTILITY SERVICE AND/OR OPERATIONS OF ADJACENT
WORK CLASS: "K" (REPAIR / MAINTENANCE WORK) - WORK PLAN
30 APR 24
HS-00092-3J
CAMP CARROLL
CHONG, CHANG NAK
NAM, TAE CHIN
SYSTEM IN SEWAGE PLANT
REPAIR/REPLACE WASTEWATER TREATMENT
US ORIGIN MATERIALS:
AS INDICATED ON THE DRAWINGS.
INTERNET SITE HTTP:// WWW.CCKBID.COM). ALL NON-GENERIC US ORIGIN MATERIALS SHALL BE
DATED FEBRUARY 2, 2004 (ELECTRONIC VERSION OF THIS DOCUMENT CAN BE FOUND AT
REGISTER OF IMA-KORO PAMPHLET 420-1 "INSPECTION OF CONSTRUCTION CONTRACTS",
ALL GENERIC US ORIGIN MATERIALS SHALL BE AS OFF-SHORE IN THE GENERIC SUBMITTAL
GENERAL REQUIREMENTS
SYSTEM IS FULLY OPERATIONAL AND FUNCTIONAL.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT NEW SEWAGE TREATMENT
GUARDS, BEARINGS, SUPPORTS AND NECESSARY ACCESSORIES AND PARTS.
OXIDATION DITCHES INCLUDING ROTOR MOTORS, GEAR REDUCERS, POWER TRANSMISSIONS, BELT
1. REPLACE EXISTING VARIOUS DETERIORATED PARTS OF MAGNA ROTOR ASSEMBLIES IN EXISTING
ACCESSORIES AND PARTS.
SKIRTS, RACE SKIMMER, SCUM TROUGHS, SHAFTS, SCRAPERS, PIPES, SUPPORTS AND NECESSARY
INCLUDING DRIVE MOTORS, GEAR REDUCERS, WEIR PLATES, SURFACE SKIMMERS ASSEMBLIES,
2. REPLACE EXISTING DETERIORATED WASTEWATER CLARIFICATION SYSTEM WITH NEW ONE
PANEL COVER AS SHOWN.
3. PAINT EXISTING OXIDATION DITCH CONCRETE WALLS, CLARIFIER CONCRETE TANKS, ELECTRICAL
4. RENOVATE EXISTING BRIDGES AS SHOWN.
AND SPECIFICATIONS.
** ALL FAILED OR FAILING SYSTEM SHALL BE REPAIRED IN ACCORDANCE WITH DRAWINGS
2. SEE SPECIFIC NOTES #3 ON DRAWING REF. NO. M-4.
1. SEE GENERAL NOTES ON DRAWING REF. NO. M-1.
3. SEE SPECIFIC NOTES #1, #2, #3, #4 ON DRAWING REF. NO. M-5.
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-2
D - 24 - 24
G
CHONG, CHANG NAK
NAM, TAE CHIN
NO.
ITEM
Q’ TY D E S C R I P T I O N
EQUIPMENT SCHEDULE
E Q U I P M E N T S C H E D U L E
30 APR 24
HS-00092-3J
CAMP CARROLL
CHONG, CHANG NAK
NAM, TAE CHIN
3 25
SYSTEM IN SEWAGE PLANT
REPAIR/REPLACE WASTEWATER TREATMENT
MOTOR
1,750 RPM 460V / 3PH / 60HZ
ELEC. DATA
40 HP,
MINIMUM B10 LIFE RATING OF 100,000 HOURS.
- ONE OUTBOARD PILLOW BLOCK ROLLER BEARING, DODGE SIZE : 3-1/2" EXPANSION WITH
MINIMUM B10 LIFE RATING OF 100,000 HOURS.
- ONE INBOARD PILLOW BLOCK ROLLER BEARING, DODGE SIZE : 4-7/16" NON-EXPANSION WITH
BEARING :
V - BELT DRIVE WITH BELT GUARD, SUPPORTS AND ASSOCIATED PARTS AND ACCESSORIES
POWER TRANSMISSION :
REMARKS
MOTOR ELEC. DATA
0.75KW
REMARKS
CLARIFIER DRIVE ASSEMBLY
SCUM SKIMMER DRIVE ASSEMBLY
MOTOR ELEC. DATA
0.4KW
REMARKS
TURN TABLE
TYPE : TDUA-02TL, 0.1 RPM, SUPPORTS AND ASSOCIATED PARTS AND ACCESSORIES
GEAR REDUCER :
TYPE : DWBM-120, 0.4 RPM, SUPPORTS AND ASSOCIATED PARTS AND ACCESSORIES
GEAR REDUCER :
TYPE
TEFC
ASSOCIATED PARTS AND ACCESSORIES
MOTOR : HORIZONTAL, LINCOLN MOTOR FOR OUTDOOR OPERATION, SUPPORTS AND
TYPE
AND ACCESSORIES
MOTOR FOR OUTDOOR OPERATION, SUPPORTS AND ASSOCIATED PARTS
AND ACCESSORIES
MOTOR FOR OUTDOOR OPERATION, SUPPORTS AND ASSOCIATED PARTS
TEFC/B/F
TEFC/B/F
TYPE
OXIDATION DITCH DRIVE ASSEMBLY
460V / 3PH / 60HZ
460V / 3PH / 60HZ
AND ACCESSORIES
15.08 TO 1, WITH ADJUSTABLE MOTOR MOUNTING BASE, SUPPORTS AND ASSOCIATED PARTS
ONE DODGE TXT-815 SHAFT MOUNTED DOUBLE REDUCTION HELICAL GEAR REDUCER, RATIO
GEAR REDUCER :
Q’ TY
NO.
ITEM
D E S C R I P T I O N
S-703
PLANT
TREATMENT
SEWAGE
T
T
A
VE
N U E
SCALE : 1 / 500
DITCH #1
OXIDATION
DITCH #2
OXIDATION
CLARIFIER #1
SECONDARY
CLARIFIER #2
SECONDARY
CLARIFIER
TERTIARY
OVERALL SITE PLAN
SLUDGE HOLDING TANK
PUMP STATION
SLUDGE SCREW
P-1
M-3
SLUDGE DRYING BED
P-1
M-4
SEE
P-1
M-5
P-1
M-6
SEE
P-1
M-7
OFFICE
P-1
M-16
N
SPECIFIC NOTES
3. THE CONTRACTOR SHALL RETURN SALVAGEABLE MATERIALS TO DPW.
EXACT SIZE, LOCATION AND DIRECTION OF PIPING SHALL BE VERIFIED IN FIELD.
1. EXISTING EQUIPMENT PLANS MAY NOT EXACTLY MATCH THE FIELD THEREFORE,
SYSTEMS SHALL BE PATCHED AND FILLED OR RESTORED.
2. THE OPENINGS RESULTING FROM THE REMOVAL OF SEWAGE TREATMENT
(IN METERS)
GRAPHIC SCALE
SCALE: 1 : 500
20105
P-1
M-6
SEE
AND FUNCTIONAL.
AND CLARIFIER SYSTEMS OF SEWAGE TREATMENT PLANT ARE FULLY OPERATIONAL
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT OXIDATION DITCH
30 APR 24
HS-00092-3J
CAMP CARROLL
CHONG, CHANG NAK
NAM, TAE CHIN
OVERALL SITE PLAN
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-3
D - 24 - 24
G
4 25
CHONG, CHANG NAK
NAM, TAE CHIN
N
GRAPHIC SCALE
2000 4000mm
SCALE: 1 : 100 30 APR 24
HS-00092-3J
CAMP CARROLL
CHONG, CHANG NAK
NAM, TAE CHIN
(OXIDATION DITCH #1 & #2)
EXISTING / REMOVAL EQUIPMENT PLAN
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-4
D - 24 - 24
G
5 25
SYSTEM IN SEWAGE PLANT
REPAIR/REPLACE WASTEWATER TREATMENT
P-1
SCALE : 1 / 100M-4
N
EXISTING / REMOVAL EQUIPMENT PLAN (OXIDATION DITCH #1 & #2)
TO REMAIN
EXIST. 5’ W BRIDGE W/ HANDRAILS
TO REMAIN
EXIST. CONCRETE TURNING WALL
TO REMAIN
EXIST. CONCRETE WALL
O
OXIDATION DITCH #1
OXIDATION DITCH #2
FLOW
FLOW
FLOW
FLOW
TO REMAIN
EXIST. 42" X 18’ L ROTOR WITH COVERS (TYP. OF 4)
SPECIFIC NOTES
EXACT SIZE, LOCATION AND DIRECTION OF PIPING SHALL BE VERIFIED IN FIELD.
2. EXISTING PIPING PLANS MAY NOT EXACTLY MATCH THE FIELD THEREFORE,
5. THE CONTRACTOR SHALL RETURN SALVAGEABLE MATERIALS TO DPW.
SHALL BE VERIFIED IN FIELD.
THEREFORE, EXACT SIZE, LOCATION, SPECIFICATION AND CAPACITY OF EQUIPMENT
1. EXISTING EQUIPMENT PLANS MAY NOT EXACTLY MATCH THE FIELD AND
SYSTEMS SHALL BE PATCHED AND FILLED OR RESTORED.
4. THE OPENINGS RESULTING FROM THE REMOVAL OF SEWAGE TREATMENT
TREATMENT SYSTEM IS FULLY OPERATIONAL AND FUNCTIONAL.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT NEW SEWAGE
TO REMAIN
EXIST. ELECTRICAL PANEL
AND THE USER, PRIOR TO THE START OF CONSTRUCTION.
PERIOD. THIS PHASING PLAN SHALL BE SUBMITTED TO AND APPROVED BY DPW
FOR THE USER TO FULLY UTILIZE THE FACILITY DURING THE CONSTRUCTION
SHALL PROVIDE A PHASING PLAN FOR CONSTRUCTION COMPLETION ALLOWING
BE FULLY OPERATIONAL DURING THE CONSTRUCTION PERIOD, THE CONTRACTOR
3. DUE TO THE CRITICAL NATURE OF THE FACILITY FUNCTION, THE FACILITY SHALL
SEE NOTE 3.
BELT GUARDS, BEARINGS, SUPPORTS AND ASSOCIATED PARTS (TYP. OF 4)
REMOVE EXIST. ROTOR MOTORS, GEAR REDUCERS, POWER TRANSMISSIONS,
N
GRAPHIC SCALE
2000 4000mm
SCALE: 1 : 100 30 APR 24
HS-00092-3J
CAMP CARROLL
CHONG, CHANG NAK
NAM, TAE CHIN
(OXIDATION DITCH #1 )
NEW EQUIPMENT PLAN
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-5
D - 24 - 24
G
6 25
SYSTEM IN SEWAGE PLANT
REPAIR/REPLACE WASTEWATER TREATMENT
EXIST. 42" X 18’ L ROTOR WITH COVER (TYP. OF 4)O
FLOW
FLOW
FLOW
FLOW
P-1
SCALE : 1 / 100M-5
OXIDATION DITCH #1
OXIDATION DITCH #2
N
NEW EQUIPMENT PLAN (OXIDATION DITCH #1 )
TO SECONDARY CLARIFIER
TO SECONDARY CLARIFIER
GRAPHIC SCALE
2000 4000mm
SCALE: 1 : 100
EXIST. 5’ W BRIDGE FLOOR FINISH AND HANDRAILS
OXIDATION DITCH DRIVE ASSEMBLY
1 OXIDATION DITCH DRIVE ASSEMBLY
1 OXIDATION DITCH DRIVE ASSEMBLY
1 OXIDATION DITCH DRIVE ASSEMBLY
(TYP. OF 4)
BEARING EXPANSION TYPE, LIFE RATIONG OF 100,000 HOURS
NEW BEARING ONE OUTBOARD PILLOW BLOCK ROLLER
PAINT EXIST. ELECTRICAL PANEL COVER
OUTSIDE SURFACE (#1, #2)
PAINT OXIDATION DITCHES CONCRETE WALL
OUTSIDE SURFACE (#1, #2)
PAINT OXIDATION DITCHES CONCRETE WALL
SPECIFIC NOTES
SYSTEMS (ISO 45001) CERTIFICATION.
(3) THE CONTRACTOR SHALL HAVE OCCUPATIONAL HEALTH AND SAFETY (OH&S) MANAGEMENT
EQUIPMENT MAINTENANCE.
1. THE CONTRACTOR SHALL MEET THE FOLLOWING CONDITIONS FOR CONSTRUCTION QUALITY AND
BUSINESS LICENSE".
LICENSE" AND "PUBLIC WATER SUPPLIES AND SEWAGE EQUIPMENT CONSTRUCTION
CONSTRUCTION BUSINESS LICENSE", "MECHANICAL EQUIPMENT CONSTRUCTION BUSINESS
(2) THE CONTRACTOR SHALL HAVE "SPECIALIZED WATER QUALITY ENVIRONMENTAL
WON FOR PROJECT WITHIN THE LAST THREE (3) YEARS RELATED CONSTRUCTION.
(1) THE CONTRACTOR SHALL HAVE ANNUAL SALES REVENUE OF MORE THAN TEN (10) BILLION
THIS CONCEPTUAL DRAWING.
4. THE CONTRACTOR SHALL PROVIDE THEIR OWN DRAWINGS AND DESIGN ANALYSIS WITHOUT USING
PIPING AND NECESSARY ACCESSORIES AND PARTS NOT SHOWN ON THIS DRAWING.
3. THE CONTRACTOR SHALL REDESIGN SEWAGE TREATMENT SYSTEM TO REFLECT ALL EQUIPMENT, AS WELL AS DESIGN THE SEWAGE TREATMENT SYSTEM
2. THE CONTRACTOR SHALL BE A SPECIALIZED COMPANY THAT HAS THE ABILITY TO CONSTRUCT
GRAPHIC SCALE
2000 4000mm
SCALE: 1 : 100
N
30 APR 24
HS-00092-3J
CAMP CARROLL
CHONG, CHANG NAK
NAM, TAE CHIN
(SECONDARY #1, #2AND TERTIARY CLARIFIER)
EXISTING / REMOVAL PLAN
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-6
D - 24 - 24
G
7 25
SYSTEM IN SEWAGE PLANT
REPAIR/REPLACE WASTEWATER TREATMENT
GRAPHIC SCALE
2000 4000mm
SCALE: 1 : 100
P-1
SCALE : 1 / 100M-6
SECONDARY CLARIFIER #2 TERTIARY CLARIFIERSECONDARY CLARIFIER #1
TO REMAIN
EXIST. BRIDGE W/ HANDRAILS
TO REMAIN
EXIST. BRIDGE W/ HANDRAILS
TO REMAIN
EXIST. BRIDGE W/ HANDRAILS
N
P-2
SCALE : 1 / 100M-6
EXISTING / REMOVAL PLAN (SECONDARY CLARIFIER #1, #2) EXISTING / REMOVAL PLAN (TERTIARY CLARIFIER)
SPECIFIC NOTES
EXACT SIZE, LOCATION AND DIRECTION OF PIPING SHALL BE VERIFIED IN FIELD.
2. EXISTING PIPING PLANS MAY NOT EXACTLY MATCH THE FIELD THEREFORE,
5. THE CONTRACTOR SHALL RETURN SALVAGEABLE MATERIALS TO DPW.
SHALL BE VERIFIED IN FIELD.
THEREFORE, EXACT SIZE, LOCATION, SPECIFICATION AND CAPACITY OF EQUIPMENT
1. EXISTING EQUIPMENT PLANS MAY NOT EXACTLY MATCH THE FIELD AND
SYSTEMS SHALL BE PATCHED AND FILLED OR RESTORED.
4. THE OPENINGS RESULTING FROM THE REMOVAL OF SEWAGE TREATMENT
TREATMENT SYSTEM IS FULLY OPERATIONAL AND FUNCTIONAL.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT NEW SEWAGE
AND THE USER, PRIOR TO THE START OF CONSTRUCTION.
PERIOD. THIS PHASING PLAN SHALL BE SUBMITTED TO AND APPROVED BY DPW
FOR THE USER TO FULLY UTILIZE THE FACILITY DURING THE CONSTRUCTION
SHALL PROVIDE A PHASING PLAN FOR CONSTRUCTION COMPLETION ALLOWING
BE FULLY OPERATIONAL DURING THE CONSTRUCTION PERIOD, THE CONTRACTOR
3. DUE TO THE CRITICAL NATURE OF THE FACILITY FUNCTION, THE FACILITY SHALL
SEE NOTE 3.
SHAFTS, SCRAPERS, PIPES, SUPPORTS AND ASSOCIATED PARTS
MOTORS, WEIR PLATES, SKIRTS, RACE SKIMMER, TROUGHS, VALVES,
REMOVE EXIST. TERTIARY CLARIFIER SYSTEM INCLUDING DRIVE
SEE NOTE 3.
SCRAPERS, PIPES, VALVES, SUPPORTS AND ASSOCIATED PARTS
ASSEMBLIES, SKIRTS, RACE SKIMMER, SCUM TROUGHS, SHAFTS,
INCLUDING DRIVE MOTORS, WEIR PLATES, SURFACE SKIMMER
REMOVE EXIST. SECONDARY CLARIFIER #1 & #2 SYSTEMS
GRAPHIC SCALE
2000 4000mm
SCALE: 1 : 100
N
30 APR 24
HS-00092-3J
CAMP CARROLL
CHONG, CHANG NAK
NAM, TAE CHIN
(SECONDARY CLARIFIER #1 & #2)
NEW EQUIPMENT PLAN
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-7
D - 24 - 24
G
8 25
SYSTEM IN SEWAGE PLANT
REPAIR/REPLACE WASTEWATER TREATMENT
N-2 18"
N-3
6"
N-1
18"
N-2
18"
SCRAPER ARM
TURNBUCKLE
SHAFT
SKIRT PLATE
WEIR PLATE
ASME
RATING
6"
N-1
MARK
1 18"
NO.
REQ’D
SIZE
MAT’L SPECIFICATION
SLUDGE OUTLET
FACING
WATER INLET
DESCRIPTION REMARKS
150A, SCH80
SO RF
STS304
S-1
SCALE : 1 / 100M-7
P-1
SCALE : 1 / 100M-7
NEW EQUIPMENT PLAN (SECONDARY CLARIFIER #1 & #2)
GRAPHIC SCALE
2000 4000mm
SCALE: 1 : 100
SECTION
SECONDARY CLARIFIER #2 SECONDARY CLARIFIER #1
18" EFFLUENT TO TERTIARY CLARIFIER
O18" FROM OXIDATION DITCH
SPLITTER BOX W/ COVER
FOR SCUM TROUGH OPERATION(TYP.)
6"TELESCOPING VALVE(TYP.)
18" EFFLUENT TO TERTIARY CLARIFIER
TROUGH OPERATION(TYP.)
HANDWHEEL FOR SCUM
O 6" SLUDGE DRAWOFF LINE
18" ASME SO RF
ASME SO RF
N-2
N-3
DESCRIPTION REMARKSNO Q’TY
STS304
STS304
STS304
STS304
2LOT
2LOT
2LOT
2LOT
2LOT
3/4" x 12"
N
1 2
3 1
[ 200x100x10T
3T
2T
15240
300 300 300 14640
15240
14640
PART LIST
NOZZLE SCHEDULE
WATER OUTLET2
CLARIFIER DRIVE ASSEMBLY
2 CLARIFIER DRIVE ASSEMBLY
SCUM SKIMMER DRIVE ASSEMBLY
3 SCUM SKIMMER DRIVE ASSEMBLY
22 CLARIFIER DRIVE ASSEMBLY 3 SCUM SKIMMER DRIVE ASSEMBLY
CLARIFIER DRIVE ASSEMBLY
3 SCUM SKIMMER DRIVE ASSEMBLY
18" EFFLUENT TO TERTIARY CLARIFIER
CLARIFIER
18" EFFLUENT TO TERTIARY
SEE NOTE 7.
SEE NOTE 7. RENOVATE EXIST. BRIDGE W/ HANDRAILS
RENOVATE EXIST. BRIDGE W/ HANDRAILS
W/ HANDRAILS
RENOVATE EXIST. BRIDGE
RENOVATE EXIST. BRIDGE W/ HANDRAILS
SPECIFIC NOTES
CONCEPTUAL. THE CONTRACTOR SHALL VERIFY AND RECALCULATE THEM.
2. THE CAPACITIES AND SIZES OF EQUIPMENT AND PIPING SHOWN ON THIS DRAWING ARE
THIS CONCEPTUAL DRAWING.
3. THE CONTRACTOR SHALL PROVIDE THEIR OWN DRAWINGS AND DESIGN ANALYSIS WITHOUT USING
SHALL FOLLOW THE MANUFACTURER’S INSTALLATION GUIDE.
4. THIS DRAWING SHOWS SUGGESTED EQUIPMENT AND PIPING CONFIGURATION. THE CONTRACTORS
MANUFACTURER’S RECOMMENDATION AND SITE CONDITIONS. THE CONTRACTOR SHALL VERIFY THEM.
5. SIZES AND LAYOUTS OF INSTALLATION OF EQUIPMENT MAY CHANGE DEPENDING ON
IS FULLY OPERATIONAL AND FUNCTIONAL.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT NEW SEWAGE TREATMENT SYSTEM
APPROVED BY DPW AND THE USER, PRIOR TO THE START OF CONSTRUCTION.
FACILITY DURING THE CONSTRUCTION PERIOD. THIS PHASING PLAN SHALL BE SUBMITTED TO AND
PLAN FOR CONSTRUCTION COMPLETION ALLOWING FOR THE USER TO FULLY UTILIZE THE
OPERATIONAL DURING THE CONSTRUCTION PERIOD, THE CONTRACTOR SHALL PROVIDE A PHASING
6. DUE TO THE CRITICAL NATURE OF THE FACILITY FUNCTION, THE FACILITY SHALL BE FULLY
OUTSIDE SURFACE
PAINT CLARIFIER CONCRETE TANK
OUTSIDE SURFACE
PAINT CLARIFIER CONCRETE TANK
PIPING AND NECESSARY ACCESSORIES AND PARTS NOT SHOWN ON THIS DRAWING.
1. THE CONTRACTOR SHALL REDESIGN THE SEWAGE TREATMENT SYSTEM TO REFLECT ALL EQUIPMENT, MAT’L SPECIFICATIONDESCRIPTION REMARKSNO Q’TY
4 STS304
STS304
STS304
STS304
2LOT
2LOT
2LOT
2LOTSHAFT
PAD PLATE
PLATE
PLATE
20T
150A, SCH80
20T
12T
P-1
M-8
NEW SHAFT DETAIL (SECONDARY CLARIFIER #1 & #2)
300 400 300
70 260 70 t t
2022020
150 150
50 220 30
80 Ø216.3 80
Ø .3
30 316.3 30 3
.3
300 300400
150 150 260 7070 150 150
25 210 25
5 1
R30
30 50
80 Ø216.3 80
12t
FLANGE 8"
TYP.
"A"
"B"
FOR M22 x 350L B/N/W
24 DRILL HOLES
FOR SHAFT 216.3
218 HOLESO
O
DETAIL - "A"
SCALE = NONE
DETAIL - "B"
SCALE = NONE
PART LIST
SCALE : NTS
30 APR 24
HS-00092-3J
CAMP CARROLL
CHONG, CHANG NAK
NAM, TAE CHIN
(SECONDARY CLARIFIER #1 & #2)
NEW SHAFT DETAIL
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-8
D - 24 - 24
G
9 25
2 STS304
STS304
2LOT
2LOTWEIR PLATE 3T
TROUGH 5T
P-1
M-9
NEW WEIR & WEIR TROUGH DETAIL (SECONDARY CLARIFIER #1 & #2)
6600300
10050
PART LIST
SCALE : NTS
30 APR 24
HS-00092-3J
CAMP CARROLL
CHONG, CHANG NAK
NAM, TAE CHIN
(SECONDARY CLARIFIER #1 & #2)
NEW WEIR & WEIR TROUGH DETAIL
10 25
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-9
D - 24 - 24
G
[150x75x9t
WEIR TROUGH
B/N/W M16 x 400L
SCUM TROUGH PLATE, 6t
2850L x 100H
L-75 x 6t
MAT’L SPECIFICATIONDESCRIPTION REMARKSNO Q’TY
4 STS304
STS304
STS304
STS304
2LOT
2LOT
2LOT
2LOT
5T
STS304
STS304
SKIMMER SUPPORT
2LOT
2LOTSCUM SKIMMER SUPPROT
SCUM SKIMMER
P-1
M-10
NEW SCUM SKIMMER & THOUGH DETAIL (SECONDARY CLARIFIER #1 & #2)
BRIDGE BEAM
PART LIST
SCALE : NTS
30 APR 24
HS-00092-3J
CAMP CARROLL
CHONG, CHANG NAK
NAM, TAE CHIN
11 25
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-10
D - 24 - 24
G
SYSTEM IN SEWAGE PLANT
REPAIR/REPLACE WASTEWATER TREATMENT
(SECONDARY CLARIFIER #1 & #2)
NEW SCUM SKIMMER & THOUGH DETAIL
SPLICE PLATE
SKIRT BRACKET L-75 x 6t
B/N/W M16
MAT’L SPECIFICATIONDESCRIPTION REMARKSNO Q’TY
4 STS304
STS304
STS304
STS304
2LOT
2LOT
2LOT
2LOTSKIRT PLATE
2T
2T
P-1
M-11
NEW WEIR DETAIL (SECONDARY CLARIFIER #1 & #2)
DETAIL - "A"
SKIRT SPLICE
SKIRT
SPL
ICE
"A"
SKIRT BRACKET
M16 B/N/W
PART LIST
SCALE : NTS
30 APR 24
HS-00092-3J
CAMP CARROLL
CHONG, CHANG NAK
NAM, TAE CHIN
(SECONDARY CLARIFIER #1 & #2)
NEW WEIR DETAIL
12 25
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-11
D - 24 - 24
G
4 STS304
STS304
STS304
STS304
STS3045
6 RUBBER
FLAT BAR
ANGLE
PLATE
FLAT BAR
PLATE
RUBBER PLATE
L-50x6tx700L
[-200x100x6tx8550LCHANNEL
7 STS304
50x6T
120x80x9T
220x80x9T
50x6Tx700L
700x200x12T
P-1
M-12
NEW SCRAPER ARM DETAIL (SECONDARY CLARIFIER #1 & #2)
50 120 50 t t
R
R
50 150 150 150 50
50 120 50
050 120 50
30 30 50
120 50
500x15=6000750
165020003300 t
"B"
"B"
"A"
"A"
ARM DETAIL
SCRAPER BLADE DETAIL
RUBBER 12t
F.B 50x6t
L - 50x50x6t M12x50L B/N/W
4 - 14 D/HOLESO
5 TYP.
DETAIL - "A" - "A" DETAIL - "B" - "B"
STS PLATE 9t STS PLATE 9t
TYP.4
PART LIST
SCALE : NTS
30 APR 24
HS-00092-3J
CAMP CARROLL
CHONG, CHANG NAK
NAM, TAE CHIN
(SECONDARY CLARIFIER #1 & #2)
NEW SCRAPER ARM DETAIL
13 25
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-12
D - 24 - 24
G
FLAT BAR
PLATE
CHANNEL
MAT’L SPECIFICATIONDESCRIPTION REMARKSNO Q’TY
4 STS304
STS304
STS304
STS304
PLATE
[-200x100x6Tx4550L
50x6T
120x80x9T
220x80x9T
P-1
M-13
50 120 t 5
R
R t
50 120 50 30 312
050120 t
3000 50
3300 250
DETAIL - "A" - "A"
"A"
"A"
ARM DETAIL
STS PLATE 9t
TYP.
27 HOLEO
NEW SCRAPER SIDE ARM DETAIL (SECONDARY CLARIFIER #1 & #2)
PART LIST
SCALE : NTS
30 APR 24
HS-00092-3J
CAMP CARROLL
CHONG, CHANG NAK
NAM, TAE CHIN
(SECONDARY CLARIFIER #1 & #2)
NEW SCRAPER SIDE ARM DETAIL
14 25
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-13
D - 24 - 24
G
WIRE ROPE
WIRE CLAMP
TURNBUCKLE M22
MAT’L SPECIFICATIONDESCRIPTION REMARKSNO Q’TY
3 STS304
STS304
STS304 -
O 10
O 10
P-1
M-14
ARM BRACE - A
(Q’TY -4SET)
ARM BRACE - B
(Q’TY -4SET)
WIRE CRAMP M22
M22M22
M22 M22
M22
M22M22
M22
O 10 WIRE ROPE
1 2 3
M22
M22
M22
WIRE CRAMP O 10 WIRE ROPE
1 2
WIRE CRAMP O 10 WIRE ROPE
1 2
WIRE CRAMP O 10 WIRE ROPE
1 2
NEW ARM BRACE DETAIL (SECONDARY CLARIFIER #1 & #2)
PART LIST
SCALE : NTS
(Q’TY -8SET)
SIDE ARM ROD
ARM & SIDE ARM BRACE
(Q’TY -4SET)
30 APR 24
HS-00092-3J
CAMP CARROLL
CHONG, CHANG NAK
NAM, TAE CHIN
(SECONDARY CLARIFIER #1 & #2)
NEW ARM BRACE DETAIL
15 25
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-14
D - 24 - 24
G
SYSTEM IN SEWAGE PLANT
REPAIR/REPLACE WASTEWATER TREATMENT
SPECIFIC NOTES
GUIDANCE OF WIRE ROPE MANUFACTURER
1. LOCATION AND QUANTITIES FOR WIRE CLAMP SHALL BE INSTALLED IAW ASME B30.9 AND
SEE SPECIFIC NOTES #1
1 2LOT
P-1
M-15
NEW SPROCKET DETAIL (SECONDARY CLARIFIER #1 & #2)
R
CASTER
PLATE 9t
PART LIST
SCALE : NTS
9TSTS275PLATE
GEARED MOTOR
30 APR 24
HS-00092-3J
CAMP CARROLL
CHONG, CHANG NAK
NAM, TAE CHIN
(SECONDARY CLARIFIER #1 & #2)
NEW SPROCKET DETAIL
16 25
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-15
D - 24 - 24
G
GRAPHIC SCALE
2000 4000mm
SCALE: 1 : 100
N
30 APR 24
HS-00092-3J
CAMP CARROLL
CHONG, CHANG NAK
NAM, TAE CHIN
NEW EQUIPMENT PLAN (TERTIARY CLARIFIER)
17 25
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-16
D - 24 - 24
G
SYSTEM IN SEWAGE PLANT
REPAIR/REPLACE WASTEWATER TREATMENT
N-3
6"
N-1
18"
N-2
18"
45°
P-1
SCALE : 1 / 100M-16
S-1
SCALE : 1 / 100M-16
SECTION
SCRAPER ARM
TURNBUCKLE
SHAFT
SKIRT PLATE
WEIR PLATE
ASME
RATING
6"
N-1
MARK
1 18"
NO.
REQ’D
SIZE
MAT’L SPECIFICATION
SLUDGE OUTLET
FACING
WATER INLET
DESCRIPTION REMARKS
150A, SCH80
[ 200x100x10t
SO RF
STS304
1 18" ASME SO RF
1 ASME SO RF
N-2
N-3
DESCRIPTION REMARKSNO Q’TY
STS304
STS304
STS304
STS304
1LOT
1LOT
1LOT
1LOT
1LOT
3/4" x 12"
GRAPHIC SCALE
2000 4000mm
SCALE: 1 : 100
N
15240
14640 300
3T
2T
NEW EQUIPMENT PLAN (TERTIARY CLARIFIER)
PART LIST
NOZZLE SCHEDULE
WATER OUTLET
18" DIP OUTLET TO EFFLUENT PARSHALL FLUME
18" INFLUENT
8" RETURN SLUDGE LINE
8" RETURN SLUDGE LINE
18" INFLUENT
RENOVATE EXIST. BRIDGE W/ HANDRAILS
RENOVATE EXIST. BRIDGE W/ HANDRAILS
SEE NOTE 7.
SPECIFIC NOTES
CONCEPTUAL. THE CONTRACTOR SHALL VERIFY AND RECALCULATE THEM.
2. THE CAPACITIES AND SIZES OF EQUIPMENT AND PIPING SHOWN ON THIS DRAWING ARE
THIS CONCEPTUAL DRAWING.
3. THE CONTRACTOR SHALL PROVIDE THEIR OWN DRAWINGS AND DESIGN ANALYSIS WITHOUT USING
SHALL FOLLOW THE MANUFACTURER’S INSTALLATION GUIDE.
4. THIS DRAWING SHOWS SUGGESTED EQUIPMENT AND PIPING CONFIGURATION. THE CONTRACTORS
MANUFACTURER’S RECOMMENDATION AND SITE CONDITIONS. THE CONTRACTOR SHALL VERIFY THEM.
5. SIZES AND LAYOUTS OF INSTALLATION OF EQUIPMENT MAY CHANGE DEPENDING ON
IS FULLY OPERATIONAL AND FUNCTIONAL.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT NEW SEWAGE TREATMENT SYSTEM
APPROVED BY DPW AND THE USER, PRIOR TO THE START OF CONSTRUCTION.
FACILITY DURING THE CONSTRUCTION PERIOD. THIS PHASING PLAN SHALL BE SUBMITTED TO AND
PLAN FOR CONSTRUCTION COMPLETION ALLOWING FOR THE USER TO FULLY UTILIZE THE
OPERATIONAL DURING THE CONSTRUCTION PERIOD, THE CONTRACTOR SHALL PROVIDE A PHASING
6. DUE TO THE CRITICAL NATURE OF THE FACILITY FUNCTION, THE FACILITY SHALL BE FULLY
CLARIFIER DRIVE ASSEMBLY
CLARIFIER DRIVE ASSEMBLY
OUTSIDE SURFACE
PAINT CLARIFIER CONCRETE TANK
PIPING AND NECESSARY ACCESSORIES AND PARTS NOT SHOWN ON THIS DRAWING.
1. THE CONTRACTOR SHALL REDESIGN THE SEWAGE TREATMENT SYSTEM TO REFLECT ALL EQUIPMENT, 4 STS304
STS304
STS304
STS304
2LOT
2LOT
2LOT
2LOTSHAFT
PAD PLATE
PLATE
PLATE
20T
150A, SCH80
20T
12T
P-1
M-17
300 400 300
70 260 70 t t
2022020
150 150
50 220 30
80 Ø216.3 80
Ø .3
30 316.3 30 3
.3
300 300400
150 150 260 7070 150 150
25 210 25
5 1
R30
30 50
80 Ø216.3 80
12t
FLANGE 8"
TYP.
"A"
"B"
FOR M22 x 350L B/N/W
24 DRILL HOLES
FOR SHAFT 216.3
218 HOLESO
O
DETAIL - "A"
SCALE = NONE
DETAIL - "B"
SCALE = NONE
NEW SHAFT DETAIL (TERTIARY CLARIFIER)
PART LIST
SCALE : NTS
30 APR 24
HS-00092-3J
CAMP CARROLL
CHONG, CHANG NAK
NAM, TAE CHIN
NEW SHAFT DETAIL (TERTIARY CLARIFIER)
18 25
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-17
D - 24 - 24
G
2 STS304
STS304
2LOT
2LOTWEIR PLATE 3T
TROUGH 5T
P-1
M-18
6600300
10050
NEW WEIR & WEIR TROUGH DETAIL (TERTIARY CLARIFIER)
PART LIST
SCALE : NTS
30 APR 24
HS-00092-3J
CAMP CARROLL
CHONG, CHANG NAK
NAM, TAE CHIN
(TERTIARY CLARIFIER)
NEW WEIR & WEIR TROUGH DETAIL
19 25
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-18
D - 24 - 24
G
SPLICE PLATE
SKIRT BRACKET L-75 x 6t
B/N/W M16
MAT’L SPECIFICATIONDESCRIPTION REMARKSNO Q’TY
4 STS304
STS304
STS304
STS304
2LOT
2LOT
2LOT
2LOTSKIRT PLATE
2T
2T
P-1
M-19
DETAIL - "A"
SKIRT SPLICE
SKIRT
SPL
ICE
"A"
SKIRT BRACKET
M16 B/N/W
NEW WEIR DETAIL (TERTIARY CLARIFIER)
PART LIST
SCALE : NTS
30 APR 24
HS-00092-3J
CAMP CARROLL
CHONG, CHANG NAK
NAM, TAE CHIN
NEW WEIR DETAIL (TERTIARY CLARIFIER)
20 25
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-19
D - 24 - 24
G
4 STS304
STS304
STS304
STS304
STS3045
6 RUBBER
FLAT BAR
ANGLE
PLATE
FLAT BAR
PLATE
RUBBER PLATE
L-50x6tx700L
[-200x100x6tx8550LCHANNEL
7 STS304
50x6T
120x80x9T
220x80x9T
50x6Tx700L
700x200x12T
P-1
M-20
50 120 50 t t
R
R
50 150 150 150 50
50 120 50
050 120 50
30 30 50
120 50
500x15=6000750
165020003300 t
"B"
"B"
"A"
"A"
ARM DETAIL
SCRAPER BLADE DETAIL
RUBBER 12t
F.B 50x6t
L - 50x50x6t M12x50L B/N/W
4 - 14 D/HOLESO
5 TYP.
DETAIL - "A" - "A" DETAIL - "B" - "B"
STS PLATE 9t STS PLATE 9t
TYP.4
NEW SCRAPER ARM DETAIL (TERTIARY CLARIFIER)
PART LIST
SCALE : NTS
30 APR 24
HS-00092-3J
CAMP CARROLL
CHONG, CHANG NAK
NAM, TAE CHIN
(TERTIARY CLARIFIER)
NEW SCRAPER ARM DETAIL
21 25
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-20
D - 24 - 24
G
FLAT BAR
PLATE
CHANNEL
MAT’L SPECIFICATIONDESCRIPTION REMARKSNO Q’TY
4 STS304
STS304
STS304
STS304
PLATE
[-200x100x6Tx4550L
50x6T
120x80x9T
220x80x9T
P-1
M-21
50 120 t 5
R
R t
50 120 50 30 312
050120 t
3000 50
3300 250
DETAIL - "A" - "A"
"A"
"A"
ARM DETAIL
STS PLATE 9t
TYP.
27 HOLEO
NEW SCRAPER SIDE ARM DETAIL (TERTIARY CLARIFIER)
PART LIST
SCALE : NTS
30 APR 24
HS-00092-3J
CAMP CARROLL
CHONG, CHANG NAK
NAM, TAE CHIN
(TERTIARY CLARIFIER)
NEW SCRAPER SIDE ARM DETAIL
22 25
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-21
D - 24 - 24
G
WIRE ROPE
WIRE CLAMP
TURNBUCKLE M22
MAT’L SPECIFICATIONDESCRIPTION REMARKSNO Q’TY
3 STS304
STS304
STS304 -
O 10
O 10
P-1
M-22
ARM BRACE - A
ARM BRACE - B
NEW ARM BRACE DETAIL (TERTIARY CLARIFIER)
PART LIST
SCALE : NTS
(Q’TY -2SET)
(Q’TY -2SET)
(Q’TY -4SET)
ARM & SIDE ARM BRACE
SIDE ARM ROD
(Q’TY -2SET)
CHONG, CHANG NAK
NAM, TAE CHIN CAMP CARROLL
30 APR 24
HS-00092-3J
(TERTIARY CLARIFIER)
NEW ARM BRACE DETAIL
23 25
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
M-22
D - 24 - 24
G
SYSTEM IN SEWAGE PLANT
REPAIR/REPLACE WASTEWATER TREATMENT
M22 M22
M22
M22M22
M22
M22
M22
M22
WIRE CRAMP O 10 WIRE ROPE
1 2
WIRE CRAMP O 10 WIRE ROPE
1 2
WIRE CRAMP O 10 WIRE ROPE
1 2
WIRE CRAMP M22
M22M22
O 10 WIRE ROPE
1 2 3
SPECIFIC NOTES
GUIDANCE OF WIRE ROPE MANUFACTURER
1. LOCATION AND QUANTITIES FOR WIRE CLAMP SHALL BE INSTALLED IAW ASME B30.9 AND
SEE SPECIFIC NOTES #1
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
ELECTRICAL
AS SHOWN
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
UNITED STATES ARMY GARRISION DAEGU
DIRECTORATE OF PUBLIC WORK
UNIT #15746, APO AP 96218-5746
DATE:
N O T E S
3.
2.
4. MOUNTING HEIGHTS ARE AS BELOW. MEASUREMENT IS TO CENTER OF OUTLET.
WIRES IS INDICATED AS FOLLOW;
AND ONE (1)-#12AWG GROUND WIRE IN 16mm CONDUIT. A GREATER NUMBER OF
ANY CIRCUIT WITHOUT FURTHER DESIGNATION INDICATES TWO (2)-#12AWG WIRES
3-#12AWG WIRES AND 1-#12AWG GROUND WIRE IN 16mm CONDUIT.
4-#12AWG WIRES AND 1-#12AWG GROUND WIRE IN 16mm CONDUIT.
LIGHTING FIXTURE--------------------SEE LIGHTING FIXTURE SCHEDULE
TOGGLE SWITCH-----------------------1220mm TO CENTER OF THE OUTLET
RECEPTACLE---------------------------460mm TO CENTER OUTLET
PANELBOARD, CIRCUIT BREAKER------------------------SEE SPECIFICATION
CAULKING MATERIAL SHALL BE VERIFIED BY F&ES OFFICE PRIOR TO CONSTRUCTION.
BOTH SIDE OF FIRE WALLS, FIRE-PARTITIONS AND FIRE-RATED PIPE CHASE WALLS.
ALL PIPE PENETRATIONS SHALL BE SEALED WITH FIRE RATED CAULKING MATERIAL ON
1.
SPECIFICATIONS FOR O&MA PROJECTS, AND SPECIFICATIONS.
ELECTRICAL CODE, NATIONAL ELECTRICAL SAFETY CODE, FIRE CODE, TECHNICAL STANDARD
ALL ELECTRICAL WORK SHALL CONFORM TO THE LATEST REQUIREMENTS OF THE NATIONAL
CONDUIT WHICH IS TO BE BONDED TO THE MAIN GROUNDING SYSTEM AT BOTH ENDS.
GROUNDING WIRE SHALL BE GREEN INSULATED COPPER WIRE IN RIGID GALVANIZED STEEL
ALL WIRING SHALL BE CONCEALED ABOVE THE CEILING WHEN THE ROOM HAS A CEILING.
L E G E N D
NEWEXSTREMOVE
PANELBOARD OR LOAD CENTER
+ WIRING CONCEALED IN UNDERGROUND
HOMERUN CIRCUIT TO PANELBOARD OR ENCLOSURE
WIRING CONCEALED IN CEILINGS AND WALL
WIRING EXPOSED ON CEILINGS AND WALL
///// C C CONTROL CIRCUITC
SCOPE OF WORK
SHEET OF
5.
6.
7.
TO MWR CATV, ONCE COMPLETED BY THE CONTRACTOR, BEFORE THE FINAL ACCEPTANCE INSPECTION.
SIGNAL LEVEL RESULTS WILL BE RECORDED BY THE CONTRACTOR AND GIVEN IMMEDIATELY
CONTRACTOR SHALL COORDINATE WITH MWR CATV TO PERFORMING FINAL ACCEPTANCE TESTING.
INSTALLED IN THE SUSPENDED CEILING SHALL BE SUPPORTED BY THE CEILING GRID BAR SYSTEM.
LIGHTING FIXTURES SHALL BE SUPPORTED FROM THE BUILDING STRUCTURES EXCEPT LIGHTING FIXTURES
HS-00092-3J
CAMP CARROLL
30 APR 24
1.
D - 24 - 24
8.
9.
10.
MOTOR STARTING AUTO TRANSFORMER AND ALL NECESSARY ACCESSORIES IN EXISTING MOTOR CONTROL CENTER.
REPLACE DETERIORATED EXISTING MOTOR PROTECTION CIRCUIT BREAKERS, MAGNETIC CONTACTORS, WORK CLASS: "K" (REPAIR / MAINTENANCE)
WORK-PLAN
<ALL FAILED OR FAILING SYSTEM SHALL BE REPAIRED IN ACCORDANCE WITH DRAWING AND SPECIFICATIONS.>
24 25
E-1
AND THE COLOR OF TOGGLE SWITCHES AND RECEPTACLE SHALL BE GRAY.
ALL COVER PLATES OF RECEPTACLES AND SWITCHES SHALL BE STAINLESS STEEL METALLIC ONES
LEGEND, NOTES AND SCOPE OF WORK
US ORIGIN MATERIAL:
CHANGES SHALL BE APPROVED BY THE CONTRACTING OFFICE.
BE RESPONSIBLE TO RESIZE AND PROVIDE THE REQUIRED WIRING AND OVER CURRENT DEVICES. THE
IF EQUIPMENT OTHER THAN INDICATED ON THE PLANS ARE PROVIDED, THEN THE CONTRACTOR SHALL
INDICATED ON THE DRAWINGS.
INTERNET SITE (http//www.cckbid.com). ALL NON-GENERIC US ORIGIN MATERIALS SHALL BE AS
DATED FEBRUARY 2, 2004 (ELECTRONIC VERSION OF THIS DOCUMENT CAN BE FOUND AT
REGISTER OF IMA-KORO PAMPHLET 420-1 "INSPECTION OF CONSTRUCTION CONTRACTS
ALL GENERIC US ORIGIN MATERIALS SHALL BE AS OFF-SHORE IN THE GENERIC SUBMITTAL
SIN, YS
AN, CY
GRAPHIC SCALE
SCALE: 1 : 500
TRAINING
CONFINED SPACE
BURN BUILDING AND
S-705
S-703
PLANT
TREATMENT
SEWAGE
S-701
T
T
A
VE
N U E
S-957
S-702
SCALE : 1 / 500- E2
P-1
N
10000 20000
"MCC"
- NOT TO SCALE
D-1
D-1
30 APR 24
HS-00092-3J
MOTOR STARTING AUTO TRANSFORMER
1 11 1
2 2
DEVICE SCHEDULE
LS ELECTRIC, "MC-65a" OR EQUIVALENT
LS ELECTRIC, "MC-18b" OR EQUIVALENT
SPECIFICATION NOTE
ELECTRICAL SITE PLAN (WORK-PLAN)
"MCC" POWER SINGLE LINE DIAGRAM (WORK-PLAN)
L E G E N D
MOTOR PROTECTION CIRCUIT BREAKER
MAGNETIC MOTOR CONTACTOR
LS ELECTRIC, "MC-9b" OR EQUIVALENT
E-2
E-2
V A
VS AS
CT
300/5
G
R R R
G
V A
VS AS
CT
300/5
G
G
"MLP"
PNL
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
ELECTRICAL
AS SHOWN
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
UNITED STATES ARMY GARRISION DAEGU
DIRECTORATE OF PUBLIC WORK
UNIT #15746, APO AP 96218-5746
DATE:
SHEET OF
E-2
PROJECT NO.
CAMP CARROLL
25 25
D - 24 - 24
SEE SINGLE LINE DIAGRAM
ACCESSORIES FOR CONTROL PANEL
CIRCUIT BREAKERS AND NECESSARY
REPLACE MOTOR STARTERS,
NO.
ITEM
Q’TY SPECIFICATION REMARKS
3P-480V-60Hz-50HP,TAPS: 65 - 80%
MOTOR STARTING AUTO TR.
MAGNETIC CONTACTOR
NEMA SIZE 3 (TYP. OF 3EA)
3P-100AF-60AT
MOTOR PROTECTION CIRCUIT BREAKER
3P-100AF-15AT
MOTOR PROTECTION CIRCUIT BREAKER
NEMA SIZE 1
MAGNETIC CONTACTOR
3P-100AF-3AT
MOTOR PROTECTION CIRCUIT BREAKER
NEMA SIZE 00
MAGNETIC CONTACTOR
MOLDED CASE CIRCUIT BREAKER
3P-100AF-20AT
LS ELECTRIC,
"UTE100N-FTU-20A-3P-UL" OR EQUIVALENT
NEMA MEDIUM DUTY TYPE (NEMA SIZE 3)
THE CONTRACTOR SHALL VERIFY AND RECALCULATE THEM.
2. THE CAPACITIES AND SIZES OF EQUIPMENT SHOWN ON THIS DRAWING ARE CONCEPTUAL.
5. PARTS AND WIRING MAY CHANGE DEPENDING ON MANUFACTURER’S RECOMMENDATION AND SITE CONDITIONS.
AN, CY
ACCESSORIES AND PARTS NOT SHOWN ON THE DRAWING.
1. THE CONTRACTOR SHALL REDESIGN THE CONTROL PANEL TO REFLECT ALL EQUIPMENT, WIRING AND NECESSARY
CONCEPTUAL DRAWING.
3. THE CONTRACTOR SHALL PROVIDE THEIR OWN DRAWINGS AND DESIGN ANALYSIS WITHOUT USING THIS
THE MANUFACTURER’S INSTALLATION GUIDE.
4. THE DRAWING SHOWS SUGGESTED EQUIPMENT AND PART CONFIGURATION THE CONTRACTORS SHALL FOLLOW
AND FUNCTIONAL.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT NEW CONTROL SYSTEM IS FULLY OPERATIONAL
LINE DIAGRAM AND PANEL SCHEDULE
ELECTIRCAL SITE PLAN, "MCC" POWER SINGLE
SIN, YS
EXTERIOR HANDLE AND THE OTHER PARTS IF REQUIRED.
6. THE REPLACEMENT PARTS ARE CIRCUIT BREAKER, MAGNETIC CONTACTOR, THERMAL RELAY, INDICATOR LAMP, 3P-100A-5AT
MOTOR PROTECTION CIRCUIT BREAKER
NEMA SIZE 00
MAGNETIC CONTACTOR
LS ELECTRIC, "MC-9b" OR EQUIVALENT
LS ELECTRIC, "MMS-63H-63A" OR EQUIVALENT
LS ELECTRIC, "MMS-32H-17A" OR EQUIVALENT
LS ELECTRIC, "MMS-32H-6A" OR EQUIVALENT
LS ELECTRIC, "MMS-32H-4A" OR EQUIVALENT
| HS-00092-3J_T01-Default-000 |
| HS-00092-3J_G01-Default-000 |
| HS-00092-3J_M01-Default-000 |
| HS-00092-3J_M02-Default-000 |
| HS-00092-3J_M03-Default-000 |
| HS-00092-3J_M04-Default-000 |
| HS-00092-3J_M05-Default-000 |
| HS-00092-3J_M06-Default-000 |
| HS-00092-3J_M07-Default-000 |
| HS-00092-3J_M08-Default-000 |
| HS-00092-3J_M09-Default-000 |
| HS-00092-3J_M10-Default-000 |
| HS-00092-3J_M11-Default-000 |
| HS-00092-3J_M12-Default-000 |
| HS-00092-3J_M13-Default-000 |
| HS-00092-3J_M14-Default-000 |
| HS-00092-3J_M15-Default-000 |
| HS-00092-3J_M16-Default-000 |
| HS-00092-3J_M17-Default-000 |
| HS-00092-3J_M18-Default-000 |
| HS-00092-3J_M19-Default-000 |
| HS-00092-3J_M20-Default-000 |
| HS-00092-3J_M21-Default-000 |
| HS-00092-3J_M22-Default-000 |
| HS-00092-3J_E01-Default-000 |
| HS-00092-3J_E02-Default-000 |