Attachment_1_-_Big_Hole_Recreation_Site_Renovations_Technical_Specifications.pdf
PDF 467 KB Posted
- Solicitation number
- 140L3622R0003
About this file
This document provides details of a solicitation for construction services. The Bureau of Land Management is seeking proposals to renovate two recreation sites in Montana, including constructing new entrance roads, parking areas, and boat ramp facilities. Offerors must submit fixed-price proposals by June 16th, with award anticipated on July 16th. Work must begin within 10 days of award and be completed within 102 days. Services include site grading, aggregate base installation, asphalt paving, markings, toilet installation, curbing, signs, fencing, topsoil, seeding, plantings, and boat ramp construction. The total small business set-aside has an estimated price range of $500,000 to $1,000,000 under NAICS code 237990. Payment will be made through the Invoice Processing Platform.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATION INDEX
BIG HOLE RECREATION SITE RENOVATIONS
MT-01009 . . . . . . . . . . . . . . . . General Information and Requirements
MT-01500 . . . . . . . . . . . . . . . . . Temporary Facilities and Controls
MT-02201 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Watering
MT-02213 . . . . . . . . . . . . . . . . . . . . . . . . . . . . Site Grading
MT-02233 . . . . . . . . . . . . . . . . . . . . Crush Aggregate Base Course
MT-02743 . . . . . . . . . . . . . . . . . . . . Bituminous Concrete Pavement
MT-02765 . . . . . . . . . . . . . . . . . . . . . . . . . . Pavement Marking
MT-02878 . . . . . . . . . . . . . . . . . . Miscellaneous Project Site Items
MT-02933 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Seeding
MT-02950 . . . . . . . . . . . . . . . . . . . . . . . . . . Trees and Shrubs
MT-03305 . . . . . . . . . . . . . . . . . . . . . . . . . Boat Ramp Facility
MT-03306 . . . . . . . . . . . . . . . . . . . . . Concrete, Minor Quantities
SECTION MT-01009
GENERAL INFORMATION AND REQUIREMENTS
GENERAL INFORMATION AND REQUIREMENTS 02/21
MT-01009-1
PART 1: GENERAL
1.01 SUMMARY:
A. Description of Work: Furnishing labor, equipment, supplies, and materials, to renovate Jerry Creek and Divide day-use areas. Work to include but not limited to: re-routing and constructing a new entrance road, as well as, constructing a new parking area and boat ramp facility for both sites, as well as other related appurtenances in accordance with the drawings and these specifications.
B. Location: Work under this Contract is located in Silver Bow County, Montana. Work locations are shown on the drawings.
1.02 REFERENCES:
A. Referenced Specifications/Standards with Abbreviations and/or Acronyms:
Wherever the following acronyms are used in these specifications or on the drawings, they are to be construed the same as the respective expressions represented. Copies of the referenced specifications/standards referred to herein may be procured by the Contractor from the following:
AASHTO American Association of State Highway and Transportation
Officials
444 North Capitol Street N.W., Suite 225
Washington, DC 20001
AISC American Institute of Steel Construction
400 North Michigan Avenue
Chicago, IL 60611
ANSI American National Standards Institute
1430 Broadway
New York, NY 10018
ASTM American Society for Testing and Materials
1916 Race Street
Philadelphia, PA 19103
AWS American Welding Society, Inc.
P.O. Box 351040
Miami, FL 33135
CRSI Concrete Reinforcing Steel Institute
933 North Plum Grove Road
Schamberg, IL 60173-4758
MT-01009-2
FP Standard Specifications for Construction of Roads and
Bridges on Federal Highway Projects
Superintendent of Documents
Government Printing Office
Washington, DC 20402
Fed. Spec. Federal Specification/Standard
General Services Administration
Specifications Branch
Room 6039, GSA Building
Seventh and D Streets, S.W.
Washington, DC 20407
MDT Standard Specifications for Road and Bridge Construction, 1995
Edition
Montana Department of Transportation
Contract Plans Section
2701 Prospect Avenue
Helena, MT, 59620
MUTCD Manual on Uniform Traffic Control Devices for Streets and
Highways
Superintendent of Documents
Government Printing Office
Washington, DC 20402
OSHA Occupational Safety and Health Administration's Standards
U.S. Department of Labor
Occupational Safety and Health Administration
Denver Area Office
333 West Colfax Avenue
Denver, CO 80204
WWPA West Coast Lumber Inspection Bureau
1500 Yeon Building
Portland, OR 97204
*Federal Specifications and catalogs may be obtained at Business Service
Centers of Regional Offices of the General Services Administration.
(Washington, DC; Boston, MA; New York, NY; Philadelphia, PA; Atlanta, GA;
Chicago, IL; Kansas City, MO; Fort Worth, TX; Denver, CO; San Francisco, CA;
and Auburn, WA.)
1.03 DEFINITIONS:
A. Approvals: Approval of the submittal is an indication that the
Contractor's submittal has been reviewed and that there are no objections, except as noted. Approval of deviations shall apply only to those deviations or omissions from the requirements of the drawings and specifications brought to the Government’s attention in writing. After
MT-01009-3
approval of an item, the Contractor may submit a substitute for approval if approved item cannot be obtained.
1.04 SUBMITTAL:
A. Scope: Submittals include, but are not limited to the following: design computations, shop drawings, manufacturer’s literature, as-built drawings, samples, and maintenance manuals.
B. Requirements: Refer to specifications for required submittals. Allow at least five working days for review. All Submittal shall be delivered to the Government prior to any work beginning.
C. Identification of Submittal: Two copies of each submittal shall be presented to the Government for approval. Completely identify each submittal by showing at least the following information:
1. Name and address of submitter, as well as name and telephone number of the individual to contact for further information.
2. Name of project as it appears in these specifications.
3. Contract number, drawing number, and specification section number to which the submittal applies.
4. Whether this is an original submittal or re-submittal.
5. Each item shall clearly note the manufacturer's name and address, trade name, product, lot, style, color, catalog designation or model number, and locations of use.
1.05 CERTIFICATES OF CONFORMANCE:
A. Requirements: Government may permit use, prior to sampling and testing of materials, when accompanied by Certificates of Conformance. Materials used on the basis of a Certificate of Conformance may be sampled and tested. Installation of materials on the basis of Certificates of
Conformance shall not relieve the Contractor of responsibility for incorporating materials conforming to the requirements of the drawings and specifications. Material not conforming to those requirements will be subject to rejection, whether in place or not.
C. Format: The form of the Certificate of Conformance provided by the supplier shall be as follows:
1. Two copies of the Certificate of Conformance shall be submitted for approval.
2. The certificate shall state that the named product conforms to the contract requirements.
MT-01009-4
3. The certificate shall either be accompanied with a certified copy of the test results or certify that such test results are on file with the manufacturer and will be furnished to the Government upon request.
4. The certificate shall provide the name and address of the manufacturer, the testing agency, and the date of tests.
5. The certificate shall set forth the means of identification permitting field determination of the product delivered as being the product covered by the certification.
1.06 QUALITY ASSURANCE:
A. Codes and Standards: All work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This Contract incorporates materials, applications, and tests by reference, with the same force and effect as when they were given in full text.
B. Conflict: Where a conflict occurs between reference documents and project specifications, the project specifications shall govern.
C. Measurements: Where approved, manufacturer's diagrams and shop drawings shall give specific measurements or rough-in dimensions for equipment.
These dimensions shall take precedence over dimensions indicated on the drawings.
1.07 DELIVERY, STORAGE, AND HANDLING:
A. Delivery: Contractor shall protect products incorporated into the work from damage while in transit to the site. Products must be delivered in original unopened containers with manufacturer's name and brand designation and contents legibly indicated. The containers shall bear the referenced specification number, type, and class as applicable.
B. Storage: Contractor shall provide temporary storage facilities for products complying with manufacturer's recommendations, which will protect them from damage until installation on the project and final acceptance.
The storage area shall permit access for inspection and handling.
C. Handling: Contractor shall load and unload products in such a manner that protects them from damage until installation on the project.
1.08 PROJECT/SITE CONDITIONS:
A. Access to the Work: The work site is accessed by State, County and
Federal roads. Contractor shall furnish all construction signage identified in Section MT-01500 Temporary Facilities and Controls of the specifications, as well as any additional signage required by local, state or federal authorities with jurisdiction. The day-use site will be temporarily closed for a portion of the contract. It is the Contractor’s
MT-01009-5
responsibility to provide adequate barriers and signage to communicate the site closure to the public. See Section MT-01500 Temporary Facilities and
Controls for further guidance.
B. Construction Stipulations:
1. The area under construction shall be closed to the public during the construction process. Contractor shall be responsible for all closures which shall be communicated to the public through the use of construction signage.
C. Environmental Considerations: The aesthetic value of the site and surrounding area are of prime importance. Contractor shall take all care necessary to preserve all plant life and other natural features. No surface damage outside the staked area shall occur. Any surface damage outside the staked area shall be corrected at the expense of the
Contractor. Any damage to existing state, county or local roads used to transport materials to the project, shall also be corrected at the expense of the Contractor.
D. Construction Facilities:
1. Do not park vehicles or equipment or store materials on private property without written permission from the property owner.
2. Contractor shall contact the Montana one-call system for utility locations prior to starting work. All utility locations shall include public and private utilities at the construction site. The number for the Montana one-call system is 1-800-424-5555.
E. Repair of Underground and Overhead Utilities: Contractor is responsible for any damage to underground and overhead utilities such as, but not limited to: water, electrical, communication, sewer, fiber optic and main power lines. All damage to underground or overhead utilities will be the full responsibility of the Contractor and shall be repaired at the
Contractor’s expense.
1.09 SEQUENCING AND SCHEDULING:
A. Work Schedule: A detailed work schedule shall be submitted by the
Contractor at the pre-work conference. Contractor shall not perform any work at the project site until the Contractor’s work schedule is received by the Government. When requested, the Contractor shall submit an updated schedule within 3 calendar days.
PART 2: PRODUCTS
(There are no applicable requirements.)
MT-01009-6
PART 3: EXECUTION
3.01 PROJECT MEETINGS:
A. Pre-Work Conference:
1. Notification: A pre-work conference will be held prior to the start of work. The Contractor will be notified in advance of the meeting time, date, and place. The purpose of the meeting will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the
Contract.
2. Attendance: Contractor, subcontractors, and the persons responsible for coordination of the work shall be present at the meeting.
3. Presentation: Contractor shall be prepared to summarize and explain procedures planned for the project. Contractor shall also present all submittals and construction schedules requested in the specifications.
B. Progress Meetings:
1. Location: Meetings shall be held at the project site or as determined by the Government.
2. Notification: Meetings may be called by either the Government or the
Contractor. The request shall state who should attend.
C. Final Inspection:
1. Location: Meeting shall be held at the project site, or as determined
2. Notification: Contractor shall notify the Government, in writing, at least five working days prior to the completion date so the Government can schedule final inspection.
3. Attendance: Contractor shall require the superintendent to be present during this inspection.
3.02 CLEANUP:
A. Waste Removal: Contractor shall keep the premises free from accumulation of waste materials or rubbish resulting from the construction process.
This includes any waste produced from employees at the construction site.
At the completion of the work, it is the Contractor’s responsibility to remove any remaining waste materials from the work site. If waste materials are not promptly removed from the site, the Government may remove the waste and charge the cost of removal to the Contractor.
MT-01009-7
PART 4: MEASUREMENT AND PAYMENT
4.01 METHOD OF MEASUREMENT:
A. Units: The work described in this section will not be measured for payment.
4.02 BASIS OF PAYMENT:
A. Payment: No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.
END OF SECTION
SECTION MT-01500
TEMPORARY FACILITIES AND CONTROLS
TEMPORARY FACILITIES AND CONTROLS 02/21
MT-01500-1
A. Section Includes: Requirements for sanitary facilities, vehicular access, temporary barriers, permits, erosion control, and controls for storm water.
1.02 DEFINITIONS:
A. Landscape Preservation: The term "injury" includes, without limitation, bruising, scarring, tearing, and breaking of roots, trunks, or branches.
1.03 SUBMITTALS:
A. Requirements: Contractor shall submit the Manufacturer's Certificate of
Compliance for materials. Submittals shall be in accordance with Section
MT-01009 - General Information and Requirements.
1.04 QUALITY ASSURANCE:
A. Regulations: Comply with applicable local regulations for haul routes over public highways, roads, or bridges. Comply with industry standards and applicable laws and regulations of authorities having jurisdiction including, but not limited to, the following:
1. Health and Safety regulations.
2. Utility company regulations.
3. Environmental protection regulations.
4. Prevention and control of water pollution.
B. Manuals: Comply with latest Manual on Uniform Traffic Control Devices
(MUTCD), Part VI.
1.05 PROJECT CONDITIONS:
A. Access Routes: Use only established roadways, areas, and haul routes, or temporary roadways, areas, or haul routes constructed by the Contractor when and as authorized by the Government.
MT-01500-2
2.01 MATERIALS:
A. Water: Water for compaction and dust control is available at the project site from the Big Hole River. Contractor shall obtain all permits required and bear any costs for the permits to draft water from the river. Contractor shall abide by the rules and procedures contained in
Department of Environmental Quality’s erosion control manual to draft water from the river.
B. Toilet Units: Provide self-contained, single occupant toilet units of the chemical, aerated recirculation, or combustion type. Provide units properly vented and fully enclosed with a glass-fiber-reinforced polyester shell or similar nonabsorbent material.
C. Construction Signs: Only signs to expedite deliveries, maintain traffic flow, project site closure, promote safety, and caution against danger shall be erected, as necessary.
D. Silt Fence Geotextile: The geotextile shall be made of ultra-violet resistance material. The fabric shall have a minimum width of 6 feet.
E. Silt Fence Post: Posts shall be a minimum of 5 feet long and either wood or steel posts may be used.
F. Fasteners: The fabric shall be fastened using heavy-duty wire staples at least 1 inch long, tie wires or hog rings.
G. Straw Bales: Shall be certified weed free straw bales.
3.01 INSTALLATION:
A. Erosion Control Methods: Erosion control will be placed as described in the Department of Environmental Quality’s “Montana Sediment and Erosion
Control Manual”. At no time will sediment be allowed to leave the staked construction area or to enter any water source. All erosion control items and devices will be completely setup and installed prior to construction.
All erosion control will remain in place throughout the construction process and until the soil is stabilized. Contractor is responsible for implementing and removal of erosion control measures.
1. Reseeding: All disturbed areas in the construction site will be covered with topsoil, matting, and hydroseeded. Contractor shall mat disturbed areas identified in the contract drawings with erosion control fabric in accordance with Section MT-02933 – Seeding. The
Government’s specified seeding rate shall be followed by the
Contractor. Once seeding has taken place, all equipment and workers are to remain off of the seeded areas. If for any reason, an area
MT-01500-3
that has been seeded is disturbed, that area will be reseeded again, at the Contractor’s expense.
2. Silt Fences: Contractor is responsible for placing all silt fence prior to the start of construction. Silt fence is to be placed as specified in the Department of Environmental Quality Erosion Control
Manual. Fabric must be buried in soil to ensure sediment does not wash under the silt fence around stockpiled gravel or soil if stockpiled for more than 12 hours. Silt fences must stay in place until the surrounding soil is stabilized. Contractor is solely responsible for any sediment loss from the construction site onto non-construction areas and will bear the costs to fix, repair and replace the damaged areas.
C. Toilets: Install self-contained toilet units. Shield toilets to ensure privacy. Use of pit type privies will not be permitted.
1. Provide toilet tissue, paper towels, paper cups, and similar disposable materials for each facility. Provide covered waste containers for used material.
B. Vehicle Traffic Control: Provide, erect, and maintain all necessary traffic control devices, including traffic cones, delineators, barricades, suitable and sufficient flasher lights, flag persons, danger signals, and signs, as required by the federal, state, and local authorities having jurisdiction. Take all necessary precautions for protection of the work and safety of the public on roads affected by the work during the contract period as construction work proceeds.
1. Do not start any construction work along public roads until the proper traffic control devices for warning, channeling, and providing safety for the motorists are in place at the construction site.
2. Protect all roads closed to traffic with effective barricades.
Illuminate all barricades and obstructions at night, and keep all lights burning from sunset until sunrise.
3. Erect such additional warning and directional signs in connection with the work as may be required by the Government.
4. Maintain the condition, operation, and effectiveness of all traffic control devices throughout period of use. Remove all temporary traffic control devices when no longer needed.
D. Established Roadways as Haul Routes: Use existing available public highways and roads as haul routes subject to the governing local, state and federal regulations. Contractor is responsible for damage caused by construction traffic.
MT-01500-4
1. Provide barricades, flag persons, lighting, signs, and other necessary precautions for safety of the public where haul routes cross public highways or roads.
E. Storage/Staging Areas: Contractor shall use a staging area as approved by the Government for trailers, equipment, and materials. Fencing of materials or equipment shall not be required at this site; however, the
Contractor shall be responsible for cleanliness and orderliness of the area used and for the security of any material or equipment stored in this area.
3.02 Permits, Responsibilities and Controls:
A. Contractor Water Pollution Violations: If noncompliance should occur, of applicable federal, state, or local laws, orders, regulations, or water quality standards, the Government may stop all site activity until compliance is ensured. Contractor shall not be entitled to any extension of time, claim for damage, or additional compensation by reason of such a work stoppage. Corrective measures required to bring activities into compliance shall be at the Contractor's expense.
B. Dredge and Fill Permit: Government has acquired the authorization permit to discharge dredged or fill material into the waters of the United States
(including wetlands) as required under section 404 of the Clean Water Act
(Public Law 92-500 as amended). A copy of the permit will be given to the
Contractor at the Pre-Work Conference. Contractor shall comply with all the terms and limitations of the authorization.
C. Montana Stream Protection Permit: Government has acquired the authorization permit of sediment control and protection of fish and wildlife as required by DFWP 124. A copy of the permit will be given to the Contractor at the Pre-Work Conference. Contractor shall comply with all terms and limitations of the authorization.
D. Stormwater Discharge Permit Associated with a Construction Site: A
Notice of Intent (NOI) and Storm Water Pollution Plan (SWPPP) shall be acquired by the Contractor under a stormwater general permit to control stormwater discharges from the construction site as required under section
402 of the Clean Water Act (Public Law 92-500, as amended). A copy of the permit shall be supplied to the Government at the Pre-Work Conference.
Contractor shall adhere to all terms and conditions of the permit.
E. Pollution Controls: Control pollutants by use of Construction site management practices, and other controls including state and local control requirements.
1. Construction Site Management: Perform construction activities by methods that will prevent entrance, or accidental spillage, of solid matter, contaminants, debris, or other pollutants or wastes into streams, flowing or dry watercourses, lakes, wetlands, reservoirs, or underground water sources.
MT-01500-5
2. No on-site fuel storage tanks and/or petroleum products are allowed.
All fuel/oiling/greasing of equipment shall be carried by service trucks.
3.03 LANDSCAPE PRESERVATION:
A. Preservation: Preserve the natural landscape and preserve and protect existing vegetation not required or otherwise authorized to be removed.
Conduct operations, to prevent unnecessary destruction, scarring, or defacing of the natural surroundings in the vicinity of the work.
Move crews and equipment within the rights-of-way and over routes provided for access to the work in a manner to prevent damage to grazing land or property.
B. Damaged Vegetation: The repair or treatment of injured vegetation and the replacement of trees or shrubs shall be at the expense of the Contractor.
1. Contractor is responsible for injuries to vegetation caused by
Contractor operations, personnel, or equipment.
2. Restore temporary roads to original landscape. Scarify and re-grade the Government land used for construction purposes not required for the completed installation so that surfaces blend with the natural terrain, provide proper drainage and prevent erosion. Seed disturbed areas according to Section MT-02933 - Seeding.
3.04 MAINTENANCE AND REMOVAL:
A. Maintenance: Maintain temporary structures, facilities, and controls as long as needed for safe and proper completion of the work and as directed
B. Removal: Remove temporary structures, facilities, and controls as rapidly as progress of the work will permit and as approved by the Government.
3.05 CLEANUP:
A. Requirements: Construction debris, waste materials, packaging material and the like shall be removed from the work site daily.
B. Restoration of Storage Area: Upon completion of the project and after removal of trailers, materials, and equipment, restore the areas to its original condition, including topsoil and seeding as necessary in accordance with Section MT-02923 - Seeding.
MT-01500-6
A. Payment: No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.
SECTION MT-02201
WATERING
WATERING 02/21
MT-02201-1
A. Section Includes: Distributing and applying water required for compaction of the two new parking lots outlined in these specifications
1.02 PROJECT/SITE CONDITIONS:
A. Water Source: Contractor shall be responsible for obtaining the water source. Both project sites are near the Big Hole River. Contractor shall obtain and bear all costs for any permits required to draw water from the river or any other water source as required by state law.
A. Water: Shall be clean and free from deleterious materials.
2.02 EQUIPMENT:
A. Requirements: Provide necessary pumping equipment and water trucks.
Water trucks shall be equipped with a pressure pump and spray bar of adequate capacity and designed to ensure uniform application of water in the amounts designated.
3.01 APPLICATION:
A. Requirements: Water shall be applied in such a manner to ensure uniform moisture content.
B. Compaction: The amount of water added or applied shall be sufficient to obtain a relative compaction.
C. Dust Control: Water dry material to prevent dust.
WATERING 02/21
MT-02201-2
A. Payment: No direct payment for the work described under this section will be made. The Contractor shall include consideration for this item in the bid price for other scheduled items of the contract.
SECTION MT-02213
SITE GRADING
SITE GRADING 02/21
MT-02213-1
A. Section Includes: All earthwork required to complete the subgrade sections of the project, including clearing and grubbing, excavation, embankment, grading, compacting, and all miscellaneous landscaping related work to prepare the sites as indicated and as shown on the
A. American Association of State Highway and Transportation Officials
AASHTO T 99-86 Moisture-Density Relations of Soils Using a 5.5-lb (2.5
kg) Rammer and a 12-inch (305 mm) Drop
AASHTO T 239-86 Moisture Content of Soil and Soil-Aggregate in Place by
Nuclear Methods (Shallow Depth)
1.03 DEFINITIONS:
A. Excavation: All excavation materials shall be considered as unclassified excavation, regardless of its nature.
B. Embankment: Shall be mineral soil, free from peat, frozen material, brush, trees, roots over 2 inches in diameter, and rocks over 6 inches in greatest diameter, and be obtained from on-site during excavation.
Embankment is that material placed beneath roads, parking lots, structures, and other areas at the site.
C. Waste Excavation: Excavation that is not used for construction of embankments shall be wasted in areas on-site, as directed by the
Government and as shown on the drawings.
1.04 QUALITY ASSURANCE:
A. Failure Criteria: Not limited to the following:
1. Formation of pools of moisture where positive drainage is indicated on the drawings and in waste embankment areas.
2. Settlement of embankment.
3. Flow of moisture toward, or entrapment against, building foundations.
MT-02213-2
1.05 PROJECT/SITE CONDITIONS:
A. Excess Material:
1. Excavated material unsuitable for building up embankment sections of the subgrade surface shall be wasted at the designated waste areas.
2. Usable excess material excavated shall be used in the subgrade embankment construction before the use of imported borrow is allowed.
Borrow wasting is not permitted.
3. All oversized rocks removed below subgrade elevations shall be brought back to the original subgrade elevation using excavated material before the use of imported borrow is allowed. Borrow wasting is not permitted.
4. Rocks and boulders greater than two feet in diameter shall be separated and set aside at the direction of the Government in the field. All rock removal is considered incidental to site grading.
B. Elevations: Verify the grade elevations existing on the site. Notify the Government immediately if adjustments are required to provide finish elevations indicated. Site drainage shall be considered of prime importance.
C. Environmental Conditions: Do not attempt to grade saturated material.
Water dry material to prevent dust.
A. General: See definitions.
3.01 CLEARING AND GRUBBING:
A. Requirements: The area to be excavated, and the surface area to be covered by embankments, shall be thoroughly cleared and stripped of objectionable vegetative matter, brush, trees, stumps, roots, and rocks and shall be wasted in areas on site, as directed by the Government and shown on the drawings.
3.02 SCARIFYING:
A. Requirements: Sod and vegetation shall be removed from the surface upon which the fill shall be placed. Cleared surface shall be completely broken up by scarifying to a minimum depth of 6 inches. Scarifying furrows shall
MT-02213-3
be a maximum of 3 feet apart and shall be parallel to the center line of the fill. No embankment materials shall be placed until the surface upon which the embankment material shall be placed has been approved.
3.03 PREWATERING:
A. Requirements: Excavation areas may be prewatered before excavating the material. The area to be excavated shall be moistened to the full depth from the surface to the bottom of the excavation. The application of water shall be controlled so that the excavated material will be near the optimum moisture content as specified in paragraph 3.06 A below. When necessary, prewatering shall be supplemented to assure that embankment material and backfill material moisture content comply with paragraph
3.06 A below. Obtain water for prewatering according to Section 02201 -
Watering.
3.04 INSTALLATION:
A. Excavation: Excavated material shall be used to bring the roadway, parking lots, and other areas to the required subgrade elevations as shown on the drawings or as staked in the field. Contractor shall obtain sands and gravels from the excavated material and mix to obtain the best possible embankment for which the fill is intended.
B. Grades: Grades not otherwise indicated shall be level or maintain uniform slopes between points where elevations are given, or between such points and existing finished grades. Any abrupt change in slopes shall be rounded.
C. Earthfill Placement: Embankment materials used to construct the roadway and parking lots, or any other fill areas shall be spread over the full width of the cross section of the embankment to a maximum loose thickness of six inches and shall be compacted as specified in paragraph 3.06 A and
B before the next layer is spread. Contractor shall use compaction equipment suitable to the type and depth of material being compacted to obtain the required degree of compaction. The in-place materials shall be free of lenses, pockets, streaks, or layers of materials that differ substantially in texture or gradation from the surrounding materials.
D. Disposal of Materials: Excess excavation shall be disposed of on-site in waste areas as designated by the Government and as shown on the drawings.
Waste material shall be shaped and blended in with the surrounding terrain and shall not exceed 5:1 slopes for Jerry Creek Day Use Area, 3:1 slopes for Divide Day Use Area, and 3:1 slopes for both boat ramps unless otherwise specified by the Government in the field.
E. Use of Borrow Material: Do not use imported borrow material until after the materials obtained from the required excavation have been placed in the fill, unless otherwise directed by the Government
MT-02213-4
3.05 FINISHING:
A. The subgrade shall be finished with equipment capable of shaping and grading the finished surface within the tolerance specified below.
1. The surface will be checked for the required grades staked in the field by the Government with a tolerance of ± 5 hundredths of a foot.
3.06 FIELD QUALITY CONTROL:
A. Moisture Content: During watering and compacting of the embankment subgrade, the optimum moisture content (-4 percent to +2 percent), as determined by AASHTO T 99 and AASHTO T 239, shall be maintained by wetting or drying.
1. The waste areas for both sites shall be watered to control dust.
B. Field Density Testing: The embankment subgrade and all crushed aggregate base course material shall be compacted to a minimum density of 95 percent of the maximum dry density obtained by AASHTO T 99. All field density testing shall be performed by a Certified Geotechnical Laboratory.
1. In-place field density tests for quality assurance are at the
Contractor’s expense and must pass at least one of the following tests: AASHTO T238 and T239 (ASTM D2922 and D3017), Nuclear
Densometer Methods. Quality assurance field density testing frequency shall be two passing tests per every 200 linear feet of alignment for both subgrade and finish grade. Tests shall be in locations as designated by the Government.
2. Re-testing failing areas is at the expense of the Contractor.
3. At the direction by the Government, the Contractor may be directed to provide necessary equipment and labor to excavate and replace materials for test holes up to 5 feet deep into the compacted backfill to allow testing below any site grading surface.
4. Government reserves the right to require additional testing to re-affirm suitability of completed work including compacted soils that have been exposed to adverse weather conditions.
A. Units: The work described in this section will be measured and paid for on a lump sum basis. Crushed aggregate base course materials will be paid for under Section MT-02233(1) Crushed Aggregate Base-Installed.
MT-02213-5
B. Units: Pit run material will be paid separately from site grading work under MT-02233(2) Pit Run-Installed.
C. Units: Topsoil that is removed and stockpiled shall be considered as part of site grading. Imported screened topsoil will be paid separately from site grading work under MT-02933(1) Imported Screened Topsoil
A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:
Pay Item Pay Unit
MT-02213(1) Site Grading . . . . . . . . . . . . . . . . . . Lump Sum
SECTION MT-02233
CRUSHED AGGREGATE BASE COURSE
CRUSHED AGGREGATE BASE COURSE 02/21
MT-02233-1
A. Section Includes: This work includes furnishing, placing, and compacting aggregate base course materials at the two day-use sites in accordance with these specifications and to the lines, grades, and thickness as shown on the drawings or as staked in the field.
1.02 REFERENCES
A. American Association of State Highway and Transportation Officials:
AASHTO T 99-86 Moisture-Density Relationship of Soils Using a 5.5-lb
(2.5 kg) Rammer and a 12-inch (305 mm) Drop
AASHTO T 239-86 Moisture Content of Soil and Soil-Aggregate in Place by
Nuclear Methods (Shallow Depth)
1.03 CERTIFICATE OF CONFORMANCE:
A. Certification: Contractor to submit two copies of written certification from the supplier that the Contractor-furnished material to be used on this project conforms to the requirements of this specification section.
Contractor shall include in the submittal, test results from a Certified
Geotechnical Laboratory: Samples shall be obtained from the stockpile of material to be used on this project at the time of Construction for the
3/4-Inch Minus Crushed Aggregate.
1. Sieve Analysis according to AASHTO T 99.
2. Standard Proctor according to AASHTO T 99.
3. A Loose Wet Density of the material according to Jigging Method
ASTM C 29.
4. Atterburg limits according to ASTM D 4318
5. Percentage of Mechanically Fractured Particles according to Montana
Department of Transportation (MDT), MT-217.
MT-02233-2
2.01 MATERIALS: Shall be in conformance with the following requirements:
A. General: Aggregate material shall consist of hard, durable particles or fragments of slag, stone, or gravel crushed of the required size and grading. Material shall be visually free from organic matter and lumps or balls of clay and shall meet the requirements for the grading given.
B. 3/4-Inch Crushed Aggregate Base: Shall meet the following gradation and requirements including any added binder or blending material:
Sieve Size Percent Passing
3/4 inch 100 percent
No. 4 40-80 percent
No. 10 25-60 percent
No. 200 5-20 percent
1. The Maximum liquid limit for the material passing the No. 40 sieve is
35.
2. The Plasticity Index for the material passing the No. 40 sieve may vary between 0 and 6.
3. At least 35 percent by weight of the aggregate retained on the No. 4 sieve must have at least one mechanically-fractured face. Test for determining percentage of mechanically fractured particles shall be according to MDT, MT-217.
B. Pit Run Material: Shall meet the following gradation and requirements including any added binder or blending material:
1. Have 50% by weight retained on the 1-1/2 inch sieve, with the remaining material composed of sand with a nominal quantity of silt/clay.
2. Material shall be substantially free of topsoil, organic materials, and other deleterious materials.
3. Government may reject material produced from any pit with excessive non-durable rock such as sandstone, shale, slate, disintegrated granite, or heavily weathered rock.
4. Material shall have no rocks that are 6-inches or larger.
MT-02233-3
3.01 PREPARATION:
A. The subgrade shall be prepared in accordance with Section MT-02213 - Site
Grading.
3.02 INSTALLATION:
A. All aggregate base course materials shall have water added as required in
Section 02201 - Watering. The aggregate shall then be mixed and processed to produce a uniform blend of material before final placement.
After processing, the material shall be placed on the prepared subgrade in a minimum uniform thickness of 6 inches in compacted depth. The method of dumping and spreading shall be determined by the Contractor.
The spread material shall be free of segregation.
B. Existing aggregate base material from the existing parking lot shall be salvaged and stockpiled for placement at the designated waste areas at each site.
C. Make sure there is adequate moisture in the material during placing, shaping, and compacting to prevent segregation and achieve adequate compaction for pit run material.
E. Spread and compact pit run in compacted layers of 6 inches or less.
3.03 COMPACTION:
A. Each layer of aggregate base shall be compacted to the full width by means of compaction equipment suitable to the type and depth of material being compacted. Compaction of each layer shall continue until density of not less than 95 percent of the maximum dry density is achieved in accordance with AASHTO T 99.
3.04 FINISHING:
A. Finish grade of each aggregate base course material shall be finished with equipment capable of shaping and grading the finished surface within the tolerance specified below.
1. The surface will be checked for the required grades specified on the drawings by the Government with tolerances of ± 3-hundredths of a foot.
MT-02233-4
A. Units: Work described in this section will be measured and paid for by the cubic yard compacted in place for imported aggregate base material.
Determination of quantities shall be as follows:
1. Loose Material hauled shall be weighed at a certified scale and tickets given to the Government.
2. Loose material hauled shall then be divided by the Loose Wet Density of the material to obtain the loose cubic yards delivered.
3. The loose cubic yards shall be divided by the Factor of 1.33 to obtain the compacted yards in place.
Factor Derivation:
• 25 percent shall be used for shrink and loss (20% for shrink and 5% for loss).
Factor = 100% = 1.33
100%-25%
A. Payment: The accepted quantities will be paid for at the contract price per unit of measurement, respectively, for the pay item shown in the Bid
Schedule. Price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools, and incidentals necessary to complete the work described in this section.
Payment will be made under:
Payment Pay Unit
MT-02233(1) Crushed Aggregate Base - Installed . . . . . Compacted Cubic Yard
MT-02233(3) Pit Run-Installed . . . . . . . . . . . . . Compacted Cubic Yard
End of Section
SECTION MT-02743
BITUMINOUS CONCRETE PAVEMENT
BITUMINOUS CONCRETE PAVEMENT 2/21
MT-02743-1
A. Section Includes: Furnishing, placing, and compacting one or more courses of bituminous pavement on a prepared base.
A. American Association of State Highway and Transportation Officials:
AASHTO M 82-75 Cut-Back Asphalt (Medium Curing Type)
AASHTO M 156-86 Requirements for Mixing Plants for Hot-Mixed, Hot-
Laid, Bituminous Paving Mixtures
AASHTO M 165-86 Test for Effect of Water on Cohesion of Compacted
Bituminous Mixtures
B. American Society for Testing and Materials:
ASTM C 117-87 Test Method for Materials Finer Than 75-um (No. 200)
Sieve in Mineral Aggregates By Washing
ASTM C 131-89 Test Method for Resistance to Degradation of Small-
Size Coarse Aggregates by Abrasion and Impact in the
Los Angeles Machine
ASTM C 136 REV A-84 Sieve Analysis of Fine and Course Aggregate
ASTM D 546-88 Sieve Analysis of Mineral Filler for Road and Paving
Materials
ASTM D 1188-88 Test Method for Bulk Specific Gravity and Density of
Compacted Bituminous Mixtures Using Paraffin-Coated
Specimens
ASTM D 1559-89 Test Method for Resistance to Plastic Flow of
Bituminous Mixtures Using Marshall Apparatus
ASTM D 2172-88 Test Method for Quantitative Extraction of Bitumen
From Bituminous Paving Mixtures
ASTM D 2726-88 Test Method for Bulk Specific Gravity and Density of
Compacted Bituminous Mixtures Using Saturated
Surface-Dry Specimens
A. General: Submittals and Certificates of Conformance shall be according to
Section 01009 - General Information and Requirements.
B. Mix Formula: Submit one copy of the bituminous job mix formula, prepared within one year of submittal, to be used on this project at least three weeks prior to placement of paving. Contractor shall have written approval of the formula by the Government prior to placement of pavement.
MT-02743-2
C. Certificates of Conformance: Submit one copy of written certification from the supplier of the following Contractor-furnished items to be used on this project that they conform to the requirements of this specification section.
1. Bituminous material
2. Aggregates
3. Mineral filler
4. Bituminous mix
1.04 DELIVERY, STORAGE AND HANDLING:
A. Storage: Store aggregates in such a manner as to prevent segregation, contamination, or intermixing of the different aggregate sizes.
1.05 PROJECT/SITE CONDITIONS:
A. Traffic Control: Vehicular traffic, including heavy equipment, shall not be permitted on the pavement until all rolling and compacting equipment operations have been completed.
B. Weather Limitations: Place bituminous mixture only during dry weather on dry surfaces. Place courses only when the surface temperature of the underlying course is greater than 45 degrees F for course thicknesses greater than one inch and 55 degrees F for course thicknesses one inch or less.
A. General: Aggregate materials shall be free from vegetative matter, and other deleterious substances, and shall not contain an excess of thick or elongated pieces.
C. Liquid Asphalt: The prime coat shall be MC 70 and shall conform to the requirements of AASHTO M 82.
D. Asphalt Concrete: Asphaltic concrete design mix products shall adhere to the Standard Specifications for Road and Bridge Construction 2020 edition of the Montana Department of Transportation or Montana Public Works
Standard Specifications 2014 Edition and shall be approved by Government prior to placement.
MT-02743-3
2.02 CONSTRUCTION EQUIPMENT:
A. General: Construction equipment used shall be dependable and adequate for the purpose intended, properly maintained in satisfactory and safe operating condition at all times. Calibrated equipment, such as scales, batching equipment, spreaders and similar equipment, shall have been recalibrated by an approved calibration laboratory within 12 months of commencing work.
B. Paving Equipment:
1. Spreading Equipment: Spreading equipment shall be self-propelled electronically or manually controlled type; with hoppers, tamping or vibrating devices, distributing screws, adjustable screeds, and equalizing devices. Equipment shall be capable of spreading hot bituminous mixtures without tearing, shoving, or gouging and to produce a finished surface of specified grade and smoothness. The use of a spreader that leaves indented areas or other objectionable irregularities in the fresh mix during operations will not be permitted.
2. Rolling Equipment: Shall be self-propelled pneumatic-tired rollers for initial rolling, supplemented by three-wheel and tandem type steel wheeled rollers for finish rolling. The number, type and weight of rollers shall be sufficient to compact the mixture to the required density without detrimentally affecting the compacted material. All rollers shall be suitable for rolling hot-mix bituminous pavements and capable of being operated both forward and backward without turning on the mat, and without loosening the surface being rolled. Equip rollers with suitable devices and apparatus to keep the rolling surfaces wet and prevent adherence of bituminous mixture.
a. Vibratory Rollers: At the Contractor's option, vibratory rollers especially designed for bituminous concrete compacting may be used provided rollers do not impair stability of pavement structure and any underlying layers. Repair depressions in pavement surfaces resulting from use of vibratory rollers at no cost to the Government. Rollers shall be self-propelled, single or dual vibrating drums, and steel drive wheels, as applicable;
equipped with variable amplitude and separate controls for energy and propulsion.
3. Hand Tampers: Shall have a minimum weight of 25 pounds with a tamping face of not more than 200 square inches.
MT-02743-4
2.03 MIXES:
A. Gradation of Aggregates: Shall meet the requirements of the Montana
Department of Transportation Standard Specifications for Road and Bridge
Construction 2006 Edition 701.03.2 Aggregate for Plant Mix Surfacing, Grade A.
GRADATION OF AGGREGATES
TOTAL PERCENT PASSING (BY WEIGHT)
Sieve Size Mix-Grade A. Tolerance
3/4 inch 100
1/2 inch 87-93 +/- 8
3/8 inch 77-83 +/- 8
No. 4 52-58 +/- 7
No. 10 36-41 +/- 6
No. 40 19-21 +/- 5
No. 200 6-8 +/- 2
B. Quantity of Bituminous Material: Mix asphalt cement with aggregates of corresponding mixes in the following proportions: 5% + 1/2%-0%, asphalt cement content by weight of total mix.
2.04 SOURCE QUALITY CONTROL:
A. Testing: Contractor shall make arrangements for a certified independent testing laboratory to perform the required testing, recording, and distributing of the results for the following items. Contractor shall furnish necessary equipment, labor, and materials to conduct the testing.
1. Aggregate gradation shall be determined according to ASTM C 136.
2. Mineral filler gradation shall be determined according to ASTM D 546.
3. Resistance to abrasion shall be determined according to ASTM C 131
(Los Angeles Test). Perform one test initially prior to incorporation into the work and whenever the source is changed.
4. Bituminous mix shall meet the requirements of ASTM D 2172. Test one sample for each 4000 square yards, or fraction thereof, of the uncompacted mix for each extraction. Sieve analysis shall meet the requirements of ASTM C 136 and C 117. Test one sample for each 4000 square yards or fraction thereof for stability and flow according to
ASTM D 1559. Test one sample for each material blend for index of retained strength according to AASHTO T 165.
MT-02743-5
A. Approval of Base Course: Before constructing the asphaltic concrete pavement the Contractor shall obtain written approval from the Government that the crushed aggregate base course has been tested and meets the requirements of the specifications.
B. Surface Preparation of Underlying Course: Prior to the laying of the asphalt concrete, clean underlying course of all foreign or objectionable matter.
C. Preparation of Aggregate Surfaces: Immediately before priming an aggregate surface with bitumen, apply a light application of water to lay dust and improve the absorbency of the surface.
D. Prime Coat: Shall be applied over the base course at a coverage of 0.1 gallons per square yard. Bituminous material shall be applied by a self-powered pressure distributor when the road surface is 50 degrees F or more and when the weather is not foggy or rainy. Allow prime coat on base courses to dry for 24 hours and maintain free from traffic. Absorb any excess material with sand.
3.02 APPLICATION:
A. Placing of Bituminous Material: The pavement shall consist of hot mineral aggregate uniformly mixed with hot bituminous material. Place the pavement in one or more layers, as indicated. Except as otherwise permitted by the Government, provide lines and grade stakes as necessary for control. Place grade stakes in lanes parallel to the center line of the areas to be paved and suitably spaced for string lining.
B. Bituminous Mixing Plant: Plants used for the preparation of bituminous mixtures shall conform to AASHTO M 156 and to local or state highway department requirements. The bituminous mixture when required shall be weighed on approved scales or on public scales at the Contractor's expense.
C. Transportation of Bituminous Mixtures: Transport bituminous material from the mixing plant to the paving site in trucks having tight, clean, smooth beds that have been coated with a minimum amount of concentrated solution of hydrated lime and water or other approved coating to prevent adhesion of the mixture to the truck bodies. Petroleum products will not be permitted for coating truck bodies. If air temperature is less than 60 degrees F or if haul time is greater than 30 minutes, cover each load with canvas or other approved material of ample size to protect the mixture from the loss of heat. Make deliveries so that the spreading and rolling of all the mixture prepared for one day's run can be completed during daylight, unless adequate approved artificial lighting is provided.
Deliver mixture to the area to be paved in such a manner that the
MT-02743-6
temperature at the time of dumping into the spreader will be higher than that specified herein. Rejection will occur any loads that are below minimum temperature, that have crusts of cold unworkable material, or that have been wet excessively by rain. Hauling over freshly laid material is not permitted.
D. General Requirements for Use of Bituminous Spreaders: The range of temperatures of the mixtures at the time of spreading shall be between 275 and 350 degrees F.