Attachment 1 CAD Elden Fire Lookout.pdf

PDF 3 MB Posted

Attached to
New Roof for Mt Elden & East Pocket Fire Lookout Towers, Coconino NF
Solicitation number
127EAX25Q0020
Issued by

About this file

These architectural drawings are for the Elden Fire Lookout Reroof project located in Coconino National Forest, Flagstaff Ranger District, prepared by the USDA Forest Service. The documents provide detailed floor and roof framing plans with comprehensive technical specifications for a building renovation. Key technical details include floor and roof framing plans showing structural elements, specific material requirements, and construction notes. The drawings (X-01 sheets) outline two primary project requirements: 1) remove and properly dispose of the existing roof membrane, and 2) install a new top roof that shall be fully adhered and mechanically attached per specifications. The drawings include precise measurements, structural annotations, and provide front and side rough framing perspectives with detailed keynotes explaining construction methodologies and material specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Elden Lookou_roof_2023 Page2.pdf Elden Lookou_roof_2023_1.pdf

File details come from the government source that posted it. Updated .