Attachment_1_Assabet_Trail_Gravel_SOW.pdf
PDF 796 KB Posted
- Attached to
- TRAIL GRAVEL AT ASSABET NWR MA
- Solicitation number
- 140FS325Q0087
About this file
This Statement of Work (SOW) details gravel material delivery for the Assabet National Wildlife Refuge in Sudbury, MA for trail/road construction materials. The project requires delivering two specific aggregate materials: 500 tons of PERK-PAK (recycled aggregate mixture) and 200 tons of 2-3" minus angular crushed clean stone aggregate, to be delivered during a limited 2-week period in July and August 2025. Delivery will occur at 680 Hudson Rd, Sudbury, MA, with a maximum of 10 truck loads per day during refuge staff hours of 6AM-6PM Monday through Friday. Material will be stock piled/spot dumped, and state-certified scales will be used for weight verification, with daily written tickets provided to refuge staff to ensure accurate load counts and volumes. The contract is a "Not to Exceed" arrangement with material provided on an as-needed basis within a 2-mile radius of the specified site.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_2_Past_Performance_Survey.doc | DOC document | |
| Sol_140FS325Q0087.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Station: Date:
Contact: Phone No:
2.
3.
4. X Tail Gate Spread Thickness:
5. MaxLoads: 10 MinLoads: 0
6.
7. X NO
NOTE:
8.
M-F 6A 6P
9.
M-F 6A 6P
10.
ROADWAY SURFACING MATERIAL
NOT TO EXCEED
Assabet NWR 4/28/2025 Darren Stover 302-222-7598
Material Description (i.e., gravel, aggregate, etc.): PERK-PAK and 2-3" clean stone
Total Tons/Yards Required: PERK-PAC: 500ton, 2-3" clean stone 200 tons
Check one or more: Stock Piled (Spot Dumped)
Maximum/Minimum Amount to be delivered daily:
Attach a delivery and/or local site map.
(Insert number of truck loads per day)
Are there State certified scales in the area? YES
If yes, weight tickets are required for each delivery.
If no, delivery must be by cubic yards.
Required commencement date for delivery:
Last date for delivery:
Local conditions (bridge restrictions, weather conditions, water levels, road flooding, etc.)
that may affect delivery: Operational needs and weather may impact delivery
Summer 2025
Summer 2025
Delivery Days/Hours (Closed Federal Holidays)
Delivery Days/Hours (Closed Federal Holidays) schedule.
File details come from the government source that posted it. Updated .