Attachment 1 - Characteristics.pdf

PDF 40 KB Posted

Attached to
RIP Straight Line SAW with installation & training for DDAA Federal contract opportunity
Solicitation number
SP3300-25-Q-0102
Issued by
Defense Logistics Agency Distribution

About this file

This document contains salient characteristics and contractor tasks for a Rip Saw that must be equal to or greater than the Diehl SL 65-56 model, to be delivered to DLA Distribution Anniston, Alabama.

The required equipment specifications include: 208V/3-phase/60-cycle electrical operation, 20HP belt-driven spindle with automatic brake, 3HP feed drive motor with 70-200 FPM variable speed, 56" throat capacity, 30" table support, and 3/8" to 4¼" thickness capacity. The contractor must deliver and install one Rip saw, provide complete documentation and manuals, and conduct 8 hours of operator/maintenance training. The work is divided into two CLINs - CLIN 1 covers equipment and transportation costs, while CLIN 2 includes training and installation. The contractor is responsible for coordinating delivery to Building 362 at DLA Distribution Anniston, though site electricians will handle electrical connections and the site is responsible for floor mounting. The equipment includes a standard one-year warranty for parts and labor.

View the file

Other files for this federal contract opportunity

Other files attached to RIP Straight Line SAW with installation & training for DDAA, newest first.
File Type Posted
CSS SP3300-25-Q-0102.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rip Saw Salient Characteristics DDAA Equal to or greater than Diehl SL 65-56

▪ Arranged for 208 volt, 3 phase, 60 cycle electrical operation

▪ Fitted with isolation transformer/line reactor

▪ 20 HP belt driven spindle with automatic “dead-man” style brake

▪ 3HP feed drive motor w/ AC inverter for 70-200 FPM variable feed speed

▪ The SL65-56 had 56” of throat capacity

▪ The SL65-56 has 30” of table support to the left of the blade

▪ Lower anti-kickback fingers mounted in the work table at the infeed w/ automatic elevation control by contact with lower fingers

▪ 3/8” minimum, 4 ¼” maximum thickness capacity

▪ multi-vee chain, chain-race, and drive cam

▪ Precision spindle, spindle housing, bearings, and saw collars

▪ Electro-pneumatic feed chain lubrication system

▪ NEMA TYPE 12, Operator control panel and fascia

▪ Heavy duty pressure beam, pressure rolls/brackets, and springs

▪ Infeed safety features w/ cam-controlled claw type upper anti-kickback fingers, lower infeed anti-kickback fingers, LH & RH side pressure beam and outfeed guards

▪ One (1) 18” diameter, 24 tooth, carbide tipped saw blade

▪ Standard one (1) year new machine warranty

▪ Complete with transportation cost of machine to DDAA

▪ Complete with installation and commissioning by vendor technicians

▪ Complete with operator and maintenance training for not less than 8 hours

Exterior color: – Manufacturer’s standard.

Warranty Coverage: - Warranty coverage shall be manufacturer’s standard warranty but not less than one- year parts and labor.

Operator, Parts and Service Manual(s) and Training: – The contractor shall provide with delivery, one (1) complete set of manuals with each machine.

Description of Contractor’s Tasks:

Task 1: Fabricate and Deliver each Straight Line Rip saw to be connected to existing electrical connections by site electricians, no requirement for additional electrical work is required.

Saws to be connected to existing ventilation system, no additional ventilation system modification is required. Site is responsible for any bolting down of equipment to flooring.

Task 2: Connections are in place that are required for the installation and operation of the RIP saw prior to scheduling the installation.

Task 3: Install one (1) RIP saw in the location identified in section 1.

Task 4: Provide one (1) 8 hour period of training instruction on the safe operation and preventative maintenance procedures of the installed RIP Saw. Training to be conducted at the location to where it is delivered by personnel at the receiving location on the day of delivery and installation.

Delivery for CLIN 0001:

The contractor shall coordinate the delivery to the location listed below with the POC listed below.

SB3540

DLA DISTRIBUTION ANNISTON

BOSS SUPP OFFICER 256-235-4119/4531

7 FRANKFORD AVE BLDG 362

ANNISTON AL 36201-4199

US

Please separate equipment cost and transportation cost into CLIN 1 and training cost and installation cost into CLIN 2

File details come from the government source that posted it. Updated .