ATTACHMENT 1 Drawings.pdf
PDF 24 MB Posted
- Solicitation number
- 36C25022B0004
About this file
This document provides details for a federal contract solicitation to replace ozone depleting equipment at the Cincinnati VA Medical Center. Solicitation number 36C25022B0004 seeks general contracting, electrical, controls, and mechanical services to replace various HVAC units containing R-22 or other refrigerants throughout the hospital. The work requires planning for phasing construction to minimize disruption at the occupied medical facility. The period of performance is 360 days after notice to proceed. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. Interested parties should review the attachment for additional technical specifications.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
T A T E
OF O
H
IO
R E G
IST ERED A RC
HI
T
E C T
MARK
C.
WISEMAN
13215
Mark C. Wiseman, License #13215 Expiration Date 12/31/2021
P ro je ct
N o.
F
E
D
C
B
A
Department of Veterans Affairs Medical Center
LEVIN PORTER ASSOCIATES
ARCHITECTURE PLANNING INTERIOR DESIGN
3011 NEWMARK DRIVE
MIAMISBURG, OH 45342
937.224.1931 P
937.224.3091 F
STAN ENGINEERING
MECHANICAL ELECTRICAL
300 WEST MONUMENT AVE, SUITE 200
DAYTON, OH 45402
937.224.0861
1 2 3 4 5 6 7 8 9 10
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
F
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
CONSTRUCTION
DOCUMENTS
SD SUBMITTAL 08-24-2020
DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020
Project Manager
Cincinnati V.A.
Medical
Center
DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021
KEVIN HENDERSON
CD SUBMITTAL 03-29-2021
BID DOCUMENT SUBMITTAL
/1
/2
:2
:4
P
M
3200 Vine Street Cincinnati, OH 45220
.0
TITLE SHEET
VP SS
REPLACE OZONE DEPLETING
EQUIPMENT
G001
539--21-205
Cincinnati, Ohio
B01
REPLACE OZONE DEPLETING EQUIPMENT
VICINITY MAP
CINCINNATY CAMPUS
VICINITY MAP
FT THOMAS CAMPUS
CINCINNATI CAMPUS
SCALE: N.T.S.
FT. THOMAS CAMPUS
SCALE: N.T.S.
Sheet Number Sheet Name
1. GENERAL:
G001 TITLE SHEET
10. ARCHITECTURE
1-A101 PARTIAL FLOOR PLANS AND DETAILS
S-A102 SITE PLAN AND BUILDING 8 REMOVAL AND NEW WORK
16. MECHANICAL
M001 INDEX, LEGEND, AND GENERAL NOTES
S-M101 SITE PLANS - REMOVALS AND NEW WORK
1-M1SB SUB-BASEMENT FLOOR PLANS - REMOVALS AND NEW WORK
1-M100A BASEMENT FLOOR PLANS - REMOVALS AND NEW WORK
1-M100B BASEMENT AND FIRST FLOOR PLANS - REMOVALS AND NEW WORK
1-M102 SECOND FLOOR PLANS - REMOVALS AND NEW WORK
1-M104 FOURTH FLOOR PLANS - REMOVALS AND NEW WORK
8-M102 BLDG 8 SECOND FLOOR PLANS - REMOVALS AND NEW WORK
15-M100 BLDG 15 BASEMENT FLOOR PLANS - REMOVALS AND NEW WORK
64-M101 BLDG 64 SITE PLANS AND FLOOR PLANS - REMOVALS AND NEW WORK
M501 DETAILS
M502 DETAILS
M601 SCHEDULES, CONTROLS AND AUTOMATION
26.1 ELECTRICAL
E001 INDEX OF DRAWINGS, LEGEND AND GENERAL NOTES
S-E101 SITE PLAN AND BLDG 8 SECOND FLOOR PLAN - REMOVALS AND NEW WORK
1-E100A PARTIAL SUB BASEMENT & BASEMENT FLOOR PLANS - REMOVALS AND NEW WORK
1-E100B PARTIAL BASEMENT FLOOR PLANS - REMOVALS AND NEW WORK
1-E101 PARTIAL FIRST FLOOR PLAN - REMOVALS AND NEW WORK
1-E102 PARTIAL SECOND FLOOR PLAN - REMOVALS AND NEW WORK
1-E104 PARTIAL FOURTH FLOOR PLAN - REMOVALS AND NEW WORK
15-E100 BLDG 15 BASEMENT FLOOR PLAN - REMOVALS & NEW WORK
64-E101 BLDG 64 SITE PLAN AND PARTIAL FIRST FLOOR PLAN - REMOVALS AND NEW WORK
INDEX OF DRAWINGS
GENERAL PROJECT NOTES:
A. PATCH ALL AREAS TO MATCH ADJACENT/EXISTING FINISHES. EACH CONTRACTOR IS RESPONSIBLE FOR ANY AREAS PREVIOUSLY UNEXPOSED THAT WILL BE EXPOSED BY NEW WORK OR DEMOLITION, MATCH EXISTING FINISHES.
B. ALL WORK WILL COMPLY WITH ALL APPLICABLE NATIONAL, STATE OR LOCAL CODES, ORDINANCES AND REGULATIONS INCLUDING THE ARCHITECTUAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS) FOR FEDERAL FACILITIES
AND THE VA BARRIER FREE DESIGN STANDARD
C. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE COR OF ANY WORK THAT MIGHT REQUIRE INTERRUPTION OF UTILITY SERVICES, CAUSE NOISE, OR CREATE VIBRATION PRIOR TO COMMENCEMENT OF THIS WORK..
CONTRACTOR TO PROVIDE INFORMATION A MINIMUM OF FOUR(4) WEEKS FOR VA COR APPROVAL AND COORDINATION.
D. CONTRACTOR TO PROTECT ALL FURNITURE AND EQUIPMENT IN ALL AREAS PRIOR TO WORK COMMENCING IN EACH SPACE.
E. INTERIOR CONCRETE SLABS AND PATCHES, USE MIN. 15 MIL REINFORCED POLYETHYLENE VAPOR BARRIER UNDER THE CONCRETE SLAB. SMOOTH TROWEL FLUSH WITH EXISTING SLAB ELEVATION. SEAL VAPOR BARRIER WATER
TIGHT.
F. CONTRACTOR'S BID SHALL INCLUDE THE GREATEST QUANTITY AND QUALITY OF ALL ITEMS AND ASSEMBLIES FOR A COMPLETE AND FULLY OPERATIONAL PROJECT IN ACCORDANCE WITH OWNERS, ARCHITECTS, AND GOVERNING
AUTHORITY REQUIREMENTS.
G. UNLESS SPECIFICALLY NOTED OTHERWISE ON THE DRAWINGS, CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION, REMOVING, AND REPLACEMENT WORK SPECIFIED AND AS REQUIRED TO ACCOMMODATE THE REQUIRED
IMPROVEMENTS, AND SHALL ALSO BE RESPONSIBLE FOR ANY AND ALL NECESSARY REPLACEMENT, REPAIRING, AND PATCHING TO BE DONE BY WORKMEN SKILLED AND REGULARLY EMPLOYED IN THE TRADES INVOLVED -
FINISHES SHALL MATCH EXISTING AND/OR ADJACENT SURFACES AND AS SPECIFIED.
H. CONTRACTOR SHALL PROPERLY PLAN AND EXECUTE WORK RELATIVE TO AND IN CONSIDERATION OF WORK TO BE PERFORMED BY OTHERS IN ORDER TO MITIGATE ALL IMPACTING ISSUES AND CONFLICTS. NO EXTRA COSTS FOR
THE LACK OF PROPER PLANNING AND EXECUTION WILL BE PERMITTED.
I. CONTRACTOR SHALL VERIFY AS-BUILT CONDITIONS FOR ANY MATERIAL DIFFERENCE PRIOR TO PERFORMING ANY WORK AND SHALL NOTIFY ARCHITECT/COR MANAGER OF ANY DISCREPANCIES.
J. COORDINATE FINAL PLACEMENT OF ALL WALL MOUNTED EQUIPMENT WITH SIGNAGE.
K. THE GENERAL CONTRACTOR SHALL COMPLY WITH ALL PROVISIONS OF THE SPECIFICATIONS INCLUDING ALL GENERAL CONDITIONS, SUPPLEMENTARY GENERAL CONDITIONS, MATERIAL AND CONSTRUCTION PROVISIONS WHICH
APPLY TO MATERIALS OR CONSTRUCTION METHODS REQUIRED.
L. DO NOT PAINT ANY SEALANTS OR CAULKING WHICH ARE SUBJECT TO MOVEMENT. CONTROL JOINTS SHALL BE CAULKED AFTER PAINTING AND SPECIAL COATING APPLICATIONS. PROVIDE CAULKING OR SEALANTS WHICH MATCH
ADJACENT FINISHED COLORS UNLESS NOTED OTHERWISE.
M. ALL EXISTING CONSTRUCTION TO REMAIN THAT ARE DAMAGED OR DISTURBED DURING CONSTRUCTION SHALL BE PATCHED OR REPAIRED TO MATCH EXISTING ADJACENT CONSTRUCTION.
N. ALL INTERIOR WOOD BLOCKING, MISC. FRAMING, PANELS, ETC. THAT ARE TO BE USED SHALL BE FIRE-RETARDANT TREATED. ALL EXTERIOR WOOD BLOCKING SHALL BE PRESSURE TREATED.
O. ALL SUSPENDED ITEMS SHALL BE ATTACHED DIRECTLY TO STRUCTURE AND NOT ANCHORED TO ANY NON-STRUCTURAL ITEM, COMPONENT OR SYSTEM.
P. ALL NEW PENETRATIONS IN ALL EXISTING, MODIFIED OR NEW CORRIDOR WALLS, SMOKE AND FIRE PARTITIONS, AND FLOOR SLABS SHALL BE SEALED WITH FIRE RESISTANT CAULKING OR SEALANT THAT PREVENTS THE PASSAGE
OF SMOKE AND/OR FIRE ALL COMPLYING TO THE LIFE SAFETY AND FIRE CODE AND MEETING EXISTING CONDITIONS.
Q. NEW CORE DRILLING THROUGH EXISTING STRUCTURAL ELEMENTS REQUIRED BY CONSTRUCTION SHALL BE COORDINATED BY THE CONTRACTOR TO AVOID DRILLING THROUGH OR INTO ANY STRUCTURAL ELEMENTS.
R. NEW CONSTRUCTION INSTALLED SHALL BE COORDINATED BY THE CONTRACTOR FOR PROPER FIT, DIMENSIONS AND ACCESS TO THE BUILDING PRIOR TO BEGINNING CONSTRUCTION AND DELIVERY OF COMPONENTS TO THE SITE.
DESCRIPTION DATE
08-19-2021
08/19/2021
C&P B012
Comp. &
Pension B014
Library B015
Soil. Linen B016
Library B017
8' - 0"
ACT-1
8' - 2"
ACT-1
8' - 2"
ACT-1
9.07
9.07
9.07
2.16
2.15
9.07
2.15
2.15
Audology
Clinic B123
8' - 0"
ACT-1
9.07
2.15
Comp.
Training B430
8' - 3"
ACT-1
9.07
2.16
2.15
1-A101
2.
Sim
1-A101
1-A101
Sim
1-A101
A. A. PROVIDE ACOUSTICAL SEALANT AT ALL SOFFIT LOCATIONS THAT EXTEND TO DECK.
B. ALL CEILING TILE TO BE CENTERED IN ROOM UNLESS NOTED OTHERWISE.
C. ALL CEILING TILE TO BE 6" OR GREATER IN SIZE.
D. REFER TO ADDITIONAL TRADES FOR ITEMS NOT SHOWN ON THESE DRAWINGS.
E. ALL PLASTER AND GYP. CEILINGS TO BE FINISHED AND PAINTED U.N.O.
F. PROTECT ALL EXISTING EQUIPMENT AND FURNITURE IN ALL AREAS PRIOR TO WORK
COMMENCING IN EACH SPACE.
2X2 ACT
GYPSUM BOARD CEILING
LIGHT FIXTURE SEE
ELECTRICAL DRAWINGS
DIFFUSER SEE
MECHANICAL DRAWINGS
Lab B211
Stair 4 S*2*4
Anatomic
Pathology
Gross Room B215
Cytology B216
Special
Staining B217
Histology
Processing B218
Supervisor B219
Histology B220 Sig. Clos.
B221
Tele.
B222
Dental X Ray
Room B232
TB/ MYC Lab B210B
TB/ MYC. Lab B210C
ISO
B210D
ISO
B210E
Tele.
B210A
Lab B211A
Cold Rm.
B211B
F. Tlt.
B203A
M. Lkrs.
B202
Slide Stor.
B202A
F. Lkrs.
B203
Dir. Off.
B205Off.
B207A
Elec.
B206
Corridor C*2*17
Pathology
Off.
B209
Micro
Reading B208
Break Room B210
HAC
B204
Corridor C*2*5
Stair 3 S*2*3
Oral Surg.
B231A
Stor.
B233BElec.
B233C
T1.1
T1.0
1.06
1.03
T1.1
T1.0
1.04
1.04
T1.1
BOTTOM OF STRUCTURE
TEMPORARY PARTITION
TEMPORARY PARTITION TO BE PROVIDED.
CONSTRUCTION BARRIER TO INCLUDE A NEGATIVE
PRESSURE MONITOR (LAM FLOW LN102). LOCATION
TO BE COORDINATED WITH COR
CONSTRUCTION BARRIER WITH CONSTRUCTION
ENTRANCE DOOR. DOOR SHALL BE LATCHING, SELF
CLOSING AND FITTED WITH CORBIN RUSSWIN LOCK
KEYED TO CONTRACTORS KEY.
T1.0 TEMPORARY PARTITION
TEMPORARY INTERIOR DUST BARRIER TO BE
PROVIDED. PROVIDE NEGATIVE PRESSURE MONITOR
(LAMI FLOW LN 102) LOCATION TO BE COORDINATED
WITH COR.
PROVIDE FULL HEIGHT PLASTIC SHEETING - 10 MIL
REINFORCED PLASTIC - FLAME RETARDANT
PROVIDE SUPPORT POLES, GRIP DISKS AND CLAMPS
NEEDED TO SEAL BARRIER AT CEILING AND FLOOR.
PROVIDE PERSONNEL ACCESS
EXISTING FLOOR DECK
5/8" GYPSUM BOARD ONE
SIDE - SEAL JOINTS TO
MINIMIZE AIR FLOW
BETWEEN SPACES
PLASTIC SHEETING
3-5/8" METAL STUDS
TIGHT TO CEILING
PLASTIC SHEETING
PLASTIC SHEETING
TIGHT TO CEILING
TIGHT TO FLOOR TIGHT TO FLOOR
S
T A T E
OF O
H
IO
R E G
IST ERED A RC
HI
T
E C T
MARK
C.
WISEMAN
13215
Mark C. Wiseman, License #13215 Expiration Date 12/31/2021
P ro je ct
N o.
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
F
Phase
32 4 5 6 7 8 9 10
CONSTRUCTION
DOCUMENTS
SD SUBMITTAL 08-24-2020
DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020
Project Manager
Cincinnati V.A.
Medical
Center
DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021
KEVIN HENDERSON
CD SUBMITTAL 03-29-2021
BID DOCUMENT SUBMITTAL
/1
/2
:2
:1
P
M .0
PARTIAL FLOOR PLANS AND
DETAILS
VP SS
REPLACE OZONE DEPLETING
EQUIPMENT
1-A101
539--21-205
Cincinnati, Ohio
B01
SCALE | 1/8" = 1'-0"
B012,B014,B015 CEIILING PLAN2.SCALE | 1/8" = 1'-0"
B123 CEILING PLAN4SCALE | 1/8" = 1'-0"
B430 CEILING PLAN6
SCALE | 1" = 100'-0"
BASEMENT CEILING KEY PLAN1SCALE | 1" = 100'-0"
1ST FLOOR CEILING KEYPLAN3SCALE | 1" = 100'-0"
2ND FLOOR CEILING KEYPLAN21
SCALE | 1" = 100'-0"
4TH FLOOR CEILING KEYPLAN5
GENERAL NOTES RCP
CEILING LEGEND
KEYNOTES#
1.03 PROVIDE TEMPORARY PARTITION. CONTRACTOR TO AVOID DUST FROM
ENTERING OCCUPIED B220 SPACE. ACCESS FOR THIS WORK TO BE FROM
ROOM B219.
1.04 TEMPORARY PARTITION
1.06 TEMPORARY PARTITION. WORK IN CORRIDOR TO OCCUR DURING EVENINGS
OR WEEKENDS. COORDINATE WITH COR
2.15 REMOVE EXISTING ACOUSTICAL CEILING SYSTEM. SEE MECHANICAL
DRAWINGS FOR EXTENT OF WORK ABOVE CEILING. PREP FOR NEW CEILING
SYSTEM.
2.16 EXISTING CEILING TO REMAIN
9.07 SUSPENDED ACOUSTIC CEILING TILE / GRID SYSTEM
NORTH
NORTH
NORTH
NORTH
NORTHNORTH
NORTH
NORTH
MATERIAL LEGEND
TYPE FINISH TYPE MANUFACTURER PRODUCT/COLOR DESCRIPTION
CEILING FINISHES
ACT-1 ACCOUSTIC CEILING TILE ARMSTRONG ARMSTRONG FINE FISSURED #1728 COLOR: WHITE WHITE GRID SIZE: 2'-0"X2'-0" X 5/8"
PAINT FINISHES
PNT-1 PAINT BEJAMIN MOORE TBD - TO MATCH EXISTING SATIN GENERAL WALL COLOR
PNT-2 PAINT BEJAMIN MOORE TBD - TO MATCH EXISTING FLAT FINISH FOR CEILING FINISH COLOR
PNT-3 PAINT BEJAMIN MOORE TBD - TO MATCH EXISTING SEMI-GLOSS FOR DOORS AND WINDOW FRAMES
SCALE | 1/8" = 1'-0"
PARTIAL SECOND FLOOR PLAN27
SCALE | 1 1/2" = 1'-0"
WALL TYPES26
DEDUCT ALTERNATE #2
DESCRIPTION DATE
08/19/2021
ARCHITECT/ENGINEER OF RECORDCONSULTANT
Storage
Office
Toilet
Office
Upper Level of Catwalk
Corridor
C-2-1
Stairs
S-2-1
Lift Platform
UP
UP
UP
UP
UP
Storage
Office
Toilet
Office
Upper Level of Catwalk
Corridor
C-2-1
Stairs
S-2-1
Lift Platform
UP
UP
UP
UP
UP
Storage
Office
Toilet
Office
Corridor
C-2-1
Stairs
S-2-1
Lift Platform
UP
UP
UP
UP
S-A102
2.01
PHOTO 2 - ROOF MOUNTED EQUIPMENT PHOTO 1 - BUILDING 8 PARTIAL VIEW
2.04
7.01
2.04
2.162.16
8' - 0"
ACT-1
8' - 0"
ACT-1
9.07 9.07
2.19 2.19
SPECIFIED CANT
EXSITING ROOF DECK
EXISTING ROOF
INSULATION
EXISTING TREMCO
BUILT UP ROOF
MEMBRANE
GRAVEL SURFACING
TWO-PLY STRIPPING
SPECIFIED BASE
FLASHING ADHERED
WITH ADHESIVE
NEW SURFACE MOUNTED
METAL COUNTERFLASHING
S
T A T E
OF O
H
IO
R E G
IST ERED A RC
HI
T
E C T
MARK
C.
WISEMAN
13215
Mark C. Wiseman, License #13215 Expiration Date 12/31/2021
P ro je ct
N o.
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLEREDU.S. Department of Veterans Affairs
F
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
CONSTRUCTION
DOCUMENTS
SD SUBMITTAL 08-24-2020
DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020
Project Manager
Cincinnati V.A.
Medical
Center
DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021
KEVIN HENDERSON
CD SUBMITTAL 03-29-2021
BID DOCUMENT SUBMITTAL
/1
/2
:5
:0
P
M .0
SITE PLAN AND BUILDING 8
REMOVAL AND NEW WORK
VP SS
REPLACE OZONE DEPLETING
EQUIPMENT
S-A102
539--21-205
Cincinnati, Ohio
B01
SCALE | 1" = 30'-0"
BUILDING 81
SCALE | 1/8" = 1'-0"
B8 SECOND FLOOR PARTIAL PLAN8
SCALE | 1/8" = 1'-0"
IDHS TRAILER CEILING PLAN11
IDHS TRAILER
BUILDING 8
KEYNOTES#
2.01 REMOVE EXISTING ROOF MOUNTED SYSTEM, SEE MECHANICAL DRAWINGS
2.04 REMOVE PORTION OF EXISTING ROOF TO PREP FOR NEW EQUIPMENT
SUPPORT CURB, SEE MECHANICAL
2.16 EXISTING CEILING TO REMAIN
2.19 REMOVE EXISTING PLASTER CEILING, PREP AS NECESSARY FOR
INSTALLATION OF NEW CEILING.
7.01 PROVIDE NEW EQUIPMENT SUPPORT, SEE MECHANICAL DRAWINGS. THE
EXISTING TREMCO ROOFING MEMBRANE SHOULD BE REMOVED AND
RESTORED AS REQUIRED FOR NEW MECHANICAL CURB INSTALLATION.
ROOF CONTRACTOR SHALL BE A CERTIFIED INSTALLER FOR SUCH
INSTALLATION TO MAINTAIN THE EXISTING ROOF INTEGRITY.
9.07 SUSPENDED ACOUSTIC CEILING TILE / GRID SYSTEM
SCALE | 3/8" = 1'-0"
BUILT UP ROOFING EQUIPMENT CURB6
DESCRIPTION DATE
08/19/2021
M001
INDEX, LEGEND, AND GENERAL
NOTES -
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE OZONE DEPLETING
EQUIPMENT
CINCINNATI, OH
539-21-205
Project Manager
08/19/2021Revisions: Date:
Cincinnati V.A.
Medical Center
SD SUBMITTAL 08-24-2020
DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020
DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021
KEVIN HENDERSON
CD SUBMITTAL 03-29-2021
BID DOCUMENT SUBMITTAL 08-19-2021
INDEX OF DRAWINGS
SHEET DESCRIPTION
BASEMENT FLOOR PLANS - REMOVALS AND NEW WORK1-M100A
1-M100B
BASEMENT AND FIRST FLOOR PLANS - REMOVALS AND NEW WORK
JAC GEH
DUCT THERMOSTAT WITH AVERAGING ELEMENT
DUCT STATIC PRESSURE SENSOR
DUCT HUMIDITY SENSOR
ROOM SENSOR: TEMPERATURE, HUMIDITY
LENGTH IN DUCT WHEN SPACE PERMITS)
REMOTE BULB THERMOSTAT
ROOM CONTROL: THERMOSTAT, HUMIDISTAT
DIFFERENTIAL PRESSURE SWITCH
DUCT TEMPERATURE SENSOR WITH AVERAGING ELEMENT
SMOKE DETECTOR (SEE ELECTRICAL SPECIFICATIONS)
DUCT OR PIPE TEMP. SENSOR
DUCT OR PIPE THERMOSTAT (NOTE 1: PROVIDE 12" MIN.
AFTER FILTER
CURRENT SENSING RELAY
AIR FOIL WHEEL (FAN)
AIR HANDLING UNIT
ANALOG INPUT
AIR PRESSURE DROP
ANALOG OUTPUT
AUTOMATIC TEMPERATURE CONTROLS
BACKWARD INCLINED WHEEL (FAN)
AIR FLOW MEASURING DEVICE
ABOVE FINISHED FLOOR
DIFFERENTIAL OR STATIC PRESSURE TRANSMITTER
CLEAN OUT
CEILING GRILLE
CEILING DIFFUSER
CEILING REGISTER
COLD WATER (POTABLE)
DIGITAL OUTPUT
DIGITAL INPUT
DIRECT DIGITAL CONTROLS
DRY BULB TEMPERATURE, DEG. F
AUTOMATIC CONTROL DAMPER
EXHAUST FAN
ENGINEERING CONTROL CENTER
DOUBLE WIDTH DOUBLE INLET (FAN)
DOOR UNDERCUT BY GENERAL CONTRACTOR
ITEM. (TO BE USED AS AN AID IN COORDINATING THE
LISTED SIZE OF DUCT, PIPE, DEVICE OR EQUIPMENT
APPROXIMATE ELEVATION FROM FLOOR TO CENTER OF
MANUAL VOLUME DAMPER
U/C
VARIOUS TRADES.)
FIRE DAMPER
BUTTERFLY VALVE
CIRCUIT SETTER
BALL VALVE
COMBINATION BALANCING/SHUT-OFF VALVE
MANUAL AIR VENT
AUTOMATIC FLOW CONTROL VALVE
TEST PLUG (PRESSURE/TEMPERATURE)
SAFETY VALVE OR PRESSURE RELIEF
PRESSURE REDUCING VALVE
STRAIGHT-THRU TWO-POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
STRAIGHT-THRU MODULATING CONTROL VALVE
EX.
EF
EXISTING
DWDI
ECC
DI
DO
DB
DDC
D
Db
DECIBELS
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
EQUIPMENT ABBREVIATION (SUPPLY FAN)
SUPPLY FAN NO.3 IN BUILDING NO.1
SHEET NUMBER WHERE DRAWN
DRAWING NUMBER WHERE DRAWN
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
RETURN DUCT (UP & DOWN)
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
EXHAUST OR RETURN TOP REGISTER OR GRILLE,
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE,
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
SUPPLY DUCT (UP & DOWN)
INCLINED RISE, IN DIRECTION OF AIR FLOW
NEW DUCT - WIDTH X DEPTH
RECTANGULAR ELBOWS WITH VANES EVEN IF
VANED ELBOW (PROVIDE ALL SQUARE OR
INCLINED DROP, IN DIRECTION OF AIR FLOW
ACOUSTICAL DUCT LINING
STANDARD RADIUS ELBOW
R
10/8
FC
D
SYMBOL IS MISSING)
FLEXIBLE CONNECTION
UP
(WALL TYPE)
(WALL TYPE)
DN
UP
1-01
1-SF3
AIR HANDLING UNIT NUMBER
TERMINAL UNIT DESIGNATION
TYPICAL UNIT NO.
DN
SECTION LETTER
ECCENTRIC REDUCER
DIRECTION OF FLOW
CAPPED OUTLET
SIDE CONNECTION
EXISTING WORK.
ACCESSORIES
INVERTED BUCKET TRAP SET INCLUDING PIPING
POINT OF CONNECTION BETWEEN NEW AND
RISE OR DROP IN PIPE
BOTTOM CONNECTION, 45 DEG. OR 90 DEG.
TOP CONNECTION, 45 DEG. OR 90 DEG.
REDUCER OR INCREASER
DIRECTION OF PIPE PITCH (DOWN)
THERMOMETER
UNIVERSAL (2-BOLT) INVERTED BUCKET TRAP STATION
STRAINER
GATE VALVE
PRESSURE GAGE
CHECK VALVE
GLOBE VALVE
PIPING ACCESSORIES
FLOAT AND THERMOSTATIC TRAP SET INCLUDING
GATE VALVE WITH 3/4" HOSE END ADAPTER
EXISTING PIPE TO BE REMOVED
DRAIN LINE
UNION
D
CW
CR
CO
CG
CD
BIW
ATC
AFW
AI
APD
AO
AHU
AFM
AFF
AF
VENT LINE
HEATING HOT WATER RETURN
HEATING HOT WATER SUPPLY
LOW PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG & BELOW)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
NUMBER INDICATES STEAM PRESSURE
NUMBER INDICATES STEAM PRESSURE
LPR
V
HWS
HWR
LPS (5)
MPS (30)
MPR
HEATING
SP
S
F
T
H
T
T H
WET BULB TEMPERATURE, DEG. FWb
MAXIMUM
OUTSIDE AIR
PRE-FILTER
PUMPED CONDENSATE
PREHEAT COIL
RELATIVE HUMIDITY
SUPPLY FAN
STEAM HUMIDIFIER
TRANSFER GRILLE
UNIT HEATER
STATIC PRESSURE (INCHES OF WATER)
PRESSURE REDUCING VALVE
PRESSURE DROP (FEET OF WATER)
TOP REGISTER (WALL TYPE)
VARIABLE FREQUENCY DRIVE
STATIC PRESSURE SENSOR
DOOR UNDERCUT BY GENERAL CONTRACTOR
SPS
TR
U/C
VFD
UH
V
TG
VALVE
S.P.
SH
SF
Rh
PD
PF
PH
PRV
MAX
O.A.
NOM
MIN
PC
NOMINAL
MINIMUM
HEATING COIL
HORSEPOWER
FLR.
HC
HP
FLOOR
BLOW UNLESS OTHERWISE NOTED)
CEILING DIFFUSERS (FOUR WAY
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CHS
CHR
AIR CONDITIONING
CONTROL CIRCUIT CONN.
H1 N
ETCHED CLEAR LACQUER
E.C.L.
WHITE BAKED ENAMELW.B.E.
BRAKE HORSEPOWER
BHP
BRITISH THERMAL UNIT
BTU
BRITISH THERMAL UNIT PER HOUR
BTUH
CUBIC FEET PER MINUTE
CFM
DEGREE
DEG
DIAMETER
DIA
DIFFERENTIAL PRESSURE SENSOR
DPS
ENTERING
ENT
F
FAHRENHEIT
FPM
FEET PER MINUTE
FT
FEET
GALLONS PER MINUTE
GPM
HEAD
HD
CHILLED WATER RETURN
CHR
CHILLED WATER SUPPLY
CHS
INCHES
IN
INCHES WATER COLUMN
IN WC
INCHES WATER GAUGE
IN WG
LEAVING AIR TEMPERATURE
LAT
LEAVING
LVG
MBH
1000 BTUH
MERV
MINIMUM EFFICIENCY REPORTING VALUE
NC
NOISE CRITERIA
REVOLUTIONS PER MINUTE
RPM
SMOKE DAMPER (SUPPLY)
SDS
SMOKE DAMPER (RETURN)
SDR
STEAM PRESSURE REDUCING VALVE
SPRV
VOLUME DAMPERVD
HIGH PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
NUMBER INDICATES STEAM PRESSURE
HPS (125)
HPR
PIPE UP
PIPE DOWN
IN-LINE CENTRIFUGAL FAN
ICF
T
T
T
T
H dP
CS
DP SP
1-MS4
A
H7
9'-6"
MV
MANUAL AIR VENT
ABBREVIATIONS
CONTROLSPIPING SYMBOLS
DRAWING SYMBOLS
DUCTWORK SYMBOLS
GENERAL NOTES
GENERAL
VALVES
ABBREVIATIONS
EXHAUST DUCT (UP & DOWN)
UP DN
PUMPED CONDENSATE RETURNPC
EXPANSION TANK PIPE
ET
FCU
FAN COIL UNIT
PUMP
P
PROPELLER UNIT HEATER
PUH
RETURN FAN
RF
WATER FILTERWF
POWER TYPE ROOF VENTILATOR
RV
POWER TYPE WALL VENTILATORWV
COR
PROPELLER TYPE EXHAUST FANPEF
RETURN AIR
R.A.
SUPPLY AIR
S.A.
SINGLE WIDTH SINGLE INLET (FAN)
SWSI
SPECIFIC GRAVITY
SP. GR.
ACCESS DOOR
AD
FCW
FOWARD CURVED WHEEL (FAN)
FC
FLEXIBLE CONNECTION
ENERGY EFFICIENCY RATIO
EER
EXHAUST AIR
E.A.
CONTRACTING OFFICER'S REPRESENTATIVE
AIR SEPARATOR
AS
ANGLE GLOBE VALVE
PIPE GUIDE
PIPE ANCHOR
ORIFICE UNION
STAINLESS STEEL DUCT
DOMESTIC HOT WATER SUPPLYDHW
DOMESTIC HOT WATER RECIRCULATIONDHWR
COMBINATION AXIAL/BACKWARD CURVED WHEEL
A/BCW
UTILITY SET FANUSF
T
GENERAL
DOMESTIC COLD WATER
W
FLOW METER
PIPE MOUNTED DDC TEMPERATURE SENSOR
TOP GRILLE (WALL TYPE)TG
WATER GAUGEWG
WATTSW
VARIABLE AIR VOLUMEVAV
THERMOSTATTSTAT
TOTAL STATIC PRESSURETSP
SMOKE DETECTOR
SD
SUPPLY AIR TEMPERATURE
SAT
OUTSIDE DIAMETER
OD
N.C.
NORMALLY CLOSED
N.O.
NORMALLY OPEN
MCA
MINIMUM BRANCH CIRCUIT AMPACITY
LEAVING WATER TEMPERATURE
LWT
ENTERING WATER TEMPERATURE
EWT
EXTERNAL STATIC PRESSURE
ESP
DIRECT EXPANSION
DX
ENTERING AIR TEMPERATURE
EAT
1 ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE THE SUSPENDED CEILING.
2 ACCESS PANELS IN NON ACCESSIBLE SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC.
3 FOR TYPICAL STEAM, WATER AND REFRIGERANT PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD DETAILS AND PIPING
SCHEMATICS.
4 PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW BETWEEN HEATING
MEDIUM AND AIR.
5 WHERE DUCTS OR PIPES ARE REMOVED THRU BUILDING ELEMENT THAT IS TO REMAIN, PATCH BUILDING OPENING TO MATCH
EXISTING WHERE OPENING IS NOT RE-USED.
6 ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.
7 ALL CUTTING AND PATCHING REQUIRED FOR THE PROJECT WORK SHALL BE INCLUDED IN THE CONTRACT. REFINISH ANY SURFACE
DISTURBED UNDER THIS WORK TO MATCH EXISTING.
8 WHERE WORK IS REQUIRED ABOVE EXISTING SUSPENDED CEILINGS, CONTRACTOR SHALL CAREFULLY REMOVE SUSPENDED
CEILING COMPONENTS AS REQUIRED TO PERFORM THE SPECIFIED WORK. UPON COMPLETION, REINSTALL CEILING AND
COMPONENTS. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO CEILING COMPONENTS.
9 ALL WALL & FLOOR PENETRATIONS SHALL BE FIRESTOPPED TO RETARD PASSAGE OF FIRE & SMOKE.
10 WHERE EXISTING LAY-IN DEVICE IN SUSPENDED CEILING IS REMOVED AS PART OF THIS PROJECT, PROVIDE NEW ACOUSTIC
CEILING TILE TO FILL EMPTY GRID SPACE. CEILING TILE PATTERN, STYLE, COLOR, ETC. SHALL MATCH ADJACENT TILES.
11 ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE VA. ITEMS NOT DESIRED BY THE VA SHALL BE REMOVED FROM THE
PREMISES AND DISPOSED OF PROPERLY BY THE CONTRACTOR.
12 REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
13 THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL OFFSET WHICH MAY BE NECESSARY
TO INSTALL THE SYSTEMS. COORDINATE WORK IN ADVANCE WITH ALL OTHER TRADES AND REPORT IMMEDIATELY ANY
ANTICIPATED INSTALLATION ISSUES.
14 FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, PIPE AND EQUIPMENT SIZES, SERVICES AND LOCATIONS PRIOR TO
PERFORMING WORK.
15 HEPA FILTERED EXHAUST IS REQUIRED TO MAINTAIN A MINIMUM OF 0.01" W.G. NEGATIVE PRESSURE IN CONSTRUCTION AREAS.
COORDINATE WITH COR.
16 WHERE CONTROL DEVICES ARE REMOVED, PNEUMATIC LINES SHALL BE REMOVED BACK TO ACTIVE MAIN AND CAPPED, AND
CONTROL WIRING AND CONDUIT SHALL BE REMOVED BACK TO SOURCE.
17 ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE
EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PERMANENT PLATFORMS, WITHOUT
THE USE OF PORTABLE LADDERS. EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS
AND STRAINERS, TRANSMITTERS, CONTROL DEVICES.
18 CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS
SHALL BE COORDINATED WITH THE COR.
19 ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, CONTROLS, ETC. SHOWN DASHED SHALL BE REMOVED. THE MAJORITY OF WORK
TO BE REMOVED IS SHOWN. REMOVE ALL INCIDENTAL ABANDONED UTILITY ITEMS THAT MAY NOT BE SHOWN BUT ARE
ASSOCIATED WITH THE REMOVAL WORK.
20 INCLUDE ALL WORK NECESSARY TO ACCOMMODATE PHASING. REFER TO GENERAL REQUIREMENTS SECTION 01 00 00.
21 WHERE EXISTING HVAC UTILITIES IN SERVICE WILL BE DISRUPTED DURING THE CONSTRUCTION OF THIS PROJECT, THIS WORK
SHALL BE PERFORMED ON WEEKENDS OR WEEK NIGHTS, IF REQUIRED BY THE COR. DOWNTIME SHALL BE KEPT TO A MINIMUM, AND SHALL BE COORDINATED AND SCHEDULED WELL IN ADVANCE WITH THE COR.
22 RE-INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED OR REMOVED IN THE PERFORMANCE OF
WORK IN THIS PROJECT, INCLUDING INSULATION REMOVAL FOR ASBESTOS ABATEMENT.
23 ALL WORK MUST BE COORDINATED WITH THE CONTRACTING OFFICER AND COR TO MAINTAIN OPERATION OF THE EXISTING
FACILITY.
24 EXISTING CONDITIONS SHOWN ARE BASED UPON AVAILABLE EXISTING DRAWINGS, AND MAY DIFFER FROM ACTUAL WORK IN PLACE.
THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING THE
EXECUTION OF THE WORK. ANY VARIATION BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT
DOCUMENTS WHICH MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING
OFFICER IN WRITING FOR RESOLUTION BEFORE PROCEEDING WITH THE WORK.
25 ABATEMENT, REMOVAL OR ENCAPSULATION OF EXISTING HAZARDOUS MATERIALS (ASBESTOS, LEAD, ETC.) IS INCLUDED IN THIS
CONSTRUCTION CONTRACT. REFER TO DRAWINGS AND/OR SPECIFICATIONS FOR LOCATION AND QUANTITIES OF ASBESTOS. ANY
ABATEMENT WORK PERFORMED AS PART OF THIS PROJECT SHALL BE COMPLETED PRIOR TO STARTING ANY OTHER PROJECT
WORK.
26 CONTRACTOR SHALL PROVIDE A QUARTERLY REPORT OF QUANTITIES OF REFRIGERANT REMOVED THROUGHOUT THE DURATION
OF THE PROJECT.
DOMESTIC HOT WATER SUPPLY
DHW
DOMESTIC HOT WATER RECIRCULATION
DHWR
FREE STEAM (LOW PRESSURE STEAM)
FS(5)
M
VALVE ON RISE/DROP (LOCATED IN VERTICAL PIPE)
(REFER TO DETAIL FOR ADDITIONAL SPECIALTIES)
SST
CS
PT
SP
AFMS
AIRFLOW MEASURING STATION
CURRENT SWITCH (FAN STATUS INDICATION)
START-STOP RELAY FOR FAN
FAN SPEED CONTROL SIGNAL
PRESSURE TRANSMITTER
TT TEMPERATURE TRANSMITTER
OS ROOM OCCUPANCY SENSOR(S)
DPT DIFFERENTIAL PRESSURE TRANSMITTER
PS PRESSURE SWITCH
DUPLEX PLUME EXHAUST FAN PACKAGE
DPF
CONSTANT VOLUME REHEAT TERMINAL UNIT
CVR
VARIABLE VOLUME REHEAT TERMINAL UNITVVR
SIMPLEX PLUME EXHAUST FANSPF
15-M100
BLDG 15 BASEMENT FLOOR PLANS - REMOVALS AND NEW WORK
1-M104
FOURTH FLOOR PLANS - REMOVALS AND NEW WORK
1-M102
SECOND FLOOR PLANS - REMOVALS AND NEW WORK
SITE PLANS - REMOVALS AND NEW WORKS-M101
64-M101
BLDG 64 SITE PLANS AND FLOOR PLANS - REMOVALS AND NEW WORK
M601
SCHEDULES, CONTROLS AND AUTOMATION
M501
DETAILS
INDEX, LEGEND, AND GENERAL NOTESM001
M502
DETAILS
SUB-BASEMENT FLOOR PLANS - REMOVALS AND NEW WORK1-M1SB
BLDG 8 SECOND FLOOR PLANS - REMOVALS AND NEW WORK8-M102
S-M101
SITE PLANS - REMOVALS AND NEW
WORK
SITE
SCALE: 1/8" = 1'-0"
SITE PLAN - TRAILERS - NEW WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE OZONE DEPLETING
EQUIPMENT
CINCINNATI, OH
539-21-205
Project Manager
08/19/2021Revisions: Date:
Cincinnati V.A.
Medical Center
SD SUBMITTAL 08-24-2020
DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020
DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021
KEVIN HENDERSON
CD SUBMITTAL 03-29-2021
BID DOCUMENT SUBMITTAL 08-19-2021
JAC GEH
SCALE: 1/8" = 1'-0"
SITE PLAN - TRAILERS - REMOVALS
T-CU-1
T-CU-2
T-CU-3
T-CU-4
T-CU-5
T-CU-6
T-CU-7
T-AC-3
T-AC-4
T-AC-5
T-AC-7
T-AC-1
T-AC-2
T-AC-6
CG1-12x12
TYP.
TYP.
4 TYP.
3D
D
TYP.
A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
B. CONTRACTOR SHALL PROTECT ALL FURNITURE AND VA OWNED
EQUIPMENT AND SUPPLIES WITHIN WORK AREA WITH PLASTIC
SHEETING.
C. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
ADDITIONAL GENERAL NOTES.
D. MAINTAIN MANUFACTURER REQUIRED CLEARANCES AROUND NEW
SPLIT SYSTEM INDOOR AND OUTDOOR UNITS.
E. INTEGRATE NEW SPLIT SYSTEMS TO BAS VIA BACNET.
F. MAXIMUM ALLOWABLE DOWNTIME FOR REPLACEMENT OF EACH
TRAILER HVAC UNIT SHALL BE 2 DAYS, AND ONLY 1 UNIT IN A GIVEN
TRAILER SHALL BE OUT OF SERVICE AT ONCE.
G. DUCT RUNOUT SIZE TO DIFFUSERS SHALL MATCH DIFFUSER NECK
SIZE.
GENERAL NOTES
1. REMOVE EXISTING WALL-MOUNTED HVAC UNIT AND ASSOCIATED
CONTROLS, ACCESSORIES,ETC.
2. PROVIDE DUCT PLENUM SAME WIDTH AS INDOOR UNIT INLET AND
OUTLET. PLENUM SHALL BE TALL ENOUGH TO ACCOMMODATE
DUCT TAPS.
3. EXISTING ABOVE CEILING DUCTWORK TO REMAIN.
4. EXISTING AIR DEVICES TO REMAIN.
5. PROVIDE REFRIGERANT PIPING AND ACCESSORIES PER
MANUFACTURER.
6. ALL WORK ASSOCIATED WITH THIS TRAILER SHALL OCCUR DURING
WEEKENDS (I.E. BETWEEN 8PM FRIDAY AND 6AM MONDAY).
7. WORK ASSOCIATED WITH THIS TRAILER MAY OCCUR DURING
NORMAL HOURS, BUT SHALL OCCUR BETWEEN APRIL 1 AND MAY 31
OR BETWEEN SEPTEMBER 1 AND OCTOBER 31. DURING
PERFORMANCE OF WORK, ROOMS WITH ACTIVE CONSTRUCTION
WILL BE VACATED/UNOCCUPIED BY THE VA.
8. REMOVE EXISTING DUCT TO THIS POINT FOR RECONNECTION IN
NEW WORK.
9. EXTEND AND CONNECT NEW CONDENSATE DRAIN PIPING TO
EXISTING DRAINAGE TILE.
10. AFTER REMOVAL OF EXISTING WALL-MOUNTED UNIT, INFILL DUCT
OPENINGS THRU WALL WITH FRAMING AND INSULATION, AND
PROVIDE DOUBLE-WALL INSULATED SHEETMETAL BLANK-OFF
PANEL (MINIMUM R-VALUE 10). COVER EXISTING OPENING IN
SIDING. FASTEN PANEL TO WALL FRAMING, AND ENSURE
WEATHERTIGHT SEAL. PANEL SHALL BE PAINTED TO MATCH COLOR
OF EXISTING SIDING.
11. PROVIDE ANGLE STEEL SUPPORT BRACKET FOR MOUNTING OF
NEW SPLIT SYSTEM OUTDOOR UNIT ON NEW BLANK-OFF PANEL.
MINIMUM HEIGHT TO BOTTOM OF OUTDOOR UNIT SHALL BE 7'-0"
ABOVE GRADE. BRACKET SHALL BE SECURED TO EXISTING WALL
FRAMING.
PLAN NOTES
TYP.
TYP.8
TYP.
TYP.
TYP.
4 TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE OZONE DEPLETING
EQUIPMENT
CINCINNATI, OH
539-21-205
Project Manager
08/19/2021Revisions: Date:
Cincinnati V.A.
Medical Center
SD SUBMITTAL 08-24-2020
DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020
DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021
KEVIN HENDERSON
CD SUBMITTAL 03-29-2021
BID DOCUMENT SUBMITTAL 08-19-2021
1-M1SB
SUB-BASEMENT FLOOR PLANS -
REMOVALS & NEW WORK
GEHJAC
SCALE: 1/4" = 1'-0"
SUB-BASEMENT PLAN - BUILDING 1 - REMOVALS
SCALE: 1/4" = 1'-0"
SUB-BASEMENT PLAN - BUILDING 1 - NEW WORK
UP
UP
UP
UP
UP
Tank Room
SB06
Pipe Shop
SB08
Foreman
SB09
Storage
SB07
Tlt.
SB08A
Areaway
SB10
Elevator Pit
SB05
Elevator Pit
SB04
Storage
SB02
Corridor
C*SB*01
Stair 1
S*SB*1
Elevator Pit
SB03
Crawl
Space
CS*SB*010
Crawl
Space
CS*SB*011
SUB-BASEMENT KEY PLAN
NO SCALE
Pipe Shop
SB08
Foreman
SB09
Tlt.
SB08A
Crawl
Space
CS*SB*010
10"10"
C H
R
C H
S
C H
R
C H
S
12"
C H
S
C H
S
L P
S
LPS(5)
LPR
L P
S
Z
O N
E
L P
R
2.5"
L P
R
D C
W
S A
N
D
Pipe Shop
SB08
Foreman
SB09
Tlt.
SB08A
C H
R
C H
S
C H
R
C H
S
5"5"
10"
10"10"
FCU-SB08
CHS
CHR
1. REMOVE EXISTING PIPING TO THIS POINT AND CAP.
2. REMOVE EXISTING VERTICAL FLOOR-SET WATER-COOLED AC UNIT
AND ASSOCIATED PIPING, SUPPORTS, CONTROLS, ACCESSORIES,
ETC.
3. REFER TO SHEET 1-M100A FOR CONTINUATION.
4. REFER TO SHEET 1-M100B FOR CONTINUATION.
5. ROUTE CONDENSATE PIPE THRU WALL AND SPILL INTO EXISTING
DRAIN TROUGH IN ADJACENT ROOM.
PLAN NOTES
A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
B. CONTRACTOR SHALL PROTECT ALL FURNITURE AND VA OWNED
EQUIPMENT AND SUPPLIES WITHIN WORK AREA WITH PLASTIC
SHEETING.
C. DURING THE PERFORMANCE OF THIS WORK, COOLING SHALL NOT
BE DISRUPTED TO ANY AREA OUTSIDE THE CURRENT AREA OF
WORK, DURING NORMAL WORKING HOURS.
D. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
ADDITIONAL GENERAL NOTES.
GENERAL NOTES
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE OZONE DEPLETING
EQUIPMENT
CINCINNATI, OH
539-21-205
Project Manager
08/19/2021Revisions: Date:
Cincinnati V.A.
Medical Center
SD SUBMITTAL 08-24-2020
DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020
DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021
KEVIN HENDERSON
CD SUBMITTAL 03-29-2021
BID DOCUMENT SUBMITTAL 08-19-2021
1-M100A
BASEMENT FLOOR PLANS -
REMOVALS AND NEW WORK 01
SCALE: 1/4" = 1'-0"
BASEMENT FLOOR PLAN - REMOVALS
JAC GEH
BASEMENT KEY PLAN
NO SCALE
SCALE: 1/4" = 1'-0"
BASEMENT FLOOR PLAN - NEW WORK
UP
UP
DN
UP
UP
UP UP
UP
UP
DN
UP
UP
DN
UP
UP
UP
DN
UP
UP
UP
DN
UP
DN
UPDN
UP
DN
UP
UP
UP
UP
UP
1. REMOVE EXISTING VERTICAL FLOOR-SET WATER-COOLED DUCTED
AC UNIT AND ASSOCIATED DUCTWORK, PIPING, SUPPORTS,
CONTROLS, ACCESSORIES, ETC.
2. REMOVE EXISTING HORIZONTAL ABOVE-CEILING DUCTED WATER
COOLED AC UNIT AND ASSOCIATED DUCTWORK, PIPING,
SUPPORTS, CONTROLS, ACCESSORIES, ETC.
3. REMOVE EXISTING HORIZONTAL ABOVE-CEILING DUCTED
INDUCTION UNIT AND ASSOCIATED DUCTWORK, PIPING, SUPPORTS,
CONTROLS, ACCESSORIES, ETC.
4. REMOVE EXISTING AIR DEVICE AND ASSOCIATED DUCTWORK,
SUPPORTS, ETC.
5. REMOVE EXISTING PIPING TO THIS POINT AND CAP.
6. REMOVE EXISTING DUCTWORK TO THIS POINT AND CAP.
7. ASBESTOS-CONTAINING BROWN CEILING GLUE DOTS IN THIS AREA
SHALL BE REMOVED BY A STATE-LICENSED ASBESTOS ABATEMENT
CONTRACTOR. REFER TO SPECIFICATION SECTION 02 82 11.
8. REMOVE EXISTING PIPING TO THIS POINT FOR RECONNECTION IN
NEW WORK.
9. REMOVE EXISTING DUCTWORK TO THIS POINT FOR RECONNECTION
IN NEW WORK.
10. DURATION OF WORK WITHIN THIS AREA SHALL BE A MAXIMUM OF 7
CALENDAR DAYS. DURING PERFORMANCE OF WORK, AREA SHALL
BE VACATED/UNOCCUPIED BY THE VA.
11. DURATION OF WORK WITHIN THIS AREA SHALL BE A MAXIMUM OF 21
CALENDAR DAYS. DURING PERFORMANCE OF WORK, AREA SHALL
BE VACATED/UNOCCUPIED BY THE VA.
12. REMOVE EXISTING PIPING THRU FLOOR SLAB, AND PATCH SLAB
OPENINGS TO MATCH EXISTING. REFER TO SHEET 1-M1SB FOR
CONTINUATION.
PLAN NOTES
A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
B. CONTRACTOR SHALL PROTECT ALL FURNITURE AND VA OWNED
EQUIPMENT AND SUPPLIES WITHIN WORK AREA WITH PLASTIC
SHEETING.
C. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
ADDITIONAL GENERAL NOTES.
D. ALL WORK WITHIN THE CORRIDORS SHALL OCCUR DURING
WEEKENDS (I.E. BETWEEN 8PM FRIDAY AND 6AM MONDAY).
E. DURING THE PERFORMANCE OF THIS WORK, COOLING SHALL NOT
BE DISRUPTED TO ANY AREA OUTSIDE THE CURRENT AREA OF
WORK, DURING NORMAL WORKING HOURS.
F. DUCT RUNOUT SIZE TO DIFFUSERS SHALL MATCH DIFFUSER NECK
SIZE.
GENERAL NOTES
C&P
B012
Comp. &
Pension
B014
Sig
B008B
Tele.
B008C
Soil. Linen
B016
Library
B015
Library
B017
Elec.
B016A
Engineering
Office
B018
Storage
B017B
Eng. Stor.
B019
A/C
B014A
Storage
B017A
FCU-B014
FCU-B017
FCU-B017B
12"x12"
CD1-10"Ø
CD1-10"Ø
CD1-8"Ø
CG1-12x24
CG1-24x24
CD1-8"Ø
CG1-12x24
CD1-6"Ø
CD1-8"Ø
CG1-12x24
14"x10" x
12"x12"
26"x8"
CHR
CHS
D
16"x8"
SG1-8"X6"
T
T
T
CD2-8"Ø
CD2-6"Ø
CD2-6"Ø
CD2-6"Ø
SG1-12"X6"
205 CFM
D
RG1-12"X12"
615 CFM
C H
S
C H
R
O A
H U
O
H U
D
D
SG1-12"X6"
205 CFM
x
SG1-12"X6"
205 CFM
8"x8"
C&P
B012
Comp. &
Pension
B014
Sig
B008B
Tele.
B008C
Soil. Linen
B016
Library
B015
Library
B017
Elec.
B016A
Engineering
Office
B018
Storage
B017B
Eng. Stor.
B019
A/C
B014A
Storage
B017A
CHR
CHS
FCU
D
FCU
C H
R
C H
S
D
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE OZONE DEPLETING
EQUIPMENT
CINCINNATI, OH
539-21-205
Project Manager
08/19/2021Revisions: Date:
Cincinnati V.A.
Medical Center
SD SUBMITTAL 08-24-2020
DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020
DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021
KEVIN HENDERSON
CD SUBMITTAL 03-29-2021
BID DOCUMENT SUBMITTAL 08-19-2021
1-M100B
BASEMENT AND FIRST FLOOR
PLANS - REMOVALS AND NEW
WORK 01
SCALE: 1/4" = 1'-0"
BASEMENT FLOOR PLAN
JAC GEH
BASEMENT KEY PLAN
NO SCALE
BASEMENT KEY PLAN
NO SCALE
BASEMENT KEY PLAN
NO SCALE
SCALE: 1/4" = 1'-0"
BASEMENT FLOOR PLAN
SCALE: 1/4" = 1'-0"
BASEMENT FLOOR PLAN
SCALE: 1/4" = 1'-0"
BASEMENT FLOOR PLAN
BASEMENT KEY PLAN
NO SCALE
SCALE: 1/4" = 1'-0"
FIRST FLOOR PLAN - NEW WORK
SCALE: 1/4" = 1'-0"
FIRST FLOOR PLAN - REMOVALS
1ST FLOOR KEY PLAN
NO SCALE
UP
UP
DN
UP
UP
UP UP
UP
UP
DN
UP
UP
DN
UP
UP
UP
DN
UP
UP
UP
DN
UP
DN
UPDN
UP
DN
UP
UP
UP
UP
UP
UP
UP
DN
UP
UP
UP UP
UP
UP
DN
UP
UP
DN
UP
UP
UP
DN
UP
UP
UP
DN
UP
DN
UPDN
UP
DN
UP
UP
UP
UP
UP
UP
UP
DN
UP
UP
UP
UP
UP
UP
DN
UP
UP
DN
UP
UP
UP
DN
UP
UP
UP
DN
UP
DN
UPDN
UP
DN
UP
UP
UP
UP
UP
UP
UP
DN
UP
UP
UP UP
UP
UP
DN
UP
UP
DN
UP
UP
UP
DN
UP
UP
UP
DN
UP
DN
UPDN
UP
DN
UP
UP
UP
UP
UP
UP
UP
DN
DN
DN
DN
UP
UP
UP
UP
DN
UP
UP
DN
DN
DN
DN
DN
UP
DN
UP
DN
DN
UP
DN
UP
DN
DN
1. REMOVE EXISTING WATER-COOLED CHILLER AND ASSOCIATED
PIPING, SUPPORTS, CONTROLS, ACCESSORIES, ETC.
2. CONNECT TO EXISTING VALVED SUPPLY AND RETURN PIPE STUBS
AT THIS LOCATION.
3. EXTEND AND CONNECT FACILITY CHILLED WATER PIPING TO
EXISTING CONDENSERS TO SERVE AS PRIMARY CONDENSER
WATER SOURCE, WITH VALVED DOMESTIC WATER CONNECTION AS
BACKUP. REFER TO PIPING DETAIL ON SHEET M502.
4. REMOVE EXISTING HORIZONTAL SUSPENDED DUCTED WATER
COOLED AC UNIT AND ASSOCIATED DUCTWORK, PIPING,
SUPPORTS, CONTROLS, ACCESSORIES, ETC.
5. REMOVE EXISTING DUCT BACK TO THIS POINT FOR RECONNECTION
IN NEW WORK..
6. REMOVE EXISTING DX SPLIT SYSTEM INDOOR UNIT AND
ASSOCIATED DUCTWORK, PIPING, SUPPORTS, CONTROLS,
ACCESSORIES, ETC.
PLAN NOTES
A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
B. CONTRACTOR SHALL PROTECT ALL FURNITURE AND VA OWNED
EQUIPMENT AND SUPPLIES WITHIN WORK AREA WITH PLASTIC
SHEETING.
C. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
ADDITIONAL GENERAL NOTES.
D. ALL WORK WITHIN THE CORRIDORS SHALL OCCUR DURING
WEEKENDS (I.E. BETWEEN 8PM FRIDAY AND 6AM MONDAY).
E. DURING THE PERFORMANCE OF THIS WORK, COOLING SHALL NOT
BE DISRUPTED TO ANY AREA OUTSIDE THE CURRENT AREA OF
WORK, DURING NORMAL WORKING HOURS.
F. DUCT RUNOUT SIZE TO DIFFUSERS SHALL MATCH DIFFUSER NECK
SIZE.
GENERAL NOTES
Ref. Eq.
B020
Hazard
Chem. Stor.
A007B
Mech. Stor.
A013
Ref. Equip.
Rm.
A013A
Mech. Rm
A013B
CHR
CHS
0.75" Ø
Mech.
Room
A005D
Eng. Stor.
B019
Fire Alarm
Control
B019A
FCU-B019
C H
S
C H
R
SG1-12"X12"
180 CFM
RG1-12"X12"
180 CFM
12"x14"12"x14"
T
15 22
RG1-12"X6"
95 CFM
SG1-6"X6"
95 CFM
CHS
CHR
D
Eng. Stor.
B019
Fire Alarm
Control
B019A
UP
Audiology
Clinic
B123
Stair 3
D
Elec.
Audiology
Clinic
B123
Stair 3
FCU-B123
CD1-8"Ø
CG1-12x24
CD1-8"Ø
CHS
CHR
D
0.75" Ø
8"x8"
12"x10"
8"x10" x
T
CD2-8"Ø
D
7. REMOVE EXISTING AIR-COOLED CHILLER ON GRADE AND
ASSOCIATED PIPING, SUPPORTS, CONTROLS, ACCESSORIES, ETC.
8. REMOVE EXISTING DX SPLIT SYSTEM AIR-COOLED CONDENSING
UNIT IN AREA WELL, AND ASSOCIATED PIPING, SUPPORTS,
CONTROLS, ACCESSORIES, ETC.
9. REMOVE EXISTING PIPING TO THIS POINT AND CAP.
10. BALANCE THIS DUCT BRANCH TO CFM INDICATED.
11. REMOVE EXISTING DUCT AND ASSOCIATED ACCESSORIES,
SUPPORTS, ETC.
12. REMOVE EXISTING AIR DEVICE AND ASSOCIATED RUNOUT
DUCTWORK.
13. EXISTING DUCTWORK TO REMAIN.
14. BLACK TAR WRAP/TAPE IN THIS AREA SHALL BE REMOVED BY A
STATE-LICENSED ASBESTOS ABATEMENT CONTRACTOR. REFER TO
SPECIFICATION SECTION 02 82 11.
15. DURATION OF WORK WITHIN THIS AREA SHALL BE A MAXIMUM OF 7
CALENDAR DAYS. DURING PERFORMANCE OF WORK, ROOM SHALL
BE VACATED/UNOCCUPIED BY THE VA.
16. REFER TO ROOM B020 PLAN ON THIS SHEET FOR CONTINUATION.
17. REFER TO ROOM B019 PLAN ON THIS SHEET FOR CONTINUATION.
18. REMOVE EXISTING PIPING BACK TO THIS POINT FOR
RECONNECTION IN NEW WORK.
19. EXISTING PIPING TO REMAIN.
20. REMOVE EXISTING STEAM CONVECTOR AND ASSOCIATED
CONTROLS, ACCESSORIES, ETC.
21. EXISTING CONDENSERS ASSOCIATED WITH CANTEEN WALK-IN
COOLER AND FREEZER TO REMAIN.
22. PROVIDE TEMPORARY COOLING UNIT IN THIS SPACE DURING FCU
REPLACEMENT, TO ENSURE NO DOWNTIME OF SPACE COOLING.
TEMPORARY COOLING UNIT MAY BE AIR-COOLED, WATER-COOLED,
OR CHILLED WATER TYPE. DOOR TO ROOM SHALL REMAIN LOCKED
WHEN UNATTENDED.
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE OZONE DEPLETING
EQUIPMENT
CINCINNATI, OH
539-21-205
Project Manager
08/19/2021Revisions: Date:
Cincinnati V.A.
Medical Center
SD SUBMITTAL 08-24-2020
DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020
DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021
KEVIN HENDERSON
CD SUBMITTAL 03-29-2021
BID DOCUMENT SUBMITTAL 08-19-2021
1-M102
SECOND FLOOR PLANS -
REMOVALS AND NEW WORK
SCALE: 1/4" = 1'-0"
SECOND FLOOR PLAN - REMOVALS
JAC GEH
2ND FLOOR KEY PLAN
NO SCALE
2ND FLOOR KEY PLAN
NO SCALE
SCALE: 1/8" = 1'-0"
SECOND FLOOR PLAN - NEW WORK
SCALE: 1/4" = 1'-0"
SECOND FLOOR PLAN - REMOVALS
2ND FLOOR KEY PLAN
NO SCALE
UP
DN
DN
DN
DN
UP
DN
UP
UP
DN UP DN
DN
UP
UP
DN
UP
UP
A/C Shaft
A/C Shaft
A/C Shaft
UP
DN
DN
DN
DN
UP
DN
UP
UP
DN UP DN
DN UP
UP
DN
UP
UP
A/C Shaft
A/C Shaft
A/C Shaft
UP
DN
DN
DN
DN
UP
DN
UP
UP
DN UP DN
DN
UP
UP
DN
UP
UP
A/C Shaft
A/C Shaft
A/C Shaft
1. REMOVE EXISTING VERTICAL FLOOR-SET WATER-COOLED AC UNIT
AND ASSOCIATED DUCTWORK, PIPING, SUPPORTS, CONTROLS,
ACCESSORIES, ETC.
2. EXISTING DUAL DUCT TERMINAL UNIT AND ASSOCIATED
DUCTWORK, SUPPORTS, CONTROLS, ACCESSORIES, ETC. TO
REMAIN.
3. REMOVE EXISTING AIR DEVICE AND ASSOCIATED RUNOUT
DUCTWORK.
4. PROVIDE VALVED AND CAPPED PIPE STUBS FOR FUTURE
CONTINUATION.
5. REMOVE EXISTING DUCT TO THIS POINT FOR RECONNECTION IN
NEW WORK.
6. REMOVE EXISTING DUCT TO THIS POINT, CAP AND SEAL AIRTIGHT.
7. EXISTING DUCT AND ASSOCIATED SUPPORTS, ACCESSORIES, ETC.
TO REMAIN.
8. ASBESTOS-CONTAINING BROWN MASTIC ON DUCT WORK IN THIS
AREA SHALL BE REMOVED BY A STATE-LICENSED ASBESTOS
ABATEMENT CONTRACTOR. REFER TO SPECIFICATION SECTION 02
82 11.
9. WORK WITHIN THIS AREA SHALL BE DELETED FROM THE SCOPE
OF THE PROJECT UNDER BID ITEM #2 (DEDUCT ALTERNATE #1).
10. EXISTING FLOOR DRAIN TO REMAIN.
11. REMOVE EXISTING WALL MOUNTED THERMOSTAT ASSOCIATED
WITH WATER-COOLED AC UNIT.
12. ROUTE CONDENSATE DRAIN PIPING DOWN INTO EXISTING FLOOR
DRAIN.
13. DURATION OF WORK WITHIN THIS AREA SHALL BE A MAXIMUM OF
7 CALENDAR DAYS. DURING PERFORMANCE OF WORK, AREA
SHALL BE VACATED/UNOCCUPIED BY THE VA.
14. REFER TO ARCHITECTURAL DRAWINGS FOR TEMPORARY
PARTITIONS ASSOCIATED WITH WORK IN THIS AREA.
15. WORK WITHIN THIS AREA SHALL BE DELETED FROM THE SCOPE
OF THE PROJECT UNDER BID ITEM #3 (DEDUCT ALTERNATE #2).
16. REMOVE EXISTING DOMESTIC COLD WATER PIPING TO THIS POINT
AND CAP.
17. EXISTING AIR DEVICE AND ASSOCIATED RUNOUT DUCTWORK TO
REMAIN.
PLAN NOTES
A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
B. CONTRACTOR SHALL PROTECT ALL FURNITURE AND VA OWNED
EQUIPMENT AND SUPPLIES WITHIN WORK AREA WITH PLASTIC
SHEETING.
C. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
ADDITIONAL GENERAL NOTES.
D. ALL WORK WITHIN THE CORRIDORS SHALL OCCUR DURING
WEEKENDS (I.E. BETWEEN 8PM FRIDAY AND 6AM MONDAY).
E. DURING THE PERFORMANCE OF THIS WORK, COOLING SHALL NOT
BE DISRUPTED TO ANY AREA OUTSIDE THE CURRENT AREA OF
WORK, DURING NORMAL WORKING HOURS.
F. DUCT RUNOUT SIZE TO DIFFUSERS SHALL MATCH DIFFUSER NECK
SIZE.
GENERAL NOTES
Lab
B211
Lab
B211A
Cold Rm.
B211B
T
DN
UP
UP
DN
Lab
B211
Stair 4
S*2*4
Ana
Path
Gross
Room
B215
Office
B216
Cytology
B217
Hist
Proces/
Special
Staining?
B218
Supervisor
B219
Tissue Lab
B220
Sig. Clos.
B221
Tele.
B222
Off.
B223
TB/ MYC
Lab
B210B
TB/ MYC.
Lab
B210C
ISO
B210D
ISO
B210E
Tele.
B210A
Lab
B211A
Cold Rm.
B211B
F. Tlt.
B203A
M. Lkrs.
B202
Slide Stor.
B202A
F. Lkrs.
B203
Dir. Off.
B205Off.B207A
Elec.
B206
Corr
C*2*17
Off.
Off.
B207C
Pathology
Off.
B209
Micro
Reading
B208
Break
Room
B210
HAC
B204
Corridor
C*2*5
Stair 3
S*2*3
Waiting
Rm.
B224A
FCU-B220
CD3
FCU-B211
CG1-24x24
CD1-12"Ø
CD1-12"Ø
CHS
CHR
0.75"
0.75"
14"x14"
28"x8"
T
T
2.5"
CHR
CHS
35"x11"
35"x10"
CD1-6"Ø
2.5"
UP
DN
Supervisor
B219
Tissue Lab
B220
HAC
B204
Stair 3
S*2*3
17 17
T
35"x11"
35"x10"
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE OZONE DEPLETING
EQUIPMENT
CINCINNATI, OH
539-21-205
Project Manager
08/19/2021Revisions: Date:
Cincinnati V.A.
Medical Center
SD SUBMITTAL 08-24-2020
DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020
DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021
KEVIN HENDERSON
CD SUBMITTAL 03-29-2021
BID DOCUMENT SUBMITTAL 08-19-2021
1-M104
FOURTH FLOOR PLANS -
REMOVALS AND NEW WORK 01
SCALE: 1/4" = 1'-0"
FOURTH FLOOR PLAN - REMOVALS
JAC GEH
SCALE: 1/4" = 1'-0"
FOURTH FLOOR PLAN - NEW WORK
FOURTH FLOOR KEY PLAN
NO SCALE
DN
DN
UP
DN
UP
DN
UP
DN
UP
UP
DN
A/C Shaft
A/C Shaft
A/C Shaft
UP
DN
Stor.
A420
IRM Office
A427
Stair 2
S*4*2
Comp.
Training
A430
Comp.
Specialist Off.
A431
Trash
Chute
A435
Stor.
A436A
Corridor
C*4*2
A/C Shaft
T
T
PLAN NOTES
A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
B. CONTRACTOR SHALL PROTECT ALL FURNITURE AND VA OWNED
EQUIPMENT AND SUPPLIES WITHIN WORK AREA WITH PLASTIC
SHEETING.
C. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
ADDITIONAL GENERAL NOTES.
D. ALL WORK WITHIN THE CORRIDORS SHALL OCCUR DURING
WEEKENDS (I.E. BETWEEN 8PM FRIDAY AND 6AM MONDAY).
E. DURING THE PERFORMANCE OF THIS WORK, COOLING SHALL NOT
BE DISRUPTED TO ANY AREA OUTSIDE THE CURRENT AREA OF
WORK, DURING NORMAL WORKING HOURS.
F. DUCT RUNOUT SIZE TO DIFFUSERS SHALL MATCH DIFFUSER NECK
SIZE.
GENERAL NOTES
1. REMOVE EXISTING DX SPLIT SYSTEM AIR-COOLED CONDENSING
UNIT ON ROOF, AND ASSOCIATED PIPING, SUPPORTS, CONTROLS,
ACCESSORIES, ETC.
2. REMOVE EXISTING DX SPLIT SYSTEM INDOOR UNIT AND
ASSOCIATED DUCTWORK, PIPING, SUPPORTS, CONTROLS,
ACCESSORIES, ETC.
3. REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED DUCTWORK,
PIPING, ACCESSORIES, SUPPORTS, CONTROLS, ETC.
4. REMOVE EXISTING PIPING TO THIS POINT FOR RECONNECTION IN
NEW WORK.
5. DURATION OF WORK WITHIN THIS AREA SHALL BE A MAXIMUM OF 21
CALENDAR DAYS. DURING PERFORMANCE OF WORK, AREA WILL BE
VACATED/UNOCCUPIED BY THE VA.
6. REMOVE EXISTING REFRIGERANT PIPING AND ASSOCIATED
SPECIALTIES, SUPPORTS, ETC. APPROXIMATE ROUTE SHOWN.
UP
DN
Stor.
A420
IRM Office
A427
Stair 2
S*4*2
Comp.
Training
A430
Comp.
Specialist Off.
A431
Trash
Chute
A435
Stor.
A436A
Corridor
C*4*2
A/C Shaft
FCU-A431
CD1-10"Ø
CD1-10"Ø
FCU-A430
CD1-12"Ø
CD1-12"Ø
CG1-24x24
14"x14
CD2-8"Ø
CD2-8"Ø
CG1-24x24
T
T
CHS
CHR
D
14"x12"
14"x12"
C H
R
C H
S
D
D
CHR
CHS
OA (AHU-3)
14"x14
8-M102
BLDG 8 SECOND FLOOR PLANS -
REMOVALS AND NEW WORK
SITE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE OZONE DEPLETING
EQUIPMENT
CINCINNATI, OH
539-21-205
Project Manager
08/19/2021Revisions: Date:
Cincinnati V.A.
Medical Center
SD SUBMITTAL 08-24-2020
DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020
DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021
KEVIN HENDERSON
CD SUBMITTAL 03-29-2021
BID DOCUMENT SUBMITTAL 08-19-2021
JAC GEH
SCALE: 1/4" = 1'-0"
BUILDING 8 - SECOND FLOOR PLAN - NEW WORK
UP
UP
UP
UP
UP
Storage
Office
Toilet
Office
Upper Level of Catwalk
Corridor
C-2-1
Stairs
S-2-1
Lift Platform
BUILDING 8 SECOND FLOOR KEY PLAN
NO SCALE
SCALE: 1/4" = 1'-0"
BUILDING 8 SECOND FLOOR PLAN - REMOVALS
A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
B. CONTRACTOR SHALL PROTECT ALL FURNITURE AND VA OWNED
EQUIPMENT AND SUPPLIES WITHIN WORK AREA WITH PLASTIC
SHEETING.
C. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
ADDITIONAL GENERAL NOTES.
GENERAL NOTES
1. REMOVE EXISTING ROOF-MOUNTED SPLIT SYSTEM CONDENSING
UNIT AND ASSOCIATED PIPING, ACCESSORIES, SUPPORTS, ETC.
2. CONNECT NEW INDOOR UNIT TO EXISTING SUPPLY & RETURN
DUCTWORK AND CONDENSATE DRAIN PIPING. INTEGRATE NEW
UNIT TO EXISTING BUILDING AUTOMATION SYSTEM VIA BACNET.
3. EXISTING DUCTWORK TO REMAIN.
4. EXISTING AIR DEVICES TO REMAIN.
5. REMOVE EXISTING SPLIT SYSTEM INDOOR UNIT AND ASSOCIATED
ACCESSORIES, ETC.
6. PROVIDE REFRIGERANT PIPING AND ACCESSORIES PER
MANUFACTURER - APPROXIMATE ROUTE SHOWN.
7. PROVIDE EQUIPMENT SUPPORT ROOF CURBS - REFER TO DETAIL
ON SHEET M502 AND ARCHITECTURAL DRAWINGS.
8. COORDINATE SCHEDULING OF THIS WORK WITH VA ENGINEERING
MAINTENANCE SUPERVISOR.
PLAN NOTES
UP
UP
UP
Storage
Office
Toilet
Office
Corridor
C-2-1
Lift Platform
T
UP
UP
UP
Storage
Office
Toilet
Office
Corridor
C-2-1
Lift Platform
8-AC-204
8-CU-207
T
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE OZONE DEPLETING
EQUIPMENT
CINCINNATI, OH
539-21-205
Project Manager
08/19/2021Revisions: Date:
Cincinnati V.A.
Medical Center
SD SUBMITTAL 08-24-2020
DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020
DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021
KEVIN HENDERSON
CD SUBMITTAL 03-29-2021
BID DOCUMENT SUBMITTAL 08-19-2021
15-M100
BLDG 15 BASEMENT FLOOR PLANS -
REMOVALS & NEW WORK
SCALE: 1/8" = 1'-0"
BASEMENT PLAN - BUILDING 15 - REMOVALS
GEHJAC
SCALE: 1/4" = 1'-0"
BASEMENT PLAN - BUILDING 15 - NEW WORK
SCALE: 1/4" = 1'-0"
BASEMENT PLAN - BUILDING 15 - NEW WORK
UP
E-EF
E-EF
E-PRV 1
E-PRV 2
E-6" CHS
E-6" CHR
EXIST PIPING UP TO AHU-31
E-CHLR
Mech. Room
B15
Stor.
B01A
Transformer
Vault
B02
Stor.
B05A
A/c Shop Off.
B05
Glass Wash
& Still
B04
Lobby
C*B*08
Elev. Equip.
Room
B03
Stair #1
S*B*1
Research
Stor.
B04A
Air Comp
B06
Corridor
B08A
E-HEATING
WATER PUMPS
EXIST-HEATING
WATER HEAT
EXCHANGER
EXIST-HEATING
WATER HEAT
EXCHANGER
Glass Wash
& Still
B04
Lobby
C*B*08
Air Comp
15-FCU-B04
24"x12" 14"x12"
SG1-18"x10"
335 CFM
SG1-18"x10"
335 CFM
RG1-24x12"
670 CFM
D
1. REMOVE EXISTING WATER-COOLED CHILLER AND ASSOCIATED
SUPPORTS, ACCESSORIES, ETC.
2. REMOVE EXISTING VERTICAL FLOOR-SET WATER-COOLED AC UNIT
AND ASSOCIATED PIPING, SUPPORTS, CONTROLS, ACCESSORIES,
ETC.
3. DURATION OF WORK WITHIN THIS AREA SHALL BE A MAXIMUM OF 7
CALENDAR DAYS.
4. REMOVE EXISTING PIPING TO THIS POINT FOR RECONNECTION IN
NEW WORK. REFER TO CHILLER PIPING DETAILS ON SHEET M502.
5. REMOVE PIPING TO THIS POINT AND CAP.
6. PROVIDE 4" HIGH CONCRETE PAD FOR NEW CHILLER - REFER TO
DETAIL ON SHEET M501.
7. ROUTE CONDENSATE DRAIN PIPING DOWN TIGHT TO WALL AND
SPILL INTO EXISTING OPEN DRAIN.
PLAN NOTES
A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
B. CONTRACTOR SHALL PROTECT ALL FURNITURE AND VA OWNED
EQUIPMENT AND SUPPLIES WITHIN WORK AREA WITH PLASTIC
SHEETING.
C. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
ADDITIONAL GENERAL NOTES.
D. DURING THE PERFORMANCE OF THIS WORK, COOLING SHALL NOT
BE DISRUPTED TO ANY AREA OUTSIDE THE CURRENT AREA OF
WORK, DURING NORMAL WORKING HOURS.
E. DUCT RUNOUT SIZE TO DIFFUSERS SHALL MATCH DIFFUSER NECK
SIZE.
GENERAL NOTES
Stor.
B01A
15-CHLR-1
P-1
C H
S
C H
R
P-2
C H
S
C H
R
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE OZONE DEPLETING
EQUIPMENT
CINCINNATI, OH
539-21-205
Project Manager
08/19/2021Revisions: Date:
Cincinnati V.A.
Medical Center
SD SUBMITTAL 08-24-2020
DESIGN DEVELOPMENT (DD1) SUBMITTAL 11-20-2020
DESIGN DEVELOPMENT (DD2) SUBMITTAL 02-08-2021
KEVIN HENDERSON
CD SUBMITTAL 03-29-2021
BID DOCUMENT SUBMITTAL 08-19-2021
64-M101
BLDG 64 SITE PLANS AND FLOOR
PLANS - REMOVALS AND NEW WORK
JAC GEH
KEY PLAN
NO SCALE
AREA OF WORK
AREA OF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .