This is a Performance Work Statement (PWS) issued by the Department of the Air Force at Hurlburt Field, Florida, dated August 24, 2026, for the repair, component overhaul, and safety/load testing of one Government-owned Grove Mobile Crane, Model RT530-E (Serial Number: 231891). The contractor must provide all personnel, equipment, tools, materials, supervision, and transportation necessary to complete the work in accordance with original equipment manufacturer (OEM) specifications, professional industry standards, and federal environmental/safety regulations.
The scope of work encompasses four primary tasks: (1) removal of the main boom lift cylinder from the crane, transport to a specialized hydraulic facility (Tampa Hydraulic Shop or equivalent), and reinstallation upon completion; (2) cylinder overhaul including rod resurfacing/re-chroming to OEM specifications, complete resealing with a primary lift cylinder seal kit, and replacement of the holding valve with a new OEM-equivalent component; (3) operator seat safety switch replacement with integration into the crane's safety interlock loop to ensure engine/hydraulic functions cut out when the operator leaves the seat; and (4) system testing including hydraulic system bleeding, leak checks, operational verification of the new holding valve and safety switch, and certified load testing in strict compliance with OSHA 29 CFR 1910.180 and ASME B30.5 standards. All primary disassembly, overhaul, and specialized component restoration work shall be performed off-site at the contractor's authorized facilities, with the Government providing on-site access during designated duty hours (0700–1600, Monday–Friday, excluding Federal Holidays) for removal, reinstallation, and final testing. The period of performance is thirty (30) calendar days from notice to proceed. Key deliverables include no hydraulic leaks, successful operator interlock switch function, and a certified load test certificate with zero structural/holding drift, with the contractor responsible for correcting any defects at no additional cost to the Government.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
DEPARTMENT OF THE AIR FORCE
Hurlburt Field, FL 32544
PROJECT TITLE: Grove Crane RT530-E Repair, Component Overhaul, and Safety/Load Testing DATE: August 24, 2026
1.0 DESCRIPTION OF SERVICES
1.1 Scope of Work
The Contractor shall provide all personnel, equipment, tools, materials, supervision, transport, and other items or services necessary to perform complete repair, component overhaul, safety, and operational load testing on one (1) Government-owned Grove Mobile Crane, Model RT530-E (Serial Number: 231891).
All work shall be performed in accordance with original equipment manufacturer (OEM) specifications, professional industry standards, and federal environmental/safety regulations.
1.2 Background
The Grove RT530-E crane is a critical mission-support asset located at Hurlburt Field AFB, FL. Due to wear and tear, the crane's main boom lift cylinder requires removal, specialized hydraulic shop re-chroming and resealing, safety component replacements, and subsequent certified load testing to return the asset to fully mission-capable (FMC) status.
1.3 Specific Tasks / Technical Requirements
Task 1: Boom Cylinder Removal, Logistics, and Reinstallation
• Removal: The Contractor shall safely disconnect, secure, and pull the main boom lift cylinder from the Grove RT530-E crane body at the vendor job site.
• Logistics & Transport: The Contractor shall transport the removed main boom lift cylinder to a specialized hydraulic facility (Tampa Hydraulic Shop or equivalent certified facility) for overhaul.
• Reinstallation: Upon completion of off-site overhauls, the Contractor shall transport the cylinder back to the Tallahassee/Hurlburt Field facility, safely align, and reinstall the overhauled cylinder into the crane chassis.
Task 2: Cylinder Overhaul, Rod Resurfacing, and Resealing
• Resurfacing/Re-chroming: The Contractor shall strip, inspect, and resurface/re-chrome the main cylinder rod to restore the surface finish to OEM specifications.
• Resealing: The Contractor shall perform a complete cylinder rebuild, replacing all internal seals and packing using a primary lift cylinder seal kit.
• Holding Valve Replacement: The Contractor shall replace the cylinder holding valve with a brand new OEM-equivalent valve component to ensure appropriate load-holding capability and safety margins.
Task 3: Operator Seat Safety Switch Replacement
• Removal & Disassembly: The Contractor shall remove the faulty operator seat safety switch.
• Installation: The Contractor shall install a new, fully compatible replacement seat safety switch.
• Integration: The Contractor shall wire and integrate the safety switch back into the crane’s safety interlock loop to ensure the engine/hydraulic functions cut out if the operator leaves the seat.
Task 4: System Testing, Calibration, and Certified Load Testing
• System Bleeding & Leak Checks: The Contractor shall fill the hydraulic systems with appropriate fluids, bleed any air from the lines, and conduct a thorough pressurized inspection to verify no leaks exist in any newly installed or repaired hydraulic connections.
• Operational Checks: The Contractor shall perform complete operational testing of the new lift cylinder holding valve and verify the proper functioning of the newly installed seat safety switch.
• Certified Load Test: The Contractor shall perform a full hoist holding-valve load test to verify structural and mechanical integrity. The load test must conform strictly to OSHA 29 CFR 1910.180 and ASME B30.5 standards. A certified load test certificate must be provided to the Contracting Officer Representative (COR) upon successful completion.
2.0 GOVERNMENT-FURNISHED PROPERTY (GFP) AND SERVICES
• Access: The Government will provide the Contractor with access to the crane on-site at Hurlburt Field AFB during designated duty hours for removal, reinstallation, and final testing.
• Escort: If required by base security protocols, the Government will provide a personnel escort for Contractor employees while performing work on-site at Hurlburt Field AFB.
3.0 GENERAL INFORMATION
3.1 Place of Performance
All scope of work including primary disassembly, overhaul, specialized component restoration (e.g., honing and re-chroming), reassembly, and operational load-testing—shall be performed off-site at the Contractor's authorized facilities.
No primary servicing, disassembly, or overhaul work shall take place on-site at Hurlburt Field. Transport, pickup, and return delivery of all assemblies and associated hardware between Hurlburt Field and the Contractor's facilities.
3.2 Hours of Operation
On-site work at Hurlburt Field AFB shall be performed during normal base operational hours, typically 0700 to 1600 hours, Monday through Friday, excluding Federal Holidays, unless coordinated in advance and approved by the Contracting Officer (CO) or COR.
3.3 Period of Performance
All services, including off-site overhaul, re-installation, and certified load testing, shall be completed within thirty (30) calendar days after notice to proceed (NTP) or contract award.
3.4 Environmental, Safety, and Hazardous Materials
• The Contractor shall comply with all federal, state, local, and Air Force environmental laws, regulations, and instructions regarding the handling, containment, and disposal of hazardous materials (such as hydraulic oils, greases, solvents, and chrome residues).
• Any spills of hazardous materials on-site at Hurlburt Field AFB must be immediately contained, cleaned up, and reported to the COR and the Base Environmental Office.
4.0 KEY DELIVERABLES / PERFORMANCE REQUIREMENTS SUMMARY (PRS)
Performance Objective
Performance Standard Method of Surveillance
Remonstrance / Remedy
Complete Cylinder Repair & Assembly
No hydraulic leaks.
Cylinder rod resurfaced, re-chromed, and resealed to OEM specs.
Direct COR inspection & operational test.
Contractor shall correct any defects at no additional cost to the Government.
Seat Safety Switch Function
Operator interlock switch successfully cuts out systems when seat is unoccupied.
Operational verification of safety system.
Immediate repair or replacement of faulty parts/wiring.
Certified Load Testing & Documentation
Load test performed per ASME B30.5 with zero structural/holding drift.
Load test certificate provided.
Review of certified load test documentation and observation of test by COR.
Re-testing required if failure occurs.