Attachment 02_VHA Required Div 01 Spec Sections.pdf

PDF 108 KB Posted

Attached to
EHRM Training and Admin Space Support - Tuscaloosa, AL. (VA-22-00035466) 679-22-703 A/E
Solicitation number
36C77622R0141
Issued by

About this file

This presolicitation notice requests Standard Form 330 submissions from architectural and engineering firms for design services. The project involves developing construction documents for EHRM Training and Admin Space Support at the Tuscaloosa VA Medical Center in Alabama, with an anticipated construction cost between $1 million and $5 million. The design contract is set aside for Service-Disabled Veteran-Owned Small Businesses and will be awarded using the Architect-Engineer short selection process. Submissions are due by September 2, 2022 and will be evaluated based on specialized experience with similar IT and network infrastructure projects, personnel qualifications, capacity to complete the work within 215 days, and past performance. The highest rated firm may receive a site visit during negotiations, with the goal of awarding a firm-fixed price contract by October 2022.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA Required Division 01 – General Requirement Specification Sections

* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.

01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements

File details come from the government source that posted it. Updated .