Appendix C Lewis and Clark Interpretive Center Parking Areas

Maintenance Services Solicitation no.

Lewis and Clark National Forest

01010 - 1

SUMMARY OF WORK

SECTION 01010

SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. Work for this project consists of: Cleaning, patching minor holes, filling cracks, 1.2 applying two coats of emulsified asphalt seal coat, and marking paint of all paved areas at the Lewis and Clark Interpretive Center, Great Falls, MT

LOCATION

A. This project is located at 4201 Giant Springs Rd, Great Falls, MT 59405

1.3 GENERAL SITE CONDITIONS AND WEATHER

A. The elevation of the site is approximately 3,000 feet above mean sea level. The construction site is can experience snowfall and cold temperatures into June, with snow on the ground typically until mid-April.

1.4 USE OF PREMISES

A. General: Contractor shall have full use of premises for contract operations, including use of Project site during construction period. Contractor's use of premises is limited only by the Government's right to perform work, retain provisional use, or to retain other contractors on portions of the project. Foot traffic visitation of the Information Center Kiosks, Restroom and Trail head shall continue; public will use parking areas not under construction by the contractor. The Contractor shall schedule operations so that half the parking area is available for public use. The contractor will facilitate this access through signage and barriers.

B. Closures of all paved areas will be permitted, when required, upon written approval of the Contracting Officer (CO).

C. Confine storage of materials to areas as approved by the CO.

D. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations, and coordinate all traffic control work with the Montana Transportation Department. Contractor shall minimize disturbance of all native areas.

E. Preservation of Natural Features: Confines all operations to work limits of the project.

Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

cgondeiro Cross-Out

Solicitation no.

Lewis and Clark National Forest

01010 - 2

SUMMARY OF WORK

1. Provide temporary barriers to protect existing trees and plants and root zones.

2. Do not remove, injure, or destroy trees or other plants without prior approval.

Consult with CO and remove agreed-on roots and branches that interfere with construction.

3. Do not fasten ropes, cables, or guys to existing trees.

4. Carefully supervise repair work near trees to prevent damage.

F. Existing Utilities: Notify CO and utility companies of proposed locations and times for any excavation.

1. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.

2. Interruption of Existing Utility Service: Notify CO, 48 hours in advance of any interruption of existing utilities.

1.5 MEALS AND LODGING

A. Meals and lodging are commercially available in the city of Great Falls

1.6

Meals or lodging will not be available at Forest Service facilities.

CAMPING

A. With written approval by the District Ranger, National Forest Service lands may be used by the Contractor to have one fully contained recreation vehicle (RV) which may remain at this site for lodging and security. An RV pad onsite contains power, water and septic connections.

1.7 CONSTRUCTION SEQUENCE/OPERATIONS

A. Work will be performed between July 15th and August 31st, 2021. The Contractor Shall schedule one continuous 14 day work period between July 15 and August 31.

B. The contractor will submit a schedule showing all work required by the contract within 14 days of award.

C. Apply emulsified asphalt seal coat only when temperatures are at least 50 degrees F and rising, when no surface moisture is present, and when rain is not expected throughout the duration of the curing periods.

D. Except for material indicated to be recycled, remove excavated materials from Project site and legally dispose of them in an EPA-approved landfill.

E. Proceed with pavement marking only on clean, dry surfaces and at a minimum ambient or surface temperature of 40 deg F for oil-based materials, 50 deg F for water-

Solicitation no.

Lewis and Clark National Forest

01010 - 3

SUMMARY OF WORK

based materials, and not exceeding 95 deg F. Apply paint with mechanical equipment to produce pavement markings, of dimensions indicated, with uniform, straight edges.

Apply at manufacturer's recommended rates.

1.8 FIELD VERIFICATION

A. Field verify all new and existing dimensions affecting the work of this contract before ordering products.

1.9 PERMITS

A. Special permits for this work or any other permits required by County, State, or Federal laws or regulations shall be obtained by the Contractor.

PART 2 - PRODUCTS (NOT USED)

2.1

PART 3 - EXECUTION (NOT USED)

END OF SECTION 01100

1.
1.1 summary
A. Work for this project consists of: Cleaning, patching minor holes, filling cracks, applying two coats of emulsified asphalt seal coat, and marking of all paved areas at the Priest Lake Information Center, Priest Lake Idaho.
1.2 location
A. This project is located 22 miles north of Priest River on Hwy 57.
1.3 GENERAL SITE CONDITIONS AND WEATHER
A. The elevation of the site is approximately 2,500 feet above mean sea level. The construction site is can experience snowfall and cold temperatures into June, with snow on the ground typically until mid-April.
1.4 USE OF PREMISES
A. General: Contractor shall have full use of premises for contract operations, including use of Project site during construction period. Contractor's use of premises is limited only by the Government's right to perform work, retain provisional use,...
B. Closures of all paved areas will be permitted, when required, upon written approval of the Contracting Officer (CO).
C. Confine storage of materials to areas as approved by the CO.
D. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations, and coordinate all traffic control work with the Idaho Transportation Department. Contractor shal...
E. Preservation of Natural Features: Confines all operations to work limits of the project. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
1. Provide temporary barriers to protect existing trees and plants and root zones.
2. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with CO and remove agreed-on roots and branches that interfere with construction.
3. Do not fasten ropes, cables, or guys to existing trees.
4. Carefully supervise repair work near trees to prevent damage.
F. Existing Utilities: Notify CO and utility companies of proposed locations and times for any excavation.
1. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.
2. Interruption of Existing Utility Service: Notify CO, 48 hours in advance of any interruption of existing utilities.
1.5 MEALS AND LODGING
A. Meals and lodging are commercially available in the cities of Priest River, Coolin and Nordman Idaho within 12 miles of the construction site. Meals or lodging will not be available at Forest Service facilities.
1.6 camping
A. With written approval by the District Ranger of the Priest Lake Ranger District, National Forest Service lands may be used by the Contractor to have one fully contained recreation vehicle (RV) which may remain at this site for lodging and security....
1.7 construction sequence/OPERATIONS
A. There is no specified construction sequence for this project.
B. Depending on conditions, normal fire restrictions may apply to activities associated with this project.
C. Apply emulsified asphalt seal coat only when temperatures are at least 50 degrees F and rising, when no surface moisture is present, and when rain is not expected throughout the duration of the curing periods.
D. Except for material indicated to be recycled, remove excavated materials from Project site and legally dispose of them in an EPA-approved landfill.
E. Proceed with pavement marking only on clean, dry surfaces and at a minimum ambient or surface temperature of 40 deg F for oil-based materials, 50 deg F for water-based materials, and not exceeding 95 deg F. Apply paint with mechanical equipment to...
1.8 Field verification
A. Field verify all new and existing dimensions affecting the work of this contract before ordering products.
1.9 permits
A. Special permits for this work or any other permits required by County, State, or Federal laws or regulations shall be obtained by the Contractor.

2.1

2.
3.