Attachment 1 - C-130 Furniture Performance Work Statement.pdf

PDF 68 KB Posted

Attached to
LRAFB FuT Furniture
Solicitation number
LRAFBFuTFurniture2023
Issued by

About this file

This performance work statement outlines furniture requirements for a new C-130 fuselage trainer building at Little Rock Air Force Base. The contractor shall purchase, deliver, and install over 60 different types of office furniture totaling over 1,000 individual items throughout the building. Furniture includes chairs, tables, desks, file cabinets, refrigerators, and other miscellaneous items. Delivery and installation must be coordinated with the local training unit and is required within 90 days of award. The contractor must comply with all base requirements and obtain necessary visitor passes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C-130 Fuselage Trainer Building Furniture

PERFORMANCE WORK STATEMENT

(PWS)

Date Prepared: 26 June 2023

Prepared by:

Air Force Life Cycle Management Center (AFLCMC)

Agile Combat Support Directorate

Simulators Division (AFLCMC/WNS)

Wright-Patterson AFB (WPAFB), OH

1.0 INTRODUCTION

The C-130J Maintenance and Aircrew Training Systems (C-130J MATS) and C-130H Hercules

Aircrew Training System (ATS) programs provides training support for the Air Mobility

Command (AMC) at Little Rock AFB, AR. The purpose of this effort is to acquire and install office furniture for the new consolidated C-130 Fuselage Trainer (FuT) building (Building

#6168) at Little Rock AFB. Building 618 is scheduled to complete late 4QFY23 with devices scheduled to begin delivering as early as July 2023 and training to begin in January 2024.

1.1 SCOPE

This Performance Work Statement (PWS) describes the tasks associated with the acquisition of the furniture for the new FuT building. The contractor shall purchase, deliver, and install all furniture/fixtures identified in the table below. All items shall be delivered and installed in building 6168 at Little Rock AFB, in accordance with the included building breakdown.

Commercially available items shall be used to the maximum extent possible and all furniture throughout the building should match and have a professional presentation. Quantity discounts shall be sought where applicable. Form-fit-function substitutions to the list below are acceptable, but require pre-coordination with local on-site Government personnel.

The following table lists the desired furniture.

Item # Supply/Service Description Quantity Unit

01 Clary - Upholstered Back Guest Side - Fixed Arm 25 EA

02 ORION, 29"w x 31"d x 34.5"h, Lounge Chair, Std w/ Wood

Armcaps, Std w/ Wood Legs

2 EA

03 Standalone Kit (3-Prong 2 AC, Dual USB, 2 Data, Convenience Outlet), Silver

40 EA

04 Standalone Kit (3-Prong 2 AC, Dual USB, 2 Data, Convenience Outlet), Silver

60 EA

05 TIMBERLANE,GUEST,ARMLESS,FULL UPHOLSTERED

BACK

12 EA

06 Devens Black Configurable Task Chair 207 EA

07 Devens Black Configurable Stool 8 EA

08 SCOTSMAN ICE BIN 1 EA

09 SCOTSMAN ICE MAKER - CUBE STYLE 1 EA

10 BB CONTEMPORARY (H) NO HDR (2)DR 4'x6' (JET

BLACK FRAME AND WEDGEWOOD FABRIC

1 EA

11 DOCK704-20000X - OX-12D-SA 10 EA

12 19 in. 3.1 cu. ft. Mini Refrigerator without Freezer, Stainless

Steel

1 EA

13 CHROME WIRE SHELVING UNIT - 36 x 24 x 72 6 EA

14 CHROME WIRE SHELVING UNIT - 48 x 24 x 72 10 EA

15 WATER FILTRATION SYSTEM, FOR ICE MACHINES 1 EA

16 SILVER 6000K NO MOTION LIGHT 43 EA

17 MAGNETS FOR LIGHTS 30 EA

18 Divi Linear Base - End of Run Shroud 64 EA

19 Divi Linear Tack Panel - Perm/Mono - NPWR - 66H x 24W 16 EA

20 Divi Linear Tack Panel - Perm/Mono - NPWR - 66H x 36W 32 EA

21 Divi Linear Tack Panel - Perm/Mono - NPWR - 66H x 48W 24 EA

22 Divi Linear Wall Mount Kit - 66H 32 EA

23 Type C Flipper Unit - Solid Face - 36W 60 EA

24 Cbx Table Rect 36d X 72w 2mm 1 Sec 2 A-base 11 EA

25 Single door Locking Lectern w/ casters 18dx42hx24w 3 EA

26 Single door Locking Lectern w/ casters 18dx42hx24w 5 EA

27 Pedestal - B/B/F - 24D 30 EA

28 Pedestal - F/F - 24D 30 EA

29 Key Alike Kit (2 Cores) - Wesko Type 10 EA

30 Key Alike Kit (5 Cores) - Wesko Type 2 EA

31 Key Alike Kit (6 Cores) - Wesko Type 1 EA

32 Key Alike Kit (7 Cores) - Wesko Type 30 EA

33 Wardrobe Tower Left - F/F W/Cupboard 65"H 15 EA

34 Wardrobe Tower Right - F/F W/Cupboard 65"H 15 EA

35 Table, rectangle, 2mm, 24Dx48Wx29H, FLIP, CSTR 100 EA

36 Table, rectangle, 2mm, 24dx48wx29h, Stlt24, Gld 5 EA

37 Table, round, 2mm, 42dx29h, Stlx36, Gld 2 EA

38 Table, square, 2mm, 24dx29h, Stlx24, Gld 1 EA

39 Table, square, 2mm, 42dx42wx29h, Sqr, Gld 3 EA

40 BALL BEARING PENCIL DRAWER 43 EA

41 Side/Support Rear Bracket - Pair 30 EA

42 Regular Cantilever - Pair - 24D 45 EA

43 Shared Cantilever - Pair - 24D 45 EA

44 U-Channel - 60W 49 EA

45 Rectangular - 2mm Edge - 24D x 48W 30 EA

46 Rectangular - 2mm Edge - 24D x 72W 30 EA

47 Cbx Partial Depth Bbf Ped 23dx28hx16w 13 EA

48 CB Desk Return LH 24Dx42Wx29H 2 EA

49 CB Desk Return RH 24Dx42Wx29H 2 EA

50 CB Desk Return LH 24Dx48Wx29H 7 EA

51 CB Desk Return RH 24Dx48Wx29H 2 EA

52 Cb Desk Shell Full Mod Recessed 30dx72wx29h 4 EA

53 Cb Desk Shell With Full Mod Flush 24dx72wx29h 16 EA

54 Cb Desk Shell With Full Mod Flush 30dx72wx29h 5 EA

55 Cbx Partial Depth Ff Ped 23dx28hx16w 17 EA

56 Cbx 4d Full Depth Lat 54hx18w 1 EA

57 Cbx Single Hutch With Cabinet Doors 14dx37hx66w 4 EA

58 Cbx Single Hutch With Cabinet Doors 14dx37hx78w 9 EA

59 Cbx Tackboard Hutch Mount 20hx66w 4 EA

60 Cbx Tackboard Hutch Mount 20hx78w 9 EA

61 Cbx Wardrobe Ff Cd Lh 24dx66hx24w 3 EA

62 Miscellaneous Installation & Delivery charges 1 EA

1.1.1 DELIVERY/INSTALLATION

The contractor shall deliver and install all furniture as listed above, and remove any trash associated with the delivery (boxes, packing materials, etc.). A breakout by room is included as an attachment to this contract. Delivery and installation times shall be coordinated with the local training unit and accomplished without impacting training operations. Delivery shall occur within 90 days of contract award.

During delivery/installation, the contractor shall comply with all local/federal facility requirements, to include receiving appropriate visitor passes. Local Government personnel will help facilitate any visit requests, as necessary.

File details come from the government source that posted it. Updated .