This document is a draft equipment specification for the Cottonwood Substation Section G Control Building. It provides detailed descriptions and requirements for the following equipment:
- Surge arresters (230-kV, single-unit, metal oxide, qualified to IEEE 693 High seismic criteria)
- Automatic transfer switch (240V, 600A, outdoor NEMA 4X enclosure, contactor-based, delayed open transition with various control features)
- Fusible safety switches (240V, 600A, NEMA 4X)
- Station service voltage transformers (230-kV, single-phase, 167kVA, pedestal-mounted)
- Outdoor AC distribution panel (240/120V, 600A, NEMA 4X)
The document also outlines submittal and delivery requirements, including packaging, unloading, and delivery location details. It references various WAPA equipment standards that the specified equipment must comply with.
The related federal contract opportunity is a Request for Information (RFI) for the Cottonwood Substation Control Building equipment. This RFI is for market research purposes only and is not seeking competitive quotes at this time. No reimbursement will be made for costs associated with providing information in response to this RFI.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_5-_Estimated_Pricing_1.xlsx | XLSX spreadsheet | |
| RFI_-_Cottonwood_Substation_Control_Bldg_Equipment_1.docx | DOCX document | |
| Attachment_2_-_Drawing-cw_1110_1.pdf | ||
| Attachment_4_-_Drawing-cw_1600_1.pdf | ||
| Attachment_3_-_Drawing-cw_1111_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESCRIPTION/SPECIFICATIONS
COTTONWOOD SUBSTATION
SECTION G CONTROL BUILDING EQUIPMENT
A. GENERAL
1. Support Structures
2. Installation and painting of electrical equipment and material
B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule items, “Surge arresters”
2. Bidding Schedule item, “Automatic transfer switch, 240V, 600A”
3. Bidding Schedule items, “Fusible safety switches, 240V, 600A”
4. Bidding Schedule items, “Station service voltage transformers, 230-kV
5. Bidding Schedule item, “Outdoor AC distribution panel, 240/120V, 600A”
C. SUBMITTALS AND CORRESPONDENCE:
1. GENERAL
2. TRANSMITTAL
3. SUBMITTAL RESPONSE
4. PHYSICAL SAMPLE SUBMITTAL
5. PROJECT PROTOCOL:
D. DELIVERY:
1. UNLOADING MATERIAL:
2. DELIVERY LOCATION:
3. DELIVERY DATE:
4. DELIVERY SCHEDULE:
5. NOTIFICATION:
6. PACKING SLIP:
7. UNLOADING:
8. CONTACT FOR DELIVERY
DRAFT
COTTONWOOD SUBSTATION SECTION G CONTROL BUILDING EQUIPMENT
A. GENERAL: Electrical equipment and material shall be as specified in WAPA’s “WAPA ES” standard equipment specifications, as shown on project drawings and in accordance with NEMA, ANSI, IEEE, ICEA, ASTM, NEC, NESC, UL and Federal specifications and standards as applicable. Applicable requirements shall be met under the following service conditions:
Ambient Temperatures:
Maximum .............................................................................. +40°C Maximum 24-Hour Average ................................................. +30°C Minimum ................................................................................ -30°C
Elevation:
Above Mean Sea Level ....................................................500-Feet
*ASCE-7 Wind Load Minimum Basic Wind Speed ............................................. 90-MPH Importance Factor ................................................................... 1.15
*IEEE 693 Seismic Qualification ......................................... .......... High
*May include support structure in accordance with STANDARD 9 1.1.2. Wind and seismic loads are nonsimultaneous.
1. Support Structures: Unless otherwise spec ed, ass ciated support structures provided for each electrical equipment rated above 7-kV shall e 1 2-inches in height and hot-dip galvanized, if made of steel. Instrument transformers that ar seismically qualified shall be 96-inches in height. If tubular steel supports are furni hed, they sh ll be galvanized internally and externally.
2. Installation and painting of electrical equipment and material shall be provided in accordance with
Standards 9 and 12 respectivel
B. DESCRIPTION OF BIDDING CHEDULE ITEMS
1. Bidding Schedule items, “ rge arresters” includes furnishing two (2) surge arresters, single unit, 230-kV, in a corda ce wit ANSI C62.1 and WAPA ES 9.1 equipment standard:
Designati n (Single- hase) AV10B2, AV10A2
Class Station
System (kV) (L-L) 230 MCOV*(kV, RMS) (Not less than) 152
Duty Cycle Voltage (kV) 192
a. Surge arresters shall be qualified to operate under the service conditions specified in paragraph A. General and as follows:
*IEEE 693 Seismic Qualification .................................... High
b. Surge arresters shall have the following features:
(1) Be suitable for base mounting.
(2) Be metal oxide station-type.
(3) Be equipped with pressure relief diaphragm.
(4) Have gray colored porcelain.
(5) Have NEMA CCI terminal pads.
(6) Have ground connector for No. 2 AWG to 400-kcmil copper cable.
(7) Be equipped with grading rings if required for application.
2. Bidding Schedule item, “Automatic transfer switch, 240V, 600A” includes furnishing free standing outdoor automatic source transfer switch Schneider Electric ASCO J7ADTSB20600F5XP or equal, as shown on drawing CW 1600 and in accordance with WAPA ES 2.3.6 equipment standards:
DESIGNATION ATS
Type Metal enclosed, single-phase, switched neutral, 60 Hz, outdoor
Required Voltage Rating 240/120V
Enclosure NEMA 4X Transition Type Contactor based Source Continuous Current Rating (amps) 600
Withstand Rating Momentary Current 10 Cycle Asym. (kA)
Operation Type D layed Open Transition (break before make)
Switched Neutral Yes Cabinet Heater Yes Mounting co figuratio Free-standing
a. WAPA ES 2.3 6 6 Remo e Supervisory Control and Monitoring is required.
b. Mounting configuratio is shown on Drawings.
c. The Automa ic Transfe Switch shall also include the following:
(1) Solenoid op rating mechanisms shall be provided in lieu of mechanical rack mounted switchgear.
(2) Neutral block/connection to accommodate incoming and outgoing switched neutral conductors.
(3) Adjustable time delay up to up to 6-seconds.
(4) Mechanical Interlocks to prevent direct connection of both sources.
(5) Integrated controller with a LCD graphical display and keypad control on front access door with LED indicators for switch position, source availability, not in auto, and alert condition.
(6) Integrated controller shall derive power from source.
(7) Integrated controller shall have manual local operation control.
(8) The controller shall operate for 30-seconds without AC Power. (ASCO 1UP accessory or equal).
(9) Integrated controller shall have multiple source voltage and frequency sensing.
(10) Internal strip cabinet heater with thermostat.
(11) Load side power monitoring on the ATS shall be provided, to include voltage, current, frequency and power factor, read from an LCD screen ASCO 5210 digital power meter or equal.
(12) Primary source selection switch ASCO option 29A or equal.
(13) The ATS shall include provisions for RS485 interface capable of external Modbus
RTU communication.
d. No internal lead-acid batteries permitted. If DC is requi ed, the assembly shall be designed for 125 V DC and the Contractor shall provide a 12 DC feed from the service building.
Primary and secondary source feeds from two safety swit hes SSA and SSB.
e. The automatic transfer switch assembly shall be qualified to operate under the service conditions specified in paragraph A. Gen ral.
3. Bidding Schedule items, “Fusible safety switc es, 240V, 600A” includes providing NEMA 4X fusible safety switches, 3-wire, 2-pole with fuses d ignated as SSA and SSB on drawing CW 1600. The safety switches shall be h avy ty Schneider Electric Square D H226NDS (or equal). There shall be provisions to padlock SSA nd SSB in the open position. The safety switches shall be installed as shown on rawing CW 1600 and in accordance with WAPA ES
2.3.10 equipment standards
4. Bidding Schedule item “Sta o rvice voltage transformers, 230-kV, single-phase, 167kVA” includes furnishing ll equipment and material and support structures in accordance with WAPA ES 6 4 Eq pment Standards:
DESIGNATION KW10B2, KW10A2
Type Pedestal mounted, single-phase, 60 Hz, outdoor, self-cooled, oil filled
Nominal System Voltage (kV) 230
Basic Impulse Insulation Level (kV) 900
Secondary Voltage Rating
(V) 240/120
Capacity (kVA) 167
Support Structure Height (in) 102”
Mounting Base/Pedestal
5. Bidding Schedule item, “Outdoor AC distribution panel, 240/120V, 600A” includes furnishing outdoor NEMA 4X AC distribution panel with main breaker, thermostat, 240V strip
4. PHYSICAL SAMPLE SUBMITTALS: When physical specimens or digital media are required to be submitted for approval, (i.e., brick samples, roofing material samples, carpeting, CDs, DVDs, etc.) the Contractor shall provide a digital cover letter outlining the physical sample submittal prior to sending the sample (including tracking data when applicable), and shall deliver physical specimens to:
Western Area Power Administration
ATTN: A7900
12155 W. Alameda Parkway Lakewood, CO 80228-2802
5. PROJECT PROTOCOL:
a. Electronic Correspondence:
EMAIL SUBMITTAL FORMAT:
Subject Line in Email Submittal number, Subject, Applicable Standard Number, Pro ect Name/Number, and Contract Number Example: Submittal 017, Steel Compression Dead End Std 10, Cottonwood Substation Stage
No 01, 9503222CWA000XXX -1065
b. Request for Information:
EMAIL (REQUEST FOR INFORMATION) FORMAT:
Subject ine in mail
Request for Information (RFI), Project Name/N mb r, and Contract Number Example: RFI-003, Labeling Info, Cotto wood S bstation Stage 01, 9503222CWA000XXX -
D. DELIVERY:
1. UNLOADING MATERIA A s parate bidding schedule item does not exist for unloading material. The Contractor sh ll deliver and unload materials. Include delivery and unloading costs in applicable B dding Sched e items. The Contractor is responsible for the route of delivery and any associated pe mitting. The Contractor shall provide wood blocking and unload the materials and place them on w od b ocking material in the laydown yard as directed by WAPA or a WAPA representative.
a. Box all loose hardware and label by count and description, bolts of different lengths shall be packaged separately.
b. Utilize wood blocking material. Provide 6-inch minimum height to keep material off the ground.
c. Hardware and other small materials may be placed on wooden pallets.
2. DELIVERY LOCATION:
a. Materials shall be delivered to Cottonwood Substation:
Cottonwood Substation is located approximately 20 miles south of Redding, CA.
21212 Trefoil Lane Cottonwood CA, 96022
Message from the Administrator
At Western Area Power Administration (WAPA), we show our commitment to safety every day through the actions we take, the training we offer and the work conditions we provide. We expect the same commitment to safety from each of our contractors who provide products or services to WAPA. In performing work for WAPA, all contractors must make the right decisions to ensure that the work environment is as safe as possible.
Our safety program is based on four points:
Safety procedures or common sense must be applied by each Federal and contract employee. Safety should not be set a ide to meet a project schedule or for personal convenience.
Employees and contractors must belie e that they have the right and the responsibility to identify and take action reduce, if not eliminate, hazardous work environments and hazardou work practices.
Managers and supervisors must lead by example and execute their responsibility to ensur each ob is accomplished in a safe and healthy way.
Safety is a personal resp nsibility. Each individual makes the decision on what action to take to accomplish a task.
By integrating these principle into every task we take, together we can ensure WAPA is a safe place to work.
Tracey A. LeBeau Administrator and CEO
File details come from the government source that posted it. Updated .