This Statement of Work (SOW) details a construction renovation project for the Mann-Grandstaff VA Medical Center in Spokane, Washington. The project involves renovating 1,200 square feet of the Sterile Processing Service (SPS) located in Building 1E, 2nd floor, with the goal of correcting deficiencies from a previous contractor's default. The scope includes addressing architectural, life safety, mechanical, electrical, plumbing, and data system issues to restore full functional capacity. The contractor will be responsible for providing labor, materials, equipment, supervision, installation, programming, startup, training, O&M documentation, and a one-year warranty. The project has a total duration of 180 calendar days, with an estimated budget between $1,500,000 and $2,000,000, targeting small businesses under NAICS code 236220 with a size standard of $45.0 million.

View the file

Other files

File Type Posted
Attachment 2 668-22-104 DRAFT Specifications.pdf PDF
Attachment 3 668-22-104_DRAFT Drawings.pdf PDF
36C26025R0067.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK FOR CONSTRUCTION SERVICES

Mann-Grandstaff VA Medical Center

Spokane, WA

1. Contract Title. 668-22-104 Renovate Building 1 SPS and Lab Space

2. General.

The Veterans Affairs (VA) Spokane Healthcare System, Spokane, WA requires labor, materials, and equipment for the renovation of the Sterile Processing Service located in Building 1 (Main Hospital). Scope of work is indicated below. Total project duration shall be 180 calendar days.

3. Scope.

In accordance with the Drawings and Specifications, this project will renovate 1,200 square feet and correct deficiencies and incomplete work resulting from a Minor project contractor default in the Sterile Processing Service located in Building 1E, 2nd floor (west wing of the main hospital). The corrections are required to address: architectural and life safety concerns, mechanical/HVAC, electrical power distribution, plumbing omissions and water distribution inefficiencies, data and other building system deficiencies which are preventing full functional capacity of the SPS. The contractor shall provide all supervision, labor, tools and materials, installation, programming, startup, training, O&M documentation and one-year warranty of materials and installation.

Contractor shall do a field verification to ensure all equipment, parts and materials are identified and verify all the existing conditions.

3.1. The contractor shall provide a qualified manufacturer’s representative to check complete installation for conformance to manufacturer’s recommendation, to place the system into service, to make all adjustments required for full conformance to design and specified requirements and to perform all demonstrations and testing.

3.2. An operating test shall be run in the presence of the Contracting Officer’s Representative (COR).

3.3. The contractor shall provide Commissioning documentation.

3.4. The contractor shall provide demonstration and training to VA personnel.

3.5. The contractor shall verify locations for space requirements.

4. Deliverables:

Inspection, testing documents, and manuals and warranty documents per section 4 above.

5. Performance Monitoring The COR will evaluate all work and testing performed. Items must be in a clean state and in a proper working condition and must be in an acceptable working condition.

6. Government-Furnished Equipment (GFE)/Government-Furnished Information

(GFI).

The Contractor will not have access to any Government-Furnished Equipment. All equipment and supplies used under the terms of this contract will be the responsibility of the Contractor.

7. Inspection and Acceptance Criteria.

As part of final system acceptance, a systems demonstration is required. Prior to start of this demonstration, the contractor is to perform a complete validation of all aspects of the Controls and Instrumentation System. System operation and calibration shall be demonstrated by the installer in the presence of the COR.

8. Place of Performance.

VA Medical Center Spokane Washington, located at 4815 North Assembly Street, Spokane Washington 99205.

9. Period of Performance.

The Contractor has 180 days to perform all described work.