Attachment 1 87 Shafts SCHEDULE OF SUPPLIES SERVICES Template.xls

XLS spreadsheet 70 KB Posted

Attached to
Propulsion Shafts for U. S. Coast Guard’s 87’ WPB Coastal Patrol Boats
Solicitation number
70Z08022Q15005B00
Issued by

View the file

Other files

File Type Posted
RFQ 70Z08022Q15005B00.pdf PDF
Work Item1 2010014589175 ShftPrplsn R Update 2-22.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ORDERING PD 1

SUPPLIES/SERVICES AND PRICES/COSTS FOR:
ORDERING PERIOD 1
Contractor Name:
*Note, unless otherwise stated. All prices on below CLINs shall be a firm fixed price for one year and applicable Ordering Period years.
ITEMDESCRIPTIONHOURLY LABOR RATEUNIT PRICEEST QTYORDERING PERIOD 1 EXTENDED PRICE
(multiply estimated labor hours x hourly rate) = Unit Price
1001Manufacture new propulsion shafts which include material certifications, keys, new shipping container, QA inspection, PP&M and shipping to Baltimore, MD in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.2.Job14$ - 0
1002For Approval, Certifications of material conformance in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair paragraph 3.2.2.Job$ NSP14$ NSP
1003For Approval, Condition Found Report, Inspection, and Cost Estimate for shaft and shipping crate repair in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.3.Job26$ - 0
1004Cost to package, pack, mark and deliver to Baltimore, MD any shaft not being repaired in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 6.1.Job1$ - 0
1005(Optional) Cost - Weld Repairs: General (non-bearing areas) - 3 cubic inch increment (based on 1/8" deep areas to repair, 1" length, 360° undercut as required by MILSPEC) in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 6.1.Job1$ - 0
1006(Optional) Cost - Weld Repairs: Aft bearing repair (entire area) - 18 cubic inch increment (based on 1/16" deep area to repair, full bearing length, 360° around) in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 6.1.Job1$ - 0
1007(Optional) Cost - Weld Repairs: Intermediate bearing repair (entire area) - 12 cubic inch increment (based on 1/16" deep area to repair, full bearing length, 360° around) in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 6.1.Job1$ - 0
1008(Optional) Cold Straightening: Cost estimate (CFR) to cold straighten shafts as necessary in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.4.1.Job1$ - 0
1009Cost to preserve, package, pack, mark, bar-code and ship to Baltimore, MD propulsion shafts in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 5.0Job26$ - 0
1010(Optional) Cost to manufacture (1) propeller end and (1) coupling end key in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.3.6.Job26$ - 0
1011For Approval, Final inspection and test report for each manufactured or repaired propulsion shaft in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.7.Job$ NSP40$ NSP
$ NSP
1012(Optional) Cost to manufacture a new shipping crate as required in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair paragraph 5.4.Job1$ - 0
Total Estimated Amount$ - 0

ORDERING PD 2

SUPPLIES/SERVICES AND PRICES/COSTS FOR:
ORDERING PERIOD 2
ITEMDESCRIPTIONHOURLY LABOR RATEUNIT PRICEEST QTYORDERING PERIOD 2 EXTENDED PRICE
(multiply estimated labor hours x hourly rate) = Unit Price
2001Manufacture new propulsion shafts which include material certifications, keys, new shipping container, QA inspection, PP&M and shipping to Baltimore, MD in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.2.Job14$ - 0
2002For Approval, Certifications of material conformance in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair paragraph 3.2.2.Job$ NSP14$ NSP
2003For Approval, Condition Found Report, Inspection, and Cost Estimate for shaft and shipping crate repair in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.3.Job26$ - 0
2004Cost to package, pack, mark and deliver to Baltimore, MD any shaft not being repaired in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 6.1.Job1$ - 0
2005(Optional) Cost - Weld Repairs: General (non-bearing areas) - 3 cubic inch increment (based on 1/8" deep areas to repair, 1" length, 360° undercut as required by MILSPEC) in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 6.1.Job1$ - 0
2006(Optional) Cost - Weld Repairs: Aft bearing repair (entire area) - 18 cubic inch increment (based on 1/16" deep area to repair, full bearing length, 360° around) in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 6.1.Job1$ - 0
2007(Optional) Cost - Weld Repairs: Intermediate bearing repair (entire area) - 12 cubic inch increment (based on 1/16" deep area to repair, full bearing length, 360° around) in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 6.1.Job1$ - 0
2008(Optional) Cold Straightening: Cost estimate (CFR) to cold straighten shafts as necessary in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.4.1.Job1$ - 0
2009Cost to preserve, package, pack, mark, bar-code and ship to Baltimore, MD propulsion shafts in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 5.0Job26$ - 0
2010(Optional) Cost to manufacture (1) propeller end and (1) coupling end key in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.3.6.Job26$ - 0
2011For Approval, Final inspection and test report for each manufactured or repaired propulsion shaft in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.7.Job$ NSP40$ NSP
$ NSP
2012(Optional) Cost to manufacture a new shipping crate as required in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair paragraph 5.4.Job1$ - 0
Total Estimated Amount$ - 0

ORDERING PD 3

SUPPLIES/SERVICES AND PRICES/COSTS FOR:
ORDERING PERIOD 3
ITEMDESCRIPTIONHOURLY LABOR RATEUNIT PRICEEST QTYORDERING PERIOD 3 EXTENDED PRICE
(multiply estimated labor hours x hourly rate) = Unit Price
3001Manufacture new propulsion shafts which include material certifications, keys, new shipping container, QA inspection, PP&M and shipping to Baltimore, MD in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.2.Job14$ - 0
3002For Approval, Certifications of material conformance in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair paragraph 3.2.2.Job$ NSP14$ NSP
3003For Approval, Condition Found Report, Inspection, and Cost Estimate for shaft and shipping crate repair in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.3.Job26$ - 0
3004Cost to package, pack, mark and deliver to Baltimore, MD any shaft not being repaired in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 6.1.Job1$ - 0
3005(Optional) Cost - Weld Repairs: General (non-bearing areas) - 3 cubic inch increment (based on 1/8" deep areas to repair, 1" length, 360° undercut as required by MILSPEC) in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 6.1.Job1$ - 0
3006(Optional) Cost - Weld Repairs: Aft bearing repair (entire area) - 18 cubic inch increment (based on 1/16" deep area to repair, full bearing length, 360° around) in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 6.1.Job1$ - 0
3007(Optional) Cost - Weld Repairs: Intermediate bearing repair (entire area) - 12 cubic inch increment (based on 1/16" deep area to repair, full bearing length, 360° around) in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 6.1.Job1$ - 0
3008(Optional) Cold Straightening: Cost estimate (CFR) to cold straighten shafts as necessary in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.4.1.Job1$ - 0
3009Cost to preserve, package, pack, mark, bar-code and ship to Baltimore, MD propulsion shafts in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 5.0Job26$ - 0
3010(Optional) Cost to manufacture (1) propeller end and (1) coupling end key in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.3.6.Job26$ - 0
2011For Approval, Final inspection and test report for each manufactured or repaired propulsion shaft in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.7.Job$ NSP40$ NSP
$ NSP
3012(Optional) Cost to manufacture a new shipping crate as required in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair paragraph 5.4.Job1$ - 0
Total Estimated Amount$ - 0

ORDERING PD 4

SUPPLIES/SERVICES AND PRICES/COSTS FOR:
ORDERING PERIOD 4
ITEMDESCRIPTIONHOURLY LABOR RATEUNIT PRICEEST QTYORDERING PERIOD 4 EXTENDED PRICE
(multiply estimated labor hours x hourly rate) = Unit Price
4001Manufacture new propulsion shafts which include material certifications, keys, new shipping container, QA inspection, PP&M and shipping to Baltimore, MD in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.2.Job14$ - 0
4002For Approval, Certifications of material conformance in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair paragraph 3.2.2.Job$ NSP14$ NSP
4003For Approval, Condition Found Report, Inspection, and Cost Estimate for shaft and shipping crate repair in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.3.Job26$ - 0
4004Cost to package, pack, mark and deliver to Baltimore, MD any shaft not being repaired in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 6.1.Job1$ - 0
4005(Optional) Cost - Weld Repairs: General (non-bearing areas) - 3 cubic inch increment (based on 1/8" deep areas to repair, 1" length, 360° undercut as required by MILSPEC) in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 6.1.Job1$ - 0
4006(Optional) Cost - Weld Repairs: Aft bearing repair (entire area) - 18 cubic inch increment (based on 1/16" deep area to repair, full bearing length, 360° around) in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 6.1.Job1$ - 0
4007(Optional) Cost - Weld Repairs: Intermediate bearing repair (entire area) - 12 cubic inch increment (based on 1/16" deep area to repair, full bearing length, 360° around) in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 6.1.Job1$ - 0
4008(Optional) Cold Straightening: Cost estimate (CFR) to cold straighten shafts as necessary in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.4.1.Job1$ - 0
4009Cost to preserve, package, pack, mark, bar-code and ship to Baltimore, MD propulsion shafts in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 5.0Job26$ - 0
4010(Optional) Cost to manufacture (1) propeller end and (1) coupling end key in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.3.6.Job26$ - 0
4011For Approval, Final inspection and test report for each manufactured or repaired propulsion shaft in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.7.Job$ NSP40$ NSP
$ NSP
4012(Optional) Cost to manufacture a new shipping crate as required in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair paragraph 5.4.Job1$ - 0
Total Estimated Amount$ - 0

ORDERING PD 5

SUPPLIES/SERVICES AND PRICES/COSTS FOR:
ORDERING PERIOD 5
ITEMDESCRIPTIONHOURLY LABOR RATEUNIT PRICEEST QTYORDERING PERIOD 5 EXTENDED PRICE
(multiply estimated labor hours x hourly rate) = Unit Price
5001Manufacture new propulsion shafts which include material certifications, keys, new shipping container, QA inspection, PP&M and shipping to Baltimore, MD in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.2.Job14$ - 0
5002For Approval, Certifications of material conformance in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair paragraph 3.2.2.Job$ NSP14$ NSP
5003For Approval, Condition Found Report, Inspection, and Cost Estimate for shaft and shipping crate repair in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.3.Job26$ - 0
5004Cost to package, pack, mark and deliver to Baltimore, MD any shaft not being repaired in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 6.1.Job1$ - 0
5005(Optional) Cost - Weld Repairs: General (non-bearing areas) - 3 cubic inch increment (based on 1/8" deep areas to repair, 1" length, 360° undercut as required by MILSPEC) in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 6.1.Job1$ - 0
5006(Optional) Cost - Weld Repairs: Aft bearing repair (entire area) - 18 cubic inch increment (based on 1/16" deep area to repair, full bearing length, 360° around) in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 6.1.Job1$ - 0
5007(Optional) Cost - Weld Repairs: Intermediate bearing repair (entire area) - 12 cubic inch increment (based on 1/16" deep area to repair, full bearing length, 360° around) in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 6.1.Job1$ - 0
5008(Optional) Cold Straightening: Cost estimate (CFR) to cold straighten shafts as necessary in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.4.1.Job1$ - 0
5009Cost to preserve, package, pack, mark, bar-code and ship to Baltimore, MD propulsion shafts in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 5.0Job26$ - 0
5010(Optional) Cost to manufacture (1) propeller end and (1) coupling end key in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.3.6.Job26$ - 0
5011For Approval, Final inspection and test report for each manufactured or repaired propulsion shaft in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair Section 3.7.Job$ NSP40$ NSP
$ NSP
5012(Optional) Cost to manufacture a new shipping crate as required in accordance with Work Item: 2010-01-458-9175 - Shaft, Propulsion, Manufacture/Repair paragraph 5.4.Job1$ - 0
Total Estimated Amount$ - 0

TOTAL ALL

Total Contract Value