Attachment 1- DIning Room Chairs SOW.pdf
PDF 129 KB Posted
- Attached to
- Dining Room Chairs Federal contract opportunity
- Solicitation number
- FA301622U0205
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA301622U0205- Q and A Amendment 1.pdf | ||
| FA301622U0205- Dining Room Chairs RFQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Removal and Installation of Dining Chairs in Building 124 and 7532
Joint Base San Antonio (JBSA) Lackland TX 78236
1.0 GENERAL DESCRIPTION. Contractor shall provide all supervision, labor, transportation, materials, tools, incidentals, equipment, services and quality assurance necessary to remove, existing dining chairs and place them outside of the facility, and to unload, unpack, and install new dining chairs in the dining room of the following buildings:
Building 124, 1170 Eagle Drive, JBSA-Lackland, TX, 78236 (Chapman Annex)
Building 7532, 2215 Andrews Avenue, JBSA-Lackland, TX 78236
All chairs will initially be delivered to the address below. The Government will transport the chairs to the appropriate buildings prior to installation and the contractor installation crew will complete installation.
410 N. Frank Luke Drive
Bldg. 1530/Northend Bay E. Door 22
San Antonio, TX 78226
Phone: 210-925-5111
All activities shall be coordinated with the Food Service Staff Office and Dining Facility Managers to schedule delivery and installation for each facility. All work shall be accomplished in accordance with product manufacturer’s recommendations and industry standards, and meet all municipal, state, and federal codes, standards, and guidelines.
2.0 DESCRIPTION OF SERVICES. The contractor shall remove existing dining room chairs and unpack and install new dining room chairs in the facilities identified in Section 1. The contractor shall:
2.1.1 Remove all existing dining chairs and booth seating from dining rooms, stack outside the facility along the wall leading away from the loading dock area, ensuring that the loading dock area is not blocked from trucks being able to back in to unload. Government is responsible to dispose of all existing dining room chairs/booths.
2.1.2 Unload, unpack, and place new chairs in the Dining Room specified by the
Government representative.
Bldg 124-455 chairs
Bldg 7532-436 chairs
2.1.3 Show staff/government representative installed chairs prior to departure and have them sign off on any invoices that may need verification.
2.1.4 Remove all packaging materials and pallets from the new chairs and dispose of said material off the installation and not into Government refuse containers
3.0 SAFETY. The contractor shall ensure compliance with OSHA Safety and Health Regulations, prior to daily commencement of work, the contractor shall properly secure the work site and locate and secure tools, equipment, and material as necessary to ensure the safety and protection of personnel, equipment and property.
4.0 WORKMANSHIP AND REGULATORY COMPLIANCE. This is an occupied building. Materials on site must be kept in such a manner that continuing working operations is not impaired. The contractor shall take precautions to prevent damage to government property.
The contractor shall repair or replace damaged items at no additional cost to the government. All analysis, workmanship, and quality control performed under this contract shall conform to published and recognized authoritative sources of good industry standard and practices in compliance with OSHA Standard 1926 Subparts H and O. The contractor will be responsible for any additional cost required to insure compliance to said standards and practices.
4.1 WASTE DISPOSAL AND ENVIRONMENTAL PROTECTION. At the end of each work day, the contractor shall remove all residual equipment, components, materials, and
/or debris generated and disposed of in appropriate government containers. All areas shall be cleaned of debris at the end of each working day and prior to final acceptance of the work.
5.0 SECURITY. All facilities shall be secured at the end of each day. The contractor shall ensure that all work accomplished is limited to the terms and conditions outlined in this SOW. The contractor shall coordinate with the government representative(s) designated during the pre-con upon arrival and prior to leaving the work site each day. The government representative(s) will be located in building 7065, Suite 228.
6.0 WARRANTIES. Installation shall be warranted from defect for one year, and all standard system warranties shall apply. Warranty shall begin the day of completion and acceptance by 802
Force Support Group.
7.0 COMPLETION OF WORK. The contractor shall ensure that work for this project is performed in accordance with the criteria herein, and that all equipment and systems shall be fully operational at the completion of work for this project. All surfaces shall be cleaned; tiled floors swept & mopped.
8.0 GOVERNMENT FURNISHED SERVICES.
8.1 UTILITIES. The government will provide utilities (water and electricity) and emergency, fire and security police response services.
8.2 POLICE PROTECTION. The 802d Security Forces Squadron shall provide security and law enforcement response and service to the contractor.
8.3 FIRE PROTECTION. The Lackland Fire Departments shall provide initial response, EMS, and fire protection services to the contractor.
9.0 TRAFFIC REGULATIONS. The contractor employees shall comply with all base traffic regulations, and are subject to random vehicle speed control checks. The contractor’s personnel cited for speeding on the installation may suffer loss of base driving privileges, debarment from the base, or other administrative action The use of cell phones, except hand-free phones, is prohibited while driving on military installations in San Antonio, TX.
10.0 QUALITY ASSURANCE. The government will evaluate the contractor’s performance during various phases of the project. Quality assurance maybe performed randomly by 802d TRW/SE (Wing Safety), 802d FSS/FSVF (Food Service), and /or the contracting officer and representatives. They may observe performance to monitor quality of work, insure cleanliness, and compliance with safety and security procedures. At the time of award, the contractor shall designate a program manager who will be available throughout the project to discuss with the government inspectors any quality issues that may arise.
11.0 INSPECTION AND ACCEPTANCE. All services performed under this SOW are subject to inspection by the government at the completion of each task. The contractor, at no additional expense to the government, shall promptly correct unsatisfactory services.