This attachment is a price matrix file related to a federal contract opportunity issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. The solicitation seeks bids to repair the CLC walkway and stairs at Project 573-24-800 under Solicitation Number 36C24824R0037. Interested vendors should review the price matrix file for pricing terms and submit responses by the deadline specified in the solicitation to be considered for award. The opportunity is for repair work at a VA facility and pricing details can be found in the attached Excel file.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total Construction Cost
| CONSTRUCTION COST PROGRAM - ESTIMATE WORKSHEET | DATE: | 12/31/99 | ||||||||
| PROJECT NO. | PROJECT TITLE | LOCATIONs | DATE: | |||||||
| 0 | 0 | 0 | $0.00 | |||||||
| ESTIMATOR | TOTAL CONSTRUCTION COST SUMMARY | BUILDING NO(S) | DRAWING NOs. | $0.00 | ||||||
| 0 | 0 | 0 | $0.00 | |||||||
| NRM | LABOR (w/ equip) | MATERIALS | ||||||||
| CODE | CSI # | The Start | SYSTEMS/SUBSYSTEM | QTY | UNIT | $/UNIT | TOTAL | $/UNIT | TOTAL | TOTAL |
| 16 DIV. CONSTRUCTION COST | $0 | |||||||||
| TOTAL CONSTRUCTION COST (Low Bid) | $0 | |||||||||
| $0 | ||||||||||
| Subtotal | $0 | |||||||||
| Impact Cost with R.O.P | ||||||||||
| Subtotal | $0 | |||||||||
| Subtotal | $0 | |||||||||
| TOTAL PROJECT COSTS | $0 |
&RSHEET NO &P OF &N
Detail Base Offer Cost Breakdown
"FOR OFFICIAL USE ONLY"
| ESTIMATE WORKSHEET | ||||||||||
| Project Number | Location | PROJECT NAME | DATE: | |||||||
| TYPE OF ESTIMATE: | ESTIMATOR: | BUILDING NO./LOCATION: | ||||||||
| LABOR | MATERIALS/EQUIPMENT | TOTAL COST BY ITEM | ||||||||
| CODE: | The Start | SYSTEM/SUBSYSTEM | QTY | UNIT | $/UNIT | TOTAL | $/UNIT | TOTAL | ||
| 1 | GENERAL CONDITIONS | $0.00 | ||||||||
| 1 | Mobilization/Demobilization | |||||||||
| 2 | Permits/Environmental Regulations Compliance | |||||||||
| 3 | Safety Requirements | |||||||||
| 4 | Maintenance of Traffic (MOT) | |||||||||
| 2 | Existing Conditions | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Removal of Wood Floor System | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | Removal of Metal Floor System and Connections | ea | $0.00 | $0.00 | $0.00 | |||||
| 3 | Paint Removal | ea | $0.00 | $0.00 | $0.00 | |||||
| 4 | Chain-Link Fabric Removal | ea | $0.00 | $0.00 | $0.00 | |||||
| 5 | Miscellaneous Removal (signs, wiring,conduits, etc. | ea' | $0.00 | $0.00 | $0.00 | |||||
| 3 | CONCRETE | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Cracks Repairs at Concrete Ramps | ea | $0.00 | $0.00 | $0.00 | |||||
| 4 | METALS | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Retrofit of Existing Structural Connections | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | New Floor System | ea | $0.00 | $0.00 | $0.00 | |||||
| 3 | New Connections for Floor System | ea | $0.00 | $0.00 | $0.00 | |||||
| 5 | FINISHES | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Protective Paint Coating (Epoxy) | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | Finish Paint Coating | ea | $0.00 | $0.00 | $0.00 | |||||
| 6 | SPECIALTIES | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | New Vinyl Coated Chain Link Fabric | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | New Green Chain Link Fence Privacy Slats | ea | $0.00 | $0.00 | $0.00 | |||||
| 3 | New Signage | ea | $0.00 | $0.00 | $0.00 | |||||
| 7 | ELECTRICAL | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Electrical Conduits, Wiring, Junctions, Lighting | ea | $0.00 | $0.00 | $0.00 | |||||
| 8 | BRIDGE MODIFICATIONS | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Lightning Protection System | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | Structure Adaptations (To comply with current codes) | $0.00 | $0.00 | $0.00 | ||||||
| 3 | Roof Cover | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| Subtotal | $0.00 | $0.00 | $0.00 | |||||||
| Overhead % | ||||||||||
| Profit % | ||||||||||
| Bond % | $$ | |||||||||
| Overhead/Profit Subtotals: | $0.00 | $0.00 | $0.00 | |||||||
| Total Base Offer Cost |