This is a Statement of Work (SOW) for the procurement, manufacture, and delivery of new ground-based geodesic radomes to Tobyhanna Army Depot (TYAD). The contract will be awarded as firm-fixed-price and includes completion of successful Factory Acceptance Test (FAT) data, government-witnessed inventory at the vendor's facility, and delivery of radomes and accessories to TYAD.
The Contractor shall procure and deliver two 18-foot diameter metal space frame radomes and two 26-foot diameter metal space frame radomes, each designed to protect dual polar/geostationary antennas and interface with existing HVAC systems. Key technical requirements include 6061-T6 aluminum construction, operational wind loads of 150 mph, temperature ranges from -65°F to +165°F, electromagnetic performance specifications with panel membrane dielectric constant of 3.0, electrical resistance of 10 milliohms or less, and 90% or greater solar radiation rejection. Both radome sizes must meet RF requirements, achieve 20-year design lifecycle, and include aluminum storm doors, 14-inch OD HVAC ducts (inlet/outlet), and obstruction light kits. The Contractor must develop and provide comprehensive Technical Manuals for each radome size (18-foot and 26-foot) in both hard copy and searchable PDF formats, including detailed engineering drawings, assembly and installation instructions, preventive and corrective maintenance procedures, and complete Bills of Materials. Prior to shipment, the Contractor shall facilitate a government-witnessed physical inventory of all deliverable items at their facility, coordinating with the Government Contracting Officer's Representative no later than 45 days prior to inventory and finalizing the schedule no later than 30 days prior. A one-time, post-award site survey at Hickham Air Force Base, Oahu, Hawaii is required to visually inspect legacy radome installations (one 18-foot and one 26-foot model) to finalize the Bill of Material and clarify design details; all Contractor personnel costs for this survey are included in the firm-fixed-price, while Government personnel costs are borne by the Government. All shipments must be FOB destination to TYAD in 40-foot or 20-foot ISO containers (double-door for 40-foot, single-door for 20-foot) using the Carrier Appointment System, delivered to Building 1C Bay 5, with drivers required to possess valid vehicle insurance, registration, proper endorsement, and a bill of lading containing contractor/vendor information and delivery details. The Contractor shall maintain a two-year warranty covering performance specification requirements and provide FOB shipping during the warranty period. Quality assurance requires the Contractor to perform standard manufacturing assembly, inspection, and testing activities according to internal processes; provide a Certificate of Conformance with deliveries; and store all FAT data in their configuration management system available for Government review upon request. Mandatory compliance is required with specified military standards including MIL-STD-129P, MIL-STD-130N, MIL-STD-882D, MIL-STD-1472G, MIL-STD-2073-1E, and DoD Directive 5230.24, with guidance provided by MIL-PRF-49506, MIL-STD-3018, FED-STD-313D, MIL-HDBK-61B, and MIL-HDBK-502. The Contractor must maintain minimum insurance coverage including Worker's Compensation with Employer's Liability of at least $100,000, General Liability of at least $500,000 per occurrence, and Automobile Liability of at least $200,000 per person and $500,000 per occurrence for bodily injury.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W51AA1-26-Q-A022 Amendment 0002.pdf | ||
| W51AA1-26-Q-A022 Amendment 0001.pdf | ||
| W51AA1-26-Q-A022.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Statement of Work This Statement of Work (SOW) and the documents referenced herein define the requirements to procure, manufacture, and deliver new ground-based, geodesic radomes. Completion of this effort is identified by providing successful Factory Acceptance Test (FAT) data, an inventory at the vendor’s facility witnessed by government personnel, and subsequent delivery of radomes and accessories to Tobyhanna Army Depot (TYAD). The funding for efforts identified in this SOW shall be delivered as a firm-fixed-price contract.
2. Program Objectives The specific objective of this SOW is to provide the necessary supplies to assist the Government in the following areas:
1. Design, manufacture and deliver a metal space frame radome that will protect a 10-foot dual polar/geostationary antenna and match the existing anchor bolt pattern. Looking for a radome that is approx. 18 foot in diameter.
2. Design, manufacture, and deliver a metal space frame radome that will protect a 17-foot geostationary antenna and match the existing anchor bolt pattern.
Looking for a radome that is approx. 26 foot in diameter.
3. Provide radomes that will interface with existing Heating, Ventilation, and Air Conditioning (HVAC) system. Both 18 foot and 26 foot radome will need intake and outtake panel.
4. Provide radomes that will meet or exceed current Radio Frequency (RF) requirements of the existing system.
5. Provide radomes that will meet or exceed wind load requirements of the existing system.
6. The Contractor shall develop and provide a comprehensive Technical Manual for each unique radome size (18ft and 26ft) procured under this contract.
7. Extend the lifecycle of the fielded systems at various locations around the world by providing adequate protection from environmental factors.
8. Optimize system Reliability, Maintainability, and Availability (RMA).
9. Minimize annual maintenance and support costs.
To meet the stated objectives, the Contractor shall provide the material requirements specified by salient characteristics referenced in Section 3.
2.1 Description of Supplies
The government was awarded mission workload to procure and install. These radomes will provide protection of Department of War (DoW) equipment from the harsh weather and environmental conditions. The system requires a temperature controlled electronic equipment environment. The current radomes have been categorized as Beyond Economical Repair (BER) assets.
2.2 Definition of Terms and Phrases
The following terms and phrases are used throughout this SOW:
The word “shall” is a verifiable requirement for the Contractor.
The word “will” is used as a statement of fact, not subject to verification.
The word “may” is used to express an optional requirement.
2.3 Applicable Documents
The following documents of the exact issue shown form a part of this SOW to the extent specified herein. In the event of conflict between the documents referenced herein and the contents of this SOW, the SOW is considered the superseding document. In the event of conflict between documents referenced herein and their associated sketches/drawings, the production standard is considered the superseding document.
The applicable DoD specifications and standards used in the current equipment design are accepted for use in this program. The Contractor has the right to use updated/replacement DoD specifications and standards for new or modified designs.
For specifications and standards that are obsolete with no DoD replacement, the Contractor shall submit a contract letter to the Government with recommendations.
The Government will review for approval.
2.4 Government Documents
Military Standards (MIL-STD) and Specifications – Mandatory Compliance
These MIL-STDs and Specifications can be found online at the Acquisition Streamlining and Standardization Information System (ASSIST) website at http://quicksearch.dla.mil/ or at – Every Spec http://www.everyspec.com/.
MIL-STD-129P w/chg 4 Military Marking for Shipment and Storage MIL-STD-130N Identification Marking of U.S. Military Property MIL-STD-882D Standard Practice for System Safety MIL-STD-1472G Human Engineering MIL-STD-2073-1E chg 1 Department of Defense (DoD) Standard Practice for Military Packaging DoD Directive 5230.24 Distribution Statements on Technical Documents
(Aug 2012)
Military Standards (MIL-STD) and Specifications – Guidance Only MIL-PRF-49506 Logistics Management Information Notice 1, http://quicksearch.dla.mil/ http://www.everyspec.com/
18 January 2005 MIL-STD-3018 chg 1 Parts Management
Federal Standard (FED-STD) – Mandatory FED-STD-313D chg 1 Safety Data for Hazardous Material
Military Handbooks (MIL-HDBK) – Guidance Only MIL-HDBK-61B Configuration Management Guidance MIL-HDBK-502 Acquisition Logistics
3. Requirements The following paragraphs detail the requirements and/or tasks of this effort for the Contractor, to be procured by the Government.
3.1 Material Requirement
The Contractor shall perform all tasks required and delineated in this SOW to procure, manufacture, test and deliver the following to satisfy the minimum requirements:
• Qty (2) – 18-foot Metal Space Frame Radome,
• Qty (2) – 26-foot Metal Space Frame Radome
Below is list of salient characteristics required for the 18-foot and 26-foot radomes respectively.
The Contractor shall provide all materials, documentation, equipment, special installation tooling, personnel, facilities and recommendations necessary to perform the tasks in this SOW and deliver the types and quantities of deliverables specified by the contract. Acceptance criteria for the deliverables is specified in Section 4.
3.1.1 Salient Characteristics for an 18-foot diameter Radome
Electromagnetic Requirements
Panel Membrane Dialectric Constant 3.0
Panel Membrane Loss Tangent 0.01
Electrical Resistance Between Panel 10 milliohms or less
Mechanical Requirements
Assembled Outside Diameter 18 feet 0.0 in
Assembled Inside Diameter 16 feet 5.4 in
Assembled Outside Height 16 feet 4.1 in
Assembled Inside Height 15 feet 6.8 in
Frame Design Metal Space Frame, triangular frames to be oriented and bolted to form a geodesic dome
Frame Material 6061-T6 Extruded Aluminum
Panel Membrane Material Electromagnetically transparent membrane permanently bonded to framework
Panel Membrane Surface Tedlar integrally bonded hydrophobic surface on top of Tedlar
Hardware for Panel Construction Stainless Steel
Cap Hardware for Assembled Panels Plated
Environmental Requirements
Operational Wind Load (Max) 150 mph (240 km/hr)
Operational Temperature Range -65ºF to +165ºF (-54ºC to +71ºC)
Solar Radiation Rejection 90% or greater (white exterior)
Relative Humidity 0 to 100%
Actinic Radiation As encountered in the tropics
Ozone Arctic/heavy equipment
Salt Atmosphere Per MIL-STD-810, Method 509, Proc 1
Sand and Dust Per MIL-STD-810, Method 510
Altitude at Site Unlimited
Fire Retardancy Per ASTM D635
Fungus Resistance Per MIL-STD-454, Requirement 4
Precipitation Load (Ice, snow, etc) 50 psf
Lightning Protection Electrostatic (Faraday) Cage
Electrical Requirements
Sidelobe Perturbation 1 dB average at -25 dB power level with antenna gain >45 dB
Panel Membrane Dielectric Constant 3.0
Panel Membrane Loss Tangent 0.009 – 0.01
Electromagnetic Performance 0.5 GHz to 100 GHz with standard membrane, 1000 GHz with high performance membranes.
Electrical Resistance between Panel Beams 10 milliohms or less
General Requirements
Packaging and Marking MIL-STD-130N, or commercial equivalent
Transportability Air, land or sea transport
Lifecycle of Design 20 years
Coatings/Finishes Hydrophobic
Radome Entrance Aluminum Storm Door w/ standard door closer, drop pin attachment
Atmospheric Control 14” OD HVAC Duct 2X (Inlet/Outlet)
Obstruction Light Kit Included
Radome Foundation Requirements
Weight 1066 lbs
Net Lift 10,393 lbs
Drag 9,360 lbs
Moment -68,688 ft-lbs
3.1.2 Mounting Requirements for a 18-foot diameter Radome
MOUNTING AND ANCHORING REQUIREMENTS (INCHES)
NUMBER OF BASE SEGMENTS 5
WORK POINT RADIUS 59.569
WORK POINT CHORD 70.028
ANCHOR BOLT SPACING 7.000
ANCHOR BOLT HEIGHT 3.750
ANCHOR BOLT HEIGHT 1
NUMBER OF ANCHOR BOLTS 10
MAX TENSION LOAD ON EACH LOAD CARRYING BOLT 7,474 LBS
MAX SHEAR LOAD ON EACH LOAD CARRYING BOLT 8,240 LBS
Anchor Plate Dimensions
3.1.3 Salient Characterisitics for the 26 foot diameter Radome
Electromagnetic Requirements
Panel Membrane Dialectric Constant 3.0
Panel Membrane Loss Tangent 0.01
Electrical Resistance Between Panel 10 milliohms or less
Mechanical Requirements
Assembled Outside Diameter 26 feet 0.0 in
Assembled Inside Diameter 23 feet 9.21 in
Assembled Outside Height 21 feet 3.3 in
Assembled Inside Height 20 feet 1.9 in
Frame Design Metal Space Frame
Frame Material 6061-T6 Aluminum
Panel Membrane Material Electromagnetically transparent membrane permanently bonded to framework
Panel Membrane Surface Tedlar integrally bonded hydrophobic surface on top of Tedlar
Hardware for Panel Construction Stainless Steel
Cap Hardware for Assembled Panels Plated
Environmental Requirements
Operational Wind Load (Max) 150 mph (240 km/hr)
Operational Temperature Range -65ºF to +165ºF (-54ºC to +71ºC)
Solar Radiation Rejection 90% or greater (white exterior)
Relative Humidity 0 to 100%
Actinic Radiation As encountered in the tropics
Ozone Arctic/heavy equipment
Salt Atmosphere Per MIL-STD-810, Method 509, Proc 1
Sand and Dust Per MIL-STD-810, Method 510
Altitude at Site Unlimited
Fire Retardancy Per ASTM D635
Fungus Resistance Per MIL-STD-454, Requirement 4
Precipitation Load (Ice, snow, etc) 50 psf
Lightning Protection Electrostatic (Faraday) Cage
Electrical Requirements
Sidelobe Perturbation 1 dB average at -25 dB power level with antenna gain >45 dB
Panel Membrane Dielectric Constant 3.0
Panel Membrane Loss Tangent 0.009 – 0.01
Electromagnetic Performance 0.5 GHz to 100 GHz with standard membrane, 1000 GHz with high performance membranes.
Electrical Resistance between Panel Beams 10 milliohms or less
General Requirements
Packaging and Marking MIL-STD-130N, or commercial equivalent
Transportability Air, land or sea transport
Lifecycle of Design 20 years
Coatings/Finishes Hydrophobic
Radome Entrance Aluminum Storm Door w/ standard door closer, drop pin attachment
Atmospheric Control 14” OD HVAC Duct 2X (Inlet/Outlet)
Obstruction Light Kit Included
Radome Foundation Requirements
Weight 2,291 lbs
Net Lift 26,033 lbs
Drag 17,422 lbs
Moment -144,243 ft-lbs
3.1.4 Mounting Requirements for the 26 foot diameter Radome
Radome Mounting Layout
MOUNTING AND ANCHORING REQUIREMENTS (INCHES)
NUMBER OF BASE SEGMENTS 10
WORK POINT RADIUS 117.124
WORK POINT CHORD 72.387
ANCHOR BOLT SPACING 9.00
ANCHOR BOLT HEIGHT 4.500
ANCHOR BOLT HEIGHT 7/8
NUMBER OF ANCHOR BOLTS 40
MAX TENSION LOAD ON EACH LOAD CARRYING BOLT 2,771 LBS
MAX SHEAR LOAD ON EACH LOAD CARRYING BOLT 2,212 LBS
Anchor Plate Dimensions
3.2 Technical Manuals and Documentation
3.2.1 Technical Manual Requirements
The Contractor shall develop and provide a comprehensive Technical Manual for each unique radome size (18ft and 26ft) procured under this contract. The manual shall be written in clear, concise English and provide all necessary information for the assembly, installation, operation, and maintenance of the radomes.
3.2.2 Minimum Content Requirements
Each Technical Manual shall include, at a minimum, the following sections:
• Drawings and Reference Documents: A complete set of engineering drawings, interface control documents (ICDs), and any other referenced documents required to understand the radome's design, interfaces, assembly, and sustainability. The Government does not require the “As Built” drawings nor anything the Contract deems as proprietary.
• Assembly and Installation Instructions: Detailed, step-by-step procedures for the complete assembly and installation of the radome, including required tools, torque values for all hardware, and safety precautions.
• Preventive Maintenance: A schedule and detailed procedures for all required preventive maintenance activities, including inspections, cleaning, and any periodic servicing needed to ensure the radome's operational longevity. This section should also call out the recommended paint and sealant required.
• Corrective Maintenance: Procedures for repair and/or replacement of common components. This section should guide qualified technicians in performing unscheduled maintenance.
• Bill of Materials (BOM): A complete and itemized Bill of Materials that lists all components, sub-assemblies, and hardware for one complete radome assembly. The BOM shall include part numbers, descriptions, and quantities.
3.2.3 Deliverable Formats and Schedule
The Contractor shall deliver the Technical Manuals in both hard copy and soft copy formats.
• Hard Copy: One (1) printed hard copy of the final Technical Manual either bound or 3-ring binder for each radome shall be delivered concurrently with the radome components and materials. The hard copy manual shall be treated as a formal deliverable and will be an inventoried item subject to the witnessed inventory process outlined in Section 3.
• Soft Copy: A complete, searchable, and unlocked soft copy of the final Technical Manual shall be delivered to the Contracting Officer's Representative (COR). The preferred format is Adobe Acrobat (.PDF). The soft copy shall be delivered electronically or on physical media no later than the time of shipment.
3.3 Government Source Inspection and Pre-shipment Inventory
3.3.1 Requirement for Witnessed Inventory**
Prior to final packaging for shipment, the Contractor shall facilitate and conduct a complete physical inventory of all deliverable items at their facility. This inventory shall be formally witnessed by designated Government personnel. The items to be inventoried include, but are not limited to:
* Two (2) each, 18ft Radome Assemblies
* Two (2) each, 26ft Radome Assemblies
* All associated components, hardware, and sub-assemblies as defined in the Bill of Materials (BOM).
** Travel cost for the Government personnel witnessing the inventory is at the expense of the Government NOT the Contractor. Labor cost for the personnel performing inventory IS at the expense of the Contractor.
3.3.2 Inventory Scheduling and Logistics
The Contractor shall coordinate with the Government to schedule the witnessed inventory. Coordination with the government needs start NLT 45 calendar days prior to inventory and inventory schedule needs to be finalized NLT 30 days prior to the inventory. Government will be as flexible as possible with the inventory schedule in case of inclement weather or unforeseen circumstances.
3.3.2.1 Trip Consolidation
The Contractor shall make every effort to schedule the inventory to occur during a single trip to their facility, encompassing all four (4) radomes and complete associate components.
3.3.2.2 Maximum Number of Trips
If production or delivery schedules demonstrably prohibit a single-trip inventory, the process may be conducted in no more than two (2) separate trips. The rationale for requiring a second trip must be provided in writing to the COR for review prior to scheduling.
3.3.3 Inventory Procedures and Roles
3.3.3.1 Process
The inventory shall be performed as a line-by-line review of all deliverable items against the Contractor’s official Bill of Materials and/or final packing list, which shall be provided to the Government witnesses upon their arrival.
3.3.3.2 Responsibilities
The Contractor’s personnel are responsible for physically conducting the inventory (e.g., locating, presenting, and counting items). The role of the Government personnel is to witness this process to verify the accuracy and completeness of the order.
3.3.4 Discrepancy Resolution
Any discrepancies, including missing, incorrect, or damaged items, identified during the witnessed inventory shall be formally noted. The Contractor shall be solely responsible for correcting all documented discrepancies. Final packaging, crating, and/or shipment of the radomes shall not proceed until all discrepancies are resolved to the satisfaction of the Government and verified by the COR.
3.4 Material Delivery Schedule
The Contractor shall maintain an accurate schedule of program events, which provide for the earliest and latest delivery dates for the subassemblies. This schedule shall be available upon request. Contractor format is acceptable. No formal data item delivery is required. Also, see below Section 6 for further delivery information.
3.5 Shipping and Packaging Requirements
3.5.1 ISO Container
The government prefers a set of radomes to be shipped in a single 40-foot ISO container (requirements below). A ‘set’ of radomes is defined as (1) 18-foot radome and (1) 26-foot radome. The intent is to combine shipments (if feasible) to create as few shipping containers as possible.
If it’s not possible due to delivery schedule or shipping configuration it is permissible for the vendor to provide each 26-foot radome in 40-foot ISO containers (requirements below) and each 18-foot radome in a 20-foot ISO container (requirements below). Note:
40-foot containers have a double door requirement (at a minimum). 20-foot containers have a single door requirement (at a minimum)
All deliverable items shall be packed and shipped in a 40-foot, General Purpose, Dry Van ISO container (ISO 668 designation: 40'GP). The container shall be a double-door configuration with operational doors located on both short sides. The container must be certified for sea and/or land transport, and be in a clean, dry, and serviceable condition, free from any damage or contaminants that could affect the integrity of the materials within.
All deliverable items shall be packed and shipped in a 20-foot, General Purpose, Dry Van ISO container (ISO 668 designation: 20'GP) with a single set of cargo doors. The container must be certified for sea and/or land transport, and be in a clean, dry, and serviceable condition, free from any damage or contaminants that could affect the integrity of the materials within.
Packaging The Contractor shall be responsible for packaging in accordance with MIL-STD-2073-1 for each assembly. Contractor shall be responsible for providing itemized packing list of contents included in the shipment. Packed containers will be shipped from contractor to Tobyhanna Army Depot, Tobyhanna, Pennsylvania. Tobyhanna Army Depot will coordinate international shipments. Shipments shall be combined to create as few shipping containers as possible.
Preservation and Packaging Items scheduled for domestic shipment for immediate use shall be Preserved and Packaged (P&P) in accordance with the best commercial practices of ASTM D3951.
Marking for shipment and storage shall be in accordance with MIL-STD-129P, change 4.
Spare or repairable components, not declared to be Electrostatic Sensitive Devices (ESD), shall be P&P in accordance with the best commercial practices of ASTM D3951-10.
Hazardous materials shall be P&P in accordance with the requirements of FAR 47 Code of Federal Regulations (CFR) and FED-STD-313D, change 1.
Shipping
For each subassembly, the Contractor shall provide Free Onboard (FOB) domestic shipping to the destination point (FOB destination) specified by the Government. A
Certificate of Conformance shall accompany each scheduled delivery to the Government.
Warranty
The Contractor shall warrant the materials and resulting subassemblies meet their original performance specification requirements for a period of two years after delivery, per FAR 52.246-18 in the contract. The Contractor shall provide FOB shipping to the destination point (FOB destination) specified by the Government during the warranty period.
4. Post-Award Site Survey for Bill of Material Finalization
4.1 Requirement for Site Survey
The Contractor shall conduct a one-time, post-award site survey of existing, comparable radome configurations located at Hickham Air Force Base (AFB), Oahu, Hawaii.
4.2 Purpose of Survey
The express purpose of this survey is for the Contractor, in conjunction with Government personnel, to visually inspect legacy radome installations (one 18ft and one 26ft model) to finalize the Bill of Material (BOM) and clarify any minor details not precisely defined by the salient characteristics in this Statement of Work. This survey ensures the final delivered items are fully compatible with the existing infrastructure.
4.3 Financial Responsibility
4.3.1 Contractor Expense: All costs associated with this survey for the Contractor's personnel, including but not limited to airfare, lodging, meals, incidentals, and labor, shall be at the Contractor's own expense. These costs must be included in the Contractor's total firm-fixed-price for this contract.
4.3.2 Government Expense: All travel and labor costs for Government personnel participating in or witnessing the survey shall be borne by the Government and are not chargeable to the Contractor.
4.4 Survey Schedule and Duration
The survey shall be planned based on an assumed four (4) day schedule:
• Day 1: Travel to Oahu, Hawaii.
• Day 2-3: On-site at Hickham AFB to survey one (1) 18ft legacy radome and one (1)
26ft legacy radome.
• Day 4: Travel from Oahu, Hawaii.
4.5 Coordination Timeline
The Contractor shall coordinate all survey logistics with the Government Contracting Officer's Representative (COR) according to the following timeline:
• The Contractor must initiate survey planning and coordination no later than (NLT) 45 days prior to the proposed survey start date.
• Final, mutually agreed-upon survey dates must be established NLT 30 days prior to the survey.
4.6 Site Access and Security
• Government Assistance: The Government COR will coordinate and facilitate the
Contractor's base access requests for Hickham AFB for the approved survey dates.
• Contractor Personnel Requirements: The Contractor is responsible for ensuring its personnel can meet all installation access requirements. This includes, but is not limited to, successfully passing a background check and possessing a valid, REAL ID Act-compliant form of identification (e.g., REAL ID driver's license, U.S. Passport).
4.7 Classification
The site survey is an Unclassified activity. No security clearance is required for the Contractor's personnel, and they will not need to access any classified spaces or information to complete the survey.
5. QUALITY ASSURANCE PROVISIONS
The Contractor shall follow internal quality procedures and standards to ensure product integrity and to satisfy contract or order requirements. The Contractor shall verify and validate the quality of the deliverables throughout all areas of contract performance including preparation, validation, packaging and shipping.
5.1 Inspection, Verification, and Testing Activities
The Contractor shall perform standard manufacturing assembly, inspection and test activities, limited to the supplied equipment, in accordance with Contractor’s internal processes and procedures.
5.2 Data Item Deliverables
A Certificate of Conformance (COC) shall be provided to the Government, for information only, with parts delivered. The Contractor shall store all FAT data in their configuration management system and be made available to the Government for review upon request. No formal data item deliveries through Data Management are required for the services designated in this SOW.
The Contractor shall provide a Technical Manual (TM) and Drawing Package to accompany each Radome System. All shipping & packaging materials will meet the standards for international shipping (essential documents, secure packaging materials, etc.).
6. DELIVERY TO TYAD
6.1 Deliveries to TYAD
Contractors must notify the shipping company of the following:
Deliveries of materials must be scheduled utilizing the Carrier Appointment System (CAS). All carriers must register via the CAS website by utilizing the web address:
https://eta.sddc.army.mil/ETASSOPortal/default.aspx. Once initiated, registration is completed approximately two to three weeks. Appointments for TYAD deliveries can be scheduled at a minimum of 24 hours in advance and a maximum of up to two weeks in advance.
NOTE: Contractors that use UPS and FedEx Small Parcel carriers do not have to schedule their deliveries through CAS.
Shipping and receiving hours for Tobyhanna Army Depot Central Receiving are from 0730 hours to 1500 hours, Monday through Friday (excluding Federal Holidays). If additional information is needed regarding scheduling deliveries; contact John Hopkins
(570) 615-6030. Shipments being delivered by multi-axle vehicles must enter and exit via the TYAD Truck gate, located on Squire Street. Hours of operation for the Truck gate are Monday through Friday, 0730 until 1630 (excluding Federal Holidays and weekends).
Shipments being delivered by standard sized vehicles not exceeding 10 feet in height can use the Main gate, but must obtain a visitors pass and vehicle pass from the Security Office.
At all times, the driver of the vehicle must be in possession of the following valid vehicle insurance, registration driver's license with proper endorsement for the size vehicle they are driving bill of lading/purchase order containing pertinent information relative to the shipment:
• Contractor/vendor company name
• Telephone number
• Point of contact at TYAD
• Type of goods
• Where the delivery is being made at TYAD. Delivery Will be to Building 1C, Bay 5, POC: Bradley Snyder, 570-615-9882.
https://eta.sddc.army.mil/ETASSOPortal/default.aspx
6.2 Shipping address
TYAD Delivery Address:
11 Hap Arnold Blvd, Tobyhanna, PA 18466 Bldg. 1C Bay 5
6.3 TYAD Security Operations
All TYAD contracts and other acquisition-related documents must ensure privacy and security controls follow this information, and that contractors and service providers protect Privacy Act information in the same way the organization adhering to the Federal Acquisition Regulations (FAR) Privacy Act provisions (Subparts 24.1 and 24.2) and include the specified contract clauses (Parts 52.224-1 and 52.224-2), as appropriate, to ensure that personal information is protected as mandated.
In addition to the changes authorized by the clause of this contract; should Force Protection Condition (FPCON) at the installation change, the Government may require changes in contractor security matters and/or processes.
INSURANCE REQUIREMENTS - CONTRACTING OFFICER'S NOTICE
The contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance:
(a) WORKER'S COMPENSATION AND EMPLOYER'S LIABILITY. Contractors are required to comply with applicable Federal and State Worker's Compensation and Occupational Disease Statutes. If the Employer's liability section of the insurance policy, except then contract operations are so commingled with a contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in states with exclusive or monopolistic funds that do not permit Worker's Compensation to be written by private carriers.
(b) GENERAL LIABILITY. Bodily Injury Liability Insurance Coverage written on the comprehensive form of policy of at least $500,000 per occurrence shall be required.
Property Damage Liability Insurance is not normally required.
(c) AUTOMOBILE LIABILITY. Automobile Liability Insurance written on the comprehensive form of policy is required. The policy shall provide for Bodily Injury and Property Damage Liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for Bodily Injury and $20,000 per occurrence for Property Damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
| 1. Statement of Work |
| 2. Program Objectives |
| 2.1 Description of Supplies |
| 2.2 Definition of Terms and Phrases |
| 2.3 Applicable Documents |
| 2.4 Government Documents |
| Military Standards (MIL-STD) and Specifications – Mandatory Compliance |
| Military Standards (MIL-STD) and Specifications – Guidance Only |
| Federal Standard (FED-STD) – Mandatory |
| 3. Requirements |
| 3.1 Material Requirement |
| 3.1.1 Salient Characteristics for an 18-foot diameter Radome |
| 3.1.2 Mounting Requirements for a 18-foot diameter Radome |
| 3.1.3 Salient Characterisitics for the 26 foot diameter Radome |
| 3.1.4 Mounting Requirements for the 26 foot diameter Radome |
| 3.2 Technical Manuals and Documentation |
| 3.2.1 Technical Manual Requirements |
| 3.2.2 Minimum Content Requirements |
| 3.2.3 Deliverable Formats and Schedule |
| 3.3 Government Source Inspection and Pre-shipment Inventory |
| 3.3.1 Requirement for Witnessed Inventory** |
| 3.3.2 Inventory Scheduling and Logistics |
| 3.3.2.1 Trip Consolidation |
| 3.3.2.2 Maximum Number of Trips |
| 3.3.3 Inventory Procedures and Roles |
| 3.3.3.1 Process |
| 3.3.3.2 Responsibilities |
| 3.3.4 Discrepancy Resolution |
| 3.4 Material Delivery Schedule |
| 3.5 Shipping and Packaging Requirements |
| 3.5.1 ISO Container |
| Packaging |
| Shipping |
| Warranty |
| 4. Post-Award Site Survey for Bill of Material Finalization |
| 4.1 Requirement for Site Survey The Contractor shall conduct a one-time, post-award site survey of existing, comparable radome configurations located at Hickham Air Force Base (AFB), Oahu, Hawaii. |
| 4.2 Purpose of Survey The express purpose of this survey is for the Contractor, in conjunction with Government personnel, to visually inspect legacy radome installations (one 18ft and one 26ft model) to finalize the Bill of Material (BOM) and clarify ... |
| 4.3 Financial Responsibility |
| 4.3.1 Contractor Expense: All costs associated with this survey for the Contractor's personnel, including but not limited to airfare, lodging, meals, incidentals, and labor, shall be at the Contractor's own expense. These costs must be included in the... |
| 4.3.2 Government Expense: All travel and labor costs for Government personnel participating in or witnessing the survey shall be borne by the Government and are not chargeable to the Contractor. |
| 4.4 Survey Schedule and Duration The survey shall be planned based on an assumed four (4) day schedule: |
| Day 1: Travel to Oahu, Hawaii. |
| Day 2-3: On-site at Hickham AFB to survey one (1) 18ft legacy radome and one (1) 26ft legacy radome. |
| Day 4: Travel from Oahu, Hawaii. |
| 4.5 Coordination Timeline The Contractor shall coordinate all survey logistics with the Government Contracting Officer's Representative (COR) according to the following timeline: |
| The Contractor must initiate survey planning and coordination no later than (NLT) 45 days prior to the proposed survey start date. |
| Final, mutually agreed-upon survey dates must be established NLT 30 days prior to the survey. |
| 4.6 Site Access and Security |
| Government Assistance: The Government COR will coordinate and facilitate the Contractor's base access requests for Hickham AFB for the approved survey dates. |
| Contractor Personnel Requirements: The Contractor is responsible for ensuring its personnel can meet all installation access requirements. This includes, but is not limited to, successfully passing a background check and possessing a valid, REAL ID ... |
| 4.7 Classification |
| The site survey is an Unclassified activity. No security clearance is required for the Contractor's personnel, and they will not need to access any classified spaces or information to complete the survey. |
| 5. QUALITY ASSURANCE PROVISIONS |
| 5.1 Inspection, Verification, and Testing Activities |
| 5.2 Data Item Deliverables |
| 6. DELIVERY TO TYAD |
| 6.1 Deliveries to TYAD |
| 6.2 Shipping address |
| 6.3 TYAD Security Operations |