Attachment 1 BOM.xlsx
XLSX spreadsheet 24 KB Posted
- Solicitation number
- 12760425Q0053
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Bill of Materials (BOM) Excel file detailing the specifications and requirements for a PEPRO 6x6 Communications Shelter replacement project at Rim Communications site in Lincoln National Forest, New Mexico. The project involves manufacturing, delivering, and installing a complete communications shelter system including a 6x6 walk-in enclosure with 30-foot tower, DC power layout with equipment rack and battery tray, passive ventilation, dual antennas (ANT150F2 at 30' and 25' heights), steel ballast anchoring system (64 units at 100lbs each), solar mounting system, cable entry components, and various tower accessories. The delivery location is 3500 Airport Road, Alamogordo, NM 88310, with specific installation coordinates provided (Lat N32 28' 24.3", Long W105 07' 10.6", Elevation 6,763ft).
The scope includes drive-in installation, staging, and backhaul removal of existing equipment (6x8 fiberglass shelter and 22' sectioned Rohn tower for landfill disposal), plus mobilization and demobilization services. Technical specifications require tower compliance with TIA-222 standards for Risk Category I structures, accommodating 98mph wind speeds, 0.5-inch radial ice loading, and Category C exposure in open terrain. The project includes a 3% contract management fee, with all line items currently showing $0 pricing placeholders. Key contacts include Justin Byars as the local SAT point of contact (575-202-7240) and Francisco Lucero as additional technical contact, with COR Ernesto DeLeon overseeing the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 Shelter PWS.pdf | ||
| RFQ 12760425Q0053.pdf | ||
| Attachment 3 Supplemental SOW 2_19_25 rim.pdf | ||
| Competition Requirement_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| SITE | Region | BOM Amount | IAS Approver | BOC | Job Code | Unit | CIO Override/Job Code |
| Rim Communications Shelter Replacement | 3 | $ - 0 | Joe Bonaparte | 3290 | N/A | 0308 | 2505/ITJVAA25 |
| Total: | $ - 0 |
R3 Rim Bill of Materials
| Unit Name to Ship to: | Lincoln National Forest | |
| Point of Contact (Local SAT): | Justin Byars (Justin.Byars@usda.gov) | |
| Phone (Local SAT): | 575-202-7240 | |
| Street Address: | 3500 AIRPORT RD | |
| City, State: | ALAMOGOROD, NM | |
| Zip: | 88310 | |
| Additional Information needed for request. | ||
| Project Point of Contact (name and phone): | Justin Byars (Justin.Byars@usda.gov), 575-202-7240 | |
| Additional Technical Contact (name and phone), if applicable: | Francisco Lucero (Francisco.Lucero@usda.gov) | |
| WR# or Incident Number: | 20255492 | |
| Override/Job Code: | 2505/ITJVAA25 | |
| Q-Code | N/A | |
| IAS PMO | Joe Bonaparte | |
| UAI | N/A | |
| BOC | 3290 | |
| AAP# | RPSH | |
| POW Line Item # and Project Description | Rim Communications Shelter Replacement | |
| COR, if applicable: | Ernesto DeLeon, 970-837-6103 | |
| Comments: | Drive-in install: Lat N32 28' 24.3", Long W105 07' 10.6", Elevation: 6,763ft. Door location: East, Tower: West |
| LINE | |||||
| ITEM | DESCRIPTION | Manufacturers Part Number | Unit of Issue | QTY | UNIT |
| PRICE | TOTAL |
PRICE
| 1 | SHELTER DESCRIPTION | |||||
| 2 | 6x6 Walk-in Enclosure w/30' | EA | 1 | $ - 0 | ||
| 3 | INTERIOR LAYOUT | |||||
| 4 | DC Layout | EA | 1 | $ - 0 | ||
| 5 | Equipment rack | EA | 1 | $ - 0 | ||
| 6 | Battery Tray | EA | 1 | $ - 0 | ||
| 7 | Rack Mounted Bussbar | EA | 1 | $ - 0 | ||
| 8 | Drain | EA | 1 | $ - 0 | ||
| 9 | First Aid Kit | EA | 1 | $ - 0 | ||
| 10 | POWER ENTRY | |||||
| 11 | Dual DC Entry (Solar Array Voltage: 12VDC) | DUAL DC | EA | 1 | $ - 0 | |
| 12 | VENTILATION | |||||
| 13 | Passive | EA | 1 | $ - 0 | ||
| 14 | TOWER | |||||
| 15 | 30' | EA | 1 | $ - 0 | ||
| 16 | Antennas: (1) ANT150F2 @30', (1) ANT150F2 @25' | |||||
| 17 | ANCHORING | |||||
| 18 | Steel Ballast (100lbs each) | EA | 64 | $ - 0 | ||
| 19 | Long Outriggers | EA | 4 | $ - 0 | ||
| 20 | Ufer Grounded Concrete Pad | EA | 4 | $ - 0 | ||
| 21 | SOLAR | |||||
| 22 | Roof and Wall Mount | EA | 1 | $ - 0 | ||
| 23 | Solar Bracket | EA | 1 | $ - 0 | ||
| 24 | CABLE ENTRY | |||||
| 25 | Cable Entry Glands (Cable Type: LDF4 , 2-holes per gland) | EA | 1 | $ - 0 | ||
| 26 | Cable Entry Covers | EA | 8 | $ - 0 | ||
| 27 | Ice Shield | EA | 1 | $ - 0 | ||
| 28 | JVJ | |||||
| 29 | JVJ 4" 180⁰ | EA | 3 | $ - 0 | ||
| 30 | STANDOFFS | |||||
| 31 | Single 4" | EA | 1 | $ - 0 | ||
| 32 | Double 18" | EA | 1 | $ - 0 | ||
| 33 | Fall Restraint | EA | 1 | $ - 0 | ||
| 34 | Site Specific Drawing | EA | 1 | $ - 0 | ||
| 35 | Transportation to R3 | EA | 1 | $ - 0 | ||
| 36 | Delivery Address: 3500 AIRPORT RD ALAMOGOROD, NM 88310 Offload required by vendor. | EA | 1 | $ - 0 | ||
| 37 | Drive-In Install: Lat N32 28' 24.3", Long W105 07' 10.6", Elevation: 6,763ft. Door location: East, Tower: West | EA | 1 | $ - 0 | ||
| 38 | Staging Area: See delivery address | |||||
| 39 | Backhaul: 6x8 fiberglass shelter approx. 2500lbs. &22' sectioned up rohn tower will be placed inside of the shelter. Dispose at landfill. | EA | 1 | $ - 0 | ||
| 40 | Mob & Demob | EA | 1 | $ - 0 | ||
| 41 | NOTES: Tower rating shall follow current TIA-222 standards for a Risk category I structure. Site 3-second wind speed is 98mph, and radial ice loading is 0.5 inches. Exposure category is C- Open Terrain. Soil is composed of soil and loose rocks, assume a 1" ufer pad dig-in. Assumed weight of batteries is 296lbs (4x NSB 100FT BLUE+). | |||||
| 42 | Contract Management Fee | 3% | $ - 0 | |||
| 43 | GRAND TOTAL | $ - 0 |
File details come from the government source that posted it. Updated .