Attachment_1_-_draft_Soda_Springs_Specs_1.pdf
PDF 195 KB Posted
- Attached to
- Soda Springs Barracks Roof Repair Sources Sought
- Solicitation number
- 140L2623Q0049
About this file
This document package provides specifications for repair and mold remediation work at the Soda Springs Fire Station in Soda Springs, Idaho. The project involves repairing a defective roof ridge vent, mitigating existing mold growth, and replacing all damaged building materials. Work includes repairing or replacing the ridge vent and flashing, mitigating mold throughout the facility, replacing insulation and drywall, and disposing of construction debris. The specifications cover general contractor requirements, submittal procedures, mobilization, closeout processes, selective demolition, installing new insulation and sheet metal work, and finishing with new gypsum board and interior painting. Completion is required by lump sum payment with the contract awarded to the responsible bidder offering the lowest price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_2_-_draft_Soda_Springs_drawings_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABLE OF CONTENTS TOC - 1
TABLE OF CONTENTS
Number SECTION TITLE
DIVISION 01 - GENERAL REQUIREMENTS
011000 SUMMARY
013233 PHOTOGRAPHIC DOCUMENTATION
013300 SUBMITTAL PROCEDURES
017113 MOBILIZATION
017700 CLOSEOUT PROCEDURES
DIVISION 02 – EXISTING CONDITIONS
024119 SELECTIVE DEMOLITION
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
072100 THERMAL INSULATION
076200 SHEET METAL FLASHING AND TRIM
DIVISION 09 – FINISHES
092900 GYPSUM BOARD
099123 INTERIOR PAINTING
JULY 2023 SUMMARY
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 011000-1
SECTION 011000 – SUMMARY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Project information.
2. Work covered by Contract Documents.
3. Work under other contracts.
4. Use of premises.
5. Occupancy requirements.
6. Work restrictions.
7. Specification formats and conventions.
1.2 PROJECT INFORMATION
A. Project Identification: Soda Springs Fire Station Roof Repair and Mold Remediation 2023
1. Project Location: Soda Springs Fire Station is located on Wood Canyon Road in Soda Springs, Idaho, Caribou County. The facility is located on the East side of Soda Springs, north of US Highway 30 and south of the Union Pacific Railroad.
B. Project Description: The ridge cap vent on the Soda Springs Fire Station is defective and has allowed snow to pass through into the attic space. Over time the snow melt in the attic space has produce an environment for mold to grow. The project objective is to repair the faulty roof, mitigate the mold and replace all materials damaged by the mold.
1. Mold Mitigation must meet industry standard including but not limited to cleaning, deodorizing, and applying anti-microbial to building materials such as flooring and roof joists that do not need to be removed. Removing contaminated or damaged items like insulation and drywall and ensuring they are properly disposed of while protecting the rest of the facility to the best of their ability from spreading mold spores any further.
2. Roof Repair must be complete to industry standard including but not limited to removal of existing ridge cap and warn or missing pipe, HVAC and furnace jacks, caps, and storm collars. The ridge cap and/or ridge vent will need to be replaced with one designed for a standing seam steel roof and pipe, HVAC and furnace jacks, caps and storm collars replaced as necessary.
3. Interior finishing must be completed to industry standard to include but not limited to replacing drywall including hanging, tape, texture, prime and paint to match existing.
Insulation needs replaced with blow-in cellulose. Patch drywall in furnace room, seal, and paint to match.
4. Haul away and properly dispose of any construction debris and contractor waste.
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 011000-2
C. Project Work: Provide all material, labor and equipment to repair and/or replace defective roof ridge vent and all associated building materials damaged by moisture intrusion.
D. Photographs of work shall be taken throughout the process of mold remediation to document extents of moisture intrusion damage.
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. The work consists of the following:
1. The work includes:
a. Repair and/or replace defective roof ridge vent and degraded flashing around pipe/HVAC jacks
b. Repair and/or replace all building materials damaged by moisture intrusion.
- Insulation
- Drywall to include tape, texture and paint
- Wood products
c. Decontamination of any ductwork.
1.4 USE OF PREMISES
A. Contractor shall have full use of premises for construction operations, including use of Project site, during construction period. Contractor's use of premises is limited only by Government right to perform work or to retain other contractors on portions of Project.
B. Schedule operations so that Work is conducted during regular office hours which are 7:00 a.m. to 5:00 p.m.
C. Schedule and sequence operations necessary to complete the work, including coordination with other crafts relative to the Contractor's requirements. Schedule Work in such manner as to avoid delays in overall construction and permit proper installation of work.
D. Use of Existing Building: Maintain existing building in a weathertight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.
1.5 OCCUPANCY REQUIREMENTS
A. Partial Government Occupancy: Government will occupy the premises during entire construction period, with the exception of areas under construction. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government operations. Maintain existing exits, unless otherwise indicated.
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 011000-3
1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government and authorities having jurisdiction.
1.6 WORK RESTRICTIONS
A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, except when otherwise indicated.
B. Work on Saturdays, Sundays, Federal holidays or at night may not be performed without prior consent from the Contracting Officer. Submit requests 48 hours in advance of the work to the Contracting Officer for approval.
C. No signs or advertisements shall be displayed on the construction site or within the premises unless approved by the Contracting Officer.
D. Existing Utilities
1. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.
2. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.
3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.
E. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
1. Notify Contracting Officer not less than two days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Contracting Officer’s written permission.
F. Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor air intakes.
1.7 SPECIFICATION FORMATS AND CONVENTIONS
A. Specification Format: The Specifications are organized into Divisions and Sections using the CSI/CSC's "MasterFormat" numbering system.
1. Division 01 – General Requirements: Sections in Division 01 govern the execution of the Work of all Sections in the Specifications.
B. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.
These conventions are as follows:
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 011000-4
1. Abbreviated Language: Language used in the Specifications and other Contract Documents is abbreviated. Words and meanings shall be interpreted as appropriate. Words implied, but not stated, shall be inferred as the sense requires. Singular words shall be interpreted as plural, and plural words shall be interpreted as singular where applicable as the context of the Contract Documents indicates.
2. Imperative mood and streamlined language are generally used in the Specifications.
Requirements expressed in the imperative mood are to be performed by Contractor.
Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by others when so noted.
a. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
PART 4 - MEASUREMENT AND PAYMENT (Not Used)
END OF SECTION 011000
JULY 2023 PHOTOGRAPHIC DOCUMENTATION
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 013233-1
SECTION 013233 - PHOTOGRAPHIC DOCUMENTATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for the following:
1. Preconstruction photographs.
2. Periodic construction photographs.
3. Final completion construction photographs.
B. Related Requirements:
1. See Division 01 Section "Closeout Procedures" for submitting digital media as Project Record Documents at Project closeout.
1.2 SUBMITTALS
A. Key Plan: Submit key plan of Project site and building with notation of vantage points marked for location and direction of each photograph. Indicate elevation or story of construction.
Include same label information as corresponding set of photographs.
B. Digital Photographs: Submit image files within three days of taking photographs.
1. Submit photos on CD-ROM or thumb-drive or by uploading to web-based project software site. Include copy of key plan indicating the location and direction of each photograph.
2. Identification: Provide the following information with each image description in file metadata tag or in web-based project software site:
a. Date photograph was taken.
b. Photograph description.
c. Unique sequential identifier keyed to accompanying key plan.
1.3 FORMATS AND MEDIA
A. Digital Photographs: Provide color images in JPG format, produced by a digital camera with minimum sensor size of 8 megapixels, and at an image resolution of not less than 3200 by 2400 pixels, and with vibration-reduction technology. Use flash in low light levels or backlit conditions.
B. Metadata: Record accurate date and time camera.
C. File Names: Name media files with date, description and sequential numbering suffix.
JULY 2023 PHOTOGRAPHIC DOCUMENTATION
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 013233-2
1.4 CONSTRUCTION PHOTOGRAPHS
A. Take photographs using the maximum range of depth of field, and that are in focus, to clearly show the Work. Photographs with blurry or out-of-focus areas will not be accepted.
1. Maintain key plan with each set of construction photographs that identifies each photographic location.
B. Digital Images: Submit digital images exactly as originally recorded in the digital camera, without alteration, manipulation, editing, or modifications using image-editing software.
C. Preconstruction Photographs: Before starting construction, take color, digital photographs of Project site and surrounding properties, including existing items to remain during construction, from different vantage points, as directed by Contracting Officer.
D. Periodic Construction Photographs: Take color, digital photographs weekly with the cutoff date associated with each Application for Payment. Select vantage points to show status of construction and progress since last photographs were taken.
E. Final Completion Construction Photographs: Take photographs after date of Substantial Completion for submission as Project Record Documents. Contracting Officer will inform photographer of desired vantage points.
F. Additional Photographs: Contracting Officer may issue requests for additional photographs, in addition to periodic photographs specified.
1. Three days' notice will be given, where feasible.
2. In emergency situations, take additional photographs within 24 hours of request.
3. Circumstances that could require additional photographs include, but are not limited to, the following:
a. Special events planned at Project site.
b. Immediate follow-up when on-site events result in construction damage or losses.
c. Photographs to be taken at fabrication locations away from Project site. These photographs are not subject to unit prices or unit-cost allowances.
d. Substantial Completion of a major phase or component of the Work.
e. Extra record photographs at time of final acceptance.
f. Government request for special publicity photographs.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 013233
JULY 2023 SUBMITTAL PROCEDURES
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 013300-1
SECTION 013300 – SUBMITTAL PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, Design Computations, and other submittals.
B. Related Requirements:
1. See Division 01 Section "Photographic Documentation" for submitting construction photographs.
2. See Division 01 Section "Closeout Procedures" for submitting warranties.
1.2 QUALITY ASSURANCE
A. Approval: Written approval of the submittals is an indication that the Contractor's submittals have been reviewed and that there are no objections, except as noted. Installation of material based on written approval of submittals shall not relieve the Contractor of the responsibility for incorporating material which conforms to the requirements of the drawings and specifications.
Written approval of deviations shall apply only to those deviations or omissions from the requirements of the drawings and specifications brought to the Contracting Officer's attention in writing. After written approval of an item, the Contractor may submit a substitution for approval, if the approved item cannot be purchased or delivered in time to avoid delay in completion of the project.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 WORK SCHEDULE
A. Requirements: The schedule shall be submitted at the pre-work conference. When requested, the Contractor shall submit an updated schedule within three working days. As a minimum, the estimated start and completion dates should be shown in the schedule.
3.2 VALUE SCHEDULE
A. Requirements: The Contractor shall prepare a value schedule for presentation at the pre-work conference.
JULY 2023 SUBMITTAL PROCEDURES
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 013300-2
3.3 SHOP DRAWINGS AND MANUFACTURER'S LITERATURE
A. General: The Contractor shall deliver to the Contracting Officer the shop drawings and manufacturer's literature required by the specification sections in this Contract to the Contracting Officer.
B. Identification: When full catalogs or pages and tables are submitted, the specific items to be used on this project shall be circled, blocked in or underlined. Completely identify each submittal by showing the following information:
1. Name and address of preparer, plus name and telephone number of the individual to contact for further information.
2. Name of project as it appears in these specifications.
3. Contract number, drawing number and specification section number to which the submittal applies.
4. Whether this is an original submittal or resubmittal.
5. Each item shall clearly note the manufacturer's name and address, trade name, product, lot, style, color, catalog designation or model number, and locations of use.
C. Substitutions: The Contractor shall present requests for substitutions to the Contracting Officer according to the following:
1. Deliver sufficient calculations and data to justify selection of the proposed item and permit comparison with the original item.
2. Show complete layout of system, except that which is identical to Contract documents, unless unchanged portion must be shown to indicate clearances.
3. Include drawings, same scale as Contract drawings, marked to show differences.
4. Submit complete technical data including test data, drawings, manufacturer's literature, samples, and complete performance specifications.
5. The Contractor is responsible for the cost of redesign and modifications to this or other parts of the project caused by the substitutions.
3.4 SAMPLES
A. Requirements:
1. The Contractor shall deliver samples required by the specification sections in this contract. Submit samples with shop drawings when both are required.
2. Each item shall clearly note the manufacturer, trade name, product, lot, style, color, model, locations of use and contract document reference.
3. Final color selections shall be made only after related color samples have been received.
PART 4 – MEASUREMENT AND PAYMENT (Not Used)
END OF SECTION 013300
JULY 2023 MOBILIZATION
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 011000-1
SECTION 017113 – MOBILIZATION
PART 1 - GENERAL
1.1 SUMMARY
A. Selection Includes:
1. Preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies and incidentals to the project site. Also includes other work and operations which must be performed and/or costs incurred prior to beginning work on the components listed in the schedule of items.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
PART 4 - MEASUREMENT AND PAYMENT
4.1 MEATHOD OF MEASUREMENT
Progress payments for Mobilization will be made as follows:
When 5% of the original contract amount is earned from other bid items, 50% of the amount bid for mobilization or 5% of the original contract amount, whichever is the lesser will be paid.
When 10% of the original contract amount is earned from other bid items, 100% of the bid for mobilization or 10% of the original contract amount, whichever is the lesser will be paid.
4.2 BASIS OF PAYMENT
A. Payment: Prices and payment will be full compensation for the work described in this section.
Payment will be made under the following:
Pay Item
017113 – 01 Mobilization ........................................................................................... Lump Sum
END OF SECTION 017113
JULY 2023 CLOSEOUT PROCEDURES
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 017700-1
SECTION 017700 – CLOSEOUT PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes:
1. Administrative and procedural requirements for contract closeout, including, but not limited to, the following:
a. Adjust list below to suit Project.
b. Substantial and Final Completion.
c. Punch List
d. Permit Closure and Transfer.
e. Warranties.
f. Final Cleaning.
g. Repair of the Work.
B. Related Requirements:
1. See Division 01 Section "Photographic Documentation" for submitting Final Completion construction photographs and negatives.
2. See Divisions 02 through 49 Sections for specific closeout and special cleaning requirements for the work in those Sections.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of cleaning agent.
B. Contractor's List of Incomplete Items: Initial submittal at Substantial Completion.
C. Certified List of Incomplete Items: Final submittal at final completion.
1.3 SUBSTANTIAL COMPLETION
A. Contractor's List of Incomplete Items: Prepare and submit a list of items to be completed and corrected (Contractor's punch list), indicating the value of each item on the list and reasons why the Work is incomplete.
B. Submittals Prior to Substantial Completion: Complete the following a minimum of 10 days prior to requesting inspection for determining date of Substantial Completion. List items below that are incomplete at time of request.
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 017700-2
1. Certificates of Release: Obtain and submit releases from authorities having jurisdiction permitting Owner unrestricted use of the Work and access to services and utilities.
Include occupancy permits, operating certificates, and similar releases.
2. Submit closeout submittals specified in other Division 01 Sections, including project record documents, operation and maintenance manuals, damage or settlement surveys, property surveys, and similar final record information.
3. Submit closeout submittals specified in individual Sections, including specific warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents.
C. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, Contracting Officer will either proceed with inspection or notify Contractor of unfulfilled requirements. Contracting Officer will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by Contracting Officer, that must be completed or corrected before certificate will be issued.
1. Re-inspection: Request re-inspection when the Work identified in previous inspections as incomplete is completed or corrected.
2. Results of completed inspection will form the basis of requirements for Final Completion.
1.4 FINAL COMPLETION
A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:
1. Submit a final Application for Payment.
2. Submit certified copy of Contracting Officer's Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by Contracting Officer. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.
B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, Contracting Officer will either proceed with inspection or notify Contractor of unfulfilled requirements. Require superintendent, mechanical, and electrical subcontractors to be present during final inspection. Contracting Officer will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.
1. Re-inspection: Request re-inspection when the Work identified in previous inspections as incomplete is completed or corrected.
1.5 LIST OF INCOMPLETE ITEMS (PUNCH LIST)
A. Organization of List: Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 017700-3
1. Organize list of spaces in sequential order.
2. Organize items applying to each space by major element, including categories for ceiling, individual walls, floors, equipment, and building systems.
3. Submit list of incomplete items in one of the following formats:
a. MS Excel electronic file. Contracting Officer will return annotated file.
b. PDF electronic file. Contracting Officer will return annotated file.
1.6 WARRANTIES
A. Materials and equipment furnished under this Contract shall be covered by the most-favorable commercial warranties Contractor provides to any customer for such materials or equipment.
Rights or remedies provided shall be in addition to, and not limit, any rights afforded to Government by any other clause of this Contract. With respect to all warranties, expressed or implied, from manufacturers or suppliers for materials or equipment furnished under the Contract, Contractor shall:
1. Obtain warranties that would be given in normal, commercial practices.
2. Require warranties to be executed, in writing, for the benefit of the Government.
3. Submit warranties to Contracting Officer, prior to the final inspection.
B. Warranty Electronic File: Provide warranties and bonds in PDF format. Assemble complete warranty and bond submittal package into a single electronic PDF file with bookmarks enabling navigation to each item. Provide bookmarked table of contents at beginning of document.
1. Submit on digital media acceptable to Contracting Officer.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.
PART 3 - EXECUTION
3.1 FINAL CLEANING
A. Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.
B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions.
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 017700-4
1. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:
a. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.
b. Remove tools, construction equipment, machinery, and surplus material from Project site.
c. Clean exposed interior hard-surfaced finishes to a dirt-free condition, free of stains, films, and similar foreign substances. Avoid disturbing natural weathering of exterior surfaces. Restore reflective surfaces to their original condition.
d. Remove debris and surface dust from limited access spaces, including roofs, plenums, shafts, trenches, equipment vaults, manholes, attics, and similar spaces.
e. Vacuum carpet and similar soft surfaces, removing debris and excess nap;
shampoo if visible soil or stains remain.
f. Remove labels that are not permanent.
g. Leave Project clean and ready for occupancy.
C. Disposal of Debris: Items or debris not designated as salvage by Government shall become property of Contractor. Disposal of materials off site in a legal manner and payment of required fees shall be Contractor’s responsibility. When hazardous materials are encountered during demolition operations, comply with applicable federal, state, and local regulations, laws, and ordinances concerning removal, handling, and protection against exposure or environmental pollution.
D. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Government property. Do not discharge volatile, harmful, or dangerous materials into drainage systems.
3.2 REPAIR OF THE WORK
A. Complete repair and restoration operations, before requesting inspection for determination of Substantial Completion.
B. Repair, or remove and replace, defective construction. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment. Where damaged or worn items cannot be repaired or restored, provide replacements. Remove and replace operating components that cannot be repaired.
C. Restore damaged construction and permanent facilities used during construction to specified condition.
END OF SECTION 017700
JULY 2023 SELECTIVE DEMOLITION
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 024119-1
SECTION 024119 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
2. Salvage of existing items to be reused or recycled.
3. Decontamination of any ductwork or items to be reused.
B. Related Requirements:
1. Section 011000 "Summary" for restrictions on use of the premises, Owner-occupancy requirements, and phasing requirements.
2. Section 013233 “Photographic Documentation” for predemolition documentation procedures.
1.3 DEFINITIONS
A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.
B. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated.
C. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.
D. Dismantle: To remove by disassembling or detaching an item from a surface, using gentle methods and equipment to prevent damage to the item and surfaces; disposing of items unless indicated to be salvaged or reinstalled.
1.4 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 024119-2
1.5 PREINSTALLATION MEETINGS
A. Predemolition Conference: Conduct conference at Soda Springs Fire Station
1. Inspect and discuss condition of construction to be selectively demolished.
2. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.
3. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.
4. Review areas where existing construction is to remain and requires protection.
1.6 FIELD CONDITIONS
A. Owner will occupy portions of building immediately adjacent to selective demolition area.
Conduct selective demolition so Owner's operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
C. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.
1. Hazardous materials will be removed by Owner before start of the Work.
2. If suspected hazardous materials are encountered, do not disturb; immediately notify
Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.
D. Storage or sale of removed items or materials on-site is not permitted.
1.7 COORDINATION
A. Arrange selective demolition schedule so as not to interfere with Owner's operations.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ASSE A10.6 and NFPA 241.
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 024119-3
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.
C. Verify that hazardous materials have been remediated before proceeding with building demolition operations.
D. Survey of Existing Conditions: Record existing conditions by use of preconstruction photographs or video.
1. Comply with requirements specified in Section 013233 "Photographic Documentation."
2. Inventory and record the condition of items to be removed and salvaged. Provide photographs or video of conditions that might be misconstrued as damage caused by salvage operations.
3. Before selective demolition or removal of existing building elements that will be reproduced or duplicated in final Work, make permanent record of measurements, materials, and construction details required to make exact reproduction.
3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.
3.3 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.
3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.
4. Cover and protect furniture, furnishings, and equipment that have not been removed.
B. Remove temporary barricades and protections where hazards no longer exist.
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 024119-4
3.4 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
B. Burning: Do not burn demolished materials.
3.5 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
PART 4 - MEASURMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. The work described in this section will be measured and paid for by lump sum.
4.2 METHOD OF MEASUREMENT
A. Payment: Prices and payment will be full compensation for the work described in this section.
Payment will be made under the following:
Pay Item Pay Unit
02 41 19 – 01 Selective Demolition (Mold Remediation) .............................. Lump Sum
END OF SECTION 024119
JULY 2023 THERMAL INSULATION
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 072100-1
SECTION 072100 - THERMAL INSULATION
1.1 SUMMARY
A. Section Includes:
1. Furnishing and installing loose-fill and/or glass-fiber insulation at the water damaged portion of the building. New insulation shall replace all insulation removed during mold remediation work.
B. Related Requirements:
1. Section 011000 “Summary” for restrictions on use of premises and Owner-occupancy requirements.
2. Section 013300 “Submittal procedures”
3. Section 017700 “Closeout Procedures”
4. Section 024119 “Selective Demolition”
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
1.3 INFORMATIONAL SUBMITTALS
A. Product Test Reports: For each product, for tests performed by a qualified testing agency.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Protect insulation materials from physical damage and from deterioration due to moisture, soiling, and other sources. Store inside and in a dry location. Comply with manufacturer's written instructions for handling, storing, and protecting during installation.
PART 2 - PRODUCTS
2.1 GLASS-FIBER BLANKET
A. Glass-Fiber Blanket, Polypropylene-Scrim-Kraft Faced: ASTM C665, Type II, Class A;
Category 1. Minimum rating of R-20 and R-15 for exterior and interior walls respectively.
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 072100-2
2.2 LOOSE-FILL INSULATION
A. Glass-Fiber Loose-Fill Insulation: ASTM C764, Type I for pneumatic application or Type II for poured application; with maximum flame-spread and smoke-developed indexes of 5, per ASTM E84. Provide required thickness to achieve a minimum rating of R-49 for ceiling applications.
2.3 ACCESSORIES
A. Insulation for Miscellaneous Voids:
1. Glass-Fiber Insulation: ASTM C764, Type II, loose fill; with maximum flame-spread and smoke-developed indexes of 5, per ASTM E84.
2. Spray Polyurethane Foam Insulation: ASTM C1029, Type II, closed cell, with maximum flame-spread and smoke-developed indexes of 75 and 450, respectively, per ASTM E84.
B. Eave Ventilation Troughs: Preformed, rigid fiberboard or plastic sheets designed and sized to fit between roof framing members and to provide ventilation between insulated attic spaces and vented eaves.
PART 3 - EXECUTION
3.1 PREPARATION
A. Clean substrates of substances that are harmful to insulation, including removing projections capable of puncturing insulation or vapor retarders, or that interfere with insulation attachment.
3.2 INSTALLATION, GENERAL
A. Comply with insulation manufacturer's written instructions applicable to products and applications.
B. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed to ice, rain, or snow at any time.
C. Extend insulation to envelop entire area to be insulated. Fit tightly around obstructions and fill voids with insulation. Remove projections that interfere with placement.
D. Provide sizes to fit applications and selected from manufacturer's standard thicknesses, widths, and lengths. Apply single layer of insulation units unless multiple layers are otherwise shown or required to make up total thickness or to achieve R-value.
3.3 INSTALLATION OF INSULATION IN FRAMED CONSTRUCTION
A. Blanket Insulation: Install in cavities formed by framing members according to the following requirements:
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 072100-3
1. Use insulation widths and lengths that fill the cavities formed by framing members. If more than one length is required to fill the cavities, provide lengths that will produce a snug fit between ends.
2. Place insulation in cavities formed by framing members to produce a friction fit between edges of insulation and adjoining framing members.
3. Maintain manufacturer’s recommended clearance of insulation around recessed lighting fixtures not rated for or protected from contact with insulation.
4. Attics: Install eave ventilation troughs between roof framing members in insulated attic spaces at vented eaves.
5. For metal-framed wall cavities where cavity heights exceed 96 inches, support unfaced blankets mechanically and support faced blankets by taping flanges of insulation to flanges of metal studs.
6. For wood-framed construction, install blankets according to ASTM C1320 and as follows:
a. With faced blankets having stapling flanges, lap blanket flange over flange of adjacent blanket to maintain continuity of vapor retarder once finish material is installed over it.
7. Vapor-Retarder-Faced Blankets: Tape joints and ruptures in vapor-retarder facings and seal each continuous area of insulation to ensure airtight installation.
B. Miscellaneous Voids: Install insulation in miscellaneous voids and cavity spaces where required to prevent gaps in insulation using the following materials:
1. Glass-Fiber Insulation: Compact to approximately 40 percent of normal maximum volume equaling a density of approximately 2.5 lb/cu. ft.
2. Spray Polyurethane Insulation: Apply according to manufacturer's written instructions.
C. Loose-Fill Insulation: Apply according to ASTM C1015 and manufacturer's written instructions. Level horizontal applications to uniform thickness as indicated, lightly settle to uniform density, but do not compact excessively.
1. For cellulosic-fiber loose-fill insulation, comply with CIMA's Bulletin #2, "Standard Practice for Installing Cellulose Insulation."
D. Spray-Applied Cellulosic Insulation: Apply spray-applied insulation according to manufacturer's written instructions. Do not apply insulation until installation of pipes, ducts, conduits, wiring, and electrical outlets in walls is completed and windows, electrical boxes, and other items not indicated to receive insulation are masked. After insulation is applied, make flush with face of studs by using method recommended by insulation manufacturer.
3.4 PROTECTION
A. Protect installed insulation from damage due to harmful weather exposures, physical abuse, and other causes. Provide temporary coverings or enclosures where insulation is subject to abuse and cannot be concealed and protected by permanent construction immediately after installation.
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 072100-4
PART 4 - MEASURMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. The work described in this section will be measured and paid for by lump sum.
4.2 METHOD OF MEASUREMENT
07 21 00 – 01 Insulation Installation ............................................................... Lump Sum
END OF SECTION 072100
JULY 2023 SHEET METAL FLASHING AND TRIM
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 076200-1
SECTION 076200 - SHEET METAL FLASHING AND TRIM
1.1 SUMMARY
A. Section Includes:
1. Furnishing and installing all materials required to repair and/or replace defective roof ridge vent and degraded flashing around pipe/HVAC jacks.
B. Related Requirements:
1. Section 011000 “Summary” for restrictions on use of premises and Owner-occupancy requirements.
2. Section 013300 “Submittal Procedure”
3. Section 017700 “Closeout Procedure”
1.2 COORDINATION
A. Coordinate sheet metal flashing and trim layout and seams with sizes and locations of penetrations to be flashed, and joints and seams in adjacent materials.
B. Coordinate sheet metal flashing and trim installation with adjoining roofing and wall materials, joints, and seams to provide leakproof, secure, and noncorrosive installation.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
1.4 INFORMATIONAL SUBMITTALS
A. Product Test Reports: For each product, for tests performed by a qualified testing agency.
1.5 QUALITY ASSURANCE
A. Fabricator Qualifications: Employs skilled workers who custom fabricate sheet metal flashing and trim similar to that required for this Project and whose products have a record of successful in-service performance.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Do not store sheet metal flashing and trim materials in contact with other materials that might cause staining, denting, or other surface damage.
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 076200-2
1. Store sheet metal flashing and trim materials away from uncured concrete and masonry.
2. Protect stored sheet metal flashing and trim from contact with water.
B. Protect strippable protective covering on sheet metal flashing and trim from exposure to sunlight and high humidity, except to extent necessary for period of sheet metal flashing and trim installation.
1.7 WARRANTY
A. Special Warranty on Finishes: Manufacturer agrees to repair finish or replace sheet metal flashing and trim that shows evidence of deterioration of factory-applied finishes within specified warranty period.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. General: Sheet metal flashing and trim assemblies, including cleats, anchors, and fasteners, shall withstand wind loads, structural movement, thermally induced movement, and exposure to weather without failure due to defective manufacture, fabrication, installation, or other defects in construction. Completed sheet metal flashing and trim shall not rattle, leak, or loosen, and shall remain watertight.
B. Sheet Metal Standard for Flashing and Trim: Comply with NRCA's "The NRCA Roofing Manual: Architectural Metal Flashing, Condensation and Air Leakage Control, and Reroofing" and SMACNA's "Architectural Sheet Metal Manual" requirements for dimensions and profiles shown unless more stringent requirements are indicated.
C. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes to prevent buckling, opening of joints, overstressing of components, failure of joint sealants, failure of connections, and other detrimental effects. Base calculations on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss.
2.2 FABRICATION, GENERAL
A. Custom fabricate sheet metal flashing and trim to comply with details indicated and recommendations in cited sheet metal standard that apply to design, dimensions, geometry, metal thickness, and other characteristics of item required.
1. Fabricate sheet metal flashing and trim in shop to greatest extent possible.
2. Fabricate sheet metal flashing and trim in thickness or weight needed to comply with performance requirements, but not less than that specified for each application and metal.
3. Verify shapes and dimensions of surfaces to be covered and obtain field measurements for accurate fit before shop fabrication.
4. Form sheet metal flashing and trim to fit substrates without excessive oil-canning, buckling, and tool marks; true to line, levels, and slopes; and with exposed edges folded back to form hems.
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 076200-3
5. Conceal fasteners and expansion provisions where possible. Do not use exposed fasteners on faces exposed to view.
B. Fabrication Tolerances:
1. Fabricate sheet metal flashing and trim that is capable of installation to a tolerance of 1/4 inch in 20 feet on slope and location lines indicated on Drawings and within 1/8-inch offset of adjoining faces and of alignment of matching profiles.
2. Fabricate sheet metal flashing and trim that is capable of installation to tolerances specified.
C. Expansion Provisions: Form metal for thermal expansion of exposed flashing and trim.
1. Form expansion joints of intermeshing hooked flanges, not less than 1 inch deep, filled with butyl sealant concealed within joints.
D. Sealant Joints: Where movable, nonexpansion-type joints are required, form metal in accordance with cited sheet metal standard to provide for proper installation of elastomeric sealant.
E. Fabricate cleats and attachment devices from same material as accessory being anchored or from compatible, noncorrosive metal.
F. Fabricate cleats and attachment devices of sizes as recommended by cited sheet metal standard and by FM Global Property Loss Prevention Data Sheet 1-49 for application, but not less than thickness of metal being secured.
G. Seams:
1. Fabricate nonmoving seams with flat-lock seams. Tin edges to be seamed, form seams, and solder.
2. Fabricate nonmoving seams with flat-lock seams. Form seams and seal with elastomeric sealant unless otherwise recommended by sealant manufacturer for intended use. Rivet joints where necessary for strength.
3. Seams for Aluminum: Fabricate nonmoving seams with flat-lock seams. Form seams and seal with epoxy seam sealer. Rivet joints where necessary for strength.
H. Do not use graphite pencils to mark metal surfaces.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with installer present, for compliance with requirements for installation tolerances, substrate, and other conditions affecting performance of the Work.
1. Verify compliance with requirements for installation tolerances of substrates.
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 076200-4
2. Verify that substrate is sound, dry, smooth, clean, sloped for drainage, and securely anchored.
3. Verify that air- or water-resistant barriers have been installed over sheathing or backing substrate to prevent air infiltration or water penetration.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION, GENERAL
A. Install sheet metal flashing and trim to comply with details indicated and recommendations of cited sheet metal standard that apply to installation characteristics required unless otherwise indicated on Drawings.
B. Metal Protection: Where dissimilar metals contact each other, or where metal contacts pressure-treated wood or other corrosive substrates, protect against galvanic action or corrosion by painting contact surfaces with bituminous coating or by other permanent separation as recommended by sheet metal manufacturer or cited sheet metal standard.
C. Expansion Provisions: Provide for thermal expansion of exposed flashing and trim.
D. Conceal fasteners and expansion provisions where possible in exposed work and locate to minimize possibility of leakage. Cover and seal fasteners and anchors as required for a tight installation.
E. Seal joints as required for watertight construction.
3.3 INSTALLATION OF ROOF FLASHINGS
A. Install sheet metal flashing and trim to comply with performance requirements, sheet metal manufacturer's written installation instructions, and cited sheet metal standard.
1. Provide concealed fasteners where possible, and set units true to line, levels, and slopes.
2. Install work with laps, joints, and seams that are permanently watertight and weather resistant.
B. Roof Edge Flashing:
1. Install roof edge flashings in accordance with ANSI/SPRI/FM 4435/ES-1.
2. Anchor to resist uplift and outward forces in accordance with recommendations in cited sheet metal standard unless otherwise indicated. Interlock bottom edge of roof edge flashing with continuous cleat anchored to substrate at staggered 3-inch centers.
3. Anchor to resist uplift and outward forces in accordance with recommendations in FM Global Property Loss Prevention Data Sheet 1-49 for FM Approvals' listing for required windstorm classification.
C. Copings:
1. Install roof edge flashings in accordance with ANSI/SPRI/FM 4435/ES-1.
SODA SPRINGS FS ROOF REPAIR & MOLD REMEDIATION 076200-5
2. Anchor to resist uplift and outward forces in accordance with recommendations in cited sheet metal standard unless otherwise indicated.
3. Anchor to resist uplift and outward forces in accordance with recommendations in FM Global Property Loss Prevention Data Sheet 1-49 for specified FM Approvals' listing for required windstorm classification.
D. Pipe or Post Counterflashing: Install counterflashing umbrella with close-fitting collar with top edge flared for elastomeric sealant, extending minimum of 4 inches over base flashing. Install stainless steel draw band and tighten.
E. Counterflashing: Coordinate installation of counterflashing with installation of base flashing.
1. Insert counterflashing in reglets or receivers and fit tightly to base flashing.
2. Extend counterflashing 4 inches over base flashing.
3. Lap counterflashing joints minimum of 4 inches.
F. Roof-Penetration Flashing: Coordinate installation of roof-penetration flashing with installation of roofing and other items penetrating roof. Seal with butyl sealant and clamp flashing to pipes that penetrate roof.
3.4 INSTALLATION OF MISCELLANEOUS FLASHING
A. Equipment Support Flashing:
1. Coordinate installation of equipment support flashing with installation of roofing and equipment.
2. Weld or seal flashing with elastomeric sealant to equipment support member.
B. Overhead-Piping Safety Pans:
1. Suspend pans from structure above, independent of other overhead items such as equipment, piping, and conduit, unless otherwise indicated on Drawings.
2. Pipe and install drain line to plumbing waste or drainage system.
3.5 INSTALLATION TOLERANCES
A. Installation Tolerances: Shim and align sheet metal flashing and trim within installed tolerance of 1/4 inch in 20 feet on slope and location lines indicated on…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .