Attachment 1_Drawing.pdf
PDF 3 MB Posted
- Attached to
- (MATOC, WP) Repair Well #3 in THAAD Site
- Solicitation number
- W90VN924R0126
About this file
This document contains a drawing and specifications related to a federal contract opportunity for the Repair of Well #3 at the THAAD Site.
The drawing provides a location plan, site layout plan, and scope of work details for repairing the existing water well #3 at the THAAD site. It includes requirements such as preparing and submitting shop drawings, restoring damaged items, maintaining traffic and safety, and proper disposal of hazardous materials. The related federal contract opportunity is a solicitation (W90VN924R0126) issued by the Department of the Army Materiel Command Army Contracting Command for a MATOC (Multiple Award Task Order Contract) task order to perform the repair work on Well #3 at the THAAD site. The solicitation references the attached drawing and RFP for further details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FOS Carroll Access Questionnaire (In case No PASS).pdf | ||
| Manifest Template.xlsx | XLSX spreadsheet | |
| W90VN924R0126.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
R-11SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
APPROVED BY
PROJECT NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
O & M
HOUSING DIV.
REVIEWED BY
UNITED STATES ARMY GARRISON DAEGU
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
DIRECTORATE OF PUBLIC WORK
HGFEDCBA
D - 24 - 25
CHON, HYON TAE
DESIGN REVIEW SIGNATURE
ORGANIZATION
USING AGENCY
36TH SIGNAL
MASTER PLN.
ENVIRONMENTAL
NAME SIGNATURE
O&M DIV.
FIRE DEPT.
SAFETY OFFICE
DPTMS(AT/FP)
188TH MP COM.
IND. HYGENIST
UNIT #15746, APO AP 96218-5746
DRAWING NO.
CHIEF,
DESIGN & TECH. REVIEW Br.
AS SHOWN
1 1 OF 1R - 1
T I T L E S H E E T
TITLE SHEET
USING AGENCY
DATE:14 MAY 24
H20-00049-4J
CIVIL
5 E - 2
E - 1
CIVIL
C - 1
C - 2
LOCATION PLAN
WORK PLAN SPECIAL REQUIREMENTS
DRAWINGS AND DETAIL DRAWINGS FOR CONSTRUCTION.
5. THE CONTRACTOR SHALL SUBMIT AND GET APPROVAL OF SHOP
SOLICITATION PHASE IS ENCOURAGED.
AND THEREFORE, ATTENDANCE AT SITE SURVEY DURING THE
LAYOUT PLAN MAY CHANGE DEPENDING ON THE SITE CONDITIONS
4. THE CONTRACTOR SHALL CONSIDER THAT THE PROPOSED SITE
BE ONGOING DURING THE DESIGN PHASE.
GOVERNMENT WHO MAY ALLOW CONCURRENT WORK SUCH AS DEMOLITION TO
OTHERWISE AT GOVERNMENT’S DISCRETION. IT WILL BE UP TO THE
QUANTITIES FOR APPROVAL PRIOR TO COMMENCING CONSTRUCTION UNLESS
BY REGISTERED AND CERTIFIED ENGINEER WITH BILL OF MATERIAL AND
THE PAC) AND 100% (THIRTY (30) CALENDAR DAYS AFTER THE PAC) DRAWINGS
3. THE CONTRACTOR SHALL SUBMIT 50% (TWENTY (20) CALENDAR DAYS AFTER
EVALUATION STAGE.
DRAWING WILL BE REVIEWED FOR ITS ACCEPTABILITY DURING THE TECHNICAL
SUPPORT BRIGADE (CSB) INCLUDED WITH THEIR PROPOSAL. THE CONCEPT
SCOPE OF WORK TO DPW, AREA IV, DESIGN BRANCH VIA 411TH CONTRACTING
2. THE CONTRACTOR SHALL SUBMIT CONCEPT DRAWINGS, INCLUDING
IMPACT DESIGN AND CONSTRUCTION.
GET A CLEAR UNDERSTANDING OF THE SITE OVERVIEW WHICH COULD
SITE ORIENTATION CONDUCTED BY CONTRACTING OFFICE AND DPW TO
1. IT IS HIGHLY RECOMMENDED FOR THE CONTRACTOR TO ATTEND THE
ELECTRICAL
REPAIR OF THE WELL 3
PROJECT NO. H20-00049-4J, THAAD SITE
REPAIR OF THE WELL #3
THAAD SITE
WELL CONTROL PLAN
LEGEND, NOTES AND SCOPE OF WORK
SITE LAYOUT PLAN AND SCOPE OF WORK
THAAD SITE
14 MAY 24
CHI, K.K.
KU, HUN MO
LOCATION PLAN
H20-00049-4J D - 24 - 25
AS SHOWN
REPAIR OF THE WELL #3
1 4
CANOPY
A C
F T F
IE
L D
M O T O
R P
O O L
P A T H .9
M X .9
M
U N
D E R
G R
O U
N D
T
Y P E L
S A
M E T
A L B
U T L E
R
A C R
O A
D
ROCK
A C R
O A
D
AC ROAD
WOODEN BRIDGE
AC ROAD
DECK
L A
T R
IN
E
C O
N C W
A L L
C O
N C W
A L L
C O
N C W
A L L
CURRENT M
ND FENCE
S-1020
S-1065
S-1060
A C R
O A D
ROCK
G A T E
1-
LOCATION PLAN
SCALE : 1 / 2000
REVIEWED BY
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
R E V I S I O N S
DESCRIPTIONZONESYMBOL DATE BY CHK. APVD.
DESIGNED BY
O & M
FES
FORCE PROTECTION
HOUSING DIV.
SAFETY REP
SIGNAL REP
USING AGENCY
DESIGN & TECH. REVIEW Br.
APPROVED BY
SUBMITTED BY
CHECKED BY
PROJECT NO.
SCALE :
DRAWING NO.
SHEET OF
REF NO.
CHIEF,
DATE:
ROCK
ROCK
BUNKER
BUNKER
BUNKER
GREEN
POND
POND
POND
POND
GREEN
POND
GREEN
GREEN
AC
ROAD
AC
R
O
AD
AC ROAD
AC RO
AD
A C R
O A
D
AC ROAD
ROCK
A C R
O A
D
A C R
O A
D
A C R
O A
D
SHED
A C R
O A
D
A C R
O A
D
ROCK
A C R
O A
D
A C R
O A
D
ROCK
ROCK
ROCK
ROCK SHED
A C R
O A
D
A C R
O A
D
A C R
O A
D
A C R
O A
D
A C R
O A D
A C R
O A
D
B R
ID
G E
W O
O D
E N
R O
C K
ROCK
R O
C K
ROCK
AC ROAD
AC ROAD
A C R
O A
D
AC ROAD
A C R
O A
D
AC
R
O
AD
ROCK
ROCK
ROCK
AC ROAD
ROCK
A C R
O A
D A C R
O A D
G A S T
A N
K
A C R
O A
D
ROCK
A C R
O A
D
AC ROAD
ROCK
A C R
O A
D
A C R
O A
D
W O
O D E N B
R
ID
G E
AC R
OAD
BRIDGE
WOODEN
POND
ROCK
ROCK
S-1030
B R
ID
G E
W O
O D E N
BUNKER
BUNKER
BUNKER
BUNKER
BUNKER
GREEN
BUNKER
BUNKER
HGFEDCBA
GREEN
GREEN
GREEN
GREEN
GREEN
THIS PROJECT
GRAPHIC SCALE
(IN METERS)
SCALE: 1 :2000
N
CIVIL
2-
SEE THE SITE PLAN
C-1
W A
TE
R
P
LA
N T
WELL#3
R W
R W
W
A
T E R
W
POND
GREEN
SITE LAYOUT PLAN
SCALE : 1 / 1000
SCALE: 1 : 1000
GREEN
GREEN
WATER P
LANT
AC ROAD
AC ROAD
AC R
OAD
AC ROAD
C
A D
AC ROAD
AC ROAD
POND
POND
A C
R O
A D
AC R
OAD
TBM
C-22 4
D - 24 - 25
14 MAY 24
EXISTING WATER WELL #3
PROJECT WORK LIMITS
SEE THE SCOPE OF WORK
H20-00049-4J
EXISTING RAW WATER TANK
(ASSUMED, TO BE ABANDONED)
EXISTING RAW WATER LINE
C B
C B
E
C B
C B
W V
W
C B
W V
W
C B
C B
C B
W V
W
C B
C B
W V
W
C B
C B
W V
W
C B
C B
C B
C B
C B
C B
C B
W V
W
W V
W
C B
C B
C
C B
W V
W
S
W V
W
C B
C B
W V
W
C B
C B
E
W V
W
E
W
E
C
O C
O
C B
C B
C
C B
S
W V
W
C B
E
W V
W
C B
G
W V
W
C B
C B
C B
W V
W
C B
G
W V
W
E
C B
W V
W
C B
C B
C B
C B
E
C
BE
C B
C B
C B
GATE
C
S
S
E
W V
W W
V W
P U
M P
W A
T E
R
C B
C B
C B
C B
C B
C B
S
C B
S
C
C
W V
W W
V W
W V
W W
V W
W V
W
W V
W
C B
E
C B
C B
W V
W
W V
W
W V
W
W V
W
W V
W
W V
W
W V
W
W V
W
W V
W
W V
W W
V W
C B
C B
E
C B
C B
C B
E
C B
E
E
C B
C E
W
C B
C
C B
E C B
C B
C B
C B
C B
C B
C B
E
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
A D
W V
W
W V
W
C
C B
C B
C B
C B
W V
W
E
E
W V
W
C
C B
W V
W
W V
W
W V
W
C B
W V
W
C B
W V
W
C B
W V
W
W V
W
W V
W
W V
W
C B
C B
C B
W V
W
E
C
C B
E
W V
W
W V
W
C B
C B
W V
W
C B
E
C B
W V
W
W V
W
C B
C B
W V
W
C B
C B
C B
E
C B
C B
C
C B
W V
W
G
C B
C B
C B
W V
W
C B
W V
W
C B
C B
C B
C B
W V
W
W V
W
C B
C B
E
C B
C B
E
W V
W
W
W V
W
C B
W V
W W
V W
W V
W
C B
100PVC
TEE
TEE
TEE
TEE
POND
TEETEE
FROST DEPTH UNLESS OTHERWISE NOTED.
8. WATER AND SEWER LINE SHOULD HAVE A MINIMUM COVER OF
WITHOUT ANY ADDITIONAL COST.
INCLUDING FALSEWORK SUCH AS FORMWORKS AND SHORING
9. CONTRACTOR SHOULD PROVIDE ANY NECESSARY RESOURCES
SOLID SODDING WITHIN THE WORK BOUNDARY.
CUT AND FILLED AREA SHALL BE COVERED WITH TOP SOIL AND
14.
13.
10.
11.
12.
15.
16.
OF CONTRACT PROPOSAL.
DIMENSIONS AT THE PROJECT SITE ORIENTATION PRIOR TO SUBMISSION
1. THE CONTRACTOR SHOULD VERIFY ALL EXISTING CONDITIONS AND
PROJECT.
THE CONTRACTING OFFICER PRIOR TO COMMENCING WORK ON THE
PORTION OF THE JOB BY THE COR AND SHOULD BE APPROVED BY
2. THE CONTRACTOR SHOULD SUBMIT SHOP DRAWINGS FOR ANY
EXPENSE TO THE SATISFACTION OF THE CONTRACTING OFFICER.
DISMANTLING, DEMOLISHING, OR REMOVING AT THE CONTRACTORS
TO THEIR ORIGINAL CONDITIONS OF THE ITEMS DAMAGED BY
3. THE CONTRACTOR SHOULD BE RESPONSIBLE FOR REPAIR/RESTORATION
WHICH WILL INTERFERE WITH THE CONSTRUCTION OPERATIONS.
UNDERGROUND ROCK BASE, EXISTING UTILITY LINES, AND OTHER ITEMS
CLEARED/REROUTED OF ALL NATURAL OBSTRUCTIONS, SUCH AS
4. THE SITE INDICATED ON THE DRAWING SHOULD BE GRADED AND
REQUIRED.
DETOUR ROAD FOR VEHICLES DURING CONSTRUCTION PERIOD IF
5. CONTRACTOR SHOULD PROVIDE TEMPORARY ACCESS ROAD AND
OTHER UTILITY MARKERS IN THE PROJECT LIMIT.
6. CONTRACTOR SHALL RESTORE/REESTABLISH SURVEY MONUMENTS AND
SCOPE OF WORK.
PROJECT.THE DETAILS WILL BE UTILIZED TO ACCOMPLISH THE CIVIL
INSTALLATION MANAGEMENT COMMAND" FORM AS A PART OF THIS
KOREA, REVISION1, 30 OCTOBER 2015, DEPARTMENT OF THE ARMY
AND "STANDARD TECHNICAL SPECIFICATIONS FOR O & MA PROJECT,
DEPARTMENT OF THE ARMY INSTALLATION MANAGEMENT COMMAND"
DRAWINGS, FOR O & MA PROJECT, KOREA, 30 NOVEMBER 2015,
7. THE CIVIL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL
AND REGULATIONS.
GOVERNMENT LEASED PROPERTY IN ACCORDANCE WITH LOCAL LAWS
DISPOSAL OF WASTE MATERIALS SHOULD BE OUTSIDE U.S.
GOVERNMENT.
LAY DOWN AREA SHALL BE PROVIDED FOR THE CONTRACTOR BY THE
STORAGE AREAS SHALL BE WITHIN THE CONSTRUCTION AREA AND NO
APPROVED/INDICATED BY C.O.R. ADMINISTRATIVE FIELD OFFICES AND
TEMPORARY FACILITIES ACCORDING TO O&MA SPEC. AT THE LOCATION
CONTRACTOR SHOULD PROVIDE AND MAINTAIN THE CONTRACTOR’S
PRIOR TO COMMENCING THE WORK.
TO THE DESIGN AND TECHNICAL REVIEW BRANCH FOR APPROVAL
THE CONTRACTOR SHOULD PREPARE AND SUBMIT MATERIAL SUBMITTAL
TRAFFIC AND OPERATIONS.
FOR THE PROTECTION AND SAFETY OF THE PUBLIC AND/OR MILITARY
PROTECTIVE FACILITIES AND SHALL TAKE ALL NECESSARY PRECAUTIONS
SIGNS, LIGHTS, FLARES, BARRICADES, MARKERS, CONES AND OTHER
CONTRACTOR SHALL PROVIDE, INSTALL AND MAINTAIN ALL NECESSARY
AND STATIONS AND ELEVATIONS ARE IN METERS.
UNLESS OTHERWISE NOTED ALL THE DIMENSIONS ARE IN MILLIMETERS
PROPER MATERIAL HANDLING METHODS.
MATERIALS WITHIN PROJECT LIMIT WITH COR CAREFULLY TO DETERMINE
CONTRACTOR SHOULD COORDINATE ANY SALVAGEABLE/RECYCLABLE
GENERAL NOTES:
KU, HUN MO
CIVIL
AS SHOWN
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
CHI, K. K.
GRAPHIC SCALE
N
- 4000020000
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEMPORARY BENCH MARK
EXISTING CONTOUR LINES
EXISTING IRRIGATION/VALVES
LEGEND
WV W
EL:490.376
E:430229.576 N:3989788.890
"16"WOODEN STAKED
WW
T
Y P
E L
S A
M E
T A
L B
U T L E
R
S-
S-
SCOPE OF WORK
#1 (REPAIR/MAINTENANCE)
ENVIRONMENTAL GOVERNING STANDARD(EGS) CHAPTER 5 & CHAPTER 6.
CODE OF REGULATION 1910 SUBPART H AND USFK REGULATION 201-1,
DURING THE PROJECT MUST BE STORED IN ACCORADANCE WITH THE
ALL HAZARDOUS MATERAIL AND HAZARDOUS WASTE USED/ CREATED17.
ACCORDANCE WITH DRAWING AND SPECIFICATIONS.>
RW
RW
RW
EXISTING RAW WATER LINE (ASSUMED)
R W x
R W x
R W x
(PVC, D=100)
EXISTING RAW WATER LINE,
TO BE ABANDONED
EXISTING RAW WATER LINE (ASSUMED)
RW
RWx
RWx
FINISH SURFACE SHALL BE WELL GRADED AND HAVE POSITIVE DRAINAGE SURFACE.
EARTH WORKED AREA SHALL BE PROPERLY COMPACTED IAW OMA SPEC.
NOTES:
MINIMUM WATER PIPE COVER SHALL BE 1.20 METERS.
WITH THE GUIDANCE OF AMERICAN WATER WORKS ASSOCIATION (AWWA) C605.
INSTALLATION OF PVC PRESSURE PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE
WITHIN PROJECT WORK LIMITS.
CONCRETE ENCASEMENTS FOR NEW WATER LINE SHALL BE INSTALLED ALL TRAFFIC AREAS
2.
3.
4.
6.
7.
1.
5.
8.
9.
10.
FOR THE EXACT LOCATIONS AND SHALL DEVELOP THE APPROPRIATE PLAN.
ESTIMATE AND CONTRACTOR SHALL VERIFY THE SITE CONDITIONS AND DO THE CONFIRMATIONS
SITE SHOWN IS APPROXIMATE AND ONLY FOR REFERENCE OF THE DESIGN CONCEPT AND
PROVIDE DRAIN LINE (D=200, PVC), HEADWALL, APRON, GRAVEL BED AND OTHERS FOR VALVE PIT.
REQUIREMENT UNLESS OTHERWISED SPECIFIED.
ALL ITEMS SHALL MEET THE LOCAL KS/ U.S. ANSI, OMA SPEC, AWWA, UFC DESIGN CODE
11.
12.
13.
DEMOLITION/REMOVAL NOTES
1.
INDICATED, UNLESS OTHERWISE NOTED.
ALL DEMOLITION WORK SHALL BE CONFINED WITHIN THE PROJECT WORK LIMITS
LINES.
ON THE DRAWING OR NOT, CONTRACTOR SHALL VERIFY THE LOCATION OF UTILITY
EXISTING UTILITY LINES (WATER, SEWER, STORM DRAIN, AND ELEC LINES) SHOWN
SOIL ON REMOVAL PLANS.
KOREA, USFK PAM 200-1. REFER TO DEMOLITION/DISPOSAL OF CONTAMINATED
ENVIRONMENTAL LAWS AND THE ENVIRONMENTAL GOVERNING STANDARDS FOR
ALL DISPOSAL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE KOREAN
SEE ELECTRICAL DRAWINGS FOR THE ELECTRICAL ITEMS.
2.
3.
4.
5.
6.
8.
SATISFACTION OF THE CONTRACTING OFFICER.
CONDITION AT NO ADDITIONAL COST TO THE GOVERNMENT AND TO THE
CONTRACTOR SHALL RESTORE THESE ITEMS TO THEIR ORIGINAL OR BETTER
DUE TO CONTRACTOR’S NEGLIGENCE OR CONSTRUCTION OPERATIONS, THE
STRUCTURES AND/OR IMPROVEMENTS SHOULD THESE ITEMS BECOME DAMAGED
BE MAINTAINED IN GOOD CONDITION TO RECEIVE THE PROPOSED UTILITIES,
ALL UTILITIES, STRUCTURES AND/OR IMPROVEMENTS IDENTIFIED TO REMAIN SHALL
FROM THE SITE.
SHALL BE RETAINED AND/OR TRANSPLANTED, CLEARED, GRUBBED AND REMOVED
ALL TREES, SHRUBBERY, AND ORNAMENTAL PLANTS NOT SPECIFICALLY SCHEDULED
I.E. EDGE OF PAVEMENT, EDGE OF ROADWAY, EXISTING CHAIN-LINK FENCE, ETC.
AND ROADWAYS SHALL BE USED AS DEMARCATIONS FOR THE PROJECT LIMITS,
REMOVAL WORK LIMITS SHOWN ARE APPROXIMATE, EXISTING GROUND FEATURES
7.
USFK REGULATION 201-1, TABLE 2-7 (DUST REDUCTION REQUIREMENTS).
THE CONTRACTOR SHALL PERFORM THE WORKS IN ACCORDANCE WITH THE
INSIDE WALL OF VALVE PIT SHALL BE PAINTED WITH WATERPROOFING MATERIAL.
THAAD SITE
ACFT FIELD
MOTOR POOL
BLDG.
#1
BLDG. #1020
1.
SUMP (300 X 300 X 300(D)) AND SUBMERSIBLE SUMP PUMP SHALL BE INSTALLED IN VALVE PIT.
POND
POND
<ALL FAILED OR FAILING SYSTEM SHALL BE REPAIRED IN
(D=100, PVC)
RAW WATER LINE,
(SEE NOTES, NO.8, NO.9, NO.10, NO.11, NO.12, AND NO.13 ON THIS DRAWING)
PLATE COVER
AND NECESSARY ACCESSORIES, WITH CHECKERED STEEL
WATER FLOW METER, PRESSURE GAUGE, SAMPLING TAP
INCLUDING PIPING (D=50), CHECK VALVE, GATE VALVE,
CONCRETE VALVE PIT, (3,200 X 2,000 X 1,600(D))
RAW WATER LINE
PIPING IN VALVE PIT AND VALVE PIT COVER SHALL BE STAINLESS STEEL.
AND ALL NECESSARY ITEMS, REQUIRED FUNCTIONIZE THE SYSTEMS PROPERLY.
UTILITY LINES INCLUDE SUCH AS WATER, SEWER, STORM, DRAINAGE, DITCH, CATCH BASIN,
ALL UNDERGROUND/ABOVE GROUND UTILITY LINES SHALL BE RELOCATED AS REQUIRED. THE
PIT
WATER LINE WITH NEW VALVE
CONNECTED TO EXISTING RAW
RAW WATER LINE TO BE
SITE LAYOUT PLAN AND SCOPE OF WORK
EXISTING VALVE PIT
WELL #4
RWx
(FUTURE PROJECT)
CONCRETE PAVEMENTS AND ROAD,
HELIPAD, DETENTION BASIN, ASPHALT
VALVE PIT COVER AND FRAME AROUND SHALL BE INSTALLED RUBBER PACKING.
ON THIS DRAWING)
(SEE NOTES, NO.8, NO.9, NO.10, NO.11, NO12, AND NO.13
ACCESSOIRES WITH CHECKERED STEEL PLATE COVER
INCLUDING GATE VALVES (D=100) AND NECESSARY
CONCRETE VALVE PIT, (2,400 X 1,600 X 1,600(D))
(D=50, STAINLESS STEEL)
RAW WATER LINE,
8.
UTILITY LINES.
REROUTE/RELOCATE EXISTING UNDERGROUND AND ABOVEGROUND
6.
4.
7.
2.
RESTORE EXISTING PAVERS, CHAINLINK FENCE AND DITCHES.
CUT AND PLUG EXISTING RAW WATER LINE.
3.
1.
REF. NO. C-2.
SEE GENERAL NOTES, DEMOLITION/ REMOVAL NOTES ON DRAWING
SEE NOTES ON DRAWING REF. NO. C-2.2.
#2 (GENERAL REQUIREMENTS)
SOD WITH TOP SOIL AND SOLID SODDING.
PROVIDE EARTH WORKS.
5.
PROVIDE CONCRETE VALVE PITS.
PROVIDE CONCRETE ENCASEMENTS.
BLOCKS.
FITTINGS, AND NECESSARY ACCESSORIES, THRUST BLOCKS, AND ANCHOR
PROVIDE RAW WATER LINE (D=100, PVC AND D=50, STAINLESS STEEL),
14.
(SEE NOTES, NO.14)
PROPERLY TO THE WELL #3
RAW WATER LINE SHALL BE CONNECTED
RW
AND SODDING.
ALL UNPAVED AREAS WITHIN THE PROJECT WORK LIMITS SHALL BE COVERED WITH TOPSOIL16.
AC PAVEMENT, PCC PAVEMENT, AND OTHERS FOR INSTALLATION OF RAW WATER LINE.
CONTRACTOR SHALL RESTORE EXISTING DITCHES, CHAINLINK FENCE AND PAVERS SUCH AS15.
EAST DISTRICT).
WELL CENTER, AND CONTRACTOR SHALL COORDINATE THE PIPE CONNECTION WITH FED (FAR
END OF THE WATER PIPE TOWARD WELL#3 SHALL BE EXTENDED ABOUT 2 METER FROM THE
REPAIR OF THE WELL #3
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
SIN, YS
E-1AS SHOWN
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
UNIT #15746, APO AP 96218-5746
DATE:
US ORIGIN MATERIAL:
DIRECTORATE OF PUBLIC WORKS
THE DRAWINGS.
HTTP://WWW.CCKBID.COM). ALL NON-GENERIC US ORIGIN MATERIALS SHALL BE AS INDICATED ON
FEBRURY 2, 2004 (ELECTRONIC VERSION OF THIS DOCUMENT CAN BE FOUND AT INTERNET SITE
REGISTER OF IMA-KORO PAMPHLET 420-1 "INSPECTION OF CONSTRUCTION CONTRACTS DATED
ALL GENERIC US ORIGIN MATERIALS SHALL BE IDENTIFY AS OFF-SHORE IN THE GENERIC SUBMITAL
D - 24 - 25
14 APR 24
H20-00049-4J
SCOPE OF WORK
WORK CLASS: "K" (REPAIR / MAINTENANCE)
WELL CONTROL PANEL
ELECTRICAL HAND HOLE
CONCRETE ENCASEMENT
AN, CY
G E N E R A L N O T E SL E G E N D
3.
2.
4. MOUNTING HEIGHTS ARE AS BELOW. MEASUREMENT IS TO CENTER OF OUTLET.
WIRES IS INDICATED AS FOLLOW;
AND ONE (1)-#12AWG GROUND WIRE IN 16mm CONDUIT. A GREATER NUMBER OF
ANY CIRCUIT WITHOUT FURTHER DESIGNATION INDICATES TWO (2)-#12AWG WIRES
3-#12AWG WIRES AND 1-#12AWG GROUND WIRE IN 16mm CONDUIT.
4-#12AWG WIRES AND 1-#12AWG GROUND WIRE IN 16mm CONDUIT.
LIGHTING FIXTURE--------------------SEE LIGHTING FIXTURE SCHEDULE
TOGGLE SWITCH-----------------------1220mm TO CENTER OF THE OUTLET
RECEPTACLE---------------------------460mm TO CENTER OUTLET
PANELBOARD, CIRCUIT BREAKER------------------------SEE SPECIFICATION
CAULKING MATERIAL SHALL BE VERIFIED BY F&ES OFFICE PRIOR TO CONSTRUCTION.
BOTH SIDE OF FIRE WALLS, FIRE-PARTITIONS AND FIRE-RATED PIPE CHASE WALLS.
ALL PIPE PENETRATIONS SHALL BE SEALED WITH FIRE RATED CAULKING MATERIAL ON
1.
SPECIFICATIONS FOR O&MA PROJECTS, AND SPECIFICATIONS.
ELECTRICAL CODE, NATIONAL ELECTRICAL SAFETY CODE, FIRE CODE, TECHNICAL STANDARD
ALL ELECTRICAL WORK SHALL CONFORM TO THE LATEST REQUIREMENTS OF THE NATIONAL
CONDUIT WHICH IS TO BE BONDED TO THE MAIN GROUNDING SYSTEM AT BOTH ENDS.
GROUNDING WIRE SHALL BE GREEN INSULATED COPPER WIRE IN RIGID GALVANIZED STEEL
ALL WIRING SHALL BE CONCEALED ABOVE THE CEILING WHEN THE ROOM HAS A CEILING.
NEWEXSTREMOVE
+ WIRING CONCEALED IN UNDERGROUND
WIRING CONCEALED IN CEILINGS AND WALL
WIRING EXPOSED ON CEILINGS AND WALL
5.
6.
7.
AND THE COLOR OF TOGGLE SWITCHES AND RECEPTACLE SHALL BE GRAY.
ALL COVER PLATES OF RECEPTACLES AND SWITCHES SHALL BE STAINLESS STEEL METALLIC ONES
CHANGES SHALL BE APPROVED BY THE CONTRACTING OFFICE.
BE RESPONSIBLE TO RESIZE AND PROVIDE THE REQUIRED WIRING AND OVER CURRENT DEVICES. THE
IF EQUIPMENT OTHER THAN INDICATED ON THE PLANS ARE PROVIDED, THEN THE CONTRACTOR SHALL
TO MWR CATV, ONCE COMPLETED BY THE CONTRACTOR, BEFORE THE FINAL ACCEPTANCE INSPECTION.
SIGNAL LEVEL RESULTS WILL BE RECORDED BY THE CONTRACTOR AND GIVEN IMMEDIATELY
CONTRACTOR SHALL COORDINATE WITH MWR CATV TO PERFORMING FINAL ACCEPTANCE TESTING.
INSTALLED IN THE SUSPENDED CEILING SHALL BE SUPPORTED BY THE CEILING GRID BAR SYSTEM.
LIGHTING FIXTURES SHALL BE SUPPORTED FROM THE BUILDING STRUCTURES EXCEPT LIGHTING FIXTURES
1.
8.
9.
10.
<ALL FAILED OR FAILING SYSTEM SHALL BE REPAIRED IN ACCORDANCE WITH DRAWING AND SPECIFICATIONS.>
WORK-PLAN
3 4
AND ALL NECESSARY ACCESSORIES FROM WELL#3 TO WATER TREATMENT PLANT.
PROVIDE NEW CONTROL SYSTEM WITH CABLE, CONDUIT, ELECTRIC HANDHOLES, CONCRETE ENCASEMENTS
2. PROVIDE EMPTY CONDUIT FROM NEW VALVE PIT TO NEW CONTROL PANEL WITH PULLING WIRE.
LEGEND, NOTES AND SCOPE OF WORK
ELECTRICAL
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
E-2AS SHOWN
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
UNIT #15746, APO AP 96218-5746
DATE:
DIRECTORATE OF PUBLIC WORKS
P-1
GRAPHIC SCALE
SCALE : 1 : 1000
SIN, YS
H20-00049-4J
14 APR 24
D - 24 - 25
20000 40000
SCALE: 1 : 1000
E-2
ELECTRICAL
WELL CONTROL PLAN
AN, CY
N
R
T E R
W
POND
GREEN
GREEN
GREEN
WATER P
LANT
AC ROAD
AC ROAD
AC R
OAD
AC ROAD
A D
AC ROAD
AC ROAD
POND
POND
A C
R O
A D
AC R
OAD
TBM
C B
C B
E
C B
C B
W V
W
C B
W V
W
C B
C B
C B
W V
W
C B
C B
W V
W
C B
C B
W V
W
C B
C B
C B
C B
C B
C B
C B
W V
W
W V
W
C B
C B
C
C B
W V
W
S
W V
W
C B
C B
W V
W
C B
C B
E
W V
W
E
W
E
C
O C
O
C B
C B
C
C B
S
W V
W
C B
E
W V
W
C B
G
W V
W
C B
C B
C B
W V
W
C B
G
W V
W
E
C B
W V
W
C B
C B
C B
C B
E
C
BE
C B
C B
C B
GATE
C
S
S
E
W V
W W
V W
P U
M P
W A
T E
R
C B
C B
C B
C B
C B
C B
S
C B
S
C
C
W V
W W
V W
W V
W W
V W
W V
W
W V
W
C B
E
C B
C B
W V
W
W V
W
W V
W
W V
W
W V
W
W V
W
W V
W
W V
W
W V
W
W V
W W
V W
C B
C B
E
C B
C B
C B
E
C B
E
E
C B
C E
W
C B
C
C B
E C B
C B
C B
C B
C B
C B
C B
E
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
A D
W V
W
W V
W
C
C B
C B
C B
C B
W V
W
E
E
W V
W
C
C B
W V
W
W V
W
W V
W
C B
W V
W
C B
W V
W
C B
W V
W
W V
W
W V
W
W V
W
C B
C B
C B
W V
W
E
C
C B
E
W V
W
W V
W
C B
C B
W V
W
C B
C B
W V
W
W V
W
C B
C B
W V
W
C B
C B
C B
E
C B
C B
C
C B
W V
W
G
C B
C B
C B
W V
W
C B
W V
W
C B
C B
C B
C B
W V
W
W V
W
C B
C B
E
C B
C B
E
W V
W
W
W V
W
C B
W V
W W
V W
W V
W
C B
100PVC
TEE
TEE
TEE
TEE
POND
TEETEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
EL:490.376
E:430229.576 N:3989788.890
"16"WOODEN STAKED
WW
T
Y P
E L
S A
M E
T A
L B
U T L E
R
S-
S-
RW
RW
RW
R W x
R W x
R W x
ACFT FIELD
MOTOR POOL
BLDG.
#1
BLDG. #1020
POND
POND
EXISTING VALVE PIT
WELL #4
RWx
WELL #3 CONTROL PANEL
EXISTING LOCAL WATER
(TYP. OF 2EA)
NEW HANDHOLE
H/H
H/H
EXISTING HANDHOLE
WELL CONTROL PLAN (WORK-PLAN)SPECIFIC NOTES
2. THE CONTROL CABLE SHALL BE INSTALLED WITH CONCRETE ENCASEMENT WHEN PASS ALL VEHICLE ROADS.
NECESSARY ACCESSORIES NOT SHOWN ON THIS DRAWING.
CONDUIT (TYPICAL)
CABLE 8C-#12 AWG IN 28mmD PVC
NEW UNDERGROUND WELL CONTROL
1. THE CONTRACTOR SHALL COORDINATE WITH FED WHEN CONNECT CONTROL CABLE TO CONTROL PANEL.
WITH PULLING WIRE ONLY
NEW 28mm EMPTY CONDUIT
3. THE CONTRACTOR SHALL REDESIGN THE WELL#3 CONTROL SYSTEM REFLECT ALL WIRES, CONDUITS AND
INSTALLED BY FED
CONTROL PANEL WILL BE
REMOTE WATER WELL #3
SEE NOTE #4.
CONTROL PANEL BY FED
LOCAL WATER WELL #3
NEW CONCRETE ENCASEMENT
4. THE CONTROL CABLE SHALL HAVE SLACK LOOP 5M OVER AT BOTH END CONTROL PANELS.
4 4
| H20-00049-4J_T01-Default-000 |
| H20-00049-4J_C01-Default-000 |
| H20-00049-4J_C02-Default-000 |
| H20-00049-4J_E01-Default-000 |
| H20-00049-4J_E02-Default-000 |
File details come from the government source that posted it. Updated .