These are architectural floor plans for Building 650 at a U.S. Department of Veterans Affairs facility, prepared by Concourse Federal Group. The documents show the second and third floor layouts with detailed room designations, square footage measurements, and current flooring specifications.

Floor 2 comprises approximately 19,336 net square feet and includes medical services, surgical services, offices, conference rooms, breakrooms, corridors, and support spaces such as electrical rooms and storage areas. The flooring plan indicates three types of current flooring materials: vinyl composition tile (VCT-1), ceramic tile (CPT-1 and CPT-2), and carpet (CT-1). Restrooms totaling 18,766 square feet are designated for replacement. Floor 3 encompasses approximately 18,560 net square feet with similar room types including administrative offices, conference rooms, reception areas, breakrooms, and corridors. The third floor uses four flooring material types: vinyl composition tile (VCT-2 and VCT-3), ceramic tile (CPT-3 and CPT-4), and ceramic tile (CT-2), with restrooms totaling 17,930 square feet identified for replacement. Both plans are marked as drafts and indicate that rooms with lines across them will not be replaced. The drawings were prepared in BIM 360 format and stamped by the VA Office of Construction and Facilities Management.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

UP

UP

58 SF

ELECTRICAL

ROOM

2B003

28 SF

STORAGE

2B111

7' - 0 1/2" 11' - 6" 11' - 9 1/2" 11' - 6" 35' - 3" 11' - 6" 35' - 8 1/4" 11' - 6" 12' - 0" 11' - 6" 11' - 8 3/4" 11' - 6" 11' - 11" 11' - 6" 12' - 1" 11' - 6" 11' - 7" 11' - 6" 12' - 0 3/4" 11' - 6" 7' - 5 3/4"

/4

283' - 7 1/2"

/4

/4

/4

13' - 7 1/4" 5' - 8" 17' - 10 3/4" 5' - 8" 40' - 6" 5' - 8" 35' - 5 3/4" 11' - 10" 11' - 9 1/2" 11' - 6" 11' - 4 3/4" 11' - 6" 11' - 9" 11' - 10" 11' - 10 1/4" 11' - 10" 11' - 9 3/4" 11' - 6" 12' - 1 1/4" 11' - 6" 6' - 11 1/4"

/4

/2

185 SF

MEDICAL

SERVICE

2B309

127 SF

OFFICE

2B310

112 SF

OFFICE

2B307

116 SF

OFFICE

2B311

188 SF

BREAKROOM

2B314

118 SF

OFFICE

2B308

125 SF

OFFICE

2B306

125 SF

MEDICAL

SERVICE

2B305

122 SF

OFFICE

2B304

117 SF

OFFICE

2B302

155 SF

CONFERENCE

ROOM

2B312

115 SF

MEDICAL

SERVICE

2B303

115 SF

MEDICAL

SERVICE

2B301

113 SF

MEDICAL

SERVICE

2B300

119 SF

SURGICAL

SERVICE

2B317

118 SF

MEDICAL

SERVICE

2B319

120 SF

OFFICE

2B321

196 SF

SURGICAL

SERVICE

2B315

127 SF

SURGICAL

SERVICE

2B316

124 SF

SURGICAL

SERVICE

2B318

128 SF

OFFICE

2B320

124 SF

OFFICE

2B323

143 SF

OFFICE

2B325

265 SF

CORRIDOR

2C204

428 SF

CORRIDOR

2C205

529 SF

OPEN OFFICE

SPACE

2B302A

59 SF

CORRIDOR

2C206

114 SF

OFFICE

2B326

407 SF

SECURITY

SERVICES

2B223

135 SF

BREAKROOM

2B224

200 SF

W-TOILET

2B327

145 SF

M-TOILET

2B221

39 SF

HAC

2B002

657 SF

CORRIDOR

2C207

143 SF

OFFICE

2B004

71 SF

IT

2B005

67 SF

STORAGE

2B011

138 SF

OFFICE

2B012

9 SF

ELECTRICAL

2B222

34 SF

STORAGE

2B013

813 SF

RESEARCH

SERVICE

2B010

391 SF

MULTIPURPOSE

ROOM

2B014

325 SF

CONFERENCE

ROOM

2B016

321 SF

CONFERENCE

ROOM

2B017

34 SF

STORAGE

2B018

125 SF

OFFICE

2B100

137 SF

OFFICE

2B101

129 SF

OFFICE

2B102

128 SF

OFFICE

2B106

127 SF

OFFICE

2B107

138 SF

OFFICE

2B109 127 SF

OFFICE

2B110

22 SF

HAC

2B019

62 SF

ELECTRICAL

ROOM

2B200

185 SF

BREAKROOM

2B103

118 SF

NURSING

SERVICES

2B108

119 SF

OFFICE

2B112

147 SF

CONFERENCE

ROOM

2B114

107 SF

OFFICE

2B113

119 SF

OFFICE

2B116

123 SF

OFFICE

2B117

113 SF

OFFICE

2B122

158 SF

OFFICE

2B121

168 SF

OFFICE

2B120

152 SF

OFFICE

2B119

133 SF

OFFICE

2B201

137 SF

EDUCATION

2B202 81 SF

OFFICE

2B121A

59 SF

TOILET

2B105

56 SF

TOILET

2B104

42 SF

STORAGE

2B118

74 SF

STORAGE

2B205

114 SF

OFFICE

2B203

129 SF

OFFICE

2B204

115 SF

OFFICE

2B206

193 SF

CORRIDOR

2C213

126 SF

OFFICE

2B218

115 SF

OFFICE

2B219

131 SF

QUALITY

MANAGMENT

2B217

107 SF

OFFICE

2B216

127 SF

OFFICE

2B215

110 SF

OFFICE

2B212

158 SF

OFFICE

2B214

124 SF

OFFICE

2B213

39 SF

COPY ROOM

2B220

257 SF

CORRIDOR

2C211

114 SF

OFFICE

2B209

107 SF

OFFICE

2B210

123 SF

OFFICE

2B208

150 SF

OFFICE

2B207

137 SF

CORRIDOR

2C212

614 SF

OFFICE

2B015

942 SF

CORRIDOR

2C210

428 SF

CORRIDOR

2C203

32 SF

STORAGE

2B001

130 SF

STAIR

#1

843 SF

CORRIDOR

2C201

995 SF

CORRIDOR

2C202

165 SF

CORRIDOR

2C208

129 SF

CORRIDOR

2C209

141 SF

STAIR

#2

7 SF

CLOSET

2B115

56 SF

U-TOILET

2B322

55 SF

U-TOILET

2B324

5' - 0 1/4"

/2

/2

6' - 0 3/4"

/4

8' - 1"

5' - 1 3/4"

/4

/4

/4

8' - 1 1/2"

6' - 3"

6' - 0 1/2"

/2

6' - 0"

11' - 1 3/4"

6' - 10"

64 SF

ELEVATOR

78 SF

ELEVATOR

471 SF

OFFICE

2B211

117 SF

OFFICE

2B313

58 SF

OFFICE

2B302B

4 SF

CLOSET

2B201A

VISUAL INFORMATION OFFICER

1/8" = 1'-0"

Floor 2

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

AS-BUILT

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

612-19-002

Concourse Federal Group 123 S Royal St.

Alexandria, VA 22314

(703) 566-3059

B

IM

/V A

N C

H C

S /6

M a th e r.

rv t

/0

/2

:5

:1

AS105

ARCHITECTURAL PLAN - FLOOR 2 CLINICS AND ADMINISTRATION

06.25.2020

10535 Hospital Way

Mather, CA 95655

NET SQUARE FEET: 19,336 SF

Revisions: Date:

DRAFT

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Text Box

LVT

VHAMACModesI Text Box CURRENT FLOORING - BLDG 650 2nd FLOOR

VHAMACModesI Image

VHAMACModesI Text Box

VCT-1

VHAMACModesI Image

VHAMACModesI Text Box

CPT-1

VHAMACModesI Image

VHAMACModesI Text Box

CT-1

VHAMACModesI Image

VHAMACModesI Text Box

CPT-2

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Polygon

VHAMACModesI Polygon

VHAMACModesI Polygon

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Polygon

VHAMACModesI Polygon

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Polygon

VHAMACModesI Polygon

VHAMACModesI Polygon

VHAMACModesI Polygon

VHAMACModesI Polygon

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Polygon

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Polygon

VHAMACModesI Polygon

VHAMACModesI Polygon

VHAMACModesI Polygon

VHAMACModesI Polygon

VHAMACModesI Polygon

VHAMACModesI Text Box

FLOORING TO BE REPLACED:

NET SQUARE FEET - RESTROOMS = 18,765 SF

VHAMACModesI Text Box

NOTE: ROOMS WITH LINE ACROSS WILL NOT BE REPLACED

VHAMACModesI Line

VHAMACModesI Line

VHAMACModesI Line

VHAMACModesI Line

VHAMACModesI Line

VHAMACModesI Line

VHAMACModesI Text Box

LEGEND:

VCT: VINYL COMPOSITION TILE

CT: CERAMIC FLOOR TILE

CPT: CARPET

VHAMACModesI Text Box

CARPET

VHAMACModesI Text Box

CARPET

VHAMACModesI Text Box

CARPET

VHAMACModesI Line

VHAMACModesI Line

VHAMACModesI Line

VHAMACModesI Line

DN

UP

7' - 0 1/2" 11' - 6" 11' - 9 1/2" 11' - 6" 35' - 3" 11' - 6" 35' - 8 1/4" 11' - 6" 12' - 0" 11' - 6" 11' - 8 3/4" 11' - 6" 11' - 11" 11' - 6" 12' - 1" 11' - 6" 11' - 7" 11' - 6" 12' - 0 3/4" 11' - 6" 7' - 5 3/4"

/4

/2

/4

/4

/4

/4

13' - 7 1/4" 5' - 8" 17' - 10 3/4" 5' - 8" 17' - 7 1/2" 5' - 8" 16' - 11" 5' - 8" 35' - 5 1/2" 11' - 10" 11' - 11 3/4" 11' - 6" 11' - 10 3/4" 11' - 6" 11' - 6" 11' - 10" 12' - 0 1/4" 11' - 6" 12' - 1 3/4" 11' - 6" 11' - 11 1/4" 11' - 6" 6' - 9 3/4"

283' - 7 1/2"

427 SF

OFFICE

3D-115

122 SF

OFFICE

3D-110

118 SF

OFFICE

3D-108

117 SF

OFFICE

3D-107

118 SF

OFFICE

3D-105

532 SF

CORRIDOR

3C-003

119 SF

OFFICE

3D-106

187 SF

CONFERENCE

ROOM

3D-109

143 SF

OFFICE

3D-111

177 SF

OFFICE

3D-112

133 SF

OFFICE

3D-113

90 SF

OFFICE

3D-114

108 SF

BREAKROOM

3D-116

112 SF

ACTIVATIONS

3D-117

169 SF

OFFICE

3D-118

147 SF

OFFICE

3D-120

128 SF

OFFICE

3D-121

112 SF

OFFICE

3D-123

121 SF

OFFICE

3D-124

216 SF

OFFICE

3D-125

112 SF

OFFICE

3D-122

112 SF

OFFICE

3D-119

102 SF

OFFICE

3D-126

547 SF

CORRIDOR

3C-004

244 SF

RECEPTION

AREA

3D-128

31 SF

HAC

3A-101

247 SF

M-TOILET

3A-108

296 SF

W-TOILET

3A-106

55 SF

ELECTRICAL

ROOM

3A-102

171 SF

BREAKROOM

3A-103

387 SF

CONFERENCE

ROOM

3A-104

74 SF

IT ROOM

3D-118

263 SF

LOBBY

3C-000

32 SF

HAC

3A-100

230 SF

OFFICE

3B-100

116 SF

OFFICE

3B-101

114 SF

OFFICE

3B-103

120 SF

OFFICE

3B-102

145 SF

OFFICE

3B-104

142 SF

OFFICE

3B-106

89 SF

TOILET

3B-105 118 SF

OFFICE

3B-108

125 SF

OFFICE

3B-107

122 SF

OFFICE

3B-109

143 SF

OFFICE

3B-110

142 SF

OFFICE

3B-112 125 SF

OFFICE

3B-113

107 SF

OFFICE

3B-111

120 SF

OFFICE

3B-114

195 SF

OFFICE

3B-115

142 SF

OFFICE

3B-116

213 SF

OFFICE

3C-106

165 SF

OFFICE

3C-107

100 SF

WAITING

3C-106A

73 SF

TOILET

3C-108A

338 SF

OFFICE

3C-108

142 SF

OFFICE

3C-110

188 SF

OFFICE

3C-109

152 SF

OFFICE

3C-112

279 SF

OFFICE

3C-113

138 SF

OFFICE

3C-114 44 SF

STORAGE

3C-111

21 SF

STORAGE

3C-105

127 SF

OFFICE

3B-118

55 SF

ELECTRICAL

ROOM

3C-104

1377 SF

CORRIDOR

3C-006

74 SF

TOILET

3C-103

174 SF

COPY ROOM

3C-102

143 SF

OFFICE

3C-115

173 SF

OFFICE

3C-116

282 SF

OFFICE

3C-117

139 SF

OFFICE

3C-118

140 SF

OFFICE

3C-119

139 SF

OFFICE

3C-120

279 SF

OFFICE

3C-121

298 SF

CONFERENCE

ROOM

3C-101

242 SF

RECEPTION

3C-100

107 SF

OFFICE

3C-123

122 SF

OFFICE

3C-122

146 SF

OFFICE

3A-105A

106 SF

OFFICE

3A-105

106 SF

OFFICE

3A-105B

103 SF

OFFICE

3A-107

137 SF

OFFICE

3D-100

119 SF

OFFICE

3D-101

146 SF

OFFICE

3D-102

117 SF

OFFICE

3D-104

97 SF

WAITING

3D-103

1313 SF

CORRIDOR

3C-001

144 SF

STAIR

#2

124 SF

STAIR

#1

30 SF

STORAGE

3B-117

56 SF

TOILET

3D-127

59 SF

WORK LAYOUT

3D-101A

46 SF

CORRIDOR

3C-002

1371 SF

CORRIDOR

3C-005

/4

5' - 0 1/4"

/2

7' - 0"

6' - 3 3/4"

7' - 11 3/4"

/4

9' - 0"

8' - 1"

/4

10' - 1 1/4"

/4

10' - 5 1/2"

9' - 9 1/4"

/4

/4

5' - 9 3/4"

11' - 4 1/2"

9' - 1 1/4"

4' - 2 1/2"

67 SF

ELEVATOR

85 SF

ELEVATOR

60 SF

COPY ROOM

36 SF

STORAGE

3A-105A1

1/8" = 1'-0"

Floor 3

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

AS-BUILT

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

612-19-002

Concourse Federal Group 123 S Royal St.

Alexandria, VA 22314

(703) 566-3059

B

IM

/V A

N C

H C

S /6

M a th e r.

rv t

/0

/2

:5

:1

AS106

ARCHITECTURAL PLAN - FLOOR 3 CLINICS AND ADMINISTRATION

06.25.2020

10535 Hospital Way

Mather, CA 95655

NET SQUARE FEET: 18,560 SF

Revisions: Date:

DRAFT

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Polygon

VHAMACModesI Polygon

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Text Box

CARPET

VHAMACModesI Text Box CURRENT FLOORING - BLDG 650 3rd FLOOR

VHAMACModesI Image

VHAMACModesI Text Box

VCT-2

VHAMACModesI Image

VHAMACModesI Text Box

CPT-3

VHAMACModesI Image

VHAMACModesI Text Box

CPT-4

VHAMACModesI Image

VHAMACModesI Text Box

CT-2

VHAMACModesI Image

VHAMACModesI Text Box

VCT-3

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Polygon

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Polygon

VHAMACModesI Polygon

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Polygon

VHAMACModesI Polygon

VHAMACModesI Polygon

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Rectangle

VHAMACModesI Polygon

VHAMACModesI Rectangle

VHAMACModesI Polygon

VHAMACModesI Text Box

FLOORING TO BE REPLACED:

NET SQUARE FEET - RESTROOMS = 17,930 SF

VHAMACModesI Text Box

NOTE: ROOMS WITH LINE ACROSS WILL NOT BE REPLACED

VHAMACModesI Line

VHAMACModesI Line

VHAMACModesI Line

VHAMACModesI Line

VHAMACModesI Line

VHAMACModesI Line

VHAMACModesI Line

VHAMACModesI Text Box

LEGEND:

VCT: VINYL COMPOSITION TILE

CT: CERAMIC FLOOR TILE

CPT: CARPET

VHAMACModesI PolyLine

VHAMACModesI Text Box

CARPET

VHAMACModesI Text Box

CARPET

VHAMACModesI Line

VHAMACModesI Line

VHAMACModesI Line

Sheets
AS100 - ARCHITECTURAL PLAN - FLOOR 1 PART-A
AS101 - ARCHITECTURAL PLAN - FLOOR 1 PART-B
AS102 - ARCHITECTURAL PLAN - FLOOR 1 PART-C
AS103 - ARCHITECTURAL PLAN - FLOOR 1 PART-D
AS105 - ARCHITECTURAL PLAN - FLOOR 2
AS106 - ARCHITECTURAL PLAN - FLOOR 3

File details come from the government source that posted it. Updated .