This document is the Telecommunications Infrastructure Standards (Version 4.0) adopted by the Connecticut State Colleges and Universities (CSCU) system, which comprises 12 community colleges and four state universities. The standards establish comprehensive requirements for the design, installation, and maintenance of structured cabling systems throughout CSCU facilities, specifying minimum Category 6 compliant components in accordance with ANSI/TIA and BICSI industry standards. The standards cover telecommunications pathways (interior and exterior), telecommunications spaces (Building Demarcation Points, Main Equipment Rooms, and Telecommunications Rooms), backbone and horizontal cabling systems, grounding and bonding requirements, testing protocols, and labeling procedures. Projects must incorporate fiber optic cables as the primary media for inter-building data and video cabling, utilize cable tray systems in corridors, and include 20-year manufacturer warranties on all installed cabling systems. All new construction or major renovation projects require design teams to include or employ BICSI Registered Communications Distribution Designers (RCDD) or licensed Telecommunications Infrastructure Layout Technicians (TLT), with all telecommunications plans requiring approval from both the campus and CSCU Telecommunications Department prior to construction commencement.
The standards mandate strict adherence to National Electrical Code (NEC), Connecticut Building Code, and local fire codes, with installers bearing full responsibility for all cable, hardware, labor, materials, permits, inspections, and fees. Installers must ensure proper coordination with CSCU IT Management for all network connections and must maintain a minimum 50 percent growth capacity in telecommunications spaces and pathways. The document establishes detailed specifications for conduit installation (4-inch minimum for outside plant, buried 36 inches below grade), cable support systems, outlet box configurations, and grounding busbar requirements. All work must be performed to the highest industry standards with zero defects, and any installation deficiencies identified post-completion must be corrected at the installer's expense. The standards are designed to support voice, data, video, public address, CATV, security, and environmental control systems while maintaining flexibility for future technological changes and campus expansion over a 15-to-20-year planning cycle.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revision Date: October 24 2016 Page 1 of 75
Telecommunications Infrastructure Standards V4.0
Telecommunications Infrastructure Standards
Version: 4.0
Revision Date: December 20, 2016
The Telecommunications Infrastructure Standards contained here have been adopted and are to be applied to the system office and the Colleges and Universities that make up the
Connecticut State Colleges and Universities (CSCU).
Community Colleges
Asnuntuck Community College
Capital Community College
Charter Oak State College
Gateway Community College
Housatonic Community College
Manchester Community College
Middlesex Community College
Naugatuck Valley Community College
Northwestern CT Community College
Norwalk Community College
Quinebaug Valley Community College
Three Rivers Community College
Tunxis Community College
State Universities
Central Connecticut State University
Eastern Connecticut State University
Southern Connecticut State University
Western Connecticut State University
Revision Date: October 24 2016 Page 2 of 75
Table of Contents
1. INTRODUCTION
2. GENERAL
2.1. INTRODUCTION
2.2. GENERAL REQUIREMENTS
2.3. CSCU INFRASTRUCTURE CABLING REQUIREMENTS
3. INTERIOR TELECOMMUNICATIONS PATHWAYS
3.1. GENERAL INFORMATION AND INSTALLATION PRACTICES
3.2. PATHWAY DESIGN
3.3. CONDUIT TYPES
3.4. CONDUIT INSTALLATION
3.5. PULL BOXES
3.6. CABLE TRAY SYSTEMS
3.7. CABLE HANGERS
3.8. OUTLET BOXES
3.9. PERIMETER RACEWAYS
3.10. FLOOR BOXES / POKE-THROUGHS
3.11. POWER POLES
3.12. FURNITURE IN-FEEDS
3.13. UNDERFLOOR PATHWAYS
4. OUTSIDE PLANT TELECOMMUNICATIONS PATHWAYS
4.1. GENERAL INFORMATION
4.2. MANHOLES
4.3. INSTALLATION GUIDELINES AND REQUIREMENTS
4.4. OUTSIDE PLANT CONDUIT INSIDE A BUILDING
5. TELECOMMUNICATIONS SPACES
5.1. OVERVIEW
5.2. DEFINITIONS
5.3. PROHIBITED USE OF TELECOMMUNICATIONS SPACES
5.4. BUILDING DEMARCATION POINT (BDP)
5.5. MAIN EQUIPMENT ROOM (MER)
5.6. TELECOMMUNICATIONS ROOM (TR)
5.7. EQUIPMENT RACKS, CABINETS, AND CABLE MANAGEMENT
6. BACKBONE CABLING
6.1. INTER-BUILDING COPPER BACKBONE CABLING (OUTSIDE PLANT)
6.2. INTER-BUILDING FIBER OPTIC CABLING
6.3. INTRA-BUILDING COPPER BACKBONE CABLING (INSIDE PLANT)
6.4. INTRA-BUILDING FIBER BACKBONE CABLING (INSIDE PLANT)
6.5. COAXIAL BACKBONE CABLING
6.6. TERMINATION OF BACKBONE CABLING
Revision Date: October 24 2016 Page 3 of 75
7. INSIDE BUILDING HORIZONTAL CABLING
7.1. PROHIBITED
7.2. GENERAL REQUIREMENTS
7.3. HORIZONTAL FIBER CABLING
7.4. HORIZONTAL COAX CABLING
7.5. HORIZONTAL COPPER CABLING
8. GROUNDING AND BONDING
8.1. OVERVIEW
8.2. TMGB – TELECOMMUNICATIONS MAIN GROUNDING BUSBAR
8.3. TGB – TELECOMMUNICATIONS GROUNDING BUSBAR
8.4. TBB – TELECOMMUNICATIONS BONDING BACKBONE
8.5. RACK GROUNDING
8.6. PATHWAY GROUNDING
8.7. EQUIPMENT GROUNDING
8.8. GROUNDING OF OUTDOOR WIRELESS ACCESS POINTS AND OTHER ANTENNA EQUIPMENT
8.9. TESTING AND DOCUMENTATION OF GROUNDING
9. TESTING, ACCEPTANCE, DOCUMENTATION AND LABELING
9.1. TEST REQUIREMENTS FOR HORIZONTAL COPPER CABLING
9.2. TEST REQUIREMENTS FOR FIBER OPTIC CABLING SYSTEM
10. LABELING
10.1. OVERVIEW
10.2. LABELING OF CABLING AND TERMINATION COMPONENTS
10.3. FIBER OPTIC BACKBONE, RISER CABLES AND TERMINATION COMPONENTS
10.4. STANDARD WORK OUTLET FACEPLATES
10.5. DATA PATCH PANELS
10.6. FIBER OPTIC CABLES AND TERMINATION COMPONENTS
10.7. GROUND SYSTEM LABELING
11. DOCUMENTATION
A. APPENDIX A
Revision Date: October 24 2016 Page 4 of 75
Introduction The Connecticut State Colleges & Universities (CSCU) has adopted the ANSI/TIA
(American National Standards Institute, Telecommunications Industry Association)
Standards and BICSI (Building Industry Consulting Service International) practices regarding the installation of structured cabling systems constructed with a minimum of
Category 6 compliant components. Liberal reference to these standards and practices are made throughout this document, and the Colleges/Universities are encouraged to consult the original documents for more detailed information on wiring standards. This document is intended to summarize and highlight significant aspects of these standards and practices for the purpose of creating a simplified reference which
Colleges/Universities may use in the planning, bid preparation, and implementation of a
Structured Cabling System for their campus.
Each College/University is expected to adhere to the elements identified in this document for the implementation of any new wiring projects. Compliance with these standards will result in model installations which are easy to administer and modify when necessary, and which will in turn guarantee optimal performance from the network.
These standards are intended to allow CSCU to meet the telecommunications requirements of the Colleges and Universities for the next 15-20 years. It is essential that CSCU Network Management shall be consulted prior to and throughout the planning and design process to ensure that present and future voice and data service requirements can be met.
CSCU Information Technology (IT) Management MUST provide prior written approval for any deviations from these standards, or CSCU will not assume financial responsibility to upgrade the facility to performance expectations. Where ambiguity or questions arise to specific details not mentioned in these standards, appropriate TIA, NEC, and BICSI standards shall apply.
All applicable building codes must be strictly adhered to in regards to telecommunications services. CSCU cannot authorize variations to any building codes.
In situations where a variance to a building code is required, the request for a variance must be submitted in writing to OSBI (Office of State Building Inspector) and local building officials, and only implemented if approved in written by the AHJ (Authority
Having Jurisdiction).
The use of a Commissioning Agent for the Telecommunications infrastructure is allowed, but is not required. A manufacturer’s system warranty is required for all projects unless otherwise instructed by CSCU.
Revision Date: October 24 2016 Page 5 of 75
The following Standards documents are referenced throughout this document. Where a conflict exists between the Standards listed below, and the requirements in this document, the more stringent requirement shall take precedence.
ANSI/TIA-560-C.0 Generic Telecommunications Cabling for
Customer Premises.
ANSI/TIA-568-C.1 Commercial Building Telecommunications
Cabling Standard.
ANSI/TIA-568-C.2 Balanced Twisted-Pair Telecommunications
Cabling and Components Standard.
ANSI/TIA-568-C.3 Optical Fiber Cabling Components
ANSI/TIA-569-D Telecommunications Pathways and Spaces
ANSI/TIA-606-B Administration Standard for Telecommunications
Infrastructure.
ANSI/TIA-607-C Generic Telecommunications Bonding and
Grounding (Earthing) for Customer Premises.
IEEE 802.3af Power over Ethernet (PoE) Standard.
IEEE 802.3at Power over Ethernet+ (PoE+) Standard.
IEEE 802.3an Physical Layer and Management Parameters for
10Gbps Operation Type 10GBASE-T.
IEEE 802.11 Wireless Standards (including a/b/g/n/ac)
Construction specifications are a main ingredient of an Information Technology system.
Information Technology systems shall adhere to these specifications in order to be functional in a wide variety of communications applications. This document does not allow or condone the avoidance of following any of the Laws, Standards, or Procedures of any, but not limited to the following:
National Electrical Code (NEC)
International Building Code
Connecticut Building Code
Connecticut Fire Code
Building Industry Consulting Services International (BICSI)
Americans with Disabilities Act (ADA)
The documents listed above shall be the current edition or as adopted by the AHJ.
Revision Date: October 24 2016 Page 6 of 75
General Introduction
The CSCU Wiring Distribution System (CWDS) is viewed as the most critical physical element of the long term telecommunications strategy. The
Distribution System shall provide connectivity to all other major subsystems including voice, data and video requirements. Any new systems installed shall be incorporated into the existing Distribution Systems and should combine copper and fiber optic technologies to provide enhanced communications services.
General Requirements
Any new systems installed shall be incorporated into the existing Distribution
Systems and should combine copper and fiber optic technologies to provide enhanced communications services.
Installers for new construction or renovations shall be responsible for all cable, wire, hardware, labor, and materials for full installation of a functioning
Distribution System supporting the requirements of all systems including the
Telephone Systems, Campus Data Network, Video Systems etc. This includes, but is not limited to, cross-connect fields, station cable, fiber and copper riser cable, protection, station jacks, raceways, Telecommunication Room construction, outside facilities and all associated hardware and labor.
NEC requirements do not allow cables no longer in use to remain in the ceiling plenum. All abandoned cables must be completely removed. Any cable installed, but not terminated for use, must be tagged in accordance with NEC requirements.
CSCU requires a secure distribution system while minimizing installation expense wherever possible. Designers and/or Installers shall consider the reuse of newly installed wire and fiber optic cabling in those buildings where new wire has been installed. Already installed wire and/or fiber optic cabling will be acceptable where it meets the Specifications in this document and
CSCU IT Management.
CSCU requires fiber optic cables to be the media of choice for inter-building data and video cabling to minimize future congestion in new conduits and to be positioned to exploit emerging technologies that require fiber connectivity.
Installers shall coordinate the reconnection of facilities’ cabling systems to the backbone infrastructure with CSCU IT Management and campus facilities personnel. All alarms shall be fully tested upon completion. During installation, the Installer shall not disturb fire alarm or other critical alarm circuits. If any such circuit is found to be inoperative between the time work commences in a building, but prior to system acceptance, the Installer shall immediately repair the circuit at no additional cost to the Owner.
Revision Date: October 24 2016 Page 7 of 75
All installation work shall be done in a neat and high quality manner. It is the responsibility of the Installer to ensure that all state and local building codes are met. Any costs for changes to materials in order to meet code requirements shall be borne by the Installer.
Each building requires a Building Demarcation Point (BDP) for terminating
Service Provider facilities and the inter-building cabling; a Main Equipment
Room (MER) will serve as the central point for Wiring Distribution System.
Telecommunications Rooms (TR) are required for the termination of workstation cables and the cross-connections to the backbone cables. The
Installer shall provide all hardware (e.g., mounting brackets, vertical and horizontal troughs, cable trays, etc.) within the Telecommunications Rooms.
Cross connection equipment used in the intra-building distribution system shall allow for direct termination of station and backbone cables on the blocks, and modular cross-connections between blocks.
All new construction or major renovation projects are required to have the design team either include or employ the services of a BICSI Registered
Communications Distribution Designer (RCDD) to assist in planning and design of the telecommunications infrastructure. Additionally, CT State
Statutes require licensure of individuals responsible for the design of
Telecommunications systems per Public Act #01-164. The
Telecommunications Infrastructure Layout Technician (TLT) license, issued by the Department of Consumer Protection, shall be presented upon request by
CSCU, and may be required for stamping and signing of official design documents. Alternatively, those holding a Professional Engineer (PE) license may sign and stamp design documents.
All construction plans for BDP, MER and TRs shall be approved by the CSCU
Telecommunications Department prior to construction. Approval shall also be obtained for the layout of the cross connect fields within the
Telecommunications Rooms before work starts.
All Telecommunications plans shall be reviewed and approved by the campus as well as the CSCU Telecommunication Department before work starts.
All aspects of the telecommunications distribution infrastructure shall conform to the requirements contained herein. Any deviation from this specification in regard to the design and sizing of telecommunications spaces, vertical or horizontal pathways shall be brought to the attention of the CSCU
Telecommunications Department and approval prior to the release of the bid specification.
Revision Date: October 24 2016 Page 8 of 75
The Installer shall be knowledgeable of all applicable industry standards including, but not limited to, NEC, ANSI/TIA and BICSI, and shall comply with all applicable regulations of the College/University, local, state, and federal governments. Any failure to pass inspections by any regulatory body shall be corrected wholly at the expense of the Installer and at no cost, whatsoever, to the Owner.
All work of this project shall conform to all applicable laws and ordinances and to the regulations of the local utility companies.
All components of the Installer's proposed systems shall meet the requirements of FCC Rules and Regulations Part 68 (Registration) and Part 15 (Emanation and Interference). All Proposals shall include all license, permit, and registration numbers obtained in compliance with FCC Rules and Regulations.
Any deviations to specifications must be submitted in writing with justifications and be approved by the campus facilities office and the CSCU
Telecommunications Department.
The Installer shall comply with all laws and regulations regarding safety, protection and insurance.
All equipment installed shall be firmly held in place by fastenings and/or supports, which are adequate to support their loads with an ample safety factor.
Cable run in the ceiling must be self-supporting and cannot be affixed, in any way, to the framework of the hung ceiling.
All cables, (where applicable) regardless of length, shall be marked and/or numbered at both ends. Marking codes shall correspond to recognized standards and specifications. All cabling shall be neatly laced, dressed, and adequately supported. No splices will be allowed in system wiring other than at approved designated locations.
Care shall be exercised in wiring to avoid damage to cable and equipment both existing and new. All wiring and connectors shall be installed in strict adherence to standard communications installation practices and all applicable
Federal, State, and Local Building codes. Contractor shall take all necessary precautions to protect the building areas adjacent to work. All openings required by the Contractor for the installation of any cable shall be sealed by the Contractor in accordance with applicable fire and building codes. Any permits required shall be obtained by the Contractor.
Under no circumstances shall any device be connected to Owner’s data network without approval from the Owner. This includes any phone switch equipment, laptops, PC, network diagnosis tools, hubs, data switches, or any other device capable of connecting to the data network.
Revision Date: October 24 2016 Page 9 of 75
IP Addresses for any contractor-installed equipment will be furnished by
CSCU. Only devices that have been configured with a CSCU provided IP
Address, subnet mask, gateway address, etc. may be placed on the network, and only after receiving approval from CSCU.
At the conclusion of the project, all telecommunications cabinets will be vacuumed to remove dust, dirt, wire clippings, and other debris. All rack mount equipment in cabinets and free-standing racks will be dusted and the
Telecom rooms left broom clean. All work-related rubbish must be removed from the buildings. In the case of a dispute, The Owner may remove the rubbish and charge the cost to the selected vendor/contractor.
All services provided for installation of structure cabling system shall be professional and conform to the highest standards and industry best practices.
CSCU Telecommunications Department reserves the right to halt any installation due to poor workmanship. All work shall be defect free and the installer will replace, at their expense, any work found to be defective.
CSCU Infrastructure Cabling Requirements
The primary objective for the proposed cable infrastructure system is to implement a telecommunications distribution design that allows the cable plant to be flexible, manageable, and expandable. The system should provide the ability to adapt to changing user and technology environments without re-cabling the building to meet demands for increased bandwidth or services and to facilitate ongoing moves, adds or changes. Designed to support true ubiquitous connectivity to an intelligent transport network capable of spanning both the nation and the globe, the distribution design will recognize that building communications systems and media are dynamic and shall be able to support a variety of applications and services. The distribution design should be able to accommodate voice, video, data, public address systems, CATV, security and environmental control.
The building backbone infrastructure systems will consist of cable pathways, telecommunications rooms, equipment rooms, telecommunications entrance facilities, transmission media, and support facilities that meet the requirements of the Connecticut State Colleges and Universities. The proposed backbone system for data networking is a high bandwidth, low attenuation, fiber optic design that provides a universal transport system for voice, data, video and facilities systems. Coaxial cable for CATV and broadband applications will also be provided where applicable. The proposed telecommunications building backbone infrastructure shall meet code and comply with industry and CSCU
System standards.
Revision Date: October 24 2016 Page 10 of 75
All products and installation procedures used as part of the horizontal and backbone cabling systems must be free from defects and support any current or future application ratified by IEEE, ANSI and ISO that is developed for an
ANSI/TIA-568-C.0 compliant structured cabling system. A manufacturer’s warranty shall be furnished at the completion of the project which guarantees system performance, the installed components, and the installation integrity of the horizontal and backbone cabling. This warranty must be valid for a minimum of 20 years. An example includes the Hubbell Mission Critical
Warranty or equivalent.
The standards set forth in this document are basic standards for system wiring and components. These are minimal requirements only; a detailed system specification and design is required for each installation.
These standards and specifications shall be updated periodically to reflect the most current ANSI/TIA and BICSI standards. All wiring systems that are being upgraded shall meet these guidelines. To achieve a successful long-term cabling solution, CSCU established the following performance goals based on emerging technology:
a. Cabling system shall operate the application(s) which the system was designed to support. Applications may include, but are not limited to:
10/100/1000 Mbps Ethernet (IEEE 802.3), 10Gbps Ethernet, and other network services and applications.
b. Provide a cable system with adequate bandwidth to deliver the network existing and future applications.
c. Provide a strong network foundation and physical connectivity for each campus to build upon to support the instructional and administrative data needs.
d. Provide a cable system than supports the majority of workstations upon implementation and that can be easily expanded in the areas to meet the individual campus instructional needs.
e. Provide a cable system that has high integrity, performance and usability based on the current ANSI/TIA Commercial Building Telecommunications
Cabling Standard, BICSI and future ANSI/TIA and IEEE standards.
f. Cabling System must meet the ANSI/TIA-568-C.0 standards for Category
6 or better wiring as stated above. Any deviations from standards from this document will require the prior approval of CSCU.
Installer’s Responsibilities
2.3.6.1 The Installer shall be fully responsible to the College/University for the acts and omissions of its subcontractors and of persons either directly or indirectly employed by the contracted vendor.
2.3.6.2 The Installer shall obtain and pay for all surveys, permits, licenses, inspections and fees, and make all deposits required for the proper execution of the work after award of Contract.
2.3.6.3 The Installer shall be responsible for loss or damage in shipment, delivery and installation of all equipment, parts, and goods until time of transfer to and acceptance by the College/University.
Revision Date: October 24 2016 Page 11 of 75
2.3.6.4 The Installer shall guarantee that equipment provided will not endanger the safety of College/University employees or the public, damage, require change in, or alterations for equipment or other facilities of the
College/University including telephone and data network systems, interfere with the proper functioning of telephone equipment or facilities, or otherwise injure the public in its use of telephone services.
2.3.6.5 The Installer shall be responsible for full restoration of all surfaces including floors, walls, ceilings and interior finishes damaged, altered or changed; building, and grounds of the College/University to their original condition.
2.3.6.6 The students, faculty and staff of the College/University will occupy the campus during the entire period of installation. The nature of the work of the students, faculty and staff of the College/University is such that there must be a minimum degree of interference from the contracted vendors, and the work is to be performed at such times as directed by the
College/University.
2.3.6.7 All installation efforts shall be coordinated with the College/University project manager prior to commencement of work.
2.3.6.8 Unnecessary noise shall be avoided at all times and unavoidable noises must be reduced to a minimum.
2.3.6.9 The Installer and his representatives shall exercise every precaution to protect and maintain free from damage portions of the campus and buildings adjacent to and adjoining the work. Damage to the buildings or campus must be repaired to the satisfaction of the College/University and at the expense of the Contracted vendors.
2.3.6.10 The Installer shall install all equipment in accordance with the manufacturer’s specifications.
Special Requirements
2.3.7.1 The CSCU Telecommunications Infrastructure Standards publication is intended to address standard installation practices for all of the Colleges and Universities, with safety and performance being the most important factors. While these standards are carefully monitored to ensure that the hardware and practices are technologically current, it is possible that some applications may require special consideration.
Revision Date: October 24 2016 Page 12 of 75
CSCU buildings frequently contain special purpose facilities and equipment with unique telecommunications requirements. Special telecommunications requirements may require deviation from these specifications. CSCU IT
Management needs to be notified of these special requirements as early in the design process as possible.
2.3.8.1 The following is a short (but not all-inclusive) list of facilities and equipment that commonly have special telecommunications requirements:
a. Data Centers or Computer Rooms
b. Computer labs or classrooms
c. Video conferencing rooms
d. Audio/Video and Broadcast equipment
e. Laboratories
f. Nursing simulation laboratories
g. Scientific Equipment
2.3.8.2 Installation designs and practices not specifically identified as standard in this document will require appropriate CSCU IT Management approval before connection to the campus voice or data network.
Revision Date: October 24 2016 Page 13 of 75
Interior Telecommunications Pathways General Information and Installation Practices
Communications Pathways are facilities used to distribute and support cable and connecting hardware between the MER and/or TR, and the work area outlet. Pathways that may be utilized are described in detail in Parts 3.3 thru
3.13 of this section.
Empty Raceways and Raceways installed for Telecommunications Systems including telephone, data, security, alarm, CATV, sound, video, low voltage conductors, etc. shall be installed as required by the National Electrical Code, as required for raceways specified in this Section and as indicated herein.
Backbone Communication Pathways
3.1.3.1 Backbone Communication Pathways may consist of conduits and floor penetrations (i.e., sleeves or slots), which provide routing space for communication cables.
3.1.3.2 Vertically aligned Telecommunications Rooms with connecting sleeves are the most common type of backbone pathway.
3.1.3.3 Designer shall position cable sleeves adjacent to a wall, which can support backbone cables. Sleeves must not obstruct wall-terminating space. All sleeves must be constructed in accordance with the National
Electrical Code (NEC) and local fire codes and has a minimum of 2-inch high curb from the finished floor.
3.1.3.4 Quantity, size, location and spacing of all sleeves must be reviewed and approved by a structural engineer.
3.1.3.5 Design sleeves with a 4-inch diameter unless a smaller size is required by the structural engineer.
Horizontal Communication Pathways
3.1.4.1 Horizontal Distribution Systems (horizontal pathways and spaces) consist of structures that conceal, protect, and support horizontal cables between the communications workstation outlet and the horizontal cross connect in the serving telecommunications room.
3.1.4.2 Horizontal communications pathways are used to distribute and support horizontal cable and connecting hardware between the workstation outlet and the telecommunications room. These pathways and spaces are the
"container" for the horizontal cabling.
3.1.4.3 NOTE: It is the responsibility of the Architect/Engineering Firm to review all proposed Horizontal Distribution Systems with CSCU to ensure the system design:
a. Makes optimum use of the ability of the horizontal cabling system to accommodate change
b. Is as unconstrained as possible by vendor dependence
c. Compliance with this document, Local, State, and Federal Codes
d. Compliance with ANSI/TIA-569-D.
Revision Date: October 24 2016 Page 14 of 75
Designer shall follow guidelines of ANSI/TIA-569-D for determining the number of 4-inch sleeves required.
Empty Raceways and Raceways installed for Telecommunications Systems including telephone, data, security, alarm, CATV, sound, video, low voltage conductors, etc. shall be installed as required by the National Electrical Code, as required for raceways specified in this Section and as indicated herein.
Terminate conduits with bushings. Provide grounding bushings for backbone and riser conduits and for conduits entering equipment rooms or
Telecommunications Rooms. Ground conduits, cable trays and raceways to the local Telecommunications ground bus using braided hollow copper conductor equal to Belden #8669 (equivalent to #6 AWG).
Adequate expansion/compression fittings shall be used where crossing building expansion joints. Expansion fitting shall be multidirectional and have grounding jumpers, and shall be manufactured by O-Z Gedney, Crouse-Hinds or approved equal.
Raceways shall have expansion fittings installed as recommended by the manufacturer. Provide a minimum of one expansion fitting per one hundred feet or fraction thereof for non-metallic raceways.
Raceways and outlets shall be separated from sources of EMI and RFI such as transformers, ballasts and power lines. Do not install raceways parallel to power raceways unless four foot (1219mm) distance is maintained. Cross other raceways at 90 degrees. Maintain minimum 12 inch (305 mm) clearance in all directions from lighting fixtures and power wiring rated over 20 A.
Maintain a minimum 6 inch (153 mm) clearance elsewhere from raceways and outlets. Maintain 48 inch (1220 mm) clearance from transformers. Clearances are measured all around raceway and outlets including through walls and floors.
Install raceways and outlets for power and telecommunications in separate stud wall or block cavities.
Align sleeves and conduits on opposite walls so there is a straight line between corresponding openings, parallel or perpendicular to Building Structure.
Non-metallic raceways or boxes are not allowed in interiors of buildings.
Revision Date: October 24 2016 Page 15 of 75
Pathway Design
The Architect and low voltage designer shall coordinate with the other design disciplines (i.e. mechanical, electrical, structural, etc.) to provide adequate telecommunications pathways designed for accessibility and growth. The
Architect shall bear in mind that mechanical, structural and electrical facilities tend to be static systems while the telecommunications systems are dynamic in nature, subject to additions and changes to the telecommunications systems, over the life of the facility.
Horizontal Distribution Systems must be designed to accommodate diverse user applications including but not limited to:
a. Data Communications including infrastructure for wireless networking.
b. Cable TV (both Fiber/Coax and IP based)
c. Audio Visual Systems
d. Public Address Systems
e. Distributed Antenna Systems
f. Electronic Security (Access Control, Video Surveillance, Intrusion
Detection, Audio/Video Intercom, etc.)
Note: The designer should also consider that other building information systems (e.g., building alarms and security, audio visual and audio PA system) may require area/space in the Horizontal Distribution System and should plan with these facilities accordingly.
Telecommunications Spaces and pathway design shall accommodate and facilitate continuing changes and allow for a minimum of 50% growth.
Telecommunication spaces and pathway shall not be located in stairways, elevator shafts or elevator equipment rooms.
An open ceiling distribution system is the preferred cable distribution system.
3.2.5.1 An open ceiling distribution system shall not be installed above inaccessible ceiling areas such as lock-in type tiles, drywall or plaster.
Suspended ceiling tiles shall be of the removable or lay-in type and located a maximum of 11’0” above the floor whenever possible.
3.2.5.2 Where the cable pathway will be routed above an inaccessible ceiling, metallic conduits shall be installed between accessible areas of the ceiling with no more than two, 90-degree bends. If additional bends are required, a junction box with access panel in the ceiling shall be provided.
Coordinate Access Panel locations and sizes with architect. Conduits shall align as closely to the Cable Tray or other cable support above the accessible portion of the ceiling.
3.2.5.3 Under no circumstances may unsupported telecommunications cables lay on top of ceiling tiles, pipes, ductwork, or other above ceiling structures.
Revision Date: October 24 2016 Page 16 of 75
Adequate and suitable space shall be available in the ceiling area for the distribution system. Mechanical systems (i.e. HVAC, sprinkler, etc.) shall be located as high as possible above the finished ceiling to provide space for the data/telecommunications pathways. Coordination between design disciplines during building design is critical to avoid conflicts. Utilize three-dimensional design tools (i.e. BIM) to facilitate coordination, including Clash Detection or other method to identify conflicts prior to construction.
A minimum of 6” of clear space all around the cabling pathways shall be clear accessible space not required for the removal of tile, light fixtures or service and access to other systems.
An effective design of a building’s Horizontal Distribution System should meet the following criteria:
a. Comply with all applicable local, state, and federal codes.
b. Comply with all applicable BICSI, ANSI/TIA, UL, NEC, FCC standards and codes.
c. Provide flexible cable distribution to workstation locations.
d. Facilitate ongoing maintenance.
e. Easily accommodate future changes in equipment and services.
f. Minimize occupant disruption when horizontal pathways and spaces are accessed.
The horizontal distribution system must be designed to handle all types of communications cabling (i.e., UTP, Coax, and Fiber Optic). When determining the type and size of the cable pathway, consider the quantity and size of the cables that the pathway is intended to house, and allow for growth of the area served over the planning cycle.
When designing the horizontal distribution system it is important to consider adds, moves, and changes, and minimal disruption to immediate occupants.
For new construction or major renovation projects where ready access to the roof is available, a minimum of one (1) 4” conduit shall be routed to the roof of the building from the MDF to be used for routing of antenna and other communications services into the building (i.e. Satellite, DAS, Wireless
Bridge, etc.).
Revision Date: October 24 2016 Page 17 of 75
3.2.11.1 Location of roof penetration shall be coordinated with Architect and other design disciplines.
3.2.11.2 Conduits to be terminated on roof to weatherproof junction box. All penetrations into junction box to be properly sealed to maintain weatherproof rating.
3.2.11.3 If a mast or other structure is required, the wind and ice loading of the mast must be coordinated with the structural engineer in accordance with
TIA-222 Rev. G (or most current version).
3.2.11.4 Conduit to extend to MDF Room with grounding bushing bonded to the
TMGB.
Grounding and Bonding
3.2.12.1 Horizontal Pathways must be grounded and bonded in accordance with the requirements specified in ANSI/NFPA 70 and Section 7 of this document, except where other codes or local authorities impose more stringent requirements.
Firestopping
3.2.13.1 All horizontal pathways that penetrate fire rated barriers must be stopped in accordance with applicable codes.
Conduit Types
Galvanized rigid steel conduit and Intermediate Metal Conduit shall be zinc-coated steel conforming to industry standards and specifications. GRC/IMC conduits shall be used in wet or damp environments, or in environments with a high level of vibration.
Intermediate Metal Conduit shall be zinc-coated steel conforming to industry standards and specifications and as manufactured by Allied Tube & Conduit
Corp., Triangle/PWC, Inc., or approved equal.
Electrical Metallic Tubing shall be zinc coated steel conforming to industry standards and specifications and as manufactured by Allied Tube & Conduit
Corp., Republic Steel Corp., Triangle/PWC, Inc., and Wheatland Tube Co.
Non-metallic conduit shall be composed of polyvinyl chloride, Schedule 40 suitable for 90 C conductors, conforming to industry standards and specifications and as manufactured by Carlon or approved equal. Provide sunlight resistant conduit where exposed.
3.3.4.1 Conduit, fittings and cement shall be produced by the same manufacturer, who must have had at least 5 years of experience in manufacturing the products.
3.3.4.2 Flexible conduit shall be galvanized, spiral wrapped metallic conduit or liquid-tight flexible metal conduit as herein specified.
3.3.4.3 All conduits are to be reamed and bushed.
Conduit Installation
Distribution
Revision Date: October 24 2016 Page 18 of 75
3.4.1.1 Horizontal conduit system consists of conduits radiating from the accessible ceiling in rooms or corridors to the workstation outlets in the floor, walls, and columns of a building.
3.4.1.2 Telecommunication outlets shall be with a minimum 1-inch ID continuous Electrical Metal Tubing (EMT) conduit provided to the accessible ceiling.
3.4.1.3 Conduits shall be provided with a bushing at cable exit point.
3.4.1.4 Conduits shall be placed in the straightest run possible with no more than the equivalent of two (2), 90° bends per run. Refer to the latest edition of the BICSI TDMM for information on conduit sizing and routing.
3.4.1.5 All conduits shall be equipped with a contiguous length of plastic or nylon pull string with a minimum rating of 200 lbs. (90 Kg) or a 12 AWG wire. Secure pull line at each end to prevent it from slipping back into raceway.
Routing of Conduits
3.4.2.1 Conduit runs should be designed in the most direct route, parallel to building lines, with no more than two (2), 90 degree bends between pull points or pull boxes, and contain no continuous sections longer than one hundred feet (100’) without pull points or pull boxes installed.
3.4.2.2 It is recommended that conduit runs be kept to no more than 150 ft. in total length including sections through pull boxes.
Conduit Bend Radii
3.4.3.1 The radius of a conduit bend must be at least 6 to 10 times the diameter of the conduit.
a. 2 inch (53mm) trade size and less - 6 times conduit diameter.
b. 2-1/2 inch (63mm) trade size and larger - 10 times conduit diameter.
c. Conduits for fiber optic cabling - 10 times conduit diameter.
3.4.3.2 Conduits designated for FutureFLEX tubing must be installed with a minimum bend radius of 12 times the diameter of the conduit.
Conduit Entering Telecommunications Rooms
3.4.4.1 Horizontal distribution conduits entering a Telecommunications Room should terminate near the corners and allow for proper cable racking. If conduits are entering through the floor, they must terminate four (4) inches above the finished floor.
3.4.4.2 If conduits are entering through a wall, the conduits must be reamed and bushed, and terminated as close as possible to the terminating rack or wall.
Pull Boxes
Provide pull boxes each time raceway installation exceeds a 100 foot (30M) section or a total of 180 degrees in bends and offsets between pull boxes. Do not install a pull box in lieu of a conduit bend. Align the corresponding conduits on opposite sides of pull box with each other.
Revision Date: October 24 2016 Page 19 of 75
Pull boxes shall be sized according to the following table:
Minimum Space Requirements in Pull Boxes Having One Conduit
Each in Opposite Ends of the Box
MAXIMUM
TRADE SIZE
OF CONDUIT
IN INCHES
Size of Box FOR EACH
ADDITIONAL
CONDUIT
INCREASE
WIDTH
Width Length Depth
21mm
(0.75 in.)
102 mm
(4 in.)
305 mm
(12 in.)
76 mm
(3 in.)
51 mm
(2 in.)
27 mm
(1.0 in.)
102 mm
(4 in.)
406 mm
(16 in.)
76 mm
(3 in.)
51 mm
(2 in.)
35 mm
(1.25 in.)
152 mm
(6 in.)
508 mm
(20 in.)
76 mm
(3 in.)
76 mm
(3 in.)
41 mm
(1.5 in.)
203 mm
(8 in.)
686 mm
(27 in.)
102 mm
(4 in.)
102 mm
(4 in.)
53 mm
(2.0 in.)
203 mm
(8 in.)
914 mm
(36 in.)
102 mm
(4 in.)
127 mm
(5 in.)
63 mm
(2.5 in.)
254 mm
(10 in.)
1067 mm
(42 in.)
127 mm
(5 in.)
152 mm
(6 in.)
78 mm
(3.0 in.)
305 mm
(12 in.)
1219 mm
(48 in.)
127 mm
(5 in.)
152 mm
(6 in.)
91 mm
(3.5 in.)
305 mm
(12 in.)
1372 mm
(54 in.)
152 mm
(6 in.)
152 mm
(6 in.)
103 mm
(4.0 in.)
381 mm
(15 in.)
1524 mm
(60 in.)
203 mm
(8 in.)
203 mm
(8 in.)
NOTE: Width is measured perpendicular to conduit orientation. Length is measured parallel to conduit orientation.
Pull boxes with covers over 20 inches (508 mm) shall have piano hinged covers with padlocking capability. Covers over 20 inches (508 mm) wide shall be split bulkhead type with piano hinges located on the long sides. Provide doors where one door is able to be secured to the pull box while the other is able to swing free.
Locate pull box so it is accessible and covers can be opened at least to 90 degrees. Where above ceiling or behind access door center pull box in access door or ceiling tile opening
Revision Date: October 24 2016 Page 20 of 75
Pull boxes shall be securely mounted to building structure.
Grounding continuity shall be assured throughout raceway and pull box installation equal to electrical power raceway installation.
Junction boxes shall be constructed of code gauge galvanized sheet metal, of not less than minimum size required by the Electrical Code or other applicable
Specification "Standards" and shall be furnished with screw fastened covers.
Boxes exceeding 48 inches (1200mm) in any direction shall be properly reinforced with angle iron stiffeners.
Junction boxes to be installed in normally wet location areas shall be of the cast type with threaded hub and gasketed cover plate. The cast pull and junction boxes shall be manufactured by Crouse-Hinds, Appleton, Russellstoll, or approved equal.
Cable Tray Systems
General Information
3.6.1.1 Properly installed and coordinated cable trays in the primary cable paths for Category 6 and Category 6A data cabling are critical for cable and network performance.
3.6.1.2 In the Design Development and Construction Document Phase, the
Architect and the MEP engineers shall carefully design and coordinate the cable tray paths and clearances to avoid elevation changes and transitions of the continuous path. Careful consideration in the Design and Construction Document Phases must be given to the space within the ceiling plenum so that HVAC ducts, piping, and equipment do not interfere with the cable tray paths.
3.6.1.3 In the Contract Documents phase, the Architect shall require a coordination submittal to ensure that plan and section drawings are submitted and reviewed to insure a continuous uninterrupted cable tray installation fully coordinated with HVAC systems, ducts, sprinklers, piping, and electrical work. The Architect shall provide a copy of this reviewed submittal to the Owner’s representative along with a letter verifying that this submittal has been approved and coordinated and furnished to the Contractor for coordination during the Contract
Administration Phase of the work.
3.6.1.4 Cable tray systems are used primarily as main corridor distribution apparatus. Cable tray system recommended for use in plenum areas above dropped ceilings in corridors of newly constructed and renovated buildings.
3.6.1.5 Cable wireway system is not required in all corridors. It is left to CSCU discretion to decide if application warrants the cost of the cable tray system.
3.6.1.6 Cable wireway systems should be designed as equipped to support only telecommunications and data communications cable. Other low voltage systems may be placed in the wireway system if the disparate systems are properly separated with physical barriers.
Revision Date: October 24 2016 Page 21 of 75
3.6.1.7 Shared systems with power are not acceptable under the guidelines listed in avoiding EMI.
3.6.1.8 Install cable trays as a complete system, including fasteners, hold-down clips, support systems, barrier strips, adjustable horizontal and vertical splice plates, elbows, reducers, tees, crosses, cable dropouts, adapters, covers, and bonding.
Acceptable Cable Tray Systems
3.6.2.1 The tray shall be wire basket style.
3.6.2.2 A wire basket tray shall be U shaped and constructed of round wire mesh.
The basket tray shall be hung via the trapeze style or wall-mounted.
3.6.2.3 Cable tray system must not be center hung.
Routing of Cable Tray
3.6.3.1 Cable tray systems should be installed with a minimum of bends. If more than three (3), 15 degree turns are installed in a contiguous length, then de-rate the effective capacity of the cable tray by twenty five (25) percent.
3.6.3.2 Delineations in a level cable tray installation are often unavoidable;
however, these delineations should be kept at a minimum, with each delineation not exceeding 30 degrees and 24 inches offset. The total delineation for the tray span should not exceed 180 degrees.
3.6.3.3 The cable tray system shall support unbalanced load without tilting.
3.6.3.4 Use end-of-tray cable waterfalls where wire drops down to prevent abrasions and cuts from metal tray edges.
Cable Tray Size and Capacity
3.6.4.1 Cable tray size and capacity shall be determined by the amount and type of cable, the static load capacity of the tray, and the length of the support span.
3.6.4.2 Cable tray systems should be designed to accommodate 100 percent future growth.
Cable Tray Installation Clearance
3.6.5.1 Cable trays containing telecommunication cables shall not contain any pipes, tube or equal for steam, water, air, gas, drainage or any service other than telecommunication.
3.6.5.2 It is recommended that the cable tray system be installed with as much clearance as possible from other building facilities, and installed in the lowest most location below all other building facilities but above the ceiling grid, in accordance with ANSI/TIA standards and meeting the following criteria:
a. 6 in. clearance from obstructions on both sides.
b. 6 in. clearance from obstructions to the top.
3.6.5.3 Installation of cable tray pulley systems installed in a solid ceiling environment should provide access points at 20 ft. centers and at any directional deviation greater than 15 degrees and/or 90 degree turns.
Cable Tray Entering Telecommunications Rooms
Revision Date: October 24 2016 Page 22 of 75
3.6.6.1 It is recommended that cable trays NOT be used as a method of passing through walls into the Telecommunications Rooms. The recommended method is to stop the cable trays at the wall and provide the appropriate number of 4” sleeves through the wall, continuing the pathway in the
Telecommunications Room with Ladder Racks to the terminating rack or wall. However, if a cable tray is to be used to enter a
Telecommunications Room through a wall, the cable tray should be terminated as close as possible to the terminating rack or wall, and the wall opening be properly firestopped with a mechanical firestop system.
Cable Hangers
General Information and Installation Practices
3.7.1.1 Installation and configuration shall conform to the requirements of the
ANSI/TIA Standards 568-C.0 and ANSI/TIA-569-D, NFPA 70 (National
Electrical Code), and applicable local codes.
3.7.1.2 Cable Hangers shall be spaced every 3’-5’.
3.7.1.3 Refer to manufacturer specifications for the maximum capacity of
Category-6 and Category-6A cables (both UTP and STP) allowed per support.
3.7.1.4 The appropriate type of support must be utilized based on the quantity and weight of cables being supported.
Adjustable Fabric Cable Support
3.7.2.1 In the areas along the corridors, where the cable tray cannot be used, and cables are required to be run “free-air”, flexible cable wrap systems shall be used.
3.7.2.2 Cable support straps shall be attached to 3/8” threaded rod. The rods shall be secured to the building structure and be spaced a maximum of 4’ apart.
The cable support straps shall be flexible and shall hold up to 100, four-pair UTP cables.
3.7.2.3 The cable support straps shall feature simple locking and unlocking to allow the addition of cables to pull easily through.
3.7.2.4 Cable support system shall be suitable for air handling spaces (Plenum).
3.7.2.5 Installation and configuration shall conform to the requirements of the
ANSI/TIA Standards 568-C.0 & 569-D, NFPA 70 (National Electrical
Code), and applicable local codes.
3.7.2.6 Cable support system shall be Caddy CAT425 or equal.
Cable Hook Systems
3.7.3.1 In the areas where the cables are to be branched out from the main corridors to the workstations or classrooms, cable hook systems shall be used.
3.7.3.2 Cable hooks shall be capable of supporting a minimum of 30 lbs. with a safety factor of 3.
3.7.3.3 Do not install more cables on a “J”-hook than recommended by the manufacturer.
3.7.3.4 Installation and configuration shall conform to the requirements of the
ANSI/TIA Standards 568-C.0 & 569-D, NFPA 70 (National Electrical
Code), and applicable local codes.
Revision Date: October 24 2016 Page 23 of 75
3.7.3.5 Cable hooks for non-corrosive areas shall be pre-galvanized steel, ASTM
A653 G90. Where additional strength is required, cable hooks shall be spring steel with a zinc-plated finish, ASTM B633, SC3.
3.7.3.6 Cable hooks for corrosive areas shall be stainless steel, AISI type 304.
3.7.3.7 Cable hooks shall be Eaton (Cooper Industries) series BCH21, BCH32, BCH64, or other manufacture that meets these specifications.
Bridle Rings with Saddle
3.7.4.1 Bridge Rings may be used where less than 10 cables are required to be routed above an accessible ceiling.
3.7.4.2 Plastic saddles must be secured to the ring. The use of Bridal Rings without a saddle is prohibited.
Outlet Boxes
General Information and Installation Practices
3.8.1.1 Exposed, surface mounted outlet boxes or outlet boxes installed in normally wet locations shall be of the cast metal type with threaded hubs.
3.8.1.2 Recessed outlet boxes for dry locations shall be of the pressed sheet steel, zinc coated type.
3.8.1.3 Telecommunications outlet boxes should be mounted at least 18”AFF
(Above Finished Floor) or even with adjacent electrical duplex services.
3.8.1.4 All conduits entering an outlet box are to be reamed and bushed.
3.8.1.5 Where telecommunications outlet boxes are designated for LED Screens
(i.e. Digital Signage), the boxes should be mounted at 84 inches AFF or other height as coordinated with the Architect. Locate outlets boxes for video screens such that when the screen is installed, it does not cover Fire
Alarm devices or other wall-mounted devices.
3.8.1.6 Outlet boxes should not be placed back to back in wall-stud cavities.
3.8.1.7 Outlet boxes shall be spaced 6 inches (150mm) minimum from an electrical receptacle. Install outlet boxes in separate stud cavity from electrical wiring.
3.8.1.8 For applications requiring soundproofing, specify the appropriate soundproofing material to be placed around the outlet box.
3.8.1.9 Where conditions do not allow for an outlet box with conduit to accessible ceiling to be installed, a low voltage mounting bracket, secured to the gypsum wall with screws, may be utilized (Erico #MPLS / MPLS2 or equal).
3.8.1.10 If the cable routing to an outlet box requires passing cables through the cutouts in a steel stud, insulated bushings or grommets must be provided to protect cables. This is applicable to both factory cutouts in the stud and cutouts made in the field.
Outlet Box and Conduit Sizes
3.8.2.1 Up to two Category-6 cables or one Category-6A Cable:
a.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .