Attachment 1 BSM Transformers Combined Specification.pdf

PDF 3 MB Posted

Attached to
Station Service Transformers for North Dakota
Solicitation number
89503425QWA001064
Issued by

About this file

This document is a detailed technical specification for two station service transformers for the Western Area Power Administration's North Dakota Maintenance Office. The specification requires two single-phase, 50kVA transformers with specific technical requirements, including 43.8kV primary voltage, 120/240V secondary voltage, ONAN cooling, and 65°C temperature rise. Key specifications include draw-lead threaded stud terminals, electrical grade mineral oil, de-energized tap changers, and ANSI 70 gray paint.

The transformers are for two specific locations - Washburn KX3A and Killdeer KX3A - each with unique height and base dimensions. The specification mandates new units (no refurbished transformers), includes a 2-year warranty, and specifies delivery to the Western Area Power Administration in Bismarck, ND. Delivery instructions require coordination with Bradley Seely at least seven days prior, with delivery permitted between 8:00 a.m. and 4:00 p.m. Monday through Thursday, excluding government holidays. Appendices include existing unit outlines, foundation details, and location photographs for both transformer sites.

View the file

Other files

File Type Posted
Attachment 2 Spare Station Service Padmount.pdf PDF
89503425QWA001064.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

North Dakota Maintenance Office

Bismarck Area Station Service Transformers

10/1/2024

North Dakota Maintenance Office

1. General: (2) Transformers to be Provided. Single phase, ONAN, 60Hz, 65°C Rise, meets all applicable NEMA and ANSI standards.

Note: Refurbished units will not accepted

1.1. Capacity: 50kVA

1.2. Polarity: Subtractive

1.3. Primary Voltage: 43.8kV (L-L)

1.4. Primary BIL: 250kV

1.5. Primary Bushings: Draw-lead with threaded stud terminal

1.5.1. Composite or Porcelain Bushings accepted

1.6. Secondary Voltage: 120/240V

1.7. Secondary BIL: 30kV

1.8. Secondary Bushings: NEMA 4-hole pads included

1.9. Insulating Fluid: Electrical Grade Mineral Oil, Type II (Non-PCB marked on nameplate)

1.10. DETC: Primary De-energized tap changer with ±2.5% and ±5% taps (5 positions total)

1.11. Accessories:

1.11.1. 1” Fill Valve

1.11.2. 1” Drain Valve

1.11.3. 1” Vacuum Valve

1.11.4. Pressure Relief Valve

1.11.5. Provisions for Tank Grounding

1.11.6. Level Gauge or Sight Glass

1.12. Paint: ANSI 70 gray

2. Warranty: 2-year warranty from the date of receival

3. Unit 1: Washburn KX3A – Unit 1 will require an overall height to be specified below. A galvanized steel base will be provided to match the existing anchor bolt layout as well as achieve the proper height. Anchor Bolts will not be required.

3.1. Overall Height: 9’ (Including HV Bushing)

3.2. Base: 1’-10” x 2’-4”

3.3. Anchor Bolt Holes: (4) 11/16” Diameter

4. Unit 2: Killdeer KX3A – Unit 2 will require an overall height to be specified below. A galvanized steel base will be provided to match the existing anchor bolt layout as well as achieve the proper height. Anchor Bolts will not be required.

4.1. Height: 7’-4” (Including HV Bushing)

4.2. Base: 2’-4” x 2’-4”

4.3. Anchor Bolt Holes: (4) 7/8” Diameter

North Dakota Maintenance Office

5. Delivery:

Western Area Power Administration Attn: Brandon Foss

700 North Bismarck Expressway Bismarck, ND 58501

Shipper is to contact Bradley Seely at 701-221-4501, to verify the delivery site is ready for delivery, to refine the delivery destination directions, and to coordinate delivery at least seven days prior to delivery. Delivery shall be made between 8:00 a.m. and 4:00 p.m. Monday through Thursday, excluding Government holidays.

TKeller Typewritten Text

APPENDIX A: EXISITNG UNIT 1 OUTLINE

APPENDIX B: UNIT 1 EXISTING FOUNDATION

Text Box

APPENDIX C: UNIT 1 LOCATION

Polygon

APPENDIX D: EXISTING UNIT 2 OUTLINE

APPENDIX E: UNIT 2 EXISTING FOUNDATION

Polygon

Text Box

APPENDIX F: UNIT 2 LOCATION

1 BSM Station Service Transformers
North Dakota Maintenance Office
Bismarck Area Station Service Transformers
10/1/2024
2 WB KX3A
3 wb_2025b-Layout1
4 WB KX3A
5 KD KX3A
6 kd_2004c
7 KD KX3A

File details come from the government source that posted it. Updated .