Attachment_1_12639524Q0076.pdf
PDF 230 KB Posted
- Attached to
- Food Grade Methylparaben Powder
- Solicitation number
- 12639524Q0076
About this file
This document is a request for quotation for food grade methylparaben powder. The U.S. Department of Agriculture, Plant Protection and Quarantine is seeking pricing for 40 drums containing either 1,000kg or 2,204.48lbs of methylparaben powder that meets the required specifications. Pricing must be submitted by March 15, 2024 and include all costs such as overhead, profit, insurance, and transportation. The product must be manufactured in the U.S. and the vendor must provide their SAM registration and sample product literature. If selected, the vendor must be able to deliver the order within 30 calendar days of receipt and include transportation costs in the quote. The opportunity is set aside for small businesses with less than 1,250 employees in NAICS code 325199 for all other basic organic chemical manufacturing.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Interested Vendors Please email (only) this Attachment 1 by 4pm (MT) 03/15/2024 to: Email: Carol.Dingess@usda.gov Please include RFQ# 12639524Q0076 on subject line
The U.S. Department of Agriculture, Plant Protection and Quarantine in Edinburg, TX is in immediate need of purchasing the following items(s) for a firm fixed price.
• All cost to include but not limit to: overhead, general and administrative, profit, insurance, and transportation.
• The U.S. Department of Agriculture is a tax exempt agency. (Exempt from state and Federal tax) Tax
ID Number : 41-0696271.
PLEASE COMPLETE AND RETURN ITEMS 1 -4 AND RETURN BY NOTICE DUE DATE
Quotes submitted without completion of items listed here shall be considered nonresponsive and ineligible for award.
1. Pricing:
Description Quantity Price/ Drum Total $
40 drums of 25KG or 55.112LB each.
(40DR x 25KG = 1,000KG) OR (40DR x 55.112LB = 2,204.48LB) in Food Grade Methylparaben powder In accordance with specifications.
All cost to include but not limit to: overhead, general and administrative, profit, insurance, and transportation.
Delivery Location Edinburg, TX 40
2. Name of company:__
_ SAM ID :______________________________________________________________
Phone#:_____________________________
Point of contact Name:______________________________________________________________
Email Address:
3. Product offered is in accordance with specifications listed in items# (v) and (vi) of the solicitation ?
[ ] Yes [ ] No
Per 52.225-2 Buy American Certificate. (OCT 2022) Product Manufactured in the USA [ ] Yes [ ] No if no, what country: _ mailto:Carol.Dingess@usda.gov
• Please include product literature sufficient enough for USDA Program to make a determination of suitability of product in accordance with specifications.
4. How soon could you deliver after receipt of order? __________________________
Transportation cost included with quote [ ] YES [ ] NO
5. Product Sample Instructions in accordance with FAR 52.209-4 -- First Article Approval -- Government Testing. (Sep 1989)
(a) USDA-APHIS may need a 1000 gram sample of the product for testing. If requested; submission of First Article Test sample will be at no additional cost to the Government.
All samples for testing shall be delivered to the address below when requested:
USDA-APHIS-PPQ Mexfly Rearing Facility Ref#12639524Q0047 Mexfly Rearing Facility Attn: Elias Gonzalez 22675 North Moorefield Road, Bldg. 6418 Edinburg, Texas 78541
***Be sure to label your sample with your company name and contact info.
(b) Within 30 calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) of this clause. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, the Contractor --
(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and
(2) Shall remove and dispose of any first article from the Government test facility at the Contractor’s expense.
(f) If the Government does not act within the time specified in paragraph (b) or (c) of this clause, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.
(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for
(1) progress payments, or
(2) termination settlements if the contract is terminated for the convenience of the Government.
(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.
(End of Clause)
File details come from the government source that posted it. Updated .