Attachment 1.pdf

PDF 44 KB Posted

Attached to
Sioux City, Readiness Center Soil Clearing and Hydroseeding
Solicitation number
RFQ 08112023
Issued by
Woodbury County, Sioux City, Iowa

About this file

This document is an attachment to an RFQ (Request for Quotation) issued by the Iowa Department of Public Defense for a soil tilling and hydroseeding project at the Sioux City Readiness Center in Sioux City, Iowa. The scope of work includes tilling approximately 21,000 square feet of land, clearing rocks and debris, and performing hydro-seeding. The base bid should include all labor, equipment, and materials, as well as any applicable travel charges. An alternate option is to combine the base bid scope with drill seeding. The project timeline requires work to begin by August 28, 2023 and be completed no later than September 8, 2023, though the completion date may be adjusted due to weather, environmental, or industry-wide issues. Site visits can be scheduled by contacting Koby Higgins.

Quotes and questions must be submitted to evan.schatz@iowa.gov by 2:30 p.m. on August 22, 2023. The contract will be awarded to the successful bidder, and the Department of Public Defense is the responsible agency. No additional details are provided regarding pricing terms, set asides, incumbents, funding requirements, or other salient information.

View the file

Other files

File Type Posted
Attachment 3.pdf PDF
Attachment 4.pdf PDF
Attachment 2.png PNG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ 08112023

ATTACHMENT 1

SPECIFICATIONS AND SCOPE OF WORK

Provide all labor, equipment, and materials for tilling and hydroseeding approximately 21,000 square feet of land at the Sioux City Readiness Center, 3200 Mech Dr. Sioux City, IA 51111.

Base Bid should include the following:

-Tilling of the 21,000 square feet of soil with soil conditioner -Clear rocks and debris as necessary -perform hydro-seeding (list the product that will be used) -travel charges (if applicable)

Alternate:

-Combine all base bid scope of work but also perform drill seeding

Timeline Requested:

Begin execution of work by August 28, 2023 and work needs to be completed no later than September 8, 2023. If your company is interested in the project but CAN NOT complete it on the above timelines, please submit a quote and state dates of when you CAN complete

it. If needed the “complete by” date can be changed due to weather/environmental/industry wide issues.

Point of Contact to request site visits:

Koby Higgins koby.w.higgins.nfg@army.mil (515)499-5465 mailto:koby.w.higgins.nfg@army.mil

RFQ 08112023