Attachment 02 SOW Crossett_DormitorySidingRepair.docx

DOCX document 20 KB Posted

Attached to
USDA Forest Service SRS Crossett, AR Siding Repair
Solicitation number
124568Q0011
Issued by

View the file

Other files

File Type Posted
Sol Body 12456820Q0011.rtf RTF text file
SF-1442 12456820Q0011.pdf PDF
Attachment 03 Experience Questionnaire.docx DOCX document
Attachment 00 Schedule of Items.docx DOCX document
Attachment 01 Wages.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12456820Q0011 SRS Crossett, AR Siding Repair

ATTACHMENT 02

SCOPE OF WORK

DORMITORY SIDING REPAIR AND REPLACEMENT

CROSSETT EXPERIMENTAL FOREST

This scope of work describes targeted repair and replacement of wood siding and trim required on the Dormitory (38-0001-CRO), located on the Crossett Experimental Forest. Lower courses of siding on the building have severely degraded and need to be replaced to maintain the integrity of the building envelope.

ADDRESS:

Crossett Experimental forest 4472 Highway 133 South Crossett, AR 71635

SIDING AND TRIM REPAIR AND REPLACEMENT

In general, the following work shall be accomplished:

· Remove bottom two courses of existing wood siding on three sides of the Dormitory.

· Remove rotten 1x4 door facings.

· Prime all surfaces of lumber.

· Paint and install door facings. No sealing at ends.

· Stain and install clapboard wood siding. No sealing at joints or ends.

· Screw down/refasten twisted & warped remaining siding boards as conditions allow.

NOTES:

· Size, material selection and finish of new work shall match existing

· No work to be performed at North facing wall.

· Joints and ends of siding on trim shall not be sealed

· Wood clapboard siding will be provided for installation as Government Furnished Property

· Contractor shall be responsible for providing wood trim, all required fasteners, primers, paints and other accessories necessary for a complete installation.

· All material provided by the Contractor must be designed for long term functionality in the environment typical of the area. Materials must be resistant to corrosion due to exposure and loosening or failure of the connections due to movement of the materials.

PERIOD OF PERFORMANCE

30 Calendar days after award

POINTS OF CONTRACT

Kirby Sneed Email: kirby.sneed@usda.gov Telephone: 870-367-3466

Attachment 02