ATTACHMENT 1_BLANK SOS_JESTER.xls

XLS spreadsheet 89 KB Posted

Attached to
DRYDOCK: USCGC MAURICE JESTER DD FY25
Solicitation number
70Z08024QPBPL0044
Issued by

About this file

This document is a pricing schedule template titled "ATTACHMENT 1_BLANK SOS_JESTER.xls" related to a federal contract opportunity for the drydock availability of the USCGC Maurice Jester (WPC-154) in FY2025. The document outlines various tasks and services required for the drydock availability, including inspecting and repairing the propulsion shafting system, hull plating, bow thruster, rudder assemblies, stabilizing fins, and other systems. The template provides line items for the contractor to input pricing for these tasks. The related federal contract opportunity is solicitation number 70Z08024QPBPL0044, titled "DRYDOCK: USCGC MAURICE JESTER DD FY25", with a period of performance from 21JAN2025 to 20MAY2025. The contract is being issued by the U.S. Coast Guard, a civilian federal agency. The document also includes a foreseeable cost worksheet for the contractor to estimate expenses related to transportation, per diem, cutter operations, and other factors.

View the file

Other files

File Type Posted
ATTACHMENT 2_SPECIFICATION_JESTER.pdf PDF
70Z08024QPBPL0044.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC MAURICE JESTER (WPC-154) DRYDOCK AVAILABILITY FY2025
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Propulsion Shafting System, Inspect and RepairJOB1$0.00
D-002DrydockingJOB1$0.00
D-003Hull Plating, InspectJOB1$0.00
D-004Bow Thruster Propeller and Tunnel, Inspect and RepairJOB1$0.00
D-005Rudder Assemblies, Inspect and RepairJOB1$0.00
D-006Stabilizing Fins, Inspect and RepairJOB1$0.00
D-007Impressed Current Cathodic Protection (ICCP) and Anti-Fouling System, Inspect and MaintainJOB1$0.00
D-008ASW/Firemain System Components, Renew/OverhaulJOB1$0.00
D-009Stern Launch Door, Inspect and PreserveJOB1$0.00
D-010U/W Body, PreserveJOB1$0.00
D-011Weatherdecks, PreserveJOB1$0.00
D-012Superstructure, PreserveJOB1$0.00
D-013Freeboard, PreserveJOB1$0.00
D-014Mast, PreserveJOB1$0.00
D-015Sea Trial Performance, Support, ProvideJOB1$0.00
D-016Tanks and Voids, Inspect and PreserveJOB1$0.00
D-017Temporary Services, Provide - CutterJOB1$0.00
D-018Stern Tube Interiors, PreserveJOB1$0.00
D-019Bilges, Partial PreserveJOB1$0.00
O-00AComposite Labor RateHour0$0.00
D-00BGFP ReportNSPEANSP
O-00CLaydaysDay50
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00
Over and Above/Growth Work
The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered.
OA/G-001**Provide breakdown, as follows:Hour1,692$0.00
Over and Above/Growth Labor Rate
Unit Price: $________; Quantity: 1692; Unit of Issue: Hour; Extended Price: $____________
OA/G-002Over and Above/Growth Material Markup/Handling Fee$50,040.00%0
Unit Price: $50,040.00; Quantity: 1; Unit of Issue: Percent ________%;
Extended Price: [$50,040.00 X percentage quoted]: $______________
Total Price of Over and Above/Growth$0.00

&C(6/11/2024)

Rev-0 - Page &P of &N

Foreseeable Costs

FORESEEABLE COST WORKSHEET
USCGC MAURICE JESTER DD FY25FY25
Contractor's Name:
The contractor shall fill-in all yellow labeled boxes below to determine their foreseeable costs. Please read all notes and headers of sections for instructions in completing this worksheet.
427 Commercial Street, Boston MA 02109
NAUTICAL MILES BASED ON ROUND-TRIP (TO AND FROM)
NUMBER OF DAYS OF AVAILABILITY119
(1) Port Engineer/COR Transportation: AIR TRAVEL
(Applicable if > 50 miles from PE address

(PE's desk location)

A. Number of CG Representatives from NESU:A=1
B. The number of round trips between the contractor's facility and NESUB=1
C. A multiplied by B:AxB=C=1
D. Travel cost per trip:D=
E. C multiplied by D =E, if >50 miles from NESU otherwise N/A.E=$0.00
(2) Port Engineer Transportation: CAR TRAVEL
A. Number of CG Representatives from NESU:A=1
B. Number of Driving miles Round-trip between the COR office and contractors facility:B=
C. Travel cost per driving mile (rate at $0.58 per mile)$0.580$0.00
(3) PER DIEM: (Applicable >50 miles CREW + PE)
A. Number of Ship's Crew & Port EngineerA=25
B. Total number of day(s) in drydock.B=119
C. Per diem cost at place of performance, per day: (if < 50 miles, enter "0" for all below)C=$0.00
C.1.1. Enter Lodging Daily Per Diem Rate
C.2.1. Enter Meals & Incidentals Total Daily Rate
C.2.1.1. Enter Meals & Incidentals First Day of Travel Daily Rate
D. AxBxC= D: (if >50 miles from NESU)D=$0.00
(4) PER DIEM: (Applicable >50 miles Contracting Officer Travel & Per Diem. KO location is Norfolk, VA 23510)
A. Number of KO authorized travel:A=1
B. Total number of KO travel days:B=3
C. Transportation cost for KO travelC=
D. Per diem cost at place of performance, per dayD=$0.00
D.1.1. Enter Lodging Per Diem Rate
D.2.1. Enter Meals & Incidentals Total Daily Rate
D.2.1.1. Enter Meals & Incidentals First & Last Day of Travel Daily Rate
E. A [(B*D) + C] =E=$0.00
(5) CUTTER COST Operation Factors:
A. Round Trip Nautical Miles from the vessels pier to the contractors facility:A=0
B. Cutter Cost Factor Per Nautical Mile:B=$51.04
C. A multiplied by B= CC=$0.00
(6) FAMILY SEPARATION ALLOWANCES (FSA) Applicable if > 50 miles from Homeport - for crew with dependents only (Daily Rate $8.33). If less than 50 miles enter 0 for A below.
A. Number of Personnel entitled to Family Separation Allowance:A=12
B. Number of Days for Availability minus 30 days if availability is greather than 30 days:B=89
C. A multiplied by B = C (Daily FSA rate of $8.33)C=$8,896.44
(7) CREW TRANSPORTATION FOR HOME VISIT (Applicable after 31 consecutive days if > 50 miles from Homeport - for crew with dependents only
A. Number of Personnel (with dependents) entitled to HOME visit:A=12
B. Number of Homeport Visits:B=2
C Mileage to homeport = (Roundtrip Ticket Cost)C=
D. A multiplied by B, multiplied by C = D:C=$0.00
GRAND TOTAL
1. PE/COR Transportation (AIRFARE)$0.00
2. PE/COR Transportation (CAR)$0.00
3. Per Diem for Crew and PE/COR$0.00
4. Cutter Cost Operations Factors$0.00
5. Family Separation Allowance$8,896.44
6. Crew Transportation Home Visit$0.00
Total Cost of Distance Factors:$8,896.44
Total Contractor Quoted/Proposal Price:$0.00
TOTAL EVALUATED QUOTE/PRICE$0.00

Contractor enters name here Contractor shall utilize: https://nauticalcharts.noaa.gov/publications/docs/distances.pdf http://ports.com/sea-route/ Contractor shall utilize: https://cpsearch.fas.gsa.gov/cpsearch/search.do.

Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 driving miles from the PE's homeport OR (2) Enter "0" if their dry dock is less than 150 driving miles from the PE's homeport.

Contractor will enter either (1) "0" if their dry dock is located less than 50 miles or more than 150 miles from the PE's homeport or (2) the total number of round trip driving miles if the contractor is located between 51 to 149 miles from PE's homeport.

Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates based on the location of their facility.

Contractor shall utilize: https://cpsearch.fas.gsa.gov/cpsearch/search.do. Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 miles from the KO's location in Norfolk, VA 23510 or (2) Enter "0" if their dry dock is less than 150 miles from the PE's homeport.

Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates Do Not Change this cell unless Drydock is less than 50 driving miles from Homeport. Then enter 0.

If contractor's facility is:

- located < 50 miles from the ship's homeport, enter $0.

- located > 51 miles but less than 149 miles from the ship's homeport, multiply round trip vehicle mileage by $0.58

- located > 150 miles from ship's homeport, utilize https://cpsearch.fas.gsa.gov/cpsearch/search.do.

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009) Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it. Updated .