This is a record drawing set for a Central Energy Plant, Level 1, dated December 1, 2015. The architectural drawing depicts the layout of a new hospital facility for VAMC Orlando in Florida and shows the mechanical systems infrastructure at the sublevel and ground floor areas. The plan includes multiple specialized rooms and equipment areas: normal and emergency power substations, generator rooms, a gen control room, paralleling switchgear rooms, a fire pump room, boiler room, chiller room, communications room, janitorial space, workshop, storage, male and female locker rooms with associated toilet facilities, a break room, and office space. The drawing provides detailed dimensional information with room measurements throughout and indicates the building control point at grid intersection EJ/E2. The document includes notes referencing supplemental shop drawings for additional information and states that the record drawings were prepared by the design professional based on information furnished by others without field verification of correctness. The drawing is presented at multiple scales and includes professional seals, a key plan showing Levels 1, Areas A, B, and C, and a notation indicating the building is fully sprinklered. This is a technical architectural record document rather than a contract solicitation or procurement opportunity.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP UP

T

T

T

T T T

T

T

T

T

T T

TTT

T T

T T T

T T

T

T

T

T

T

T T

T

T

T

T

T TTT

T T

T

T

T

T

T

HNP

HN

HN

HNP

HN

HN

HN

HN

HNHNHNHN

HN

HN

HN

HN

HN

HN

HN

HN

HN

HN

HNP

HNP

HN P

HN

HN

P

P

P

E-FCU-D4

E-

FC

U- C2

E-

FC

U- C1

E-FCU-D2E-FCU-D3

P

+00

25' UTI LITIES, TRAI L,

AND LANDSC

APE EASEM

ENT

C

UP

E-AE2.1023

E-AE3.101

E-AE3.101

1A101B

NORMAL SWITCH

GEAR ROOM

1A101A

NORMAL POWER

SUBSTATION ROOM

1A101

NORMAL SWITCH

GEAR ROOM

1A105

EMERGENCY

SUBSTATION ROOM

E2

E2

E6 E8 E9 E10 E11 E12 E13 E15

MB MB

MC MC

MD

E5

E5E1

EA

ME

E4

E14

E3

ED

EB

EC

EG

EF

EH

R 35' - 0 1/2"

3 4

1A109A

GEN CONTROL

ROOM

1A115B

GENERATOR ROOM

1A115A

GENERATOR ROOM

1A106

CORRIDOR

1A106B

FIRE PUMP ROOM

1A106C

CONTROL ROOM 1A208

BOILERS ROOM

E7

1A109B

PARALLELING

SWITCH GEAR

ROOM

1A109

PARALLELING

SWITCH GEAR

ROOM

1A115

PUMP ROOM

D2

7'

4"

0"

0"

/2

/2

EJ

1' - 2"

24' - 5" 18' - 0" 18' - 0" 18' - 0" 20' - 0"

2' - 0"

20' - 0" 2' - 0"

18' - 0" 18' - 0" 18' - 0" 22' - 9" 18' - 0" 18' - 0" 18' - 0" 18' - 0" 18' - 0" 18' - 0" 18' - 0" 18' - 0" 18' - 0" 18' - 0" 18' - 0" 18' - 0" 18' - 0" 13' - 10"

1A116

STORAGE

1A108

FEMALE LOCKERS

1A110A

MEN LOCKERS

1A118

WORKSHOP

1A102

BREAK ROOM

1A108B

FEM. TOILET

1A110AB

MALE TOILET

MA MA

1' - 5" 15' - 11" 26' - 4" 26' - 4" 26' - 4" 26' - 4" 26' - 4" 26' - 2"

1A112

CHILLER ROOM

1A114

COMM

1A113

JAN

1A104

OFFICE

1AC01

CORRIDOR

9' - 4"

2' - 5"

18' - 7" 175' - 10" 9' - 10"

0"

E-AE3.102

D3

6 4

15' - 0"

E-AE5.101

NOTE: BUILDING

CONTROL POINT

@ INTERSECTION

GRIDS EJ/E2

SEE CIVIL

DRAWINGS FOR

RELATIONSHIP TO

PROPERTY LINE.

E7.1

R 66' - 0"

E-AE2.203

SUBLEVEL OPEN

5' - 10"

E-AE2.1025

9'

9"

E-AE6.201 3

E-AE6.201 4

D4

E-AE6.201 7

E-AE5.101

E-AE5.101

E-AE5.101

E-AE3.203

2' - 0"

20' - 7"26' - 2"1' - 0" 9' - 3"

2' - 0"

E-AE2.203

383' - 0" 68' - 8 7/16"

451' - 8 7/16"

5' - 8 1/8"

1"

1' - 4"

10"

KEYNOTES 00

L

C

A. REFER TO SHEET G-010 FOR STANDARD SYMBOLS AND

ABBREVIATIONS.

B. REFER TO SHEET E-AE5.601 FOR PARTITION TYPES.

C. REFER TO SHEET E-AE6.201 FOR DOOR SCHEDULE.

D. REFER TO SHEET E-QH6.101 FOR TYPICAL MOUNTING

HEIGHT.

E. DIMENSIONS ARE TO COLUMN GRID, FACE OF MASONRY OR

CONCRETE OR TO FACE OF METAL STUDS.

F. SEE SHEETS E-LS1.1 / E-LS1.2 FOR LIFE SAFETY PLANS AND

FIRE WALL LEGENDS.

G. SEE SHEET E-AE6.201 FOR:

EXTERIOR LOUVER ELEVATIONS DESIGNATED BY ------

CURTAIN WALL ELEVATIONS DESIGNATED BY-------------

WINDOWS DESIGNATED BY ---------------------------------------

H. SEE SHEET E-IN6.101 FOR FINISH SCHEDULES.

I. ALL FIRE RATED WALLS TO EXTEND TO UNDERSIDE OF

METAL DECK AND PROVIDE FIRE STOPPING MATERIAL AT TOP

OF WALL TO DECK.

J. ALL MECHANICAL, ELECTRICAL AND PLUMBING EQUIPMENT

SHOWN ONLY AS REFERENCE.

W

SHEET NOTES

FIREWALL SYMBOLS

2 HR FIRERATED WALL

NOTES:

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS: ARCHITECT/ENGINEERS:

OFFICE OF

FACILITIES

MANAGEMENT

on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

A NEW HOSPITAL FOR

VAMC ORLANDO, FLORIDA

Orlando, Florida

29 OCTOBER, 2009

Professional Seals:

BUILDING IS FULLY SPRINKLERED

EB / RLF

673-950

RLB 379

THESE RECORD DRAWINGS HAVE BEEN PREPARED

BY THE DESIGN PROFESSIONAL BASED ON

INFORMATION FURNISHED BY OTHERS. NO FIELD

VERIFICATION OF THEIR CORRECTNESS HAS

OCCURRED. THE DESIGN PROFESSIONAL CANNOT

ASSURE THE ACCURACY OR INFORMATION

INCORPORATED INTO THESE RECORD DRAWINGS.

REFER TO SUPPLEMENTAL SHOP DRAWINGS

INCLUDED WITH THE RECORD DOCUMENT SET FOR

ADDITIONAL INFORMATION.

No. Description Date

RECORD DRAWINGS 12-01-2015 CENTRAL ENERGY PLANT

E-AE1.1

LEVEL 1

N

1/16" = 1'-0" GRAPHIC SCALE

8' 16' 48'32'

KEY PLAN

LEVEL 1, AREA A, B, C

A B C

LEVEL 1, AREA A, B, C

1 WATER TANK

3 SECURITY CONCOURSE ROAD

4 SECURITY WALL IN PACKAGE 1B

5 SOUND BARRIER WALL - BLAST RESISTANT

WALL

6 FENCE NOT IN CONTRACT - (IN PACKAGE 4)

7 METAL GATE ACCESS

8 UTILITIES AND LANDSCAPING SET BACKS

9 PROPERTY LINE

10 COOLING TOWERS

11 PRECAST PIER TYPE I

12 PRECAST PIER TYPE II

13 BOLLARDS AS PER OUC DESIGN