Attachment 08 - VHA Required Div 01 Spec Sections.docx

DOCX document 19 KB Posted

Attached to
C1BG--EHRM Infrastructure Upgrade - Improve IT Rooms and Cabling (VA-21-00037591)
Solicitation number
36C77621R0175
Issued by

About this file

This presolicitation notice seeks Statements of Qualifications from SDVOSB firms for architect-engineering services. The project involves upgrading IT rooms and cabling at the Grand Junction VA Medical Center to improve infrastructure. Required services include network installation, fiber optics, structured cabling, electrical and HVAC upgrades, telecom room renovations, data center reconfiguration, and security systems. Firms must have experience with VA design standards and network infrastructure projects. Submissions are due January 24, 2022 and will be evaluated on experience, staff qualifications, capacity, past performance, and local knowledge. Discussions will be held with the most qualified firms before selecting one for negotiations. The projected award date is April 2022 and work must be completed within 230 days of award. The construction budget is between $5-10 million. The contract will be set aside for SDVOSB firms.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA Required Division 01 – General Requirement Specification Sections

* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.

01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements

File details come from the government source that posted it. Updated .