Attachment 02 SOW Crossett_DormitorySidingRepair.docx
DOCX document 20 KB Posted
- Solicitation number
- 124568Q0011
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol Body 12456820Q0011.rtf | RTF text file | |
| SF-1442 12456820Q0011.pdf | ||
| Attachment 03 Experience Questionnaire.docx | DOCX document | |
| Attachment 00 Schedule of Items.docx | DOCX document | |
| Attachment 01 Wages.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12456820Q0011 SRS Crossett, AR Siding Repair
ATTACHMENT 02
SCOPE OF WORK
DORMITORY SIDING REPAIR AND REPLACEMENT
CROSSETT EXPERIMENTAL FOREST
This scope of work describes targeted repair and replacement of wood siding and trim required on the Dormitory (38-0001-CRO), located on the Crossett Experimental Forest. Lower courses of siding on the building have severely degraded and need to be replaced to maintain the integrity of the building envelope.
ADDRESS:
Crossett Experimental forest 4472 Highway 133 South Crossett, AR 71635
SIDING AND TRIM REPAIR AND REPLACEMENT
In general, the following work shall be accomplished:
· Remove bottom two courses of existing wood siding on three sides of the Dormitory.
· Remove rotten 1x4 door facings.
· Prime all surfaces of lumber.
· Paint and install door facings. No sealing at ends.
· Stain and install clapboard wood siding. No sealing at joints or ends.
· Screw down/refasten twisted & warped remaining siding boards as conditions allow.
NOTES:
· Size, material selection and finish of new work shall match existing
· No work to be performed at North facing wall.
· Joints and ends of siding on trim shall not be sealed
· Wood clapboard siding will be provided for installation as Government Furnished Property
· Contractor shall be responsible for providing wood trim, all required fasteners, primers, paints and other accessories necessary for a complete installation.
· All material provided by the Contractor must be designed for long term functionality in the environment typical of the area. Materials must be resistant to corrosion due to exposure and loosening or failure of the connections due to movement of the materials.
PERIOD OF PERFORMANCE
30 Calendar days after award