Attachment 06 -Price Metric (1).xls
XLS spreadsheet 68 KB Posted
- Solicitation number
- 36C24822R0157
About this file
This document provides details for a federal construction services solicitation from the Department of Veterans Affairs. The solicitation is for a project to correct electrical panelboard deficiencies at Building 1 at the Gainesville VA Medical Center, with a site visit scheduled for August 10, 2022 at 1:00 PM. Proposals are due by August 31, 2022 at 3:30 PM. This requirement is set aside for Service-Disabled Veteran-Owned Small Businesses, which can be verified on the VetBiz website. The attached price metric file provides a template for pricing but no other content details. The contracting officer's representative and address are also provided for any questions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02 -1449- SOLICITATION - Correct Electric PanelBoard - 36C24822R0157.pdf | ||
| Attachment 04 - Wage Determination.pdf | ||
| Attachment 09 - Experience Information Sheet.docx | DOCX document | |
| Attachment 02 - Drawing.pdf | ||
| Attachment 07 - Past Performance Questions.docx | DOCX document | |
| Attachment 03 - Specifications.pdf | ||
| Attachment 01 - Statement of Work.docx | DOCX document | |
| Attachment 10 - Specialized Experience Form.pdf | ||
| Attachment 08 - EMR.docx | DOCX document | |
| Attachment 05 - LOS Certification.doc | DOC document | |
| Attachment 11- VHA Supplemental Contract Requirements for Combatting COVID-19 (2 pages).docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total Construction Cost
| CONSTRUCTION COST PROGRAM - ESTIMATE WORKSHEET | DATE: | 12/31/99 | ||||||||
| PROJECT NO. | PROJECT TITLE | LOCATIONs | DATE: | |||||||
| 0 | 0 | 0 | $0.00 | |||||||
| ESTIMATOR | TOTAL CONSTRUCTION COST SUMMARY | BUILDING NO(S) | DRAWING NOs. | $0.00 | ||||||
| 0 | 0 | 0 | $0.00 | |||||||
| NRM | LABOR (w/ equip) | MATERIALS | ||||||||
| CODE | CSI # | The Start | SYSTEMS/SUBSYSTEM | QTY | UNIT | $/UNIT | TOTAL | $/UNIT | TOTAL | TOTAL |
| 16 DIV. CONSTRUCTION COST | $0 | |||||||||
| TOTAL CONSTRUCTION COST (Low Bid) | $0 | |||||||||
| $0 | ||||||||||
| Subtotal | $0 | |||||||||
| Impact Cost with R.O.P | ||||||||||
| Subtotal | $0 | |||||||||
| Subtotal | $0 | |||||||||
| TOTAL PROJECT COSTS | $0 |
&RSHEET NO &P OF &N
Detail Base Offer Cost Breakdown
"FOR OFFICIAL USE ONLY"
| ESTIMATE WORKSHEET | ||||||||||
| Project Number | Location | PROJECT NAME | DATE: | |||||||
| TYPE OF ESTIMATE: | ESTIMATOR: | BUILDING NO./LOCATION: | ||||||||
| LABOR | MATERIALS/EQUIPMENT | TOTAL COST BY ITEM | ||||||||
| CODE: | The Start | SYSTEM/SUBSYSTEM | QTY | UNIT | $/UNIT | TOTAL | $/UNIT | TOTAL | ||
| 1 | GENERAL CONDITIONS | $0.00 | ||||||||
| 1 | Mobilization/Demobilization | |||||||||
| 2 | Permits/Environmental Regulations Compliance | |||||||||
| 3 | Safety Requirements | |||||||||
| 4 | Maintenance of Traffic (MOT) | |||||||||
| 2 | Existing Conditions | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Removal of Wood Floor System | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | Removal of Metal Floor System and Connections | ea | $0.00 | $0.00 | $0.00 | |||||
| 3 | Paint Removal | ea | $0.00 | $0.00 | $0.00 | |||||
| 4 | Chain-Link Fabric Removal | ea | $0.00 | $0.00 | $0.00 | |||||
| 5 | Miscellaneous Removal (signs, wiring,conduits, etc. | ea' | $0.00 | $0.00 | $0.00 | |||||
| 3 | CONCRETE | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Cracks Repairs at Concrete Ramps | ea | $0.00 | $0.00 | $0.00 | |||||
| 4 | METALS | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Retrofit of Existing Structural Connections | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | New Floor System | ea | $0.00 | $0.00 | $0.00 | |||||
| 3 | New Connections for Floor System | ea | $0.00 | $0.00 | $0.00 | |||||
| 5 | FINISHES | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Protective Paint Coating (Epoxy) | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | Finish Paint Coating | ea | $0.00 | $0.00 | $0.00 | |||||
| 6 | SPECIALTIES | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | New Vinyl Coated Chain Link Fabric | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | New Green Chain Link Fence Privacy Slats | ea | $0.00 | $0.00 | $0.00 | |||||
| 3 | New Signage | ea | $0.00 | $0.00 | $0.00 | |||||
| 7 | ELECTRICAL | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Electrical Conduits, Wiring, Junctions, Lighting | ea | $0.00 | $0.00 | $0.00 | |||||
| 8 | BRIDGE MODIFICATIONS | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Lightning Protection System | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | Structure Adaptations (To comply with current codes) | $0.00 | $0.00 | $0.00 | ||||||
| 3 | Roof Cover | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| Subtotal | $0.00 | $0.00 | $0.00 | |||||||
| Overhead % | ||||||||||
| Profit % | ||||||||||
| Bond % | $$ | |||||||||
| Overhead/Profit Subtotals: | $0.00 | $0.00 | $0.00 | |||||||
| Total Base Offer Cost |