This Statement of Work (SOW) details a topographic survey service for the VA at White City, Oregon, involving the demolition of Building 250 and addition of a new parking lot. The contractor is required to provide a comprehensive topographic map of a specified red-dotted area, including private utility locates, benchmark and control points, terrain details, underground utility locations, property features, point data, and 1-foot contours. Deliverables must include electronic files in AutoCAD and ASCII formats, along with two hard copies in ANSI D and reduced ANSI C sizes.

The project has a 60-calendar-day performance period, to be conducted between 8 a.m. and 4:30 p.m., Monday through Friday, excluding federal holidays. The Notice to Proceed will be issued within 90 calendar days from the date of award. The survey is part of a pre-solicitation for a small business set-aside contract under NAICS code 541370, with a small business size standard of $19 million, aimed at developing in-house designs for future construction projects at the VA facility.

View the file

Other files

File Type Posted
36C26025R0057_SF330.REQUEST.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Topography service for B250 and Parking Lot Q

1. BACKGROUND

The VA at White City, OR 97503 plans to demolish B250 and add a parking lot, Q.

2. SCOPE OF WORK

2.1. The Contactor will survey and generate a topographic map in red-dotted bound area below.

3. SCOPE OF WORK

3.1. Provide private utility locate.

3.2. Provide Topographic map that will benchmark and control points table, terrain, underground utility locations and property features as well as point data and 1-foot contours.

3.3 Provide electronic files in AutoCAD format and an ASCII file.

3.4 Provide 2 each hard copies in ANSI D and reduced ANSI C (17 X 22) by mail to facility at

FMS office.

4. SPECIFIC TASKS

4.1. The period of performance is 60 calendar days to complete tasks 3.1. thru 3.4. between 8 a.m. and 4:30 p.m. daily, Monday thru Friday except Federal holidays.

4.2. PoP will start on the effective date of the Notice to Proceed, which will be issued within 90 calendar days from date of award.