Attachment 1 1240BF22Q0023 PWS POW Road Brushing.pdf

PDF 164 KB Posted

Attached to
Road Brushing - Prince of Wales Island, Alaska
Solicitation number
1240BF22Q0023
Issued by

About this file

This performance work statement outlines roadside brushing services required by the US Forest Service on Prince of Wales Island in Alaska. The contractor will provide labor, equipment, and supervision to remove vegetation from over 60 miles of roads from May 2022 through April 2023, with two one-year options to extend. Daily activity reports are due with invoices. The contractor must submit a work schedule five days prior to starting and a list of equipment ten days prior. Performance will be inspected by the Contracting Officer's Representative for compliance with specifications for soil and water conservation, traffic control, and other federal requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prince of Wales Island (POW) – Road Brushing

Performance Work Statement (PWS)

General Information

1.0 Purpose and Location

Purpose:

The US Forest Service, POW Ranger District, requires road maintenance services consisting of roadside brushing on the POW Island Road system.

The road segments listed for maintenance are shown in Appendix 3 - POW Brushing 2022 North Map, listing road numbers as well as beginning mileposts and ending mileposts, including total length of each road.

Background:

The POW Ranger District is a part of the Tongass National Forest located in Southeast Alaska. This forest encompasses approximately 17 million acres spread out over the vast archipelago islands of Alaska’s panhandle. Tongass National Forest Engineering Roads Program which manages over 4,000 miles of logging access roads, many of which are located on remote islands. This program of work is tasked with developing and maintaining a network of low volume roads in support of commercial timber harvest and mining activities, along with providing access and safe use for the general public.

1.1 Outline of Services: The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, and other items necessary to provide the ser-vices outlined below and described in this Performance Work Statement (PWS).

1.2 Project Location: The project area location is on the POW Island Road system within the

Tongass National Forest. See Appendix 3 - POW Brushing 2022 North Map for service loca-tions.

1.3 Period of Performance:

a. Base Items shall be: 01 May 2022 through 30 April 2023.

b. Option item 1 may be: 01 May 2023 through 30 April 2024.

c. Option Item 2 may be: 01 May 2024 through 30 April 2025.

1.4 Government Regular Working Hours: The Government's regular working hours are from 0700 to 1700, five days per week, Monday through Friday, except observed Federal holi-days. Exceptions to the regular hours of operation are detailed in subsequent sections of this

PWS.

1.5 Federal Observed Holidays: The government observes the following holidays:

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day Juneteenth

1.6 Service Interruptions: If any services must be interrupted (even temporarily) due to maintenance of contract work, the Contractor shall notify the CO, and COR at least three working days in advance. If the service is due to an emergency breakdown the Contractor shall notify the CO and COR as soon as practicable.

1.7 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administra-tion office in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5. The CO and/or COR shall meet periodically with the contractor to review the contractor's performance.

At these meetings the CO will apprise the Contractor of how the Government views the con-tractor's performance and the contractor will apprise the Government of problems, if any, be-ing experienced. Appropriate action shall be taken to resolve outstanding issues.

1.8 Project Manager (PM): The Contractor shall provide a PM and designated alternate, as applicable, who has full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be on-site during the Government's regular working hours and shall be available on-site within one hour after the Government's regular working hours.

1.9 Quality Assurance: The contractor shall comply with the quality assurance program as defined in the Quality Assurance Surveillance Plan. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable quality level(s) (AQL). Government surveillance of contractor performance is not limited to the Per-formance Objectives as outlined in this PWS. The Government reserves the right to con-duct compliance surveillance of any contractual requirement of this acquisition.

1.10 Contracting Officer’s Representative (COR): A COR may be assigned to this contract to monitor all technical aspects and assist in contract administration. The COR may be authorized to perform the following functions: Assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communication with the Contractor concern-ing technical aspects of the contract; issue written interpretations of technical requirements (without increasing or decreasing contract scope), including Government drawings designs, and specifications; monitor Contractor's performance and notify both the CO and Contractor of deficiencies; and provide site entry of Contractor personnel. The COR is not authorized to change any of the terms and conditions of the contract or any task order.

Contractor Requirements

2.0 Technical Requirements / Tasks

Brush roads: remove vegetation, including trees, on roadway surfaces and roadsides. All below listed tasks shall be applicable to the base and option years. The COR will contact the contractor to identify the priority for road services. See attached maps for roads that shall be serviced.

2.1 Contractor shall provide a work schedule to the CO and COR two (2) working days prior to commencement of work. The contractor shall notify the CO and COR as soon as possible about any work schedule deviations

2.2 Contractor Furnished Equipment: All contractor furnished equipment and vehicles to be used at the job site shall be cleaned and free of invasive species (noxious weeds), seeds, external grease and oil and shall be inspected prior to entrance onto Federal lands. The restriction shall include equipment and vehicles intended for off-road use, whether they are owned, leased, or borrowed by the Contractor or Subcontractor.

• Provide a list of all equipment to be used ten (10) days prior to the start of performance of work under this contract.

• All protective plating and armoring shall be intact and properly functioning on the equip-ment to reduce the potential for damaging hydraulic hoses or the undercarriage.

• Spill kit approved by OSHA for petroleum product leaks shall be on site at all times.

2.3 Daily Activity Report: Contractor shall log road services performed during day-to-day perfor-mance on the attached Daily Activity Report. This report shall be submitted with invoice for pay-ment.

2.4 Mobilization (151): Contractor shall move personnel, equipment, material, and incidentals to and from the project and performing work necessary before beginning work at the project site.

This work also includes obtaining permits, insurance, and bonds. Any remobilization required to meet the contract performance requirements as a result of Contractor demobilizing prior to in-spection by the Government will be done at the Contractor's expense.

2.5 Roadside Brushing Method A (842): Base item shall be 61.2 miles of roads, remove vegeta-tion, including trees on roadway surfaces and roadsides.

2.5.1 Option Item 1002, if exercised, may be 60.41 miles.

2.5.2 Option Item 2002, if exercised, may be 61.38 miles.

Contractor Requirements

3.0 Applicable Laws, Regulations, Specifications and Guidance

1) Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14) which can be downloaded here: https://highways.dot.gov/federal-lands/specs

2) Attached are Special Project Specifications and Forest Service Supplemental Specifications (FSSS) to the FP-14 that shall be followed for performance of this

3) BEST MANAGEMENT PRACTICES BMP’S Soil and Water Conservation Handbook FSH 2509.22

The BMP Soil and Water Conservation Handbook, FSH 2509.22 can be found at:

http://www.fs.fed.us/biology/resources/pubs/watershed/FS_National_Core_BMPs_April2012.pdf

4) Manual on Uniform Traffic Control Devices (MUTCD): https://mutcd.fhwa.dot.gov/

5) The above is a list of major specifications applicable to this requirement. Other specifications referred to within these specifications (even though not specifically listed here) are also fully applicable.

4.0 Deliverable/Schedule

The Contractor shall submit all deliverables for this PWS IAW within listed timelines outlined above.

Below is a list of all deliverables outlining each objective and due date.

Key Deliverables

Item No.

Deliverable Objective Due

2.1 Work Schedule To notify the government of when

the contractor shall be on site per-forming work.

5 working days prior to com-mencement of work

2.2 Equipment List For government situational aware-

ness and to ensure all equipment is inspected.

10 working days prior to start of performance.

https://highways.dot.gov/federal-lands/specs http://www.fs.fed.us/biology/resources/pubs/watershed/FS_National_Core_BMPs_April2012.pdf https://mutcd.fhwa.dot.gov/

2.3 Daily Activity Re-

port

To notify the government of when work was completed

Submitted with invoices

2.4 Covid-19 Re-

sponse Plan

To ensure the contractor is abiding by current Covid-19 policy.

Due with solicitation

5.0 Performance Requirement Measures

5.1 The Government will visually inspect the services for compliance prior to ac-ceptance and issuing any payments. Inspections will consist of direct observations and measured in place quantities.

Performance Objective

PWS

Paragraph

Measurement of Surveillance

Allowable Perfor-mance Deviation

Remedy

Roadside brush-ing Method A (842)

2.5 Task Periodic surveillance by the

COR - Visual Inspection – Measured by the mile

0% Contrac-tor shall rework prior to payment for perfor-mance.

5.2 Any Government personnel or visiting public may observe unacceptable services, incom-plete work, or required services not performed and they may contact the COR to communicate a complaint.

6.0 Definitions, Acronyms, and Applicable Publications

6.1. Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

6.2. Contracting Officer (CO): a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes cer-tain authorized representatives of the contracting officer acting within the limits of their au-thority as delegated by the contracting officer. "Administrative contracting officer (ACO)" refers to a contracting officer who is administering contracts. "Termination contracting of-ficer (TCO)" refers to a contracting officer who is settling terminated contracts. A single contracting officer may be responsible for duties in any or all of these areas. Reference in this regulation (48 CFR chapter 1) to administrative contracting officer or termination con-tracting officer does not-

6.2.1. Require that a duty be performed at a particular office or activity; or

6.2.2. Restrict in any way a contracting officer in the performance of any duty properly as-signed.

6.3. Contracting Officer’s Representative (COR): means an individual, including a contracting officer’s technical representative (COTR), designated and authorized in writing by the contracting officer to perform specific technical or administrative functions.

6.4. Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement.

6.5. Deliverable: Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

6.6. Equipment: A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale and does not ordinarily lose its identity or become a component part of another article when put into use. Equipment does not include material, real property, spe-cial test equipment or special tooling.

6.7. Government Furnished Property: Property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a con-tract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished prop-erty also includes contractor-acquired property if the contractor-acquired property is a de-liverable under a cost contract when accepted by the Government for continued use under the contract.

6.8. Non-Personal Services: The personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the government and its employees. Non per-sonal service contracts are authorized by the government in accordance with FAR 37.012, under general contracting authority, and do not require specific statutory authorization.

6.9. Quality Assurance: The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

6.10. Quality Assurance Surveillance Plan: An organized document written by the government specifying the surveillance methodology used for surveillance of contractor performance.

6.11. Workday: The number of hours per day the Contractor provides services in accordance with the contract.

6.12. Work Week: Monday through Friday, unless specified otherwise.

Appendices Appendix 1 - Forest Service Supplemental Specifications (FSSS) FP-14 Appendix 2 - Roadside Brushing Drawing Appendix 3 - POW Brushing 2022 North Map Appendix 4 - Daily Activity Report

General Information
Purpose:
Background:
Contractor Requirements

File details come from the government source that posted it. Updated .