Attachment 1. Salient Characteristics.pdf

PDF 74 KB Posted

Attached to
Notice of Intent to Sole Source - Nuclear Density Gauge
Solicitation number
Not on record
Issued by

About this file

This document is a salient characteristics specification for nuclear density gauge procurement by the 819th RED HORSE Squadron (819 RHS). The squadron is procuring 2 nuclear density gauges (specifically Troxler Model 4540 EGAUGEs) that must meet detailed technical specifications to fulfill mission construction requirements.

The equipment must be self-contained with no exposure hazards to personnel and requires no additional approvals or certifications. Key specifications include: certification for air travel with single locking travel case and appropriate transport labels, capability to test both soil and asphalt densities, moisture content probe with serial cable, low activity source exempt from USA licensing requirements, 12" rod with 2" increments, 12" minimum drill rod, extraction tool, scraper plate, and AC/DC charger. Critical timing requirement specifies that parts procurement and installation must be completed by August 4, 2025 to meet construction requirements. The document includes an illustration showing the nuclear density gauge equipment.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

819th RED HORSE TROXLER MODEL 4540 EGAUGE

Salient Characteristics

1. 819th RED HORSE Squadron (819 RHS) is procuring 2 nuclear density gauges that must meet the specifications listed below to meet the mission needs.

2. The equipment is self-contained and does not create exposure hazards to personnel handling it.

No further approvals, or certifications required.

a. System is certified for air travel

i. Single locking travel case with appropriate labels for transport required

ii. Able to test both soil and asphalt densities

iii. With moisture content probe provided

iv. Probe serial cable provided

v. Low activity source, exempt from licensing in USA

vi. 12” rod with 2” increments

vii. 12” minimum drill rod provided

viii. Extraction tool provided

ix. Scraper plate provided

x. AC/DC charger provided

xi. Parts procurement and installation must be completed by 4 August 25 in order to meet construction requirements.

3. Illustrated Detail: