ATTACHMENT 1 - Drawings 603-22-601 ASU PACU Safety Improvements.pdf

PDF 5 MB Posted

Attached to
ASU PACU Safety Improvements Federal contract opportunity
Solicitation number
36C24923C00
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9

About this file

This is an award notice for a construction contract to complete ASU PACU Safety Improvements at the Robley Rex VA Medical Center in Louisville, Kentucky. The contract was awarded by the Department of Veterans Affairs Veterans Health Administration for renovations including installing temporary barriers, HVAC modifications, and plumbing work in the ASU and PACU areas. The contractor must coordinate construction phasing to maintain operations in at least three PACU bays at all times. Infection control measures like maintaining negative air pressure and dust barriers are required. The completion date is December 2022.

View the file

Other files for this federal contract opportunity

Other files attached to ASU PACU Safety Improvements, newest first.
File Type Posted
36C24923C0083.pdf PDF
Attachment 4 - 28 31 00 Fire Detection and Alarm-20211516.pdf PDF
ATTACHMENT 3 - Wage Determination KY20230093 5-12-2023.pdf PDF
Attachment 5 - Plumbing As-Built Drawings.pdf PDF
ATTACHMENT 2 - Specs 603-22-601 ASU PACU Safety Improvements.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT IMAGE PROJECT LOCATION MAP

T-694

/8 /2

:5

:0

A

M C

U s e rs \b n e e d h a m \D o c u m e n ts

\A

-2

-V A

L o u is v ill e -A

S U

P A

C U

S a fe ty

I m p ro v e b n e e d h a m

H L .r v t

G-001

COVER

1 4BLN

ASU PACU SAFETY

IMPROVEMENTS

ROBLEY REX VA MEDICAL CENTER

800 ZORN AVENUE

LOUISVILLE, KENTUCKY 40206 DECEMBER 14, 2022

100% CONSTRUCTION DOCUMENTS

603-22-60121-287

ASU PACU SAFETY IMPROVEMENTS

ROBLEY REX VA MEDICAL CENTER

800 ZORN AVENUE

LOUISVILLE, KENTUCKY 40206

VA PROJECT #: 603-22-601

WVS

PROJECT LOCATION

N

DRAWING LIST

GENERAL

G-001 COVER 1 4

G-002 CAMPUS MAP 2 4

G-003 ICRA INFORMATION AND DETAILS 3 4

G-004 FOURTH FLOOR LIFE SAFETY PLAN 4 4

ARCHITECTURAL

A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES, AND GENERAL

INFORMATION

1 6

A-101 FOURTH FLOOR OVERALL PLAN 2 6

A-401 ASU ENLARGED PLANS 3 6

A-402 HOLDING ROOM ENLARGED PLANS 4 6

A-403 PACU RECOVERY ENLARGED PLANS 5 6

A-404 RESTROOM ENLARGED PLANS 6 6

FIRE SUPPRESSION

FX001 FIRE SUPPRESSION GENERAL INFORMATION, PLANS, AND DETAILS 1 1

PLUMBING

P-001 PLUMBING GENERAL INFORMATION, AND SCHEDULES 1 2

P-101 RESTROOM PLUMBING PLANS, RISERS, AND DETAILS 2 2

MECHANICAL

M-001 MECHANICAL GENERAL INFORMATION 1 2

M-101 RESTROOM MECHANICAL PLANS, DETAILS, AND SCHEDULES 2 2

ELECTRICAL

ET-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 4

ET-101 FOURTH FLOOR OVERALL PLAN 2 4

ET-401 ASU ENLARGED PLANS NEW WORK 3 4

ET-501 ELECTRICAL DETAILS 4 4

DocuSign Envelope ID: 18669E06-01FB-44D7-960A-CA44FF48D1CC

12/12/2022

BUILDINGS IN SCOPE

WORK TAKES PLACE ON 4TH

FLOOR OF BUILDING 1

Z O

R N

A V

E N

U E

C O

U N

T R

Y C

L U

B R

O A

D

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

T-694

/8 /2

:5

:0

A

M C

U s e rs \b n e e d h a m \D o c u m e n ts

\A

-2

-V A

L o u is v ill e -A

S U

P A

C U

S a fe ty

I m p ro v e b n e e d h a m

H L .r v t

G-002

CAMPUS MAP

2 4BLN

ASU PACU SAFETY

IMPROVEMENTS

ROBLEY REX VA MEDICAL CENTER

800 ZORN AVENUE

LOUISVILLE, KENTUCKY 40206 DECEMBER 14, 2022

100% CONSTRUCTION DOCUMENTS

603-22-60121-287

WVS

NORTH

0 3015 60 SITE KEY

Scale: 1" = 80'-0"

SITE PLAN

T20

T22

T27

3 24

A. CONTRACTOR TO COORDINATE STAGING AREA

AND CONTRACTOR PARKING WITH COR PRIOR

TO BIDDING.

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS

FOR CONSTRUCTION AND RENOVATION

PLASTIC WINDOW

SWIVEL CASTERS

WITH TWO

LOCKING BRAKES

MOBILE CART

A D

J U

S T

A B

L E

H E

IG

H

T

HEPA NEGATIVE

AIR UNIT

EXISTING WALL

EXISTING CEILING

FLEX DUCT

5/8" GYPSUM BOARD - BOTH SIDES

TAPE AND SEAL BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

5"

3 5/8" 16 GAUGE METAL

STUDS @ 16" O.C. WALL TO

EXTEND TO UNDERSIDE OF

CEILING

SEALANT, BOTH SIDES

TEMPORARY BARRIER WALL TYPE

ALTERNATE PLASTIC SHEETING BARRIER OR PRE-MANUFACTURED BARRIER SUCH AS STARC

WALL OR EDGEGUARD SYSTEM PERMITTED. SUBMIT TO COR FOR APPROVAL PRIOR TO BID.

ISLM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT

FOR LOUISVILLE VA BUILDING 1 ASU,

PACU SAFETY IMPROVEMENTS T-694

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA.

PLEASE USE ALL ALTERNATE EXITS AS MARKED.

1' - 5"

1/2"1/2"

/2

/2

/2

/2

/2

/2

EQ.EQ.

DUST CONTROL PLAN NOTES

1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE

DESIGNATION FOR THIS PROJECT IS LEVEL IV FOR THE CLASS OF

PRECAUTIONS OR LEVEL OF INFECTION CONTROL ACTIVITIES. HARD

SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED

ON THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO

SEAL AREA FROM NON-WORK AREA AS LONG AS THE SPRINKLER

SYSTEM IS INTACT AND ACTIVE.

1A. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES

(PROVIDE AND LOCATE A STAGING AREA FOR HAZMAT SUITS NEAR THE

PLASTIC BARRIER ENTRANCE SPACES - CONSTRUCTION ANTEROOM.

THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND

LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT

SEALS SHALL BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND

WALL PENETRATIONS. ANY DUST SHALL BE IMMEDIATELY CLEANED IF

TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON

COMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS SHALL

BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE

CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN PLACE

BEFORE REMOVAL OF A PERMANENT BARRIER.

AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 6A.

2. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER

ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY

OR MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND

DEBRIS INTO ADJACENT CLEAN SPACE.

INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS

CONTROL

3. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.

3A. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES

SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;

DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED

TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO

ENTER THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT

PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND

MATERIALS.

4. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION

MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE

USED; THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN

ENTRY AND THE CONSTRUCTION STAGING/PREP AREA.

4A. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH

TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES.

EFFORTS SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN

EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.

DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE

VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH

EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR

MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE

SEALED WHEN NOT IN USE. FILTERS SHALL BE BAGGED AND SEALED

BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA.

THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE

AREAS WITHOUT PRIOR APPROVAL OF THE COR.

4B. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE

INFILTRATION FROM ANY ADJACENT EXCAVATION DEBRIS.

4C. ALL EQUIPMENT REMAIN IN THE ORs AND ASSOCIATED ROOMS SHALL

BE COVERED AND PROTECTED PRIOR STARTING EACH CONSTRUCTION

PHASE.

VENTILATION AND ENVIRONMENTAL CONTROLS

5. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE

CONTRACTOR WHETHER THE CONSTRUCTION AREA USES

FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED OR

RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR

PLASTIC. AIR MUST FLOW FROM CLEAN TO DIRTY AREAS.

5A. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA

SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND

WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF

THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO

REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE,

PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800

CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE

OUTSIDE IF APPROVED BY VAMC. IF EXHAUST SHALL BE TIED INTO A

RE-CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL

BE USED BEFORE EXHAUST TO PREVENT CONTAMINATION OF THE

DUCTS.

5B. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND

CEILING SHALL BE VERIFIED DAILY.

5C. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND

CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN

CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS

NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE

CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING

THROUGHOUT THE PROJECT IN THE FREQUENCY AS IDENTIFIED BY

THE COR.

CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED

AREAS

6. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE

FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE

CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G.,

COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM

SHALL BE USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING

THE BARRICADE. IF PROTECTIVE APPAREL IS UTILIZED, THE

CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM FOR

CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA.

ALL EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS TRANSPORTED

THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM DUST AND

MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR REMOVAL

FROM THE CONSTRUCTION ZONE OR WORK AREA.

6A. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL

HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION

SITE, VA EMS STAFF HAS DONE A TERMINAL CLEANING, AND VA

INFECTIOUS DISEASE CONTROL HAS INSPECTED AND APPROVED THE

CLEANING.

ICRA NOTES

III/IVLOW Risk Group 1

Class III

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

II

I

III

MEDIUM Risk Group 2

HIGH Risk Group 3

HIGHEST Risk Group 4 IV

IV

IV

III/IV

III/IV

III

III/IV

I

III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects

Includes, but is not limited to:

- activities which require consecutive work shifts

- requires heavy demolition or removal of a complete ceiling system

- new construction

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies

Includes, but is not limited to:

- sanding of walls for painting or wall covering

- removal of floor coverings, ceiling tiles and casework

- new wall construction

- minor duct work or electrical work above ceilings

- major cabling activities

- any activity which cannot be completed within a single work shift

Small scale, short duration activities which create minimal dust

Includes, but is not limited to:

- installation of telephone and computer cabling

- access to chase spaces

- cutting of walls or ceiling where dust migration can be controlled

Inspection and Non-Invasive Activities

Includes, but is not limited to:

- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet

- painting (but not sanding), wall covering

- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection

Type of Construction / Project Activity Table

Group 2 Medium Risk

Group 1 Low Risk

- Bldg. #69 Therapy areas

- Respiratory Therapy

- Outpatient Clinics

- CBOC's

- Mental Health Units

- VACANT AREA ADJACENT TO

OCCUPIED AREA

- Office areas (non-clinical)

- Hallways

- FES/EMS areas

I

Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE A

Group 4 Highest Risk

Group 3 High Risk

- Pharmacy

- Radiology/ CT Scanner

- Urgent Care

- Laboratories

- CLCs

- SPD; AMCU;

- Respiratory Isolation Rooms

- Surgery

III

TYPE DTYPE CTYPE B

Class IVor control procedures are necessary.

C

LA

S S

IV

C

LA

S

S

II

During Construction Project

C L-

I C

LA

S

S

II

I

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant after barriers are removed.

6. Remove or isolate HVAC system in areas where work was being performed.

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering.

4. Vacuum work with HEPA-filtered vacuums.

5. Wet mop with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

1. Wipe surfaces to remove dust.

Upon Completion of Project

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.

4. Remove isolation of HVAC system in areas where work is being performed.

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

4. Complete all critical barriers before construction begins or implement control cube method.

5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.

6. Contain construction waste before transport in tightly covered containers.

7. Cover transport receptacles or carts. Tape covers.

8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.

9. Remove isolation of HVAC system in areas where work is being performed.

1. Execute work by methods to minimize raising dust from construction operations.

2. Immediately replace a ceiling tile displaced for visual inspection.

1. Includes all activities required by Class I

2. Provide active means to prevent airborne dust from dispersing into atmosphere.

3. Water mist work surfaces to control dust while cutting.

4. Seal unused doors with duct tape.

5. Block off and seal air vents.

6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.

4. Complete all critical barriers or implement control cube method before construction begins.

5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

6. Seal holes, pipes, conduits, and punctures appropriately.

7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.

8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

9. Place adhesive walk-off mats at entrance to work area within anteroom.

10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.

11. Cover transport receptacles or carts. Tape covering

12. Vacuum work area with HEPA filtered vacuums.

13. Wet mop with disinfectant after barriers are removed.

14. Remove isolation of HVAC system in areas where work is being performed.

HARDWARE SET 1

MANUFACTURERS: NOTES:

3 HINGES TA2714 630 MK

1 DUST PROOF STRIKE 570 32D RO

1 LOCKSET CONTRACTORS DISCRETION

1 DOOR CLOSER DC621xA11 689 CO

1 GASKETING S888 x HEAD & JAMBS PE

CORBIN RUSSWIN CO 1. HARDWARE MANUFACTURER'S LISTED AS BASIS OF DESIGN. ALTERNATE

MANUFACTURERS ACCEPTABLE, SUBJECT TO REVIEW BY ARCHITECT AND C.O.R.

FOR EQUAL QUALITY COMPLIANCE

2. LOCKSET TO RECEIVE BEST CORE 7 PIN SMALL FORMAT CORES VA TO PROVIDE THE

CORES AND KEYS FOR ONLY TEMPORARY DOORS. CONTRACTOR PROVIDES CORES

FOR DOORS LISTED IN DOOR SCHEDULE ON A-404.

McKINNEY MK

PEMKO PE

ROCKWOOD RO

TYPE A TYPE 1

2"

SEE SCHEDULE

2"

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

T-694

/1 /2

:4

:4

A

M C

U s e rs \b n e e d h a m \D o c u m e n ts

\A

-2

-V A

L o u is v ill e -A

S U

P A

C U

S a fe ty

I m p ro v e b n e e d h a m

H L .r v t

G-003

ICRA INFORMATION AND DETAILS

3 4BLN

ASU PACU SAFETY

IMPROVEMENTS

ROBLEY REX VA MEDICAL CENTER

800 ZORN AVENUE

LOUISVILLE, KENTUCKY 40206 DECEMBER 14, 2022

100% CONSTRUCTION DOCUMENTS

603-22-60121-287

WVS

Scale: 1/2" = 1'-0"

ICRA MOBILE CONTAINMENT CART

Scale: 3/4" = 1'-0"

ICRA BARRIER WALL TYPE

Scale: 3" = 1'-0"

ILSM CONSTRUCTION EGRESS SIGNAGE

NOTE: THIS DOOR AND FRAME SCHEDULE IS FOR TEMPORARY BARRIER ENCLOSURES ONLY

NOTE 1: CONTRACTOR TO DETERMINE DOOR WIDTH PER LOCATION

VARIES 7' - 0" 1 3/4" TYPE A HM TYPE 1 HM 5 3/4" SET 1 NOTE 1D000

WIDTH HEIGHT THICK MAT'L FINISH TYPE MAT'L

HDWR

SET REMARKSNO. DEPTH

DOORDOOR DOOR FRAME

DOOR SCHEDULE

QTY.

DocuSign Envelope ID: 3E078C19-9607-47B2-B86A-762060340D02

12/13/2022

DN

UP

S

S

S

S S

S SS

S S

S

S SS

S S S S

S S

S

S S

OR-5

(ORTHOPEDIC

B-417

EQUIP

STORAGE

C-401

OR-4

C-402

EQ

STORAGE

RM

B-416

SUB

STERILE

B-415

CORRIDOR

SCRUB

C-403

SUB

STERILE

C-402A

OR-3

C-404 ANEST

WORK

RM

C-405

OR-2

C-406

SCRUB

C-407

SUB

STERILE

C-406A

OR-1

C-408

EQUIP

STORAGE

C-409

CLEAN

UTILITY

C-413

STOR

C-414

CYSTOCOPY

C-415

HAC

C-412

MENS

RESTROOM

C-411

WOMENS

RESTROOM

C-410

CLEAN

UTILITY

B-427

TOILET

B-425A

PACU

RECOVERY

B-429

A AND

MM

OFFICE

B-432

ANEST

OFFICE

B-431

ANEST

OFFICE

B-430

BAY 1 BAY 2 BAY 3

BAY 6 BAY 5 BAY 4

SOILED

UTILITY

B-426

EQUIP

C-415A1

CONSULT

B-420

WAITING/

RECEPTION

B-413B

LOBBY

B-419

NSQIP

COORD

OFFICE

B-433

SURGY

OFFICE

B-434

CONSULT

RM

B-435

ORSUPV

OFFICE

B-436

HOLDING

RM

B-423

MED

B-423A

DARK RM

B-421A

ELEC

B-418

SUB

STERILE

B-424

CYSTOSCOPY

B-425

INSTRU

PREP

C-415A

ASU

B-413

STAIR 3

B-421

SUPPLY

B-413D

SUB

STERILE

ROOM

B-412

BAY 5

BAY 4

BAY 3

BAY 2

BAY 1

TOILET

B-413B

LIGHT RM

B-422

CORRIDOR

CORRIDORTELE RM

B-435A

OR-7

B-406

OR-6

B-408 ATTENDINGS

PHYS

LOUNGE

B-410

SUB

STERILE

B-407

HISTO

LAB

B-405

WORK

RM

B-411

HVAC

B-411A

HAC

B-404

ELEC

B-403

OR

LOUNGE

B-438

ACNS

OFFICE

B-439 CONTROL

DESK

B-440

SURGY

OFFICE

A-451

MENS

DRESSING

RM

B-402

WOMENS

LOCKER

RM

B-441

SURGY

OFFICE

A-450MENS

LOCKER

RM

B-401

ELEC

CLOS.

B-413C

STAIR 5

B-428

STAIR 8

TRAVEL DISTANCE = 57'-0"

T R

A V

E L D

IS

T

A N

C E

T R

A V

E L D

IS

T

A N

C E

TR

A V E L

D

IS

TA

N C E

9' -6

D.2 F.1 G.2 H.3 I I.1 I.2 J K K1 L L.1 L.2 L.3 M N I.12 O O.2 Q.1 Q.3 R.1 R.2 R.3

15.1

17.2

18.1

2O

12.1

BAY 4

BAY 3

BAY 2

BAY 1

TEMPORARILY REMOVE EXISTING WINDOW AND INSTALL

EXHAUST THRU - SEE ICRA CLASS III & IV ON SHEET G-003

(CONTRACTOR TO REINSTALL WINDOW AFTER COMPLETION)

TURN UP EXHAUST ON EXTERIOR SIDE. CONTRACTOR SHALL VERIFY

LOCATION OF AIR INTAKES ARE AT THE PROPER DISTANCE FROM

EXHAUST. VERIFY LOCAL JURISDICTION CODE AND VA REQUIREMENTS

FOR DISTANCE PRIOR STARTING WORK.

TEMPORARILY REMOVE EXISTING WINDOW AND INSTALL

EXHAUST THRU - SEE ICRA CLASS III & IV ON SHEET G-003

(CONTRACTOR TO REINSTALL WINDOW AFTER COMPLETION)

TURN UP EXHAUST ON EXTERIOR SIDE. CONTRACTOR SHALL VERIFY

LOCATION OF AIR INTAKES ARE AT THE PROPER DISTANCE FROM

EXHAUST. VERIFY LOCAL JURISDICTION CODE AND VA REQUIREMENTS

FOR DISTANCE PRIOR STARTING WORK.

A. SEE SHEET A-001 FOR SYMBOLS AND

ABBREVIATIONS.

B. REFER TO PLUMBING DRAWINGS FOR INFORMATION

CONCERNING PLUMBING FIXTURES AND PIPING

SYSTEM(S).

C. REFER TO ELECTRICAL DRAWINGS FOR

INFORMATION CONCERNING POWER, LIGHTING AND

COMMUNICATION SYSTEM(S).

D. CONTRACTOR TO PROVIDE ALL ADDITIONAL FRAMING

NECESSARY FOR ALL OPENINGS AND

SUPPLEMENTAL FRAMING ABOVE PARTITIONS.

E. ALL FIRE RATED ASSEMBLIES SHALL BE INSTALLED IN

STRICT ACCORDANCE WITH TESTED ASSEMBLIES

INDICATED.

F. ALL PENETRATIONS OF FIRE-RATED ASSEMBLIES

SHALL BE FIRE-SEALED IN ACCORDANCE WITH

APPROVED MANUFACTURER'S DETAIL FOR

LOCATION, TYPE OF CONSTRUCTION, PENETRATING

ITEM AND RATING REQUIRED.

G. ALL DUCTWORK, DIFFUSERS AND GRILLES

PENETRATING FIRE-RATED WALLS, CEILINGS AND

FLOORS SHALL HAVE THE APPROPRIATE TYPE OF

FIRE/SMOKE DAMPER IN ACCORDANCE WITH THE

TYPE OF CONSTRUCTION BEING PENETRATED AND

THE FIRE/SMOKE RATING REQUIRED.

H. ALL LIGHT FIXTURES AND ELECTRICAL DEVICES

PENETRATING FIRE-RATED ASSEMBLIES SHALL BE

UL-LISTED FOR INSTALLATION IN THE ASSEMBLY OR

SHALL BE INSTALLED SUCH THAT THE FIRE-RATING IS

NOT COMPROMISED.

I. STORAGE OF ANY FLAMMABLE OR COMBUSTIBLE

LIQUIDS IS UNDERSTOOD TO NOT BE WITHIN THE

BUILDING. STORAGE OF ANY MATERIAL IS TO BE IN

COMPLIANCE WITH ALL APPLICABLE CODES AND

AUTHORITIES HAVING JURISDICTION.

J. AS PER NFPA 101, 2021, THIS PROJECT IS CLASSIFIED

AS A MODIFICATION. THIS PROJECT DOES NOT

CHANGE OR ALTER EXISTING USE GROUP OR

OCCUPANT LOAD OR MEANS OF EGRESS. THE

EGRESS CAPACITY SHALL HAVE BEEN PREVIOUSLY

APPROVED AS BEING ADEQUATE.

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

T-694

/8 /2

:5

:1

A

M C

U s e rs \b n e e d h a m \D o c u m e n ts

\A

-2

-V A

L o u is v ill e -A

S U

P A

C U

S a fe ty

I m p ro v e b n e e d h a m

H L .r v t

G-004

FOURTH FLOOR LIFE SAFETY PLAN

4 4BLN

ASU PACU SAFETY

IMPROVEMENTS

ROBLEY REX VA MEDICAL CENTER

800 ZORN AVENUE

LOUISVILLE, KENTUCKY 40206 DECEMBER 14, 2022

100% CONSTRUCTION DOCUMENTS

603-22-60121-287

WVS

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/8" = 1'-0"

FOURTH FLOOR LIFE SAFETY PLAN

NORTH

0 8 16 32

LIFE SAFETY LEGEND

FLEX DUCT FROM HEPA AIR SCRUBBER

SHEET NOTES:

AFF ABOVE FINISHED FLOOR

ACP/APC ACOUSTIC CEILING PANEL/

ACOUSTIC PANEL CEILING

ACT ACOUSTIC(AL) TILE

ADJ ADJUSTABLE

ADT'L ADDITIONAL

AGG AGGREGATE

ALT ALTERNATE

AL ALUMINUM

APPROX APPROXIMATE(LY)

ASPH ASPHALT

AUTO AUTOMATIC

B/O BOTTOM OF

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BOT BOTTOM

BRG BEARING

CENTERLINE

C/C CENTER TO CENTER

CJ CONTROL JOINT

CLL CONTRACT LIMIT LINE

CEM CEMENT(ITIOUS)

CMU CONCRETE MASONRY UNIT

CLG CEILING

CLR CLEAR

COL COLUMN

CONC CONCRETE

CONST CONSTRUCTION

CONT CONTINUOUS

CPT CARPET

CT CERAMIC TILE

CTR CENTER(ED)

DF DRINKING FOUNTAIN

DS DOWNSPOUT

DBL DOUBLE

DEG DEGREE

DEMO DEMOLITION

DET/DTL DETAIL

DIA DIAMETER

DIM DIMENSION

DN DOWN

DWG(S) DRAWING(S)

E EAST

EC ELECTRICAL CONTRACTOR

EHO ELECTRICAL HOLD OPEN

EJ EXPANSION JOINT

EW EACH WAY

EA EACH

EIFS EXTERIOR INSULATION

FINISH SYSTEM

EL ELEVATION

ELEC ELECTRIC(AL)

ELEV ELEVATOR

EMER EMERGENCY

EQ EQUAL

EQUIP EQUIPMENT

EXIST EXISTING

EXT EXTERIOR

EWC ELECTRIC WATER COOLER

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FFE FINISH FLOOR ELEVATION

FV FIELD VERIFY

FEC FIRE EXTINGUISHER CABINET

FDN FOUNDATION

FIN FINISH

FLSHG FLASHING

FLR FLOOR

FRMG FRAMING

FT FOOT/FEET

FTG FOOTING

GC GENERAL CONTRACTOR

GA GAUGE

GALV GALVANIZED

GEN GENERAL

GYP GYPSUM

HM HOLLOW METAL

HDWR HARDWARE

HOL HOLLOW

HOR HORIZONTAL

HT HEIGHT

HVAC HEATING/VENTILATION/AIR

CONDITIONING

ID INSIDE DIAMETER

IN INCH

INCL INCLUDING

INSUL INSULATION

INT INTERIOR

JAN JANITOR

JT JOINT

LAV LAVATORY

LB(S) POUND(S)

L/S LANDSCAPE

LT LIGHT

MO MASONRY OPENING

MAS MASONRY

MAT'L MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MTD MOUNTED

MTL METAL

N NORTH

NIC NOT IN CONTRACT

NTS NOT TO SCALE

NOM NOMINAL

OC ON CENTER

OD OUTSIDE DIAMETER

O TO O OUT TO OUT

OPNG OPENING

OPP OPPOSITE

OVHD OVERHEAD

PEB PRE-ENGINEERED BUILDING

PJF PREFORMED JOINT FILLER

PT PRESSURE TREATED

PERIM PERIMETER

PL PLATE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PLYWD PLYWOOD

PNT PAINT

PR PAIR

PTD PAINTED

PWR POWER

RB RUBBER BASE

RD ROOF DRAIN

RO ROUGH OPENING

RAD RADIUS

REC RECESSED

REINF REINFORCED

REQ'D REQUIRED

REV REVISED (REVISION)

RM ROOM

S SOUTH

SB SPLASH BLOCK

SF SQUARE FEET

SS STAINLESS STEEL

SIM SIMILAR

SPEC SPECIFICATIONS

SQ SQUARE

STD STANDARD

STL STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

T&G TONGUE AND GROOVE

T/O TOP OF

TELE TELEPHONE

TRTD TREATED

TS TUBE STEEL

TYP TYPICAL

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

VCT VINYL COMPOSITION TILE

VIF VERIFY IN FIELD

VERT VERTICAL

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WWF WELDED WIRE FABRIC

WD WOOD

WH WATER HEATER

WT WEIGHT

CL

DEMOLITION KEYNOTE

WINDOW TYPE

TOILET ACCESSORY

ROOF PITCH SYMBOL

DOOR NUMBER

TYPICAL KEYNOTE CEILING/ SOFFIT

HEIGHT

MATL

1'-0"

1 #

1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND

CONTRACTOR BEFORE THE START OF THE WORK.

2. DRAWINGS ARE PREPARED USING PRODUCT DIMENSIONS AND DETAILS FROM BASIS OF DESIGN PRODUCT.

PRODUCTS MAY CHANGE IN DIMENSION AND DETAIL BEFORE THEY ARE INCORPORATED INTO

WORK. PRODUCTS FROM OTHER MANUFACTURER’S ARE ALSO ACCEPTABLE. DIMENSIONS AND DETAILS FOR ALTERNATE PRODUCTS MAY VARY FROM BASIS OF DESIGN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED INTO WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS REPONSIBLE FOR ACCOMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.

3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO

BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.

4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER

QUANTITY OF WORK.

5. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE

DRAWINGS AND SPECIFICATIONS.

6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT, FOR EACH PHASE. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND

ACTUAL FIELD CONDITIONS, NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.

7. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL

GOVERN.

8. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT MATERIALS.

9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.

10. REFER TO ALL OTHER TRADE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THIS

PROJECT.

11. PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS: PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE STUDS, AS

REQUIRED FOR COMPLETION OF THE WORK.

12. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF CONCRETE/MASONRY WALLS, OR FINISHED

FACE OF EXISTING WALL SURFACE.

13. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.

1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT

PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS.

2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO

PROCEEDING WITH NEW CONSTRUCTION.

3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OF, OFF PROJECT GROUNDS. COORDINATE

WITH COR.

4. AT AREAS INDICATED TO BE PATCHED AND REPAIRED, FOR ADDITION AND RENOVATION PROJECTS: THE CONSTRUCTION AND ASSEMBLY OF THE PATCH OR REPAIR SHALL MATCH THE ASSEMBLY AND INTEGRITY OF THE ADJACENT EXISTING CONSTRUCTION, FOR FIRE RATING, MATERIALS, FINISH, THICKNESS, AND QUALITY.

5. COORDINATE WORKING HOURS ALLOWED FOR DEMOLITION AND WASTE REMOVAL WITH COR.

6. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH

EXISTING.

7. CONTRACTOR SHALL PROTECT AREA ADJACENT TO THE DEMOTION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES, (IF DAMAGED REPAIR, RE-PATCH, SAND SMOOTH AND REFINISH TO MATCH EXISTING.)

REPAIR OR REPLACE ITEMS DAMAGED DURING CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST.

8. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE

COMPLETION OF THE PROJECT.

9. DO NOT ENCROACH ON ADJACENT OCCUPIED AREAS NOT IDENTIFIED WITHIN THE SCOPE OF WORK.

10. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING DEMOLITION OF ELECTRICAL

SYSTEMS.

11. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW, OR OUTSIDE THE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE SCOPE OF THE PROJECT.

12. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERING FROM THOSE INDICATED OR THAT

ARE NOT IDENTIFIED, SHALL BE REPORTED TO THE COR.

13. AFTER REMOVAL OF EXISTING SOLID CONCRETE MASONRY WALL, FILL FLOOR VOIDS UP TO FINISH CONCRETE

LEVEL AND PERFORM FLOOR LEVELING FOR ENTIRE AREA OF RENOVATION.

14. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR AND ARCHITECT OF ANY

CONFLICTS PRIOR TO PROCEEDING WITH DEMOLITION.

15. ALL ITEMS BEING SALVAGED OR REMOVED SHALL REMAIN THE PROPERTY OF THE COR/VA UNTIL CONFIRMATION HAS BEEN MADE AS TO WHETHER THE COR/VA WILL RETAIN SUCH ITEMS. ALL ITEMS NOT BEING RETAINED BY THE COR/VA OR DESIGNATED ON THE DRAWINGS, ARE TO BE RELOCATED OR

REINSTALLED FROM THE SITE BY CONTRACTOR IN APPROVED MANNER.

16. CONTRACTOR SHALL NOTIFY COR OF ANY AREA REQUIRING DEMOLITION OTHER THAN SHOWN IN THESE DRAWINGS DUE TO UNFORSEEN CONDITIONS, TO ACCOMMODATE INSTALLATION OF ALL OTHER TRADES (INCLUDING ROOF PENETRATIONS). AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE

MATERIALS AND FINISHES TO MATCH EXISTING.

17. COORDINATE WITH COR FOR CONSTRUCTION ACCESS ROUTE AND LOCATIONS OF DUMPSTER AREA.

COORDINATE WITH COR FOR SCHEDULE OF USE OF ACCESS ROUTE FOR WASTE REMOVAL AND CONTRACTOR

USE OF FREIGHT ELEVATOR (AS REQUIRED).

WALL SECTION

SYMBOL INTERIOR ELEVATION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

ROOF SLOPE

DIRECTION SYMBOL

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

VIEW NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

WALL GRID

(REPRESENTS

FACE OF EXISTING

WALL)

XX.X

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

NORTHNORTH

0 4 8 16

EXPOSED

PLUMBING AT

BARRIER

FREE

LAVATORIES

SHALL BE

INSULATED.

LEVER OPERATING

CONTROLLED

SOAP DISPENSER

NOTE: SINKS IN COUNTERS TO BE

MOUNTED WITH RIM NO MORE

THAN 2'-10" HIGH AND WITH AT

LEAST 2'-3" KNEE CLEARANCE.

CLEAR

TYPICAL ACCESSIBLE

CLEARANCE AT LAVATORY

TYPICAL ACCESSIBLE

LAVATORY AND MIRROR

1'-3" 1'-3"

M

IN

M A

X

M

A X

A

.F .F

MIN

8"

MAX

6"

M

IN9

M

IN

M

IN

M A

X

17" MIN

INTERCOM

STATION INTERCOM

MASTER

STATION

INTERCOM

WALL

OUTLET

INTERCOM STATION

T O

B O

T T

O M

O F

R

E F

L E

C T

IV

S

U R

F A

C E

O F

M

IR

R

O R

DUPLEX

OUTLET

SWITCH

THERMOSTAT

TELEPHONE

OR DATA

OUTLET

FIRE ALARM

PULL

INTERCOM

STATION

DUPLEX

OUTLET

COMPUTER

TERMINAL

MISC. WALL DEVICES

O .C

O.C.

39" - 41"

3'-6" 1'-0"

9" O.C.

2'-0"

/2

M

IN

T O

T O

P

6" 3'-0"

ACCESSIBLE TOILET

WALL MOUNTED

1-1/2"

DIAMETER

GRAB BAR

SANITARY NAPKIN

DISPOSAL

TOILET TISSUE

DISPENSER

TOILET SEAT

COVER

DISPENSER

FIRE EXTINGUISHER

CABINET

M

A X

M

A X

PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO

PARTICIPATE IN VOLUNTARY STANDARD BODIES.

GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND

STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:

• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

• INTERNATIONAL BUILDING CODE (IBC) 2021 (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES

BELOW)

• NFPA 101 LIFE SAFETY CODE 2021 (SEE NOTES BELOW)

• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

• VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• NATIONAL ELECTRICAL CODE (NEC)

• INTERNATIONAL PLUMBING CODE (IPC) 2021

• SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.

• ASME BOILER AND PRESSURE VESSEL CODE

• ASME CODE FOR PRESSURE PIPING

• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

STANDARD (PG-18-13)

• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)

• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL

BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

• ENERGY POLICY ACT OF 2005 (EPACT)

• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH- RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.

• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)

• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE

VA MASTER CONSTRUCTION SPECIFICATION.

• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2019.

• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2019.

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION

FEES.

NOTES:

1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY

HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

T-694

/8 /2

:0

:4

A

M C

U s e rs \b n e e d h a m \D o c u m e n ts

\A

-2

-V A

L o u is v ill e -A

S U

P A

C U

S a fe ty

I m p ro v e b n e e d h a m

H L .r v t

A-001

ARCHITECTURAL SYMBOLS,

ABBREVIATIONS AND NOTES, AND

GENERAL INFORMATION

1 6BLN

ASU PACU SAFETY

IMPROVEMENTS

ROBLEY REX VA MEDICAL CENTER

800 ZORN AVENUE

LOUISVILLE, KENTUCKY 40206 DECEMBER 14, 2022

100% CONSTRUCTION DOCUMENTS

603-22-60121-287

WVS

ABBREVIATIONS

ARCHITECTURAL SYMBOL LEGEND GENERAL NOTES

DEMOLITION NOTES

GENERAL SYMBOL LEGEND

Scale: 3/8" = 1'-0"

STANDARD MOUNTING HEIGHTS

CODE STANDARDS AND EXECUTIVE ORDERS

UP

DN

UP

UP

UP

S

SS S

S S

S

S

S S

S

S S

S

SS

S S S S

S S

S

S

SS

S

SS SS

S S

S

S SS

S

SS S

S S

S

S S

S

SS S

S S

S

S

S S

S

S S

S

SS

S S S S

S S

S

S

SS

S

SS SS

S S

S

S SS

S

SS S

S S

S

S S

A

A-403

A-404

2_____ A-401

OR-5

(ORTHOPEDIC

B-417

EQUIP

STORAGE

C-401 OR-4

C-402

EQ

STORAGE

RM

B-416

SUB

STERILE

B-415

CORRIDOR

SCRUB

C-403

SUB

STERILE

C-402A

OR-3

C-404

ANEST

WORK

RM

C-405

OR-2

C-406

SCRUB

C-407

SUB

STERILE

C-406A

OR-1

C-408

EQUIP

STORAGE

C-409

CLEAN

UTILITY

C-413STOR

C-414

CYSTOCOPY

C-415

HAC

C-412

MENS

RESTROOM

C-411

WOMENS

RESTROOM

C-410

CLEAN

UTILITY

B-427

TOILET

B-425A

PACU

RECOVERY

B-429

A AND

MM

OFFICE

B-432

ANEST

OFFICE

B-431

ANEST

OFFICE

B-430

BAY 1 BAY 2 BAY 3

BAY 6 BAY 5 BAY 4

SOILED

UTILITY

B-426

EQUIP

C-415A1

CONSULT

B-420

WAITING/

RECEPTION

B-413B

LOBBY

B-419

NSQIP

COORD

OFFICE

B-433

SURGY

OFFICE

B-434

CONSULT

RM

B-435

ORSUPV

OFFICE

B-436

HOLDING

RM

B-423

MED

B-423A

DARK RM

B-421A

ELEC

B-418

SUB

STERILE

B-424

CYSTOSCOPY

B-425

INSTRU

PREP

C-415AASU

B-413

STAIR 3

B-421

SUPPLY

B-413D

SUB

STERILE

ROOM

B-412

BAY 5

BAY 4

BAY 3

BAY 2

BAY 1

TOILET

B-413B

LIGHT

RM

B-422

CORRIDOR

CORRIDOR

TELE RM

B-435A

OR-7

B-406

OR-6

B-408

ATTENDINGS

PHYS

LOUNGE

B-410

SUB

STERILE

B-407

HISTO

LAB

B-405

WORK

RM

B-411

HVAC

B-411A

HAC

B-404

ELEC

B-403

OR

LOUNGE

B-438

ACNS

OFFICE

B-439

CONTROL

DESK

B-440

SURGY

OFFICE

A-451

MENS

DRESSING

RM

B-402

WOMENS

LOCKER

RM

B-441

SURGY

OFFICE

A-450

WOMENS

RESTROOM

B-441A

MENS

LOCKER

RM

B-401

TLT

B-401A

SURG

GAS

STOR

A-449

WOMENS

RESTROOM

A-445

SECY SURGY

SVC

A-435A

HAC

A-452

CORR

HVAC

EQUIP

RM

A-417

STORAGE

A-408

PATIENT

BED RM

A-409

PATIENT

BED RM

A-416

ANTE RM

A-410

PATIENT

BED RM

A-411

ANTE RM

A-415

TLT

A-414D

WOMENS

LOCER

RM

A-414C

MULTIPURPOSE

A-414

OFFICE

A-412

HAC

A-413

TLT

A-414B

MENS

LOCKER

RM

A-414A

PATIENT

BED RM

A-427

ANTE RM

A-426

PATIENT

BED RM

A-425

PATIENT

BED RM

A-424

ANTE RM

A-403

SUB

STATION

A-428

LINEN

A-430

ANTE RM

A-429

PATIENT

BED RM

A-431 STAFF

TLT

A-432

PATIENT

BED RM

A-422

PATIENT

BED RM

A-421

OFFICE

A-419

ANTE RM

A-420

SOILED

UTILITY

A-418

STAIR 2

A-434

CENTER

NUTRI

A-435

CU

A-433

CORRIDOR

FAC

ALCOVE

MED

PREP RM

A-436

SUB

STATION

A-437

ELEC

CLT

A-406

ALCOVE

A-407

PATIENT

CONSULT

A-405

EXAM

RM

A-403

EXAM

RM

A-402

ELEC

CLT

A-440

WAITING

RM

A-439

ELEC

CLT

A-438

STAIR 1

A-442

PATIENT

CHECK

IN/OUT

A-401

CORRIDOR

PATIENT

BED RM

A-486

PATIENT

RESTROOM

A-486A

PATIENT

RESTROOM

A-485A PATIENT

BED RM

A-485

PATIENT

BED RM

A-484

PATIENT

RESTROOM

A-484A

PATIENT

RESTROOM

A-483A

PATIENT

BED RM

A-483

PATIENT

BED RM

A-482

PATIENT

RESTROOM

A-482A

PATIENT

RESTROOM

A-481A

PATIENT

BED RM

A-481

PATIENT

BED RM

A-480

PATIENT

RESTROOM

A-480A

PATIENT

RESTROOM

A-479A

PATIENT

BED RM

A-479

PATIENT

BED RM

A-470

PATIENT

BED RM

A-471

PATIENT

RESTROOM

A-471A

PATIENT

BED RM

A-472

PATIENT

RESTROOM

A-472A

ALCOVE

A-473

ALCOVE

A-468

PATIENT

RESTROOM

A-469A

PATIENT

BED RM

A-469

PATIENT

RESTROOM

A-470A

PATIENT

BED RM

A-467

PATIENT

BED RM

A-466

PATIENT

RESTROOM

A-466A

PATIENT

RESTROOM

A-467A

STAIR 6

A-465

MEDS

A-464

STAFF

RESTROOM

A-463B

CORRIDOR

SOILED

UTILITY

A-476

SUPPLY

A-478

PATIENT

BED RM

A-475

PATIENT

BED RM

A-474

PATIENT

RESTROOM

A-474A

PATIENT

RESTROOM

A-475A

NURSE

STATION

A-463

FACSTOR

A-477

NURSE

REPORT

A-461

OFFICE

A-453

STAFF

LOCKER

A-462

SOILED

UTILITY

A-487

NOURISH

A-488

MECH

A-489

STORAGE

A-490

WAITING

RM

A-491

RESIDENTS

OFFICE

A-400

RSTROOM

A-400A

ELEVATOR

LOBBY

A-457

HAC

A-460

OFFICE

A-459

RESTROOM

A-458

ELEC

A-456

NURSE

CALL

EQUIP

A-454

TELE

A-455

COMM

CLT

A-441

HVAC

EQUIP

A-443

MENS

RESTROOM

A-444

CHIEF

SURGY

SVC

A-453C

STORAGE

A-458A

AA SURGY SVC

A-453B

SURGY

SVCS

A-453

CORR

ELEC

CLOS.

B-413C

STAIR 5

B-428

MULTI.

A-448DUMBWAIT.

A-447

STAIR 8

A-402

B C D E F G H.1D.1 E.1 E.2 G.1 H.2 P P.2 Q Q.2 R S T

D.2 F.1 G.2 H.3 I I.1 I.2 J K K1 L L.1 L.2 L.3 M N I.12 O O.2 Q.1 Q.3 R.1 R.2 R.3

15.1

17.2

18.1

2O

3.2

7.1

7.2

3.1

10.1

10.2

12.1

BAY 1

BAY 2

BAY 3

BAY 4

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

T-694

/8 /2

:0

:4

A

M C

U s e rs \b n e e d h a m \D o c u m e n ts

\A

-2

-V A

L o u is v ill e -A

S U

P A

C U

S a fe ty

I m p ro v e b n e e d h a m

H L .r v t

A-101

FOURTH FLOOR OVERALL PLAN

2 6BLN

ASU PACU SAFETY

IMPROVEMENTS

ROBLEY REX VA MEDICAL CENTER

800 ZORN AVENUE

LOUISVILLE, KENTUCKY 40206 DECEMBER 14, 2022

100% CONSTRUCTION DOCUMENTS

603-22-60121-287

WVS

NORTH

0 8 16 32

Scale: 1/16" = 1'-0"

FOURTH FLOOR OVERALL PLAN

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

ICRA LEGEND

FLEX DUCT FROM HEPA AIR SCRUBBER

B-413

ASU

BAY 2

BAY 1

BAY 3

BAY 4

BAY 5

ELEC

CLOS.

B-413C

SUPPLY

B-413D

STAIR 3

B-421

TOILET

B-413B

SUB

STERILE

ROOM

B-412ELEVATOR

WAITING/

RECEPTION

B-413B

CORRIDOR

CORRIDOR

C C

C C

C

H.3 I I.2 J

17.2

18.1

2O

EXHAUST AIR FOR

NEGATIVE PRESSURE

D000

D

D

D000

BAY 1

BAY 2

BAY 3

BAY 4

BAY 5

ASU

B-413

TOILET

B-413B

STAIR 3

B-421

SUB

STERILE

ROOM

B-412

SUPPLY

B-413D

ELEC

CLOS.

B-413C

ELEVATOR

WAITING/

RECEPTION

B-413B

CORRIDOR

CORRIDOR

N N

N N

N

H.3 I I.2 J

17.2

18.1

2O

TYP.

9' - 0"

ACT

2x2

N

CEILING

MOUNTED

NURSE CALL ANNUNCIATOR

C

HEADWALL NURSE CALL PATIENT STATION

WITH CALL CORD

N ABOVE

DOOR

NURSE CALL ANNUNCIATOR

2'x4' LAY-IN LED

OVERHEAD LIFT

TEMPORARY WALL

TEMPORARY DOOR

A. SEQUENCE OF WORK: ISOLATE BAYS 1 AND 2 FIRST

WITH TEMPORARY BARRIER AND VESTIBULE WHILE

BAYS 3,4,AND 5 REMAIN OPERATIONAL. AFTER BAYS

ONE AND TWO COMPLETE, REMOVE TEMPORARY

BARRIERS AND ISOLATE BAYS 3,4, AND 5 WITH

TEMPORARY BARRIERS AND VESTIBULE WHILE

BAYS 1 AND 2 REMAIN OPERATIONAL.

B. ACCESS PANELS ARE NOT PERMITTED IN SOFFITS,

CHECK ALL VALVES, FIRE DAMPERS, REHEAT

BOXES, ETC. FOR ACCESS POINTS. ARRANGE FIRE

AND SMOKE DAMPER ACCESS FROM NON-

CORRIDOR SIDE

C. LIGHTS, DIFFUSERS, EXIT SIGNAGE, SPRINKLER

HEADS, AND SMOKE DETECTORS MUST BE

CENTERED IN CEILING PANELS IN WHICH THEY

OCCUR

D. COORDINATE WITH SEPARATE MECHANICAL AND

ELECTRICAL DESIGN PACKAGES FOR CEILING

MOUNTED DEVICES

E. PAINT CUT EDGES OF ACT TO MATCH CEILING TILE

WHERE EXPOSED TO VIEW

F. CONTRACTOR TO REVIEW CEILING LAYOUT AS

SHOWN AND NOTIFY ARCHITECT OF ANY

CONFLICTS BEFORE PROCEEDING WITH

CONSTRUCTION

G. THERE IS APPROXIMATELY 47 L.F. OF TEMPORARY

WALL TO BE CONSTRUCTED IN THIS AREA

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

T-694

/8 /2

:0

:5

A

M C

U s e rs \b n e e d h a m \D o c u m e n ts

\A

-2

-V A

L o u is v ill e -A

S U

P A

C U

S a fe ty

I m p ro v e b n e e d h a m

H L .r v t

A-401

ASU ENLARGED PLANS

3 6BLN

ASU PACU SAFETY

IMPROVEMENTS

ROBLEY REX VA MEDICAL CENTER

800 ZORN AVENUE

LOUISVILLE, KENTUCKY 40206 DECEMBER 14, 2022

100% CONSTRUCTION DOCUMENTS

603-22-60121-287

WVS

Scale: 1/4" = 1'-0"

ASU NEW WORK FLOOR PLAN

NORTH

0 2 4 8 N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/4" = 1'-0"

ASU NEW WORK REFLECTED CEILING PLAN

NORTH

0 2 4 8

LEGEND

1 NEW NURSE CALL PATIENT STATION AT

HEADWALL, TYP.

2 NEW NURSE CALL ANNUNCIATOR LOCATED IN

EXISTING BULK HEAD, TYP.

3 FUTURE OVERHEAD PATIENT LIFT AND TRACKS.

NOT IN SCOPE OF WORK. INSTALLED IN ANOTHER

PROJECT.

4 TEMPORARY BARRIER FROM FLOOR TO TIGHT TO

UNDERSIDE OF CEILING. CONTRACTORS

DISCRETION, MAY USE WALL SYSTEM (STARC

WALLS OR EDGEGUARD OR EQUAL) OR BUILD

HARD BARRIERS (METAL STUDS AND 5/8" GYP. BD

BOTH SIDES. BARRIERS TO BE AIRTIGHT

5 AIR SCRUBBER UNIT

6 EXISTING CEILING TO REMAIN

7 SEE SHEET G-004 FOR COMPLETE FLEX DUCT

ROUTING

8 REPAIR FLOORS, WALLS AND CEILING TO

ORIGINAL CONDITION AFTER TEMPORARY

BARRIERS ARE REMOVED.

9 FLEXDUCT TO BE SUSPENDED FROM CEILING AND

ALLOW FOR PEDESTRIAN TRAFFIC

REFLECTED CEILING PLAN

LEGEND

ICRA LEGEND

FLEX DUCT FROM HEPA

AIR SCRUBBER

ASU AREA, HOLDING AREA, AND PACU AREAS

MUST BE DONE INDIVIDUALLY AND AT

SEPARATE TIMES. A PRE-CONTRUCTION

CONFERENCE TO BE SCHEDULED 30 DAYS IN

ADVANCE OF START OF CONSTRUCTION WITH

THE COR TO DISCUSS SCHEDULING AND

SEQUENCE OF WORK.

HOLDING

RM

B-423

ELEC

B-418

MED

B-423A

STAIR 3

B-421

CYSTOSCOPY

B-425

CORRIDOR

SUB

STERILE

B-424

CBAY 1

BAY 2

BAY 3

BAY 4

C C

C

L.1 L.2 L.3 M N I.12

17.2

18.1

D000 D000

SUB

STERILE

B-424

HOLDING

RM

B-423

MED

B-423A

STAIR 3

B-421

ELEC

B-418

CYSTOSCOPY

B-425

BAY 1

BAY 2

BAY 3

BAY 4

N

N

N

N

L.1 L.2 L.3 M N I.12

17.2

18.1

TYP.

CORRIDOR

8' - 0"

ACT

2x4

N

CEILING

MOUNTED

NURSE CALL ANNUNCIATOR

C

HEADWALL NURSE CALL PATIENT STATION

WITH CALL CORD

N ABOVE

DOOR

NURSE CALL ANNUNCIATOR

TEMPORARY WALL

TEMPORARY DOOR

A. SEQUENCE OF WORK: ISOLATE BAYS 1,2,3, AND 4

WITH TEMPORARY BARRIER AND VESTIBULE.

PERFORM ALL WORK AND REMOVE BARRIERS

B. ACCESS PANELS ARE NOT PERMITTED IN SOFFITS,

CHECK ALL VALVES, FIRE DAMPERS, REHEAT

BOXES, ETC. FOR ACCESS POINTS. ARRANGE FIRE

AND SMOKE DAMPER ACCESS FROM NON-

CORRIDOR SIDE

C. LIGHTS, DIFFUSERS, EXIT SIGNAGE, SPRINKLER

HEADS, AND SMOKE DETECTORS MUST BE

CENTERED IN CEILING PANELS IN WHICH THEY

OCCUR

D. COORDINATE WITH SEPARATE MECHANICAL AND

ELECTRICAL DESIGN PACKAGES FOR CEILING

MOUNTED DEVICES

E. PAINT CUT EDGES OF ACT TO MATCH CEILING TILE

WHERE EXPOSED TO VIEW

F. CONTRACTOR TO REVIEW CEILING LAYOUT AS

SHOWN AND NOTIFY ARCHITECT OF ANY

CONFLICTS BEFORE PROCEEDING WITH

CONSTRUCTION

G. THERE IS APPROXIMATELY 40 L.F. OF TEMPORARY

WALL TO BE CONSTRUCTED IN THIS AREA

2'x4' LAY-IN LED

1'x4' LAY-IN LED

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

T-694

/8 /2

:0

:5

A

M C

U s e rs \b n e e d h a m \D o c u m e n ts

\A

-2

-V A

L o u is v ill e -A

S U

P A

C U

S a fe ty

I m p ro v e b n e e d h a m

H L .r v t

A-402

HOLDING ROOM ENLARGED PLANS

4 6BLN

ASU PACU SAFETY

IMPROVEMENTS

ROBLEY REX VA MEDICAL CENTER

800 ZORN AVENUE

LOUISVILLE, KENTUCKY 40206 DECEMBER 14, 2022

100% CONSTRUCTION DOCUMENTS

603-22-60121-287

WVS

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/4" = 1'-0"

HOLDING ROOM NEW WORK FLOOR PLAN

Scale: 1/4" = 1'-0"

HOLDING ROOM NEW WORK REFLECTED CEILING PLAN

NORTH

0 2 4 8

NORTH

0 2 4 8

1 NEW NURSE CALL PATIENT STATION AT

HEADWALL, TYP.

2 NEW NURSE CALL ANNUNCIATOR, TYP.

3 TEMPORARY BARRIER FROM FLOOR TO TIGHT TO

UNDERSIDE OF CEILING. CONTRACTORS

DISCRETION, MAY USE WALL SYSTEM (STARC

WALLS OR EDGEGUARD OR EQUAL) OR BUILD

HARD BARRIERS (METAL STUDS AND 5/8" GYP. BD

BOTH SIDES. BARRIERS TO BE AIRTIGHT

4 EXISTING CEILING TO REMAIN

5 SEE SHEET G-004 FOR COMPLETE FLEX DUCT

ROUTING

6 REPAIR FLOORS, WALLS AND CEILING TO

ORIGINAL CONDITION AFTER TEMPORARY

BARRIERS ARE REMOVED.

7 AIR SCRUBBER UNIT

8 FLEXDUCT TO BE SUSPENDED FROM CEILING AND

ALLOW FOR PEDESTRIAN TRAFFIC

LEGEND

ICRA LEGEND

FLEX DUCT FROM HEPA

AIR SCRUBBER

REFLECTED CEILING PLAN

LEGEND

ASU AREA, HOLDING AREA, AND PACU AREAS

MUST BE DONE INDIVIDUALLY AND AT

SEPARATE TIMES. A PRE-CONTRUCTION

CONFERENCE TO BE SCHEDULED 30 DAYS IN

ADVANCE OF START OF CONSTRUCTION WITH

THE COR TO DISCUSS SCHEDULING AND

SEQUENCE OF WORK.

PACU

RECOVERY

B-429

SOILED

UTILITY

B-426

TOILET

B-425A

CLEAN

UTILITY

B-427

ANEST

OFFICE

B-431

ANEST

OFFICE

B-430

A AND

MM

OFFICE

B-432

FAC

BAY 1 BAY 2 BAY 3

BAY 6 BAY 5 BAY 4

NSQIP

COORD

OFFICE

B-433

CYSTOSCOPY

B-425

WOMENS

RESTROOM

C-410

EQUIP

STORAGE

C-409

STAIR 5

B-428

C C C

CCC

O.2 Q.1 Q.3 R.1 R.2

15.1

17.2

18.1

D

D000

D 0 D000

PACU

RECOVERY

B-429

ANEST

OFFICE

B-430

ANEST

OFFICE

B-431

A AND

MM

OFFICE

B-432

CLEAN

UTILITY

B-427

TOILET

B-425A

SOILED

UTILITY

B-426

BAY 1 BAY 2 BAY 3

BAY 6 BAY 5 BAY 4

FAC

NSQIP

COORD

OFFICE

B-433

CYSTOSCOPY

B-425

WOMENS

RESTROOM

C-410

EQUIP

STORAGE

C-409

STAIR 5

B-428

N N N

N N N

O.2 Q.1 Q.3 R.1 R.2

15.1

17.2

18.1

TYP.

9' - 0"

ACT

2x4

N

CEILING

MOUNTED

NURSE CALL ANNUNCIATOR

C

HEADWALL NURSE CALL PATIENT STATION

WITH CALL CORD

N ABOVE

DOOR

NURSE CALL ANNUNCIATOR

TEMPOR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .