ATTACHMENT 1 Drawings.pdf

PDF 24 MB Posted

Attached to
Z1DZ--Replace Ozone Depleting Equipment 539-21-205
Solicitation number
36C25022B0004
Issued by

About this file

This document provides details for a federal contract solicitation to replace ozone depleting equipment at the Cincinnati VA Medical Center. Solicitation number 36C25022B0004 seeks general contracting, electrical, controls, and mechanical services to replace various HVAC units containing R-22 or other refrigerants throughout the hospital. The work requires planning for phasing construction to minimize disruption at the occupied medical facility. The period of performance is 360 days after notice to proceed. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. Interested parties should review the attachment for additional technical specifications.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S

T A T E

OF O

H

IO

R E G

IST ERED A RC

HI

T

E C T

MARK

C.

WISEMAN

13215

Mark C. Wiseman, License #13215 Expiration Date 12/31/2021

P ro je ct

N o.

F

E

D

C

B

A

Department of Veterans Affairs Medical Center

LEVIN PORTER ASSOCIATES

ARCHITECTURE PLANNING INTERIOR DESIGN

3011 NEWMARK DRIVE

MIAMISBURG, OH 45342

937.224.1931 P

937.224.3091 F

STAN ENGINEERING

MECHANICAL ELECTRICAL

300 WEST MONUMENT AVE, SUITE 200

DAYTON, OH 45402

937.224.0861

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

SD SUBMITTAL 08-24-2020

DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020

Project Manager

Cincinnati V.A.

Medical

Center

DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021

KEVIN HENDERSON

CD SUBMITTAL 03-29-2021

BID DOCUMENT SUBMITTAL

/1

/2

:2

:4

P

M

3200 Vine Street Cincinnati, OH 45220

.0

TITLE SHEET

VP SS

REPLACE OZONE DEPLETING

EQUIPMENT

G001

539--21-205

Cincinnati, Ohio

B01

REPLACE OZONE DEPLETING EQUIPMENT

VICINITY MAP

CINCINNATY CAMPUS

VICINITY MAP

FT THOMAS CAMPUS

CINCINNATI CAMPUS

SCALE: N.T.S.

FT. THOMAS CAMPUS

SCALE: N.T.S.

Sheet Number Sheet Name

1. GENERAL:

G001 TITLE SHEET

10. ARCHITECTURE

1-A101 PARTIAL FLOOR PLANS AND DETAILS

S-A102 SITE PLAN AND BUILDING 8 REMOVAL AND NEW WORK

16. MECHANICAL

M001 INDEX, LEGEND, AND GENERAL NOTES

S-M101 SITE PLANS - REMOVALS AND NEW WORK

1-M1SB SUB-BASEMENT FLOOR PLANS - REMOVALS AND NEW WORK

1-M100A BASEMENT FLOOR PLANS - REMOVALS AND NEW WORK

1-M100B BASEMENT AND FIRST FLOOR PLANS - REMOVALS AND NEW WORK

1-M102 SECOND FLOOR PLANS - REMOVALS AND NEW WORK

1-M104 FOURTH FLOOR PLANS - REMOVALS AND NEW WORK

8-M102 BLDG 8 SECOND FLOOR PLANS - REMOVALS AND NEW WORK

15-M100 BLDG 15 BASEMENT FLOOR PLANS - REMOVALS AND NEW WORK

64-M101 BLDG 64 SITE PLANS AND FLOOR PLANS - REMOVALS AND NEW WORK

M501 DETAILS

M502 DETAILS

M601 SCHEDULES, CONTROLS AND AUTOMATION

26.1 ELECTRICAL

E001 INDEX OF DRAWINGS, LEGEND AND GENERAL NOTES

S-E101 SITE PLAN AND BLDG 8 SECOND FLOOR PLAN - REMOVALS AND NEW WORK

1-E100A PARTIAL SUB BASEMENT & BASEMENT FLOOR PLANS - REMOVALS AND NEW WORK

1-E100B PARTIAL BASEMENT FLOOR PLANS - REMOVALS AND NEW WORK

1-E101 PARTIAL FIRST FLOOR PLAN - REMOVALS AND NEW WORK

1-E102 PARTIAL SECOND FLOOR PLAN - REMOVALS AND NEW WORK

1-E104 PARTIAL FOURTH FLOOR PLAN - REMOVALS AND NEW WORK

15-E100 BLDG 15 BASEMENT FLOOR PLAN - REMOVALS & NEW WORK

64-E101 BLDG 64 SITE PLAN AND PARTIAL FIRST FLOOR PLAN - REMOVALS AND NEW WORK

INDEX OF DRAWINGS

GENERAL PROJECT NOTES:

A. PATCH ALL AREAS TO MATCH ADJACENT/EXISTING FINISHES. EACH CONTRACTOR IS RESPONSIBLE FOR ANY AREAS PREVIOUSLY UNEXPOSED THAT WILL BE EXPOSED BY NEW WORK OR DEMOLITION, MATCH EXISTING FINISHES.

B. ALL WORK WILL COMPLY WITH ALL APPLICABLE NATIONAL, STATE OR LOCAL CODES, ORDINANCES AND REGULATIONS INCLUDING THE ARCHITECTUAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS) FOR FEDERAL FACILITIES

AND THE VA BARRIER FREE DESIGN STANDARD

C. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE COR OF ANY WORK THAT MIGHT REQUIRE INTERRUPTION OF UTILITY SERVICES, CAUSE NOISE, OR CREATE VIBRATION PRIOR TO COMMENCEMENT OF THIS WORK..

CONTRACTOR TO PROVIDE INFORMATION A MINIMUM OF FOUR(4) WEEKS FOR VA COR APPROVAL AND COORDINATION.

D. CONTRACTOR TO PROTECT ALL FURNITURE AND EQUIPMENT IN ALL AREAS PRIOR TO WORK COMMENCING IN EACH SPACE.

E. INTERIOR CONCRETE SLABS AND PATCHES, USE MIN. 15 MIL REINFORCED POLYETHYLENE VAPOR BARRIER UNDER THE CONCRETE SLAB. SMOOTH TROWEL FLUSH WITH EXISTING SLAB ELEVATION. SEAL VAPOR BARRIER WATER

TIGHT.

F. CONTRACTOR'S BID SHALL INCLUDE THE GREATEST QUANTITY AND QUALITY OF ALL ITEMS AND ASSEMBLIES FOR A COMPLETE AND FULLY OPERATIONAL PROJECT IN ACCORDANCE WITH OWNERS, ARCHITECTS, AND GOVERNING

AUTHORITY REQUIREMENTS.

G. UNLESS SPECIFICALLY NOTED OTHERWISE ON THE DRAWINGS, CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION, REMOVING, AND REPLACEMENT WORK SPECIFIED AND AS REQUIRED TO ACCOMMODATE THE REQUIRED

IMPROVEMENTS, AND SHALL ALSO BE RESPONSIBLE FOR ANY AND ALL NECESSARY REPLACEMENT, REPAIRING, AND PATCHING TO BE DONE BY WORKMEN SKILLED AND REGULARLY EMPLOYED IN THE TRADES INVOLVED -

FINISHES SHALL MATCH EXISTING AND/OR ADJACENT SURFACES AND AS SPECIFIED.

H. CONTRACTOR SHALL PROPERLY PLAN AND EXECUTE WORK RELATIVE TO AND IN CONSIDERATION OF WORK TO BE PERFORMED BY OTHERS IN ORDER TO MITIGATE ALL IMPACTING ISSUES AND CONFLICTS. NO EXTRA COSTS FOR

THE LACK OF PROPER PLANNING AND EXECUTION WILL BE PERMITTED.

I. CONTRACTOR SHALL VERIFY AS-BUILT CONDITIONS FOR ANY MATERIAL DIFFERENCE PRIOR TO PERFORMING ANY WORK AND SHALL NOTIFY ARCHITECT/COR MANAGER OF ANY DISCREPANCIES.

J. COORDINATE FINAL PLACEMENT OF ALL WALL MOUNTED EQUIPMENT WITH SIGNAGE.

K. THE GENERAL CONTRACTOR SHALL COMPLY WITH ALL PROVISIONS OF THE SPECIFICATIONS INCLUDING ALL GENERAL CONDITIONS, SUPPLEMENTARY GENERAL CONDITIONS, MATERIAL AND CONSTRUCTION PROVISIONS WHICH

APPLY TO MATERIALS OR CONSTRUCTION METHODS REQUIRED.

L. DO NOT PAINT ANY SEALANTS OR CAULKING WHICH ARE SUBJECT TO MOVEMENT. CONTROL JOINTS SHALL BE CAULKED AFTER PAINTING AND SPECIAL COATING APPLICATIONS. PROVIDE CAULKING OR SEALANTS WHICH MATCH

ADJACENT FINISHED COLORS UNLESS NOTED OTHERWISE.

M. ALL EXISTING CONSTRUCTION TO REMAIN THAT ARE DAMAGED OR DISTURBED DURING CONSTRUCTION SHALL BE PATCHED OR REPAIRED TO MATCH EXISTING ADJACENT CONSTRUCTION.

N. ALL INTERIOR WOOD BLOCKING, MISC. FRAMING, PANELS, ETC. THAT ARE TO BE USED SHALL BE FIRE-RETARDANT TREATED. ALL EXTERIOR WOOD BLOCKING SHALL BE PRESSURE TREATED.

O. ALL SUSPENDED ITEMS SHALL BE ATTACHED DIRECTLY TO STRUCTURE AND NOT ANCHORED TO ANY NON-STRUCTURAL ITEM, COMPONENT OR SYSTEM.

P. ALL NEW PENETRATIONS IN ALL EXISTING, MODIFIED OR NEW CORRIDOR WALLS, SMOKE AND FIRE PARTITIONS, AND FLOOR SLABS SHALL BE SEALED WITH FIRE RESISTANT CAULKING OR SEALANT THAT PREVENTS THE PASSAGE

OF SMOKE AND/OR FIRE ALL COMPLYING TO THE LIFE SAFETY AND FIRE CODE AND MEETING EXISTING CONDITIONS.

Q. NEW CORE DRILLING THROUGH EXISTING STRUCTURAL ELEMENTS REQUIRED BY CONSTRUCTION SHALL BE COORDINATED BY THE CONTRACTOR TO AVOID DRILLING THROUGH OR INTO ANY STRUCTURAL ELEMENTS.

R. NEW CONSTRUCTION INSTALLED SHALL BE COORDINATED BY THE CONTRACTOR FOR PROPER FIT, DIMENSIONS AND ACCESS TO THE BUILDING PRIOR TO BEGINNING CONSTRUCTION AND DELIVERY OF COMPONENTS TO THE SITE.

DESCRIPTION DATE

08-19-2021

08/19/2021

C&P B012

Comp. &

Pension B014

Library B015

Soil. Linen B016

Library B017

8' - 0"

ACT-1

8' - 2"

ACT-1

8' - 2"

ACT-1

9.07

9.07

9.07

2.16

2.15

9.07

2.15

2.15

Audology

Clinic B123

8' - 0"

ACT-1

9.07

2.15

Comp.

Training B430

8' - 3"

ACT-1

9.07

2.16

2.15

1-A101

2.

Sim

1-A101

1-A101

Sim

1-A101

A. A. PROVIDE ACOUSTICAL SEALANT AT ALL SOFFIT LOCATIONS THAT EXTEND TO DECK.

B. ALL CEILING TILE TO BE CENTERED IN ROOM UNLESS NOTED OTHERWISE.

C. ALL CEILING TILE TO BE 6" OR GREATER IN SIZE.

D. REFER TO ADDITIONAL TRADES FOR ITEMS NOT SHOWN ON THESE DRAWINGS.

E. ALL PLASTER AND GYP. CEILINGS TO BE FINISHED AND PAINTED U.N.O.

F. PROTECT ALL EXISTING EQUIPMENT AND FURNITURE IN ALL AREAS PRIOR TO WORK

COMMENCING IN EACH SPACE.

2X2 ACT

GYPSUM BOARD CEILING

LIGHT FIXTURE SEE

ELECTRICAL DRAWINGS

DIFFUSER SEE

MECHANICAL DRAWINGS

Lab B211

Stair 4 S*2*4

Anatomic

Pathology

Gross Room B215

Cytology B216

Special

Staining B217

Histology

Processing B218

Supervisor B219

Histology B220 Sig. Clos.

B221

Tele.

B222

Dental X Ray

Room B232

TB/ MYC Lab B210B

TB/ MYC. Lab B210C

ISO

B210D

ISO

B210E

Tele.

B210A

Lab B211A

Cold Rm.

B211B

F. Tlt.

B203A

M. Lkrs.

B202

Slide Stor.

B202A

F. Lkrs.

B203

Dir. Off.

B205Off.

B207A

Elec.

B206

Corridor C*2*17

Pathology

Off.

B209

Micro

Reading B208

Break Room B210

HAC

B204

Corridor C*2*5

Stair 3 S*2*3

Oral Surg.

B231A

Stor.

B233BElec.

B233C

T1.1

T1.0

1.06

1.03

T1.1

T1.0

1.04

1.04

T1.1

BOTTOM OF STRUCTURE

TEMPORARY PARTITION

TEMPORARY PARTITION TO BE PROVIDED.

CONSTRUCTION BARRIER TO INCLUDE A NEGATIVE

PRESSURE MONITOR (LAM FLOW LN102). LOCATION

TO BE COORDINATED WITH COR

CONSTRUCTION BARRIER WITH CONSTRUCTION

ENTRANCE DOOR. DOOR SHALL BE LATCHING, SELF

CLOSING AND FITTED WITH CORBIN RUSSWIN LOCK

KEYED TO CONTRACTORS KEY.

T1.0 TEMPORARY PARTITION

TEMPORARY INTERIOR DUST BARRIER TO BE

PROVIDED. PROVIDE NEGATIVE PRESSURE MONITOR

(LAMI FLOW LN 102) LOCATION TO BE COORDINATED

WITH COR.

PROVIDE FULL HEIGHT PLASTIC SHEETING - 10 MIL

REINFORCED PLASTIC - FLAME RETARDANT

PROVIDE SUPPORT POLES, GRIP DISKS AND CLAMPS

NEEDED TO SEAL BARRIER AT CEILING AND FLOOR.

PROVIDE PERSONNEL ACCESS

EXISTING FLOOR DECK

5/8" GYPSUM BOARD ONE

SIDE - SEAL JOINTS TO

MINIMIZE AIR FLOW

BETWEEN SPACES

PLASTIC SHEETING

3-5/8" METAL STUDS

TIGHT TO CEILING

PLASTIC SHEETING

PLASTIC SHEETING

TIGHT TO CEILING

TIGHT TO FLOOR TIGHT TO FLOOR

S

T A T E

OF O

H

IO

R E G

IST ERED A RC

HI

T

E C T

MARK

C.

WISEMAN

13215

Mark C. Wiseman, License #13215 Expiration Date 12/31/2021

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

F

Phase

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

SD SUBMITTAL 08-24-2020

DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020

Project Manager

Cincinnati V.A.

Medical

Center

DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021

KEVIN HENDERSON

CD SUBMITTAL 03-29-2021

BID DOCUMENT SUBMITTAL

/1

/2

:2

:1

P

M .0

PARTIAL FLOOR PLANS AND

DETAILS

VP SS

REPLACE OZONE DEPLETING

EQUIPMENT

1-A101

539--21-205

Cincinnati, Ohio

B01

SCALE | 1/8" = 1'-0"

B012,B014,B015 CEIILING PLAN2.SCALE | 1/8" = 1'-0"

B123 CEILING PLAN4SCALE | 1/8" = 1'-0"

B430 CEILING PLAN6

SCALE | 1" = 100'-0"

BASEMENT CEILING KEY PLAN1SCALE | 1" = 100'-0"

1ST FLOOR CEILING KEYPLAN3SCALE | 1" = 100'-0"

2ND FLOOR CEILING KEYPLAN21

SCALE | 1" = 100'-0"

4TH FLOOR CEILING KEYPLAN5

GENERAL NOTES RCP

CEILING LEGEND

KEYNOTES#

1.03 PROVIDE TEMPORARY PARTITION. CONTRACTOR TO AVOID DUST FROM

ENTERING OCCUPIED B220 SPACE. ACCESS FOR THIS WORK TO BE FROM

ROOM B219.

1.04 TEMPORARY PARTITION

1.06 TEMPORARY PARTITION. WORK IN CORRIDOR TO OCCUR DURING EVENINGS

OR WEEKENDS. COORDINATE WITH COR

2.15 REMOVE EXISTING ACOUSTICAL CEILING SYSTEM. SEE MECHANICAL

DRAWINGS FOR EXTENT OF WORK ABOVE CEILING. PREP FOR NEW CEILING

SYSTEM.

2.16 EXISTING CEILING TO REMAIN

9.07 SUSPENDED ACOUSTIC CEILING TILE / GRID SYSTEM

NORTH

NORTH

NORTH

NORTH

NORTHNORTH

NORTH

NORTH

MATERIAL LEGEND

TYPE FINISH TYPE MANUFACTURER PRODUCT/COLOR DESCRIPTION

CEILING FINISHES

ACT-1 ACCOUSTIC CEILING TILE ARMSTRONG ARMSTRONG FINE FISSURED #1728 COLOR: WHITE WHITE GRID SIZE: 2'-0"X2'-0" X 5/8"

PAINT FINISHES

PNT-1 PAINT BEJAMIN MOORE TBD - TO MATCH EXISTING SATIN GENERAL WALL COLOR

PNT-2 PAINT BEJAMIN MOORE TBD - TO MATCH EXISTING FLAT FINISH FOR CEILING FINISH COLOR

PNT-3 PAINT BEJAMIN MOORE TBD - TO MATCH EXISTING SEMI-GLOSS FOR DOORS AND WINDOW FRAMES

SCALE | 1/8" = 1'-0"

PARTIAL SECOND FLOOR PLAN27

SCALE | 1 1/2" = 1'-0"

WALL TYPES26

DEDUCT ALTERNATE #2

DESCRIPTION DATE

08/19/2021

ARCHITECT/ENGINEER OF RECORDCONSULTANT

Storage

Office

Toilet

Office

Upper Level of Catwalk

Corridor

C-2-1

Stairs

S-2-1

Lift Platform

UP

UP

UP

UP

UP

Storage

Office

Toilet

Office

Upper Level of Catwalk

Corridor

C-2-1

Stairs

S-2-1

Lift Platform

UP

UP

UP

UP

UP

Storage

Office

Toilet

Office

Corridor

C-2-1

Stairs

S-2-1

Lift Platform

UP

UP

UP

UP

S-A102

2.01

PHOTO 2 - ROOF MOUNTED EQUIPMENT PHOTO 1 - BUILDING 8 PARTIAL VIEW

2.04

7.01

2.04

2.162.16

8' - 0"

ACT-1

8' - 0"

ACT-1

9.07 9.07

2.19 2.19

SPECIFIED CANT

EXSITING ROOF DECK

EXISTING ROOF

INSULATION

EXISTING TREMCO

BUILT UP ROOF

MEMBRANE

GRAVEL SURFACING

TWO-PLY STRIPPING

SPECIFIED BASE

FLASHING ADHERED

WITH ADHESIVE

NEW SURFACE MOUNTED

METAL COUNTERFLASHING

S

T A T E

OF O

H

IO

R E G

IST ERED A RC

HI

T

E C T

MARK

C.

WISEMAN

13215

Mark C. Wiseman, License #13215 Expiration Date 12/31/2021

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLEREDU.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

SD SUBMITTAL 08-24-2020

DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020

Project Manager

Cincinnati V.A.

Medical

Center

DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021

KEVIN HENDERSON

CD SUBMITTAL 03-29-2021

BID DOCUMENT SUBMITTAL

/1

/2

:5

:0

P

M .0

SITE PLAN AND BUILDING 8

REMOVAL AND NEW WORK

VP SS

REPLACE OZONE DEPLETING

EQUIPMENT

S-A102

539--21-205

Cincinnati, Ohio

B01

SCALE | 1" = 30'-0"

BUILDING 81

SCALE | 1/8" = 1'-0"

B8 SECOND FLOOR PARTIAL PLAN8

SCALE | 1/8" = 1'-0"

IDHS TRAILER CEILING PLAN11

IDHS TRAILER

BUILDING 8

KEYNOTES#

2.01 REMOVE EXISTING ROOF MOUNTED SYSTEM, SEE MECHANICAL DRAWINGS

2.04 REMOVE PORTION OF EXISTING ROOF TO PREP FOR NEW EQUIPMENT

SUPPORT CURB, SEE MECHANICAL

2.16 EXISTING CEILING TO REMAIN

2.19 REMOVE EXISTING PLASTER CEILING, PREP AS NECESSARY FOR

INSTALLATION OF NEW CEILING.

7.01 PROVIDE NEW EQUIPMENT SUPPORT, SEE MECHANICAL DRAWINGS. THE

EXISTING TREMCO ROOFING MEMBRANE SHOULD BE REMOVED AND

RESTORED AS REQUIRED FOR NEW MECHANICAL CURB INSTALLATION.

ROOF CONTRACTOR SHALL BE A CERTIFIED INSTALLER FOR SUCH

INSTALLATION TO MAINTAIN THE EXISTING ROOF INTEGRITY.

9.07 SUSPENDED ACOUSTIC CEILING TILE / GRID SYSTEM

SCALE | 3/8" = 1'-0"

BUILT UP ROOFING EQUIPMENT CURB6

DESCRIPTION DATE

08/19/2021

M001

INDEX, LEGEND, AND GENERAL

NOTES -

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE OZONE DEPLETING

EQUIPMENT

CINCINNATI, OH

539-21-205

Project Manager

08/19/2021Revisions: Date:

Cincinnati V.A.

Medical Center

SD SUBMITTAL 08-24-2020

DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020

DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021

KEVIN HENDERSON

CD SUBMITTAL 03-29-2021

BID DOCUMENT SUBMITTAL 08-19-2021

INDEX OF DRAWINGS

SHEET DESCRIPTION

BASEMENT FLOOR PLANS - REMOVALS AND NEW WORK1-M100A

1-M100B

BASEMENT AND FIRST FLOOR PLANS - REMOVALS AND NEW WORK

JAC GEH

DUCT THERMOSTAT WITH AVERAGING ELEMENT

DUCT STATIC PRESSURE SENSOR

DUCT HUMIDITY SENSOR

ROOM SENSOR: TEMPERATURE, HUMIDITY

LENGTH IN DUCT WHEN SPACE PERMITS)

REMOTE BULB THERMOSTAT

ROOM CONTROL: THERMOSTAT, HUMIDISTAT

DIFFERENTIAL PRESSURE SWITCH

DUCT TEMPERATURE SENSOR WITH AVERAGING ELEMENT

SMOKE DETECTOR (SEE ELECTRICAL SPECIFICATIONS)

DUCT OR PIPE TEMP. SENSOR

DUCT OR PIPE THERMOSTAT (NOTE 1: PROVIDE 12" MIN.

AFTER FILTER

CURRENT SENSING RELAY

AIR FOIL WHEEL (FAN)

AIR HANDLING UNIT

ANALOG INPUT

AIR PRESSURE DROP

ANALOG OUTPUT

AUTOMATIC TEMPERATURE CONTROLS

BACKWARD INCLINED WHEEL (FAN)

AIR FLOW MEASURING DEVICE

ABOVE FINISHED FLOOR

DIFFERENTIAL OR STATIC PRESSURE TRANSMITTER

CLEAN OUT

CEILING GRILLE

CEILING DIFFUSER

CEILING REGISTER

COLD WATER (POTABLE)

DIGITAL OUTPUT

DIGITAL INPUT

DIRECT DIGITAL CONTROLS

DRY BULB TEMPERATURE, DEG. F

AUTOMATIC CONTROL DAMPER

EXHAUST FAN

ENGINEERING CONTROL CENTER

DOUBLE WIDTH DOUBLE INLET (FAN)

DOOR UNDERCUT BY GENERAL CONTRACTOR

ITEM. (TO BE USED AS AN AID IN COORDINATING THE

LISTED SIZE OF DUCT, PIPE, DEVICE OR EQUIPMENT

APPROXIMATE ELEVATION FROM FLOOR TO CENTER OF

MANUAL VOLUME DAMPER

U/C

VARIOUS TRADES.)

FIRE DAMPER

BUTTERFLY VALVE

CIRCUIT SETTER

BALL VALVE

COMBINATION BALANCING/SHUT-OFF VALVE

MANUAL AIR VENT

AUTOMATIC FLOW CONTROL VALVE

TEST PLUG (PRESSURE/TEMPERATURE)

SAFETY VALVE OR PRESSURE RELIEF

PRESSURE REDUCING VALVE

STRAIGHT-THRU TWO-POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

STRAIGHT-THRU MODULATING CONTROL VALVE

EX.

EF

EXISTING

DWDI

ECC

DI

DO

DB

DDC

D

Db

DECIBELS

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

EQUIPMENT ABBREVIATION (SUPPLY FAN)

SUPPLY FAN NO.3 IN BUILDING NO.1

SHEET NUMBER WHERE DRAWN

DRAWING NUMBER WHERE DRAWN

SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)

RETURN DUCT (UP & DOWN)

VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF

EXHAUST OR RETURN TOP REGISTER OR GRILLE,

EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE,

EXHAUST OR RETURN CEILING REGISTER OR GRILLE

SUPPLY DUCT (UP & DOWN)

INCLINED RISE, IN DIRECTION OF AIR FLOW

NEW DUCT - WIDTH X DEPTH

RECTANGULAR ELBOWS WITH VANES EVEN IF

VANED ELBOW (PROVIDE ALL SQUARE OR

INCLINED DROP, IN DIRECTION OF AIR FLOW

ACOUSTICAL DUCT LINING

STANDARD RADIUS ELBOW

R

10/8

FC

D

SYMBOL IS MISSING)

FLEXIBLE CONNECTION

UP

(WALL TYPE)

(WALL TYPE)

DN

UP

1-01

1-SF3

AIR HANDLING UNIT NUMBER

TERMINAL UNIT DESIGNATION

TYPICAL UNIT NO.

DN

SECTION LETTER

ECCENTRIC REDUCER

DIRECTION OF FLOW

CAPPED OUTLET

SIDE CONNECTION

EXISTING WORK.

ACCESSORIES

INVERTED BUCKET TRAP SET INCLUDING PIPING

POINT OF CONNECTION BETWEEN NEW AND

RISE OR DROP IN PIPE

BOTTOM CONNECTION, 45 DEG. OR 90 DEG.

TOP CONNECTION, 45 DEG. OR 90 DEG.

REDUCER OR INCREASER

DIRECTION OF PIPE PITCH (DOWN)

THERMOMETER

UNIVERSAL (2-BOLT) INVERTED BUCKET TRAP STATION

STRAINER

GATE VALVE

PRESSURE GAGE

CHECK VALVE

GLOBE VALVE

PIPING ACCESSORIES

FLOAT AND THERMOSTATIC TRAP SET INCLUDING

GATE VALVE WITH 3/4" HOSE END ADAPTER

EXISTING PIPE TO BE REMOVED

DRAIN LINE

UNION

D

CW

CR

CO

CG

CD

BIW

ATC

AFW

AI

APD

AO

AHU

AFM

AFF

AF

VENT LINE

HEATING HOT WATER RETURN

HEATING HOT WATER SUPPLY

LOW PRESSURE STEAM CONDENSATE RETURN

LOW PRESSURE STEAM (15 PSIG & BELOW)

MEDIUM PRESSURE STEAM CONDENSATE RETURN

MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)

NUMBER INDICATES STEAM PRESSURE

NUMBER INDICATES STEAM PRESSURE

LPR

V

HWS

HWR

LPS (5)

MPS (30)

MPR

HEATING

SP

S

F

T

H

T

T H

WET BULB TEMPERATURE, DEG. FWb

MAXIMUM

OUTSIDE AIR

PRE-FILTER

PUMPED CONDENSATE

PREHEAT COIL

RELATIVE HUMIDITY

SUPPLY FAN

STEAM HUMIDIFIER

TRANSFER GRILLE

UNIT HEATER

STATIC PRESSURE (INCHES OF WATER)

PRESSURE REDUCING VALVE

PRESSURE DROP (FEET OF WATER)

TOP REGISTER (WALL TYPE)

VARIABLE FREQUENCY DRIVE

STATIC PRESSURE SENSOR

DOOR UNDERCUT BY GENERAL CONTRACTOR

SPS

TR

U/C

VFD

UH

V

TG

VALVE

S.P.

SH

SF

Rh

PD

PF

PH

PRV

MAX

O.A.

NOM

MIN

PC

NOMINAL

MINIMUM

HEATING COIL

HORSEPOWER

FLR.

HC

HP

FLOOR

BLOW UNLESS OTHERWISE NOTED)

CEILING DIFFUSERS (FOUR WAY

CHILLED WATER RETURN

CHILLED WATER SUPPLY

CHS

CHR

AIR CONDITIONING

CONTROL CIRCUIT CONN.

H1 N

ETCHED CLEAR LACQUER

E.C.L.

WHITE BAKED ENAMELW.B.E.

BRAKE HORSEPOWER

BHP

BRITISH THERMAL UNIT

BTU

BRITISH THERMAL UNIT PER HOUR

BTUH

CUBIC FEET PER MINUTE

CFM

DEGREE

DEG

DIAMETER

DIA

DIFFERENTIAL PRESSURE SENSOR

DPS

ENTERING

ENT

F

FAHRENHEIT

FPM

FEET PER MINUTE

FT

FEET

GALLONS PER MINUTE

GPM

HEAD

HD

CHILLED WATER RETURN

CHR

CHILLED WATER SUPPLY

CHS

INCHES

IN

INCHES WATER COLUMN

IN WC

INCHES WATER GAUGE

IN WG

LEAVING AIR TEMPERATURE

LAT

LEAVING

LVG

MBH

1000 BTUH

MERV

MINIMUM EFFICIENCY REPORTING VALUE

NC

NOISE CRITERIA

REVOLUTIONS PER MINUTE

RPM

SMOKE DAMPER (SUPPLY)

SDS

SMOKE DAMPER (RETURN)

SDR

STEAM PRESSURE REDUCING VALVE

SPRV

VOLUME DAMPERVD

HIGH PRESSURE STEAM CONDENSATE RETURN

HIGH PRESSURE STEAM (60 PSIG AND ABOVE)

NUMBER INDICATES STEAM PRESSURE

HPS (125)

HPR

PIPE UP

PIPE DOWN

IN-LINE CENTRIFUGAL FAN

ICF

T

T

T

T

H dP

CS

DP SP

1-MS4

A

H7

9'-6"

MV

MANUAL AIR VENT

ABBREVIATIONS

CONTROLSPIPING SYMBOLS

DRAWING SYMBOLS

DUCTWORK SYMBOLS

GENERAL NOTES

GENERAL

VALVES

ABBREVIATIONS

EXHAUST DUCT (UP & DOWN)

UP DN

PUMPED CONDENSATE RETURNPC

EXPANSION TANK PIPE

ET

FCU

FAN COIL UNIT

PUMP

P

PROPELLER UNIT HEATER

PUH

RETURN FAN

RF

WATER FILTERWF

POWER TYPE ROOF VENTILATOR

RV

POWER TYPE WALL VENTILATORWV

COR

PROPELLER TYPE EXHAUST FANPEF

RETURN AIR

R.A.

SUPPLY AIR

S.A.

SINGLE WIDTH SINGLE INLET (FAN)

SWSI

SPECIFIC GRAVITY

SP. GR.

ACCESS DOOR

AD

FCW

FOWARD CURVED WHEEL (FAN)

FC

FLEXIBLE CONNECTION

ENERGY EFFICIENCY RATIO

EER

EXHAUST AIR

E.A.

CONTRACTING OFFICER'S REPRESENTATIVE

AIR SEPARATOR

AS

ANGLE GLOBE VALVE

PIPE GUIDE

PIPE ANCHOR

ORIFICE UNION

STAINLESS STEEL DUCT

DOMESTIC HOT WATER SUPPLYDHW

DOMESTIC HOT WATER RECIRCULATIONDHWR

COMBINATION AXIAL/BACKWARD CURVED WHEEL

A/BCW

UTILITY SET FANUSF

T

GENERAL

DOMESTIC COLD WATER

W

FLOW METER

PIPE MOUNTED DDC TEMPERATURE SENSOR

TOP GRILLE (WALL TYPE)TG

WATER GAUGEWG

WATTSW

VARIABLE AIR VOLUMEVAV

THERMOSTATTSTAT

TOTAL STATIC PRESSURETSP

SMOKE DETECTOR

SD

SUPPLY AIR TEMPERATURE

SAT

OUTSIDE DIAMETER

OD

N.C.

NORMALLY CLOSED

N.O.

NORMALLY OPEN

MCA

MINIMUM BRANCH CIRCUIT AMPACITY

LEAVING WATER TEMPERATURE

LWT

ENTERING WATER TEMPERATURE

EWT

EXTERNAL STATIC PRESSURE

ESP

DIRECT EXPANSION

DX

ENTERING AIR TEMPERATURE

EAT

1 ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE THE SUSPENDED CEILING.

2 ACCESS PANELS IN NON ACCESSIBLE SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC.

3 FOR TYPICAL STEAM, WATER AND REFRIGERANT PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD DETAILS AND PIPING

SCHEMATICS.

4 PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW BETWEEN HEATING

MEDIUM AND AIR.

5 WHERE DUCTS OR PIPES ARE REMOVED THRU BUILDING ELEMENT THAT IS TO REMAIN, PATCH BUILDING OPENING TO MATCH

EXISTING WHERE OPENING IS NOT RE-USED.

6 ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.

7 ALL CUTTING AND PATCHING REQUIRED FOR THE PROJECT WORK SHALL BE INCLUDED IN THE CONTRACT. REFINISH ANY SURFACE

DISTURBED UNDER THIS WORK TO MATCH EXISTING.

8 WHERE WORK IS REQUIRED ABOVE EXISTING SUSPENDED CEILINGS, CONTRACTOR SHALL CAREFULLY REMOVE SUSPENDED

CEILING COMPONENTS AS REQUIRED TO PERFORM THE SPECIFIED WORK. UPON COMPLETION, REINSTALL CEILING AND

COMPONENTS. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO CEILING COMPONENTS.

9 ALL WALL & FLOOR PENETRATIONS SHALL BE FIRESTOPPED TO RETARD PASSAGE OF FIRE & SMOKE.

10 WHERE EXISTING LAY-IN DEVICE IN SUSPENDED CEILING IS REMOVED AS PART OF THIS PROJECT, PROVIDE NEW ACOUSTIC

CEILING TILE TO FILL EMPTY GRID SPACE. CEILING TILE PATTERN, STYLE, COLOR, ETC. SHALL MATCH ADJACENT TILES.

11 ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE VA. ITEMS NOT DESIRED BY THE VA SHALL BE REMOVED FROM THE

PREMISES AND DISPOSED OF PROPERLY BY THE CONTRACTOR.

12 REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

13 THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL OFFSET WHICH MAY BE NECESSARY

TO INSTALL THE SYSTEMS. COORDINATE WORK IN ADVANCE WITH ALL OTHER TRADES AND REPORT IMMEDIATELY ANY

ANTICIPATED INSTALLATION ISSUES.

14 FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, PIPE AND EQUIPMENT SIZES, SERVICES AND LOCATIONS PRIOR TO

PERFORMING WORK.

15 HEPA FILTERED EXHAUST IS REQUIRED TO MAINTAIN A MINIMUM OF 0.01" W.G. NEGATIVE PRESSURE IN CONSTRUCTION AREAS.

COORDINATE WITH COR.

16 WHERE CONTROL DEVICES ARE REMOVED, PNEUMATIC LINES SHALL BE REMOVED BACK TO ACTIVE MAIN AND CAPPED, AND

CONTROL WIRING AND CONDUIT SHALL BE REMOVED BACK TO SOURCE.

17 ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE

EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PERMANENT PLATFORMS, WITHOUT

THE USE OF PORTABLE LADDERS. EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS

AND STRAINERS, TRANSMITTERS, CONTROL DEVICES.

18 CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS

SHALL BE COORDINATED WITH THE COR.

19 ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, CONTROLS, ETC. SHOWN DASHED SHALL BE REMOVED. THE MAJORITY OF WORK

TO BE REMOVED IS SHOWN. REMOVE ALL INCIDENTAL ABANDONED UTILITY ITEMS THAT MAY NOT BE SHOWN BUT ARE

ASSOCIATED WITH THE REMOVAL WORK.

20 INCLUDE ALL WORK NECESSARY TO ACCOMMODATE PHASING. REFER TO GENERAL REQUIREMENTS SECTION 01 00 00.

21 WHERE EXISTING HVAC UTILITIES IN SERVICE WILL BE DISRUPTED DURING THE CONSTRUCTION OF THIS PROJECT, THIS WORK

SHALL BE PERFORMED ON WEEKENDS OR WEEK NIGHTS, IF REQUIRED BY THE COR. DOWNTIME SHALL BE KEPT TO A MINIMUM, AND SHALL BE COORDINATED AND SCHEDULED WELL IN ADVANCE WITH THE COR.

22 RE-INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED OR REMOVED IN THE PERFORMANCE OF

WORK IN THIS PROJECT, INCLUDING INSULATION REMOVAL FOR ASBESTOS ABATEMENT.

23 ALL WORK MUST BE COORDINATED WITH THE CONTRACTING OFFICER AND COR TO MAINTAIN OPERATION OF THE EXISTING

FACILITY.

24 EXISTING CONDITIONS SHOWN ARE BASED UPON AVAILABLE EXISTING DRAWINGS, AND MAY DIFFER FROM ACTUAL WORK IN PLACE.

THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING THE

EXECUTION OF THE WORK. ANY VARIATION BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT

DOCUMENTS WHICH MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING

OFFICER IN WRITING FOR RESOLUTION BEFORE PROCEEDING WITH THE WORK.

25 ABATEMENT, REMOVAL OR ENCAPSULATION OF EXISTING HAZARDOUS MATERIALS (ASBESTOS, LEAD, ETC.) IS INCLUDED IN THIS

CONSTRUCTION CONTRACT. REFER TO DRAWINGS AND/OR SPECIFICATIONS FOR LOCATION AND QUANTITIES OF ASBESTOS. ANY

ABATEMENT WORK PERFORMED AS PART OF THIS PROJECT SHALL BE COMPLETED PRIOR TO STARTING ANY OTHER PROJECT

WORK.

26 CONTRACTOR SHALL PROVIDE A QUARTERLY REPORT OF QUANTITIES OF REFRIGERANT REMOVED THROUGHOUT THE DURATION

OF THE PROJECT.

DOMESTIC HOT WATER SUPPLY

DHW

DOMESTIC HOT WATER RECIRCULATION

DHWR

FREE STEAM (LOW PRESSURE STEAM)

FS(5)

M

VALVE ON RISE/DROP (LOCATED IN VERTICAL PIPE)

(REFER TO DETAIL FOR ADDITIONAL SPECIALTIES)

SST

CS

PT

SP

AFMS

AIRFLOW MEASURING STATION

CURRENT SWITCH (FAN STATUS INDICATION)

START-STOP RELAY FOR FAN

FAN SPEED CONTROL SIGNAL

PRESSURE TRANSMITTER

TT TEMPERATURE TRANSMITTER

OS ROOM OCCUPANCY SENSOR(S)

DPT DIFFERENTIAL PRESSURE TRANSMITTER

PS PRESSURE SWITCH

DUPLEX PLUME EXHAUST FAN PACKAGE

DPF

CONSTANT VOLUME REHEAT TERMINAL UNIT

CVR

VARIABLE VOLUME REHEAT TERMINAL UNITVVR

SIMPLEX PLUME EXHAUST FANSPF

15-M100

BLDG 15 BASEMENT FLOOR PLANS - REMOVALS AND NEW WORK

1-M104

FOURTH FLOOR PLANS - REMOVALS AND NEW WORK

1-M102

SECOND FLOOR PLANS - REMOVALS AND NEW WORK

SITE PLANS - REMOVALS AND NEW WORKS-M101

64-M101

BLDG 64 SITE PLANS AND FLOOR PLANS - REMOVALS AND NEW WORK

M601

SCHEDULES, CONTROLS AND AUTOMATION

M501

DETAILS

INDEX, LEGEND, AND GENERAL NOTESM001

M502

DETAILS

SUB-BASEMENT FLOOR PLANS - REMOVALS AND NEW WORK1-M1SB

BLDG 8 SECOND FLOOR PLANS - REMOVALS AND NEW WORK8-M102

S-M101

SITE PLANS - REMOVALS AND NEW

WORK

SITE

SCALE: 1/8" = 1'-0"

SITE PLAN - TRAILERS - NEW WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE OZONE DEPLETING

EQUIPMENT

CINCINNATI, OH

539-21-205

Project Manager

08/19/2021Revisions: Date:

Cincinnati V.A.

Medical Center

SD SUBMITTAL 08-24-2020

DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020

DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021

KEVIN HENDERSON

CD SUBMITTAL 03-29-2021

BID DOCUMENT SUBMITTAL 08-19-2021

JAC GEH

SCALE: 1/8" = 1'-0"

SITE PLAN - TRAILERS - REMOVALS

T-CU-1

T-CU-2

T-CU-3

T-CU-4

T-CU-5

T-CU-6

T-CU-7

T-AC-3

T-AC-4

T-AC-5

T-AC-7

T-AC-1

T-AC-2

T-AC-6

CG1-12x12

TYP.

TYP.

4 TYP.

3D

D

TYP.

A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN

ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR

PERFORMANCE OF THIS WORK.

B. CONTRACTOR SHALL PROTECT ALL FURNITURE AND VA OWNED

EQUIPMENT AND SUPPLIES WITHIN WORK AREA WITH PLASTIC

SHEETING.

C. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND

ADDITIONAL GENERAL NOTES.

D. MAINTAIN MANUFACTURER REQUIRED CLEARANCES AROUND NEW

SPLIT SYSTEM INDOOR AND OUTDOOR UNITS.

E. INTEGRATE NEW SPLIT SYSTEMS TO BAS VIA BACNET.

F. MAXIMUM ALLOWABLE DOWNTIME FOR REPLACEMENT OF EACH

TRAILER HVAC UNIT SHALL BE 2 DAYS, AND ONLY 1 UNIT IN A GIVEN

TRAILER SHALL BE OUT OF SERVICE AT ONCE.

G. DUCT RUNOUT SIZE TO DIFFUSERS SHALL MATCH DIFFUSER NECK

SIZE.

GENERAL NOTES

1. REMOVE EXISTING WALL-MOUNTED HVAC UNIT AND ASSOCIATED

CONTROLS, ACCESSORIES,ETC.

2. PROVIDE DUCT PLENUM SAME WIDTH AS INDOOR UNIT INLET AND

OUTLET. PLENUM SHALL BE TALL ENOUGH TO ACCOMMODATE

DUCT TAPS.

3. EXISTING ABOVE CEILING DUCTWORK TO REMAIN.

4. EXISTING AIR DEVICES TO REMAIN.

5. PROVIDE REFRIGERANT PIPING AND ACCESSORIES PER

MANUFACTURER.

6. ALL WORK ASSOCIATED WITH THIS TRAILER SHALL OCCUR DURING

WEEKENDS (I.E. BETWEEN 8PM FRIDAY AND 6AM MONDAY).

7. WORK ASSOCIATED WITH THIS TRAILER MAY OCCUR DURING

NORMAL HOURS, BUT SHALL OCCUR BETWEEN APRIL 1 AND MAY 31

OR BETWEEN SEPTEMBER 1 AND OCTOBER 31. DURING

PERFORMANCE OF WORK, ROOMS WITH ACTIVE CONSTRUCTION

WILL BE VACATED/UNOCCUPIED BY THE VA.

8. REMOVE EXISTING DUCT TO THIS POINT FOR RECONNECTION IN

NEW WORK.

9. EXTEND AND CONNECT NEW CONDENSATE DRAIN PIPING TO

EXISTING DRAINAGE TILE.

10. AFTER REMOVAL OF EXISTING WALL-MOUNTED UNIT, INFILL DUCT

OPENINGS THRU WALL WITH FRAMING AND INSULATION, AND

PROVIDE DOUBLE-WALL INSULATED SHEETMETAL BLANK-OFF

PANEL (MINIMUM R-VALUE 10). COVER EXISTING OPENING IN

SIDING. FASTEN PANEL TO WALL FRAMING, AND ENSURE

WEATHERTIGHT SEAL. PANEL SHALL BE PAINTED TO MATCH COLOR

OF EXISTING SIDING.

11. PROVIDE ANGLE STEEL SUPPORT BRACKET FOR MOUNTING OF

NEW SPLIT SYSTEM OUTDOOR UNIT ON NEW BLANK-OFF PANEL.

MINIMUM HEIGHT TO BOTTOM OF OUTDOOR UNIT SHALL BE 7'-0"

ABOVE GRADE. BRACKET SHALL BE SECURED TO EXISTING WALL

FRAMING.

PLAN NOTES

TYP.

TYP.8

TYP.

TYP.

TYP.

4 TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE OZONE DEPLETING

EQUIPMENT

CINCINNATI, OH

539-21-205

Project Manager

08/19/2021Revisions: Date:

Cincinnati V.A.

Medical Center

SD SUBMITTAL 08-24-2020

DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020

DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021

KEVIN HENDERSON

CD SUBMITTAL 03-29-2021

BID DOCUMENT SUBMITTAL 08-19-2021

1-M1SB

SUB-BASEMENT FLOOR PLANS -

REMOVALS & NEW WORK

GEHJAC

SCALE: 1/4" = 1'-0"

SUB-BASEMENT PLAN - BUILDING 1 - REMOVALS

SCALE: 1/4" = 1'-0"

SUB-BASEMENT PLAN - BUILDING 1 - NEW WORK

UP

UP

UP

UP

UP

Tank Room

SB06

Pipe Shop

SB08

Foreman

SB09

Storage

SB07

Tlt.

SB08A

Areaway

SB10

Elevator Pit

SB05

Elevator Pit

SB04

Storage

SB02

Corridor

C*SB*01

Stair 1

S*SB*1

Elevator Pit

SB03

Crawl

Space

CS*SB*010

Crawl

Space

CS*SB*011

SUB-BASEMENT KEY PLAN

NO SCALE

Pipe Shop

SB08

Foreman

SB09

Tlt.

SB08A

Crawl

Space

CS*SB*010

10"10"

C H

R

C H

S

C H

R

C H

S

12"

C H

S

C H

S

L P

S

LPS(5)

LPR

L P

S

Z

O N

E

L P

R

2.5"

L P

R

D C

W

S A

N

D

Pipe Shop

SB08

Foreman

SB09

Tlt.

SB08A

C H

R

C H

S

C H

R

C H

S

5"5"

10"

10"10"

FCU-SB08

CHS

CHR

1. REMOVE EXISTING PIPING TO THIS POINT AND CAP.

2. REMOVE EXISTING VERTICAL FLOOR-SET WATER-COOLED AC UNIT

AND ASSOCIATED PIPING, SUPPORTS, CONTROLS, ACCESSORIES,

ETC.

3. REFER TO SHEET 1-M100A FOR CONTINUATION.

4. REFER TO SHEET 1-M100B FOR CONTINUATION.

5. ROUTE CONDENSATE PIPE THRU WALL AND SPILL INTO EXISTING

DRAIN TROUGH IN ADJACENT ROOM.

PLAN NOTES

A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN

ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR

PERFORMANCE OF THIS WORK.

B. CONTRACTOR SHALL PROTECT ALL FURNITURE AND VA OWNED

EQUIPMENT AND SUPPLIES WITHIN WORK AREA WITH PLASTIC

SHEETING.

C. DURING THE PERFORMANCE OF THIS WORK, COOLING SHALL NOT

BE DISRUPTED TO ANY AREA OUTSIDE THE CURRENT AREA OF

WORK, DURING NORMAL WORKING HOURS.

D. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND

ADDITIONAL GENERAL NOTES.

GENERAL NOTES

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE OZONE DEPLETING

EQUIPMENT

CINCINNATI, OH

539-21-205

Project Manager

08/19/2021Revisions: Date:

Cincinnati V.A.

Medical Center

SD SUBMITTAL 08-24-2020

DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020

DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021

KEVIN HENDERSON

CD SUBMITTAL 03-29-2021

BID DOCUMENT SUBMITTAL 08-19-2021

1-M100A

BASEMENT FLOOR PLANS -

REMOVALS AND NEW WORK 01

SCALE: 1/4" = 1'-0"

BASEMENT FLOOR PLAN - REMOVALS

JAC GEH

BASEMENT KEY PLAN

NO SCALE

SCALE: 1/4" = 1'-0"

BASEMENT FLOOR PLAN - NEW WORK

UP

UP

DN

UP

UP

UP UP

UP

UP

DN

UP

UP

DN

UP

UP

UP

DN

UP

UP

UP

DN

UP

DN

UPDN

UP

DN

UP

UP

UP

UP

UP

1. REMOVE EXISTING VERTICAL FLOOR-SET WATER-COOLED DUCTED

AC UNIT AND ASSOCIATED DUCTWORK, PIPING, SUPPORTS,

CONTROLS, ACCESSORIES, ETC.

2. REMOVE EXISTING HORIZONTAL ABOVE-CEILING DUCTED WATER

COOLED AC UNIT AND ASSOCIATED DUCTWORK, PIPING,

SUPPORTS, CONTROLS, ACCESSORIES, ETC.

3. REMOVE EXISTING HORIZONTAL ABOVE-CEILING DUCTED

INDUCTION UNIT AND ASSOCIATED DUCTWORK, PIPING, SUPPORTS,

CONTROLS, ACCESSORIES, ETC.

4. REMOVE EXISTING AIR DEVICE AND ASSOCIATED DUCTWORK,

SUPPORTS, ETC.

5. REMOVE EXISTING PIPING TO THIS POINT AND CAP.

6. REMOVE EXISTING DUCTWORK TO THIS POINT AND CAP.

7. ASBESTOS-CONTAINING BROWN CEILING GLUE DOTS IN THIS AREA

SHALL BE REMOVED BY A STATE-LICENSED ASBESTOS ABATEMENT

CONTRACTOR. REFER TO SPECIFICATION SECTION 02 82 11.

8. REMOVE EXISTING PIPING TO THIS POINT FOR RECONNECTION IN

NEW WORK.

9. REMOVE EXISTING DUCTWORK TO THIS POINT FOR RECONNECTION

IN NEW WORK.

10. DURATION OF WORK WITHIN THIS AREA SHALL BE A MAXIMUM OF 7

CALENDAR DAYS. DURING PERFORMANCE OF WORK, AREA SHALL

BE VACATED/UNOCCUPIED BY THE VA.

11. DURATION OF WORK WITHIN THIS AREA SHALL BE A MAXIMUM OF 21

CALENDAR DAYS. DURING PERFORMANCE OF WORK, AREA SHALL

BE VACATED/UNOCCUPIED BY THE VA.

12. REMOVE EXISTING PIPING THRU FLOOR SLAB, AND PATCH SLAB

OPENINGS TO MATCH EXISTING. REFER TO SHEET 1-M1SB FOR

CONTINUATION.

PLAN NOTES

A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN

ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR

PERFORMANCE OF THIS WORK.

B. CONTRACTOR SHALL PROTECT ALL FURNITURE AND VA OWNED

EQUIPMENT AND SUPPLIES WITHIN WORK AREA WITH PLASTIC

SHEETING.

C. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND

ADDITIONAL GENERAL NOTES.

D. ALL WORK WITHIN THE CORRIDORS SHALL OCCUR DURING

WEEKENDS (I.E. BETWEEN 8PM FRIDAY AND 6AM MONDAY).

E. DURING THE PERFORMANCE OF THIS WORK, COOLING SHALL NOT

BE DISRUPTED TO ANY AREA OUTSIDE THE CURRENT AREA OF

WORK, DURING NORMAL WORKING HOURS.

F. DUCT RUNOUT SIZE TO DIFFUSERS SHALL MATCH DIFFUSER NECK

SIZE.

GENERAL NOTES

C&P

B012

Comp. &

Pension

B014

Sig

B008B

Tele.

B008C

Soil. Linen

B016

Library

B015

Library

B017

Elec.

B016A

Engineering

Office

B018

Storage

B017B

Eng. Stor.

B019

A/C

B014A

Storage

B017A

FCU-B014

FCU-B017

FCU-B017B

12"x12"

CD1-10"Ø

CD1-10"Ø

CD1-8"Ø

CG1-12x24

CG1-24x24

CD1-8"Ø

CG1-12x24

CD1-6"Ø

CD1-8"Ø

CG1-12x24

14"x10" x

12"x12"

26"x8"

CHR

CHS

D

16"x8"

SG1-8"X6"

T

T

T

CD2-8"Ø

CD2-6"Ø

CD2-6"Ø

CD2-6"Ø

SG1-12"X6"

205 CFM

D

RG1-12"X12"

615 CFM

C H

S

C H

R

O A

H U

O

H U

D

D

SG1-12"X6"

205 CFM

x

SG1-12"X6"

205 CFM

8"x8"

C&P

B012

Comp. &

Pension

B014

Sig

B008B

Tele.

B008C

Soil. Linen

B016

Library

B015

Library

B017

Elec.

B016A

Engineering

Office

B018

Storage

B017B

Eng. Stor.

B019

A/C

B014A

Storage

B017A

CHR

CHS

FCU

D

FCU

C H

R

C H

S

D

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE OZONE DEPLETING

EQUIPMENT

CINCINNATI, OH

539-21-205

Project Manager

08/19/2021Revisions: Date:

Cincinnati V.A.

Medical Center

SD SUBMITTAL 08-24-2020

DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020

DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021

KEVIN HENDERSON

CD SUBMITTAL 03-29-2021

BID DOCUMENT SUBMITTAL 08-19-2021

1-M100B

BASEMENT AND FIRST FLOOR

PLANS - REMOVALS AND NEW

WORK 01

SCALE: 1/4" = 1'-0"

BASEMENT FLOOR PLAN

JAC GEH

BASEMENT KEY PLAN

NO SCALE

BASEMENT KEY PLAN

NO SCALE

BASEMENT KEY PLAN

NO SCALE

SCALE: 1/4" = 1'-0"

BASEMENT FLOOR PLAN

SCALE: 1/4" = 1'-0"

BASEMENT FLOOR PLAN

SCALE: 1/4" = 1'-0"

BASEMENT FLOOR PLAN

BASEMENT KEY PLAN

NO SCALE

SCALE: 1/4" = 1'-0"

FIRST FLOOR PLAN - NEW WORK

SCALE: 1/4" = 1'-0"

FIRST FLOOR PLAN - REMOVALS

1ST FLOOR KEY PLAN

NO SCALE

UP

UP

DN

UP

UP

UP UP

UP

UP

DN

UP

UP

DN

UP

UP

UP

DN

UP

UP

UP

DN

UP

DN

UPDN

UP

DN

UP

UP

UP

UP

UP

UP

UP

DN

UP

UP

UP UP

UP

UP

DN

UP

UP

DN

UP

UP

UP

DN

UP

UP

UP

DN

UP

DN

UPDN

UP

DN

UP

UP

UP

UP

UP

UP

UP

DN

UP

UP

UP

UP

UP

UP

DN

UP

UP

DN

UP

UP

UP

DN

UP

UP

UP

DN

UP

DN

UPDN

UP

DN

UP

UP

UP

UP

UP

UP

UP

DN

UP

UP

UP UP

UP

UP

DN

UP

UP

DN

UP

UP

UP

DN

UP

UP

UP

DN

UP

DN

UPDN

UP

DN

UP

UP

UP

UP

UP

UP

UP

DN

DN

DN

DN

UP

UP

UP

UP

DN

UP

UP

DN

DN

DN

DN

DN

UP

DN

UP

DN

DN

UP

DN

UP

DN

DN

1. REMOVE EXISTING WATER-COOLED CHILLER AND ASSOCIATED

PIPING, SUPPORTS, CONTROLS, ACCESSORIES, ETC.

2. CONNECT TO EXISTING VALVED SUPPLY AND RETURN PIPE STUBS

AT THIS LOCATION.

3. EXTEND AND CONNECT FACILITY CHILLED WATER PIPING TO

EXISTING CONDENSERS TO SERVE AS PRIMARY CONDENSER

WATER SOURCE, WITH VALVED DOMESTIC WATER CONNECTION AS

BACKUP. REFER TO PIPING DETAIL ON SHEET M502.

4. REMOVE EXISTING HORIZONTAL SUSPENDED DUCTED WATER

COOLED AC UNIT AND ASSOCIATED DUCTWORK, PIPING,

SUPPORTS, CONTROLS, ACCESSORIES, ETC.

5. REMOVE EXISTING DUCT BACK TO THIS POINT FOR RECONNECTION

IN NEW WORK..

6. REMOVE EXISTING DX SPLIT SYSTEM INDOOR UNIT AND

ASSOCIATED DUCTWORK, PIPING, SUPPORTS, CONTROLS,

ACCESSORIES, ETC.

PLAN NOTES

A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN

ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR

PERFORMANCE OF THIS WORK.

B. CONTRACTOR SHALL PROTECT ALL FURNITURE AND VA OWNED

EQUIPMENT AND SUPPLIES WITHIN WORK AREA WITH PLASTIC

SHEETING.

C. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND

ADDITIONAL GENERAL NOTES.

D. ALL WORK WITHIN THE CORRIDORS SHALL OCCUR DURING

WEEKENDS (I.E. BETWEEN 8PM FRIDAY AND 6AM MONDAY).

E. DURING THE PERFORMANCE OF THIS WORK, COOLING SHALL NOT

BE DISRUPTED TO ANY AREA OUTSIDE THE CURRENT AREA OF

WORK, DURING NORMAL WORKING HOURS.

F. DUCT RUNOUT SIZE TO DIFFUSERS SHALL MATCH DIFFUSER NECK

SIZE.

GENERAL NOTES

Ref. Eq.

B020

Hazard

Chem. Stor.

A007B

Mech. Stor.

A013

Ref. Equip.

Rm.

A013A

Mech. Rm

A013B

CHR

CHS

0.75" Ø

Mech.

Room

A005D

Eng. Stor.

B019

Fire Alarm

Control

B019A

FCU-B019

C H

S

C H

R

SG1-12"X12"

180 CFM

RG1-12"X12"

180 CFM

12"x14"12"x14"

T

15 22

RG1-12"X6"

95 CFM

SG1-6"X6"

95 CFM

CHS

CHR

D

Eng. Stor.

B019

Fire Alarm

Control

B019A

UP

Audiology

Clinic

B123

Stair 3

D

Elec.

Audiology

Clinic

B123

Stair 3

FCU-B123

CD1-8"Ø

CG1-12x24

CD1-8"Ø

CHS

CHR

D

0.75" Ø

8"x8"

12"x10"

8"x10" x

T

CD2-8"Ø

D

7. REMOVE EXISTING AIR-COOLED CHILLER ON GRADE AND

ASSOCIATED PIPING, SUPPORTS, CONTROLS, ACCESSORIES, ETC.

8. REMOVE EXISTING DX SPLIT SYSTEM AIR-COOLED CONDENSING

UNIT IN AREA WELL, AND ASSOCIATED PIPING, SUPPORTS,

CONTROLS, ACCESSORIES, ETC.

9. REMOVE EXISTING PIPING TO THIS POINT AND CAP.

10. BALANCE THIS DUCT BRANCH TO CFM INDICATED.

11. REMOVE EXISTING DUCT AND ASSOCIATED ACCESSORIES,

SUPPORTS, ETC.

12. REMOVE EXISTING AIR DEVICE AND ASSOCIATED RUNOUT

DUCTWORK.

13. EXISTING DUCTWORK TO REMAIN.

14. BLACK TAR WRAP/TAPE IN THIS AREA SHALL BE REMOVED BY A

STATE-LICENSED ASBESTOS ABATEMENT CONTRACTOR. REFER TO

SPECIFICATION SECTION 02 82 11.

15. DURATION OF WORK WITHIN THIS AREA SHALL BE A MAXIMUM OF 7

CALENDAR DAYS. DURING PERFORMANCE OF WORK, ROOM SHALL

BE VACATED/UNOCCUPIED BY THE VA.

16. REFER TO ROOM B020 PLAN ON THIS SHEET FOR CONTINUATION.

17. REFER TO ROOM B019 PLAN ON THIS SHEET FOR CONTINUATION.

18. REMOVE EXISTING PIPING BACK TO THIS POINT FOR

RECONNECTION IN NEW WORK.

19. EXISTING PIPING TO REMAIN.

20. REMOVE EXISTING STEAM CONVECTOR AND ASSOCIATED

CONTROLS, ACCESSORIES, ETC.

21. EXISTING CONDENSERS ASSOCIATED WITH CANTEEN WALK-IN

COOLER AND FREEZER TO REMAIN.

22. PROVIDE TEMPORARY COOLING UNIT IN THIS SPACE DURING FCU

REPLACEMENT, TO ENSURE NO DOWNTIME OF SPACE COOLING.

TEMPORARY COOLING UNIT MAY BE AIR-COOLED, WATER-COOLED,

OR CHILLED WATER TYPE. DOOR TO ROOM SHALL REMAIN LOCKED

WHEN UNATTENDED.

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE OZONE DEPLETING

EQUIPMENT

CINCINNATI, OH

539-21-205

Project Manager

08/19/2021Revisions: Date:

Cincinnati V.A.

Medical Center

SD SUBMITTAL 08-24-2020

DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020

DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021

KEVIN HENDERSON

CD SUBMITTAL 03-29-2021

BID DOCUMENT SUBMITTAL 08-19-2021

1-M102

SECOND FLOOR PLANS -

REMOVALS AND NEW WORK

SCALE: 1/4" = 1'-0"

SECOND FLOOR PLAN - REMOVALS

JAC GEH

2ND FLOOR KEY PLAN

NO SCALE

2ND FLOOR KEY PLAN

NO SCALE

SCALE: 1/8" = 1'-0"

SECOND FLOOR PLAN - NEW WORK

SCALE: 1/4" = 1'-0"

SECOND FLOOR PLAN - REMOVALS

2ND FLOOR KEY PLAN

NO SCALE

UP

DN

DN

DN

DN

UP

DN

UP

UP

DN UP DN

DN

UP

UP

DN

UP

UP

A/C Shaft

A/C Shaft

A/C Shaft

UP

DN

DN

DN

DN

UP

DN

UP

UP

DN UP DN

DN UP

UP

DN

UP

UP

A/C Shaft

A/C Shaft

A/C Shaft

UP

DN

DN

DN

DN

UP

DN

UP

UP

DN UP DN

DN

UP

UP

DN

UP

UP

A/C Shaft

A/C Shaft

A/C Shaft

1. REMOVE EXISTING VERTICAL FLOOR-SET WATER-COOLED AC UNIT

AND ASSOCIATED DUCTWORK, PIPING, SUPPORTS, CONTROLS,

ACCESSORIES, ETC.

2. EXISTING DUAL DUCT TERMINAL UNIT AND ASSOCIATED

DUCTWORK, SUPPORTS, CONTROLS, ACCESSORIES, ETC. TO

REMAIN.

3. REMOVE EXISTING AIR DEVICE AND ASSOCIATED RUNOUT

DUCTWORK.

4. PROVIDE VALVED AND CAPPED PIPE STUBS FOR FUTURE

CONTINUATION.

5. REMOVE EXISTING DUCT TO THIS POINT FOR RECONNECTION IN

NEW WORK.

6. REMOVE EXISTING DUCT TO THIS POINT, CAP AND SEAL AIRTIGHT.

7. EXISTING DUCT AND ASSOCIATED SUPPORTS, ACCESSORIES, ETC.

TO REMAIN.

8. ASBESTOS-CONTAINING BROWN MASTIC ON DUCT WORK IN THIS

AREA SHALL BE REMOVED BY A STATE-LICENSED ASBESTOS

ABATEMENT CONTRACTOR. REFER TO SPECIFICATION SECTION 02

82 11.

9. WORK WITHIN THIS AREA SHALL BE DELETED FROM THE SCOPE

OF THE PROJECT UNDER BID ITEM #2 (DEDUCT ALTERNATE #1).

10. EXISTING FLOOR DRAIN TO REMAIN.

11. REMOVE EXISTING WALL MOUNTED THERMOSTAT ASSOCIATED

WITH WATER-COOLED AC UNIT.

12. ROUTE CONDENSATE DRAIN PIPING DOWN INTO EXISTING FLOOR

DRAIN.

13. DURATION OF WORK WITHIN THIS AREA SHALL BE A MAXIMUM OF

7 CALENDAR DAYS. DURING PERFORMANCE OF WORK, AREA

SHALL BE VACATED/UNOCCUPIED BY THE VA.

14. REFER TO ARCHITECTURAL DRAWINGS FOR TEMPORARY

PARTITIONS ASSOCIATED WITH WORK IN THIS AREA.

15. WORK WITHIN THIS AREA SHALL BE DELETED FROM THE SCOPE

OF THE PROJECT UNDER BID ITEM #3 (DEDUCT ALTERNATE #2).

16. REMOVE EXISTING DOMESTIC COLD WATER PIPING TO THIS POINT

AND CAP.

17. EXISTING AIR DEVICE AND ASSOCIATED RUNOUT DUCTWORK TO

REMAIN.

PLAN NOTES

A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN

ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR

PERFORMANCE OF THIS WORK.

B. CONTRACTOR SHALL PROTECT ALL FURNITURE AND VA OWNED

EQUIPMENT AND SUPPLIES WITHIN WORK AREA WITH PLASTIC

SHEETING.

C. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND

ADDITIONAL GENERAL NOTES.

D. ALL WORK WITHIN THE CORRIDORS SHALL OCCUR DURING

WEEKENDS (I.E. BETWEEN 8PM FRIDAY AND 6AM MONDAY).

E. DURING THE PERFORMANCE OF THIS WORK, COOLING SHALL NOT

BE DISRUPTED TO ANY AREA OUTSIDE THE CURRENT AREA OF

WORK, DURING NORMAL WORKING HOURS.

F. DUCT RUNOUT SIZE TO DIFFUSERS SHALL MATCH DIFFUSER NECK

SIZE.

GENERAL NOTES

Lab

B211

Lab

B211A

Cold Rm.

B211B

T

DN

UP

UP

DN

Lab

B211

Stair 4

S*2*4

Ana

Path

Gross

Room

B215

Office

B216

Cytology

B217

Hist

Proces/

Special

Staining?

B218

Supervisor

B219

Tissue Lab

B220

Sig. Clos.

B221

Tele.

B222

Off.

B223

TB/ MYC

Lab

B210B

TB/ MYC.

Lab

B210C

ISO

B210D

ISO

B210E

Tele.

B210A

Lab

B211A

Cold Rm.

B211B

F. Tlt.

B203A

M. Lkrs.

B202

Slide Stor.

B202A

F. Lkrs.

B203

Dir. Off.

B205Off.B207A

Elec.

B206

Corr

C*2*17

Off.

Off.

B207C

Pathology

Off.

B209

Micro

Reading

B208

Break

Room

B210

HAC

B204

Corridor

C*2*5

Stair 3

S*2*3

Waiting

Rm.

B224A

FCU-B220

CD3

FCU-B211

CG1-24x24

CD1-12"Ø

CD1-12"Ø

CHS

CHR

0.75"

0.75"

14"x14"

28"x8"

T

T

2.5"

CHR

CHS

35"x11"

35"x10"

CD1-6"Ø

2.5"

UP

DN

Supervisor

B219

Tissue Lab

B220

HAC

B204

Stair 3

S*2*3

17 17

T

35"x11"

35"x10"

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE OZONE DEPLETING

EQUIPMENT

CINCINNATI, OH

539-21-205

Project Manager

08/19/2021Revisions: Date:

Cincinnati V.A.

Medical Center

SD SUBMITTAL 08-24-2020

DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020

DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021

KEVIN HENDERSON

CD SUBMITTAL 03-29-2021

BID DOCUMENT SUBMITTAL 08-19-2021

1-M104

FOURTH FLOOR PLANS -

REMOVALS AND NEW WORK 01

SCALE: 1/4" = 1'-0"

FOURTH FLOOR PLAN - REMOVALS

JAC GEH

SCALE: 1/4" = 1'-0"

FOURTH FLOOR PLAN - NEW WORK

FOURTH FLOOR KEY PLAN

NO SCALE

DN

DN

UP

DN

UP

DN

UP

DN

UP

UP

DN

A/C Shaft

A/C Shaft

A/C Shaft

UP

DN

Stor.

A420

IRM Office

A427

Stair 2

S*4*2

Comp.

Training

A430

Comp.

Specialist Off.

A431

Trash

Chute

A435

Stor.

A436A

Corridor

C*4*2

A/C Shaft

T

T

PLAN NOTES

A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN

ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR

PERFORMANCE OF THIS WORK.

B. CONTRACTOR SHALL PROTECT ALL FURNITURE AND VA OWNED

EQUIPMENT AND SUPPLIES WITHIN WORK AREA WITH PLASTIC

SHEETING.

C. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND

ADDITIONAL GENERAL NOTES.

D. ALL WORK WITHIN THE CORRIDORS SHALL OCCUR DURING

WEEKENDS (I.E. BETWEEN 8PM FRIDAY AND 6AM MONDAY).

E. DURING THE PERFORMANCE OF THIS WORK, COOLING SHALL NOT

BE DISRUPTED TO ANY AREA OUTSIDE THE CURRENT AREA OF

WORK, DURING NORMAL WORKING HOURS.

F. DUCT RUNOUT SIZE TO DIFFUSERS SHALL MATCH DIFFUSER NECK

SIZE.

GENERAL NOTES

1. REMOVE EXISTING DX SPLIT SYSTEM AIR-COOLED CONDENSING

UNIT ON ROOF, AND ASSOCIATED PIPING, SUPPORTS, CONTROLS,

ACCESSORIES, ETC.

2. REMOVE EXISTING DX SPLIT SYSTEM INDOOR UNIT AND

ASSOCIATED DUCTWORK, PIPING, SUPPORTS, CONTROLS,

ACCESSORIES, ETC.

3. REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED DUCTWORK,

PIPING, ACCESSORIES, SUPPORTS, CONTROLS, ETC.

4. REMOVE EXISTING PIPING TO THIS POINT FOR RECONNECTION IN

NEW WORK.

5. DURATION OF WORK WITHIN THIS AREA SHALL BE A MAXIMUM OF 21

CALENDAR DAYS. DURING PERFORMANCE OF WORK, AREA WILL BE

VACATED/UNOCCUPIED BY THE VA.

6. REMOVE EXISTING REFRIGERANT PIPING AND ASSOCIATED

SPECIALTIES, SUPPORTS, ETC. APPROXIMATE ROUTE SHOWN.

UP

DN

Stor.

A420

IRM Office

A427

Stair 2

S*4*2

Comp.

Training

A430

Comp.

Specialist Off.

A431

Trash

Chute

A435

Stor.

A436A

Corridor

C*4*2

A/C Shaft

FCU-A431

CD1-10"Ø

CD1-10"Ø

FCU-A430

CD1-12"Ø

CD1-12"Ø

CG1-24x24

14"x14

CD2-8"Ø

CD2-8"Ø

CG1-24x24

T

T

CHS

CHR

D

14"x12"

14"x12"

C H

R

C H

S

D

D

CHR

CHS

OA (AHU-3)

14"x14

8-M102

BLDG 8 SECOND FLOOR PLANS -

REMOVALS AND NEW WORK

SITE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE OZONE DEPLETING

EQUIPMENT

CINCINNATI, OH

539-21-205

Project Manager

08/19/2021Revisions: Date:

Cincinnati V.A.

Medical Center

SD SUBMITTAL 08-24-2020

DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020

DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021

KEVIN HENDERSON

CD SUBMITTAL 03-29-2021

BID DOCUMENT SUBMITTAL 08-19-2021

JAC GEH

SCALE: 1/4" = 1'-0"

BUILDING 8 - SECOND FLOOR PLAN - NEW WORK

UP

UP

UP

UP

UP

Storage

Office

Toilet

Office

Upper Level of Catwalk

Corridor

C-2-1

Stairs

S-2-1

Lift Platform

BUILDING 8 SECOND FLOOR KEY PLAN

NO SCALE

SCALE: 1/4" = 1'-0"

BUILDING 8 SECOND FLOOR PLAN - REMOVALS

A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN

ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR

PERFORMANCE OF THIS WORK.

B. CONTRACTOR SHALL PROTECT ALL FURNITURE AND VA OWNED

EQUIPMENT AND SUPPLIES WITHIN WORK AREA WITH PLASTIC

SHEETING.

C. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND

ADDITIONAL GENERAL NOTES.

GENERAL NOTES

1. REMOVE EXISTING ROOF-MOUNTED SPLIT SYSTEM CONDENSING

UNIT AND ASSOCIATED PIPING, ACCESSORIES, SUPPORTS, ETC.

2. CONNECT NEW INDOOR UNIT TO EXISTING SUPPLY & RETURN

DUCTWORK AND CONDENSATE DRAIN PIPING. INTEGRATE NEW

UNIT TO EXISTING BUILDING AUTOMATION SYSTEM VIA BACNET.

3. EXISTING DUCTWORK TO REMAIN.

4. EXISTING AIR DEVICES TO REMAIN.

5. REMOVE EXISTING SPLIT SYSTEM INDOOR UNIT AND ASSOCIATED

ACCESSORIES, ETC.

6. PROVIDE REFRIGERANT PIPING AND ACCESSORIES PER

MANUFACTURER - APPROXIMATE ROUTE SHOWN.

7. PROVIDE EQUIPMENT SUPPORT ROOF CURBS - REFER TO DETAIL

ON SHEET M502 AND ARCHITECTURAL DRAWINGS.

8. COORDINATE SCHEDULING OF THIS WORK WITH VA ENGINEERING

MAINTENANCE SUPERVISOR.

PLAN NOTES

UP

UP

UP

Storage

Office

Toilet

Office

Corridor

C-2-1

Lift Platform

T

UP

UP

UP

Storage

Office

Toilet

Office

Corridor

C-2-1

Lift Platform

8-AC-204

8-CU-207

T

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE OZONE DEPLETING

EQUIPMENT

CINCINNATI, OH

539-21-205

Project Manager

08/19/2021Revisions: Date:

Cincinnati V.A.

Medical Center

SD SUBMITTAL 08-24-2020

DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020

DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021

KEVIN HENDERSON

CD SUBMITTAL 03-29-2021

BID DOCUMENT SUBMITTAL 08-19-2021

15-M100

BLDG 15 BASEMENT FLOOR PLANS -

REMOVALS & NEW WORK

SCALE: 1/8" = 1'-0"

BASEMENT PLAN - BUILDING 15 - REMOVALS

GEHJAC

SCALE: 1/4" = 1'-0"

BASEMENT PLAN - BUILDING 15 - NEW WORK

SCALE: 1/4" = 1'-0"

BASEMENT PLAN - BUILDING 15 - NEW WORK

UP

E-EF

E-EF

E-PRV 1

E-PRV 2

E-6" CHS

E-6" CHR

EXIST PIPING UP TO AHU-31

E-CHLR

Mech. Room

B15

Stor.

B01A

Transformer

Vault

B02

Stor.

B05A

A/c Shop Off.

B05

Glass Wash

& Still

B04

Lobby

C*B*08

Elev. Equip.

Room

B03

Stair #1

S*B*1

Research

Stor.

B04A

Air Comp

B06

Corridor

B08A

E-HEATING

WATER PUMPS

EXIST-HEATING

WATER HEAT

EXCHANGER

EXIST-HEATING

WATER HEAT

EXCHANGER

Glass Wash

& Still

B04

Lobby

C*B*08

Air Comp

15-FCU-B04

24"x12" 14"x12"

SG1-18"x10"

335 CFM

SG1-18"x10"

335 CFM

RG1-24x12"

670 CFM

D

1. REMOVE EXISTING WATER-COOLED CHILLER AND ASSOCIATED

SUPPORTS, ACCESSORIES, ETC.

2. REMOVE EXISTING VERTICAL FLOOR-SET WATER-COOLED AC UNIT

AND ASSOCIATED PIPING, SUPPORTS, CONTROLS, ACCESSORIES,

ETC.

3. DURATION OF WORK WITHIN THIS AREA SHALL BE A MAXIMUM OF 7

CALENDAR DAYS.

4. REMOVE EXISTING PIPING TO THIS POINT FOR RECONNECTION IN

NEW WORK. REFER TO CHILLER PIPING DETAILS ON SHEET M502.

5. REMOVE PIPING TO THIS POINT AND CAP.

6. PROVIDE 4" HIGH CONCRETE PAD FOR NEW CHILLER - REFER TO

DETAIL ON SHEET M501.

7. ROUTE CONDENSATE DRAIN PIPING DOWN TIGHT TO WALL AND

SPILL INTO EXISTING OPEN DRAIN.

PLAN NOTES

A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN

ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR

PERFORMANCE OF THIS WORK.

B. CONTRACTOR SHALL PROTECT ALL FURNITURE AND VA OWNED

EQUIPMENT AND SUPPLIES WITHIN WORK AREA WITH PLASTIC

SHEETING.

C. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND

ADDITIONAL GENERAL NOTES.

D. DURING THE PERFORMANCE OF THIS WORK, COOLING SHALL NOT

BE DISRUPTED TO ANY AREA OUTSIDE THE CURRENT AREA OF

WORK, DURING NORMAL WORKING HOURS.

E. DUCT RUNOUT SIZE TO DIFFUSERS SHALL MATCH DIFFUSER NECK

SIZE.

GENERAL NOTES

Stor.

B01A

15-CHLR-1

P-1

C H

S

C H

R

P-2

C H

S

C H

R

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE OZONE DEPLETING

EQUIPMENT

CINCINNATI, OH

539-21-205

Project Manager

08/19/2021Revisions: Date:

Cincinnati V.A.

Medical Center

SD SUBMITTAL 08-24-2020

DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020

DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021

KEVIN HENDERSON

CD SUBMITTAL 03-29-2021

BID DOCUMENT SUBMITTAL 08-19-2021

64-M101

BLDG 64 SITE PLANS AND FLOOR

PLANS - REMOVALS AND NEW WORK

JAC GEH

KEY PLAN

NO SCALE

AREA OF WORK

AREA OF…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .