Attachment 1.docx
DOCX document 15 KB Posted
- Attached to
- Missouri River Project Office (MRPO) Rock Supply
- Solicitation number
- W9128F23Q0089
About this file
This document outlines deliverables required under a federal contract with the Department of the Army Corps of Engineers Engineering District Omaha. The contractor must provide preliminary existing test results for conditional approval of the first 5,000 tons of stone within 5 days of award, and complete initial sampling and testing results within 45 days of award. With each new stone source, the contractor must submit sampling and testing results 21 days prior to scheduled delivery. The contractor will also need to provide printed or signed weight bills for each truckload of stone delivered to the loading site. Initial stone deliveries must be made onto government-owned barges no later than 10 days after acceptance of preliminary test results, with a representative on the barges and tow boats no later than 3 days after notice.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W9128F23Q0098_0002.docx | DOCX document | |
| SF1449_W9128F23Q0098.docx | DOCX document | |
| W9128F23Q0098_0001.docx | DOCX document | |
| Attachment1_Amendment 0001_16Aug2023.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1
Summary of Deliverables
| Deliverable |
| Description |
| Frequency |
| Format |
| To whom |
| Preliminary, existing test results |
| Preliminary, existing stone quality test results for conditional approval of first 5,000 tons of stone. |
| Once, 5 days after contract award. |
| COR |
| Complete initial sampling and testing results |
| Complete, certified test results performed not longer than twelve (12) months prior to delivery. |
| Once, 45 days after contract award. |
| COR |
| Sampling and testing results of new sources |
| Stone sampling and testing results as described in Section 2.5.2 the SOW. |
| Once for each new source 21 days prior to scheduled delivery. |
| COR |
| Weigh bills |
| Printed or signed weight bills as described in Section 4 of the SOW. |
| One for each truckload of stone delivered to the loading site. |
| PDF or original copy |
| COR |
| Stone |
| Initial stone delivery of stone onto government owned barges as described in Section 1.4 of the SOW. |
| No later than 10 days after acceptance of preliminary test results. |
| As described in the SOW |
| Representative on government barge and tow boat |
| Initial stone delivery of stone onto government owned barges as described in Section 1.4 of the SOW. |
| No later than 3 days after notice. |
| As described in the SOW |
| Representative on government barge and tow boat |