Attachment 01 - Statement of Work_9 Jul 26.docx

DOCX document 251 KB Posted

Attached to
Joint Base Lewis-McChord (JBLM), Washington, Job Order Contract (JOC)
Solicitation number
W5168W-27-R-A003
Issued by

About this file

This is a Statement of Work (SOW) for a Job Order Contract (JOC) to support Joint Base Lewis-McChord (JBLM), Washington, covering repair, maintenance, demolition, and minor construction projects. The contract is a Firm Fixed Price Indefinite Delivery-Indefinite Quantity (IDIQ) vehicle for construction work classified under NAICS 236220 (Commercial and Institutional Building Construction). Work covers multiple geographic areas including Fort Lewis (Main and North), McChord Field, Yakima Training Center, and two cemeteries. The JOC addresses projects ranging from Sustainment, Restoration, and Modernization (SRM) valued above the $2,000 micro-purchase threshold up to various facility types including barracks, administrative facilities, maintenance shops, child development centers, physical fitness centers, airfield structures, warehouses, and underground/overhead utilities.

The Contractor must use the Unified Facilities Guide Specifications (UFGS) and RSMeans Construction Cost Data as the Unit Price Book (UPB) for all pre-priced cost estimates, with contractor-developed coefficients applied to account for overhead, profit, mobilization, waste, insurance, payroll taxes, environmental compliance, quality control, permits, cleanup, and other indirect costs. Pricing excludes supplies, fuels, utilities, architectural and engineering services, equipment maintenance, housekeeping, and design services. The Contractor shall provide all necessary personnel, equipment, materials, supervision, and project management; maintain a formal construction project management software system; submit detailed proposals with site visit documentation within specified timeframes; perform quality control with three phases (preparatory, initial, and follow-up); submit daily reports and certified payrolls; obtain required permits and licenses; comply with safety regulations, environmental requirements, and security protocols including background checks and potential Common Access Card requirements; and submit as-built drawings, operation and maintenance manuals, and warranty documentation. Work hours are 0700-1600 Monday through Friday, excluding federal holidays and installation closures, with coordination required for work outside normal hours and inclement weather delays. Task Orders are issued separately after contractor proposal submission and government approval, with liquidated damages applicable for completion delays and performance evaluated throughout the contract term.

View the file

Other files

File Type Posted
JBLM JOC_Sources Sought Synopsis_W5168W-27-R-A003.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW)

For

Joint Base Lewis-McChord (JBLM), WA

Job Order Contracting (JOC)

9 July 2026

Table of Contents

1.0GENERAL1
2.0 CONTRACT DESCRIPTION1
3.0 SCOPE OF WORK1
3.1 Specifications and Attachments2
4.0 WORK RESPONSIBILITY3
4.1 Work Hours3
4.2 Federal Holidays4
4.3 Installation Closures.4
4.4 Inclement Weather Delay.4
5.0 CONTRACTOR RESPONSIBILITY4
5.1 Task Order Coordination5
5.2 Commencement5
5.3 Work Execution5
5.4 Deliverables6
6.0 ORDERING PROCEDURES6
6.1 Responsiveness6
7.0 PAYMENTS AND INVOICING7
7.1 General Requirements7
7.2 Required Invoice Submissions7
7.3 Payment Request8
7.4 WAWF8
8.0 PROPOSALS8
8.1 Contingency9
8.2 Cost Estimating Requirements10
8.3 Waste and Excess Quantities Included10
8.4 UPB Vendor Clarifications11
8.5 UPB Application – Specific Considerations11
8.6 Coefficients13
8.7 Project Schedules14
8.8 Time Extensions15
8.9 Weather Related Time Extensions15
8.10 Liquidated Damages15
9.0 TASK ORDER DOCUMENTS16
9.1 Task Order Work Files16
9.2 Notice of Completion of Task Order16
9.3 BUILDER Sustainment Management System (SMS)16
10.0 PERSONNEL16
10.1 Key Personnel17
11.0 TRAINING, PHYSICAL REQUIREMENTS, AND OTHER18
12.0 PRE-CONSTRUCTION ORIENTATION18
13.0 SUBMITTAL PROCEDURES AND REQUIREMENTS19
13.1 General Requirements19
13.2 Pre-Construction Submittals19
13.3 Construction Submittals20
13.4 Post-Construction/Closeout Submittals20
13.5 Submittal Submission Procedures20
13.6 Drawing Submissions20
14.0 REQUIRED CONTRACTOR PLANS21
14.1 Accident Prevention Plan21
14.2 Asbestos and Lead Management Plan22
14.3 Contractor Quality Control (CQC) Plan22
14.4 Management Plan23
14.5 Site Safety and Health Plan (SSHP)24
14.6 Spill Plan25
14.7 Traffic Control Plan25
15.0 CONTRACTOR QUALITY CONTROL SYSTEM25
15.1 Quality Control (QC)25
15.2 Coordination Meeting26
15.3 Inspections26
15.4 Notification of Noncompliance26
15.5 QCM’s Completion Inspection27
15.6 Pre-Final Inspection27
15.7 Final Acceptance28
15.8 Testing Procedures28
15.9 Files and Reports29
15.10 Quality Control and Inspections at Yakima Training Center29
16.0 FACILITIES30
16.1 Closure Inspections30
16.2 Secure Areas30
16.3 Conditions of Occupancy31
16.4 Elevators31
16.5 Equipment on the Site31
16.6 Office Trailer32
16.7 Construction Site Maintenance32
16.8 Permits, Fees, and Licenses (Non-Environmental)32
16.9 Excavation and Utility Permits32
16.10 Vehicular Access to Construction Sites33
16.11 Discovery of Unexploded Ordnance (UXO)33
16.12 Historical, Architectural, and Landscaping Requirements33
16.13 Historic Property or Archaeological Site34
16.14 Site Security34
16.15 Security Awareness34
16.16 Construction Project Site Sign35
17.0 SAFETY35
17.1 Pre-Construction Safety Meeting36
17.2 Safety Hazards36
17.3 Materials and Equipment36
17.4 Safety Data Sheets (SDS)37
17.5 Medical Surveillance37
17.6 Confined Space Entry Procedures37
17.7 Noise Control37
17.8 Required Seatbelt Use37
17.9 Trucking37
17.10 Construction Hazard Communication37
17.11 Fire Prevention and Protection38
17.12 Radiation Permits and Authorizations38
15.13 Hazardous Materials39
17.14 Polychlorinated Biphenyl (PCB)41
17.15 Arc/Flash Hazard Analysis42
18.0 ENVIRONMENTAL REQUIREMENTS42
18.1 Environmental Protection Considerations42
18.2 Temporary Environmental Controls43
18.3 Environmental Protection Plan (EPP)43
18.4 Sustainable Acquisition43
18.5 Wastewater44
18.6 Environmental Management System44
18.7 Green Procurement44
18.8 Environmental Compliance45
18.9 Record of Environmental Consideration (REC)45
18.10 Citations46
18.11 Permits46
18.12 Sampling47
18.13 Land Resources47
18.14 Water Resources48
18.15 Biological Resources (Fish and Wildlife)49
18.16 Air Resources50
18.17 Cultural Resources50
18.18 Waste Disposal51
18.19 Recycling54
18.20 Wastewater Discharges54
18.21 Contamination Discovery54
18.22 Construction Cleanup54
18.23 Restoration of Landscape Damage54
18.24 Maintenance of Pollution Facilities54
18.21 Covered Chutes55
18.22 Septic Tanks56
18.23 Sustainable Acquisition Requirements56
18.24 Applicable Laws, Regulations, Statutes, and Acts56
18.25 Chain of Custody Procedures56
19.0 CLEAN-UP AND WASTE MANAGEMENT56
19.1 Construction & Demolition (C&D) Debris57
19.2 Salvageable and Unsalvageable Materials57
19.3 Disposal of Asbestos58
19.4 Disposal of Hazardous Materials58
19.5 Disposal of Solid, Liquid, and Gaseous Contaminants58
19.6 Saleable Timber Requirements59
20.0 SPECIFICATIONS59
20.1 JOC Technical Specifications59
20.2 Documents59
21.0 CONTRACTOR REPORTS59
21.1 Abatement Report60
21.2 Accident Reporting60
21.3 Construction and Demolition Debris Reports60
21.4 Damage Reports60
21.5 Environmental Compliance Reporting61
21.6 Progress Charts61
21.7 Quality Control Reports (QCR)61
21.8 Solid Waste Management Report61
21.9 Warranty Item Report61
21.10 Adverse Weather Log62
22.0 Special Contract Requirements62
22.1 Work by the Government62
22.2 Security Requirements62
22.3 Anti-Terrorism (AT) Training62
22.4 Operations Security (OPSEC) Training63
22.5 Access and General Protection, Security Policy, and Procedures63
22.6 Contractor Employees Requiring Access to Government Information Systems63
22.7 Contractor Employees Requiring a Common Access Card (CAC)63
22.8 Government Furnished Material (GFM), Property (GFP), and Equipment (GFE)64
22.9 Contractor-Furnished Property (CFP) and Equipment (CFE)64
22.10 Warranty Program64
23.0 ACRONYMS AND DEFINITIONS65
23.1 Acronyms65
23.2 Definitions68
24.0 APPLICABLE DIRECTIVES AND PUBLICATIONS74
24.1 General74
24.2 Technical Publications, Codes, and Standards74
24.3 Codes and Standards74
24.4. Army Regulations (AR)75
24.5 Department of the Army Pamphlets76
24.6 Department of the Army, Corps of Engineers Manual (EM), Engineers Technical Letter (ETL)76
24.7 Other Documents76
24.8 Building Codes77
25.0 ANTI-TERRORISM (AT) AND OPERATIONAL SECURITY (OPSEC)77
25.1 AT Level 1 Training77
25.2 Access and General Protection/Security Policy and Procedures77
25.3 Real ID Act78
25.4 iWatch78
25.5 OPSEC79
25.6 Unauthorized Personnel Reporting79
25.7 OPSEC Level 1 Training79
25.8 E-Verify Screening of Employees80
25.9 Information Awareness/Information Technology (AI/AT) Training80
26.0 ADDITIONAL CONTRACT TERMS AND CONDITIONS80
27.0 SAMPLE EXHIBITS80

1.0 GENERAL

This is a non-personal services contract to provide Job Order Contract (JOC) requirements to Joint Base Lewis-McChord (JBLM), WA. The Government shall not exercise any supervision or control over the Contract Service Providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. $

2.0 CONTRACT DESCRIPTION

This is a Firm Fixed Price (FFP) Indefinite Delivery-Indefinite Quantity (IDIQ) Job Order Contracting (JOC) contract for construction work as defined under the North American Classification System (NAICS) 236220 – Commercial and Institutional Building Construction.

3.0 SCOPE OF WORK

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and construction services necessary as defined in this SOW.

The JOC will be used to fulfill repair, maintenance, demolition and minor construction requirements on a variety of projects ranging from Sustainment, Restoration, and Modernization (SRM), simplified acquisition of base repair requirements, civil works operations and maintenance, small renovations, real property repair and maintenance with an estimated value more than the micro-purchase threshold (MPT) for acquisitions of construction. At the time of this revision the MPT is $2,000.00 in accordance with (IAW) Federal Acquisition Regulation (FAR) 2.101, Definitions.

Potential projects include, but are not limited to, barracks, administrative facilities, maintenance shops, child development centers (CDC), physical fitness centers, maintenance shops, food service facilities, airfield structure, athletic fields, underground utilities, overhead utilities, gates, warehouses, auditoriums, and other general construction work deemed necessary to support the JBLM Directorate of Public Works (DPW) mission requirements. Facility repairs, renovations, and construction shall conform to the requirements of the technical criteria described in the Task Order (TO).

Projects tasks include a variety of trades such as: carpentry, roofing, painting, electrical, Heating Ventilation and Air Conditioning (HVAC), plumbing, masonry, demolition in conjunction with renovation projects, incidental roadwork, storm drainage, earthwork, welding, minor construction, operational type work and other general construction work deemed necessary to support the JBLM DPW mission requirements. JBLM covers the following areas:

· Fort Lewis (Main), WA

· Fort Lewis (North), WA

· McChord Field, WA

· Yakima Training Center (YTC), Yakima, WA

· Fort Worden Cemetery, Port Townsend, WA

· Fort Lawton Cemetery, Seattle, WA

Other site work includes site grading, drainage and retaining walls incidental to the construction.

The JOC shall not be used to purchase supplies, services, or Architect and Engineer (A-E) Services.

For example, the following items are not authorized for acquisition under this JOC contract:

· Fuels

· Utilities (Contractor is to perform any incidental work to the point of connection of primary utilities)

· Construction equipment

· Administrative equipment

· Furnishings

· Construction materials only (lumber, concrete, etc.), for other than valid JOC projects

· A-E Services (Brooks Act)

· Administrative services such as typing, transportation, reproduction, graphics, and interior design services not part of a JOC Contractor construction proposal

· Maintenance, overhaul, or repair of equipment

· Housekeeping Services

· Purchase of supplies

· No Design (Contractor is to produce shop drawings incidental to the job, reflecting the plan of action and the completed project)

· For the sole purpose of abatement of lead-based paint and/or asbestos Note: IAW Army Federal Acquisition Regulation Supplement (AFARS) 5117.9002(b), The Requiring Activity’s reoccurring facilities engineering support services, such as utility plant operation, custodial, grounds maintenance, refuse collection and disposal, and similar work shall not be acquired using a JOC. Architect-engineer services as defined in FAR 36.102 and Design-Build requirements as defined in FAR 36.3 shall not be acquired under a JOC.

3.1 Specifications and Attachments

The composition of each individual task order under this contract will derive their blanket specifications and verbiage from the Unified Facilities Guide Specifications (UFGS). Those documents contain within them one-size-fits-all contract language that the task order developer (Government PM) will modify to fit the needs of their specific task order. The contractor can access these specifications without charge or account using the attached link, https://www.wbdg.org/dod/ufgs . While these specifications cover the disciplines of work that the contractor can expect to perform, and their general performance requirements, each individual task order will utilize these to varying extents, and may still utilize the specifications listed in paragraph 24 of this SOW.

4.0 WORK RESPONSIBILITY

The Contractor shall perform repair and construction as defined in each TO. Individual SOWs will vary in size and complexity depending on the nature of the work. The Contracting Officer (KO) will issue to the Contractor a Request for Task Order Proposal (RTOP) detailing the task to be accomplished. The Contractor shall estimate the level of effort required to perform the requested work and shall submit a detailed proposal of items required to accomplish the work within the time frame stated in the RTOP. The proposal shall be of sufficient detail and broken out by item, so the Government can readily identify the estimated quantities and level of effort for each task and subtask. The Contractor shall provide supervision, labor, materials, equipment, and supplies, unless otherwise specified as Government-furnished in each TO.

The KO will identify any security training required before the start of work. The Contractor’s key personnel shall train all Contractor personnel at the Contractor's own expense.

The JOC will include a combination of repair and construction task descriptions and/or specifications, units of measure, and pre-established unit prices for each of these discrete requirements. TOs under the JOC are comprised of a number of pre-described and Pre-Priced tasks. Individual TO cost proposals shall be determined by the applicable quantities of necessary Unit Price Book (UPB) line items. The UPB lists the price for labor, equipment, and materials.

The Contractor shall use cost estimating software (RS-Means, e-Gordian, etc.) as prescribed by the Government. The Contractor shall furnish work as required per the line item in the UPB. The Contractor shall subscribe to a Software as a Service (SAS) or on-demand software platform for use by both the Contractor and Government in support of the JOC project management. The Contractor shall provide as-built drawings, which conform to the electronic computer-aided design and drafting (CADD) software currently utilized by the DPW.

The Contractor shall perform IAW current OPORDS, National Fire Protection Association (NFPA) codes, and Industry and Trade Organization standards.

4.1 Work Hours

The Government's regular (normal) hours are from 0700 – 1600 hours, excluding Federal Holidays or when the Government Facility is closed due to local or national emergencies, administrative closings, or similar Government directed Facility closings. Work outside normal duty hours shall be coordinated with and approved by the Contracting Officer’s Representative (COR). A separate coefficient shall be used for work identified as outside of normal work hours.

4.2 Federal Holidays

The Contractor’s performance shall not be required on the Federal public holidays listed below. However, that requirement is subject to mission execution requirements; and, work on Holidays, when required, will be annotated on the individual TO.

New Year’s Day1st day of January
Martin Luther King Jr.'s Birthday3rd Monday of January
Presidents Day3rd Monday of February
Memorial DayLast Monday of May
Juneteenth19th day of June
Independence Day4th day of July
Labor Day1st Monday of September
Columbus Day2nd Monday of October
Veterans Day11th day of November
Thanksgiving Day4th Thursday of November
Christmas Day25th day of December

NOTE: When a holiday falls on a Sunday, the following Monday will be observed as a holiday, and, when a holiday falls on a Friday or Saturday, the preceding Thursday is observed as a holiday by United States (U.S.) Government Agencies. Federal holidays also include any Presidential or Congressionally designated days off other than the holidays listed above.

4.3 Installation Closures.

When an unforeseen Installation closure occurs on a regularly scheduled day of work, the Contractor shall:

a. Reschedule the work to be performed the following day unless the following day is a Saturday, Sunday, a legal public holiday, and when routine work is not scheduled for that day; or

b. Reschedule the work on any day mutually satisfactory.

4.4 Inclement Weather Delay.

If the Contractor determines unsafe weather conditions for continued operations, the Contractor shall notify the KO of inclement weather within one (1) hour of suspension of work. The Contractor shall resume operations once KO approval is received.

5.0 CONTRACTOR RESPONSIBILITY

The Contractor shall assume full responsibility and liability for non-compliance with all Federal, State and local laws, regulations, codes, policies, and directives pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless. The Contractor shall perform all related Contractor administrative services, planning, programming, and management necessary to perform the work, to include but are not limited to, supply, quality control (QC), and maintenance of accurate and complete records, files, and libraries of documents.

At the Task Order level the Contractor shall provide related services to include, but are not limited to, pre-award project development, project management, QC, and submission of required deliverables necessary to satisfy requirements specified under this contract and individual TOs. The Contractor shall visit and inspect the job site prior to the start of any work. The Contractor shall document (with photos) any damaged areas and turn them into the COR, so as to preclude any responsibility for damages present that are not a result of the performance of work required in the TO. In the absence of the COR, the Alternate COR (ACOR) will assume responsibility.

5.1 Task Order Coordination

The signed, issued TO constitutes the Contractor’s Notice to Proceed (NTP) unless a separate NTP is specified in the TO. Prior to scheduling work for a TO, the Contractor shall coordinate with the KO to agree on a sequence of procedure, means of access to premises/building, space for storage of materials and equipment, delivery of materials, and use of corridors, stairways, elevators, eating spaces, and restrooms for Contractor personnel.

5.2 Commencement

The Contractor shall be required to commence work IAW the date specified in the contract award. Upon TO receipt, the Contractor shall be required to physically start work or as indicated on individual TOs.

5.3 Work Execution

The time stated for entire completion of work specified in the TO, unless a separate NTP is issued shall include final cleanup of the premises and submission of all deliverables. TOs shall be considered separate projects, and any decision by the Contractor to utilize a limited number of subcontractors on multiple orders shall not constitute grounds for non-performance, time extensions, avoidance of liquidated damages, or other reductions for cause. The Contractor shall work, so far as practicable, in definite sections or divisions and confined to limited areas which shall be completed before starting on other sections or divisions.

5.3.1 Construction Related Changes

The Contractor shall document and obtain authorization from the KO before making any requirement changes to the SOW. Construction-related requests from building occupants shall be directed to the KO prior to taking any action. Any job site changes made by construction employees, either direct or subcontracted, shall be subject to removal and corrected at no additional cost to the Government. Contractor shall inform all employees to include the subcontractor of this requirement.

5.4 Deliverables

The Contractor shall submit to the KO a complete package of pre-construction deliverables which include, but are not limited to, Government approvals, permits, notices of award of subcontracts, performance schedules, and material or product submittals no later than (NLT) fourteen (14) calendar days after TO award. The Government will make every attempt to respond to the pre-construction deliverables within seven (7) calendar days after the Contractor’s submissions are received.

Post-completion deliverables such as completed warranties certificates, completed Department of Defense (DD) Form 1354, as-built drawings, room key inventory list, installed building equipment list, operation and maintenance (O&M) manuals, payrolls, Release of Claims, and environmental closure documents shall be submitted to the Contract Specialist (CS), KO and COR prior to requesting final payment.

5.4.1 Construction/Project Management Software

Task Order management requires utilization of a formal construction project management software beyond the capabilities of manual, paper-based, or email correspondence to automate the project management process. The software shall include the following features: project scheduling, project tracking, submittal management, and other document management requirements (i.e. daily reports, RFI’s, etc.).

The Contractor shall be responsible for purchasing and maintaining RSMeans cost estimating software with the most up-to-date version throughout the contract performance period.

5.4.2 Correspondence Identification

The Contractor shall use a contract number and TO number on all correspondence sent to the KO and COR. The Contractor shall provide one (1) electronically with one (1) paper copy of all Serial Letters and Bonds. All other correspondence to be electronic only.

6.0 ORDERING PROCEDURES

The Government will issue and furnish a RTOP to the Contractor. The Contractor shall then prepare a proposal for the accomplishment of the task within the time limit specified in the RTOP. The RTOP will identify an existing requirement based on designs provided by the Government and will include as built or sketches as applicable for the SOW to be accomplished.

6.1 Responsiveness

As specified in the RTOP, the Contractor shall respond to the needs of the Government. The Contractor shall perform a site visit with the KO. The Contractor shall review the construction requirements and discuss problems, unclear items, access, etc. The site visit is considered essential to the preparation of a complete and accurate proposal of the project desired by the DPW. The site visit memorandum shall be submitted with the Contractor’s proposal. Failure to visit the site and discuss the project requirements with the COR and/or government Project Manager, shall not constitute an acceptable excuse for omissions or errors in proposals. The Contractor shall review the drawings, sketches, and any changes in the SOW that resulted from the site visit. The Contractor shall then prepare a proposal for the TO.

7.0 PAYMENTS AND INVOICING

Contractors will be required to submit your request for payment (invoice) through WAWF. For more information on the WAWF system, including how to register, visit the National Contracting Office website at: https://piee.eb.mil.

7.1 General Requirements

Prior to submitting your payment invoice request ensure you have completed the following:

7.1.1 All submittals required for the period of performance of the invoice must be submitted and approved by the government.

7.1.2 CQC Daily Reports have been submitted to the Task Order Quality Assurance Representative (QAR) through the period of performance indicated on each invoice. Billing percentages MUST match the daily reports. Daily reports are not to be revised due to billing percentages; the approved daily reports establish the accepted percentages for billing.

7.1.3 Contractor’s on-site report for the period of performance specified in the invoice submitted to the Task Order Contract Administrator.

7.1.4 All Certified Payrolls with applicable apprentice documents must be complete and submitted to the Task Order Contract Administrator in electronic .pdf format only. Certified payrolls are required to be submitted monthly for its company and any subcontractor.

7.2 Required Invoice Submissions

The payment invoice requests shall include the following in order to be considered complete. Incomplete invoice requests will be returned disapproved. All electronic pdf documents shall be legible. All pdf pages must be readable upon opening the document. The pages should be straight without having to rotate the page.

7.2.1 WAWF Checklist (See Attachment 12)

7.2.2 Contractor Invoice in tabular form with a Schedule of Values (SOV) breakdown showing major elements of work from the approved project schedule.

7.2.3 A copy of the daily report for the last day of the billing period shown on the AF Form 3065 (See Attachment 2).

7.2.4 Release of Claims (for final invoicing only).

7.3 Payment Request

The payment requests shall be emailed to the Task Order procurement tech with a CC to the MICC Contract Specialist. Upon approval from DPW and Contracting, the contractor is then required to use Wide Area Work Flow (WAWF) to electronically submit invoice payment requests. The contractor is also required to submit the Release of Claims in WAWF for final invoice payment requests.

7.4 WAWF

For approved invoice forms, input the invoice information into WAWF and send a WAWF-generated e-mail to the Task Order Contract Administrator and Inspector (Task Order COR). Failure to notify the Contract Administrator and the Inspector by the WAWF email will result in the rejection of the WAWF invoice and will require resubmission. For disapproved invoice checklists, make the necessary corrections and submit a new Progress Report and Invoice Form.

8.0 PROPOSALS

The Contractor shall prepare a detailed cost estimate using the approved UPB, RSMeans Construction Cost Data. The UPB shall be utilized for all applicable pricing under this contract, and shall be the basis of the contractors proposal cost estimate on all task orders under this contract. The Contractor shall be responsible for purchasing and maintaining RSMeans with the most up-to-date version throughout the contract performance period.

The Contractor shall not alter, append, delete, or otherwise modify the programming or UPB items, except for Government-issued changes. Any changes to a UPB item shall be requested to the Government by means of a Pre-Proposal Information (PPI) request, including a justification as to why the existing “best fit” item is not sufficient to cover the costs of the associated effort. The Contractor shall provide a detailed breakdown of the proposal, to include all pricing documentation to demonstrate that it is fair and reasonable.

In the development of a price proposal, site visits will be considered as incidental to the work and included in the Contractor’s coefficient.

The Contractor shall submit proposals electronically and include a printout of all proposed UPB items, quantities, extended prices, and total proposed costs. Significant components of work and all Non-Pre-Priced (NPP) items shall be identified in the price proposal. Any changes to UPB items as a result of an agreed to PPI as stated above shall be annotated on the proposal.

The Contractor’s proposal shall be supported by documentation and include, but not be limited to, product submittals, plans, special conditions, specifications, proposed completion period, name of the Project Manager (PM), and a copy of the initial RTOP form with notations on any agreed upon item changes. This will be incorporated in the final SOW to be issued with the TO and the TO proposal cost estimates which is comprised of the following three (3) sections:

a. Section 1, Division Summary: This section shall include the UPB Pre-Priced divisions, Trades, Assemblies, and NPP items. This section shall make up the Bare Total. No markups shall be applied at this level. The Contractor shall apply the City Cost Indexes (CCIs).

The Contractor shall support all proposed NPP items with adequate price competition from two (2) or more offerors competing independently IAW FAR 15.403-1. Contractor pricing shall include line-item number, description, material, labor, and equipment breakdowns. The Contractor shall list the supplier names, e-mail addresses, and telephone numbers for each NPP item.

b. Section 2, Totaling Components: This section includes totaling components setup for all applicable markups, including Contractor coefficients. CCIs shall be applied.

c. Section 3, Line-Item Estimate: This section shall include all line items. The report shall include a sequential line item number, line item description, full UPB item number, unit of measure, quantity, bare unit cost, and total amount (quantity multiplied by bare unit cost). The report will print: Pre-Priced line items by division for all UPB Pre-Priced line items found in the UPB, with division breaks and division subtotals, and a listing of the Trades, Assemblies, and NPP items. CCIs shall be applied.

8.1 Contingency

The Government may, at its discretion, allow for contingencies in proposals for unforeseen site conditions, changes in requirements, etc. The contingency shall be included in the proposal as a NPP item. If a contingency is considered to be warranted on a specific task order by the contractor, the contractor shall request the contingency amount, as a percentage of the total task order proposal amount, by means of a PPI to the government. The only justifications warranted for a contingency amount would include an extreme lack of detail in the task order scope. What constitutes an “Extreme lack of detail” would be determined by the KO on a case by case basis on each task order.

8.2 Cost Estimating Requirements

RSMeans shall be the UPB for this contract shall be the sole source of Pre-Priced costs. Work tasks required for the completion of specific project requirements that are not considered part of the complete-in-place construction of the UPB items or are not otherwise contained in the UPB are called NPP and their use is defined herein. Any difference between actual prices and UPB pricing shall not constitute grounds for failure to perform nor shall be grounds for any equitable adjustments in the price for the TO.

8.2.1 What Is Included

Prices in the UPB include the following: direct labor through the foreman level at current, meaning at time of contract award (includes base, options or overall modifications), Construction Wage Rate Requirements (formerly known as Davis-Bacon Act) for the area, equipment costs for the region, tools and material costs including delivery, sales tax and all incidentals. Incidentals include, but are not limited to, nails, screws, welds, and connectors. All prices in the UPB are for complete-in-place construction unless explicitly described otherwise.

Since the UPB is constructed from averaging cost data from projects nationally, there is variance in incidental options or accessories provided by equipment Manufacturers and incorporated into the costs. Therefore, the Government reserves the right to require incidental options or accessories without additional cost, except where the required additions are spelled out as a modifier within the UPB.

8.3 Waste and Excess Quantities Included

All prices in the UPB are for the complete-in-place construction unless explicitly described otherwise, and shall constitute the basis for the contractor’s proposal cost estimate. Waste or excess material quantities are incidental costs which are included within the contract coefficient unless explicitly stated otherwise in the UPB. Quantities used on TO proposals shall be for in place quantities taken from field measurements or design plans, as appropriate, without allowance for waste or incidental extra materials. Incidental nails, screws, weldments, and connectors are included in the UPB line items. Unless a connector or fastener is specifically stated as not being included, it is included in the price. Example: Installation of a suspended ceiling grid system includes connectors, fasteners, and wire for the hanging system.

8.3.1 Subdivisions and Quantities Excluded from RSMeans

The following subdivsions, as contained in the Total Cost Data, shall not be used as line items when pricing TO’s issued under this contract. These costs shall be included in the contractor’s coefficient, listed in paragraph 7.6 of this document.

· 01 11 31 – Professional Consultants

· 01 21 – Allowances

· 01 11 00 - 5

· 01 31 – Project Management and Coordination

· 01 32 – Construction Progress Documentation

· 01 41 26 – Permits

· 01 45 – Quality Control

· 01 52 – Construction Facilities

· 01 54 23 70 – Scaffolding

· 01 54 33 40– Rental of Vacuum Cleaners, Pickup Trucks, Portable Toilets, Ladders

· 01 55 – Vehicular Access & Parking

· 01 56 16 10 – Dust Barriers & Polyethylene sheets

· 01 71 – Examination and Preparation

· 01 74 – Cleaning and Waste Management (Rubbish removal shall be covered in Div. 02 41 19).

· 22 01 02 20 – Labor adjustment factors other than elevated work

· 26 01 02 20 – Labor adjustment factors other than elevated work.

Additionally, overhead and profit calculations within RSMeans shall be excluded from the proposal amount, as these quantities shall be included outside of RSMeans in the contractors coefficient, to be applied in the proposal to the total estimate amount.

8.4 UPB Vendor Clarifications

Any time clarifications are required regarding content or scope of an RSMeans line item and the issue is not covered elsewhere in this contract, the KO will act as the sole liaison with the Vendor for obtaining the necessary clarifications.

8.5 UPB Application – Specific Considerations

8.5.1 Assembly Pricing

Assembly pricing shall take precedence over individual component unit pricing.

8.5.2 Line Item Cost Adjustments

The only adjustment of price for the construction line items is the Contractor coefficient. All prices in the UPB are for complete-in-place construction unless explicitly described otherwise. Incidental fasteners (nails, screws, weldments, adhesives or other connectors), incidental options, accessories, and small tools required for a normal installation are included in the line item cost unless the line item description specifically states otherwise. Line item prices include all work required unless the line item description specifically states otherwise. Equipment costs include normal operating expendables and servicing including routine parts. All line item prices are valid to perform the work described to a height up to fourteen (14) feet above finished floor or grade level without the allowance for scaffolding or lift equipment, unless the line item description specifically states otherwise. Testing, adjusting, balancing, and start-up of installed equipment (normal commissioning) and up to four (4) hours of familiarization training for operation and maintenance of that equipment, shall be included unless the line item description specifically states otherwise. Scaffolding, lifts, staging, etc. shall be allowed only on a TO basis (per job), not per subcontractor or discipline.

8.5.3 Price Adjustment Modifiers

RSMeans contains unit pricing data to be used by the Contractor in development of price proposals for each TO. The pricing data is presented as basic items and as price adjustment modifiers to the basic item. Price adjustment modifiers provide a method for adding to or deducting from the basic item prices for optional materials, and methods of installation. One (1) or more modifiers can be utilized to adjust the basic item price as listed by the appropriate suffix number of the basic line item.

8.5.4 Non-Standard Work (Non-Pre-Priced)

Non-Pre-Priced (NPP) work is categorized as Facilities Construction Activity that is not specifically included in the UPB, but is within the basic intent and general scope of the contract. Items of work not covered by this contract’s Pre-Priced items, but within the scope and general intent, may be discussed by the KO and added to a TO at any time during the contract term. NPP items shall only be allowed if the Government deems an appropriate line item is not provided by the Pre-Priced UPB. When an exact line item within RSMeans is not available, the contractor may propose a new line item. The cost must be derived by interpolating or extrapolating from related line items, or by quantifiable market research that shows the equivalent RSMeans line item is unsuitable or unreasonable for use. The contractor's proposal shall clearly document the source line items and the methodology used for the calculation.

NPP work to be included in a TO shall be proposed by the Contractor in a format acceptable to the Government. NPP line items added to a TO shall be complete, including materials and labor and shall be for specific tasks, and not for general labor hours for example. NPP work or items shall be discussed with the Pre-Priced items in the proposal. Discussions will be held between the Government and the Contractor to clarify any identified discrepancies until the methods and requirements to perform the TO is agreed.

8.5.5 The project shall not be executed under this contract if the value of the NPP work exceeds 10% of the Pre-Priced cost of the TO unless it’s determined by the KO to be a good business decision in the best interest of the Government IAW AFARS 5117.9004-3(c)(1). TO cost shall not be considered incidental. Only NPP work that is incidental to Pre-Priced work shall be considered to be within the scope of this contract. Incidental NPP will be discussed and established on a work item-by-work item basis. The Pre-Priced coefficient is not applied to NPP items. The NPP overhead and profit rate will be applied to the agreed to bare costs of NPP items after the bare costs of these items have been established.

8.5.6 NPP Contractor Material and Equipment Costs

The Contractor shall receive the cost of the material plus the applicable coefficient as a handling fee. Material costs may include freight but shall not include any other overhead or associated costs. Equipment costs may only be included if the equipment is used solely as a result of inclusion of the NPP item.

8.5.7 Demolition

Ancillary components attached to an affected item or equipment that is scheduled for demolition shall not be priced out separately unless the ancillary component must be removed to complete the TO. Line item demolition includes all attached appurtenances and ancillary components attached to an affected item or equipment that is scheduled for demolition. If the item being demolished is attached to another item being removed and can be removed as one item, then that item shall not be priced as a separate demolition task, unless the component alone must be demolished. For example, demolition of a wood door includes hinges, hardware, closures, kick plates, etc., and removing pipe includes all in-line fittings and valves. Unless explicitly required in the SOW. Demolition prices in the UPB shall cover the cost of removal and disposal of the items. Demolition shall include the removal of the item, handling, disassembly, loading in a truck or dumpster, and disposal of demolished items, whether salvageable or non- salvageable, unless specified otherwise by the UPB task. Unit prices for demolition exclude costs for hauling.

8.6 Coefficients

Coefficients are developed and proposed by the Contractor, to be applied against the published UPB cost line items for the purpose of providing consideration to the Contractor. The Contractor shall factor in potential risks of inflation into the proposed coefficients.

Offerors shall provide indirect costs, NPP overhead and profit rate.

The Contractor's price coefficient shall include all products within the UPB, including the following:

· Mobilization and close out for the basic contract and each task order as well as mobilization for the subcontractors for each task order

· Contractor's overhead

· General and administrative and other overhead costs

· Any and all costs incurred or associated with the preparing of the proposal and corresponding supporting documentation as required for task orders

· Protective clothing

· Subcontractors' overhead

· Insurance

· Employee payroll taxes, insurance, and fringe benefits

· Business taxes, contributions, memberships, corporate

· Headquarters support (legal, financial, etc.)

· Waste and excess material

· Gross receipt and sales tax on material and equipment costs

· Close out for the total contract and each TO

· Traffic and work site signs and barriers

· Protection of and moving of Government Property

· QC

· Office Management and equipment

· Depreciation of mobile office(s)

· Interest associated with funding of equipment and payroll

· Submittal preparation

· As built drawings

· Permits, licenses, and fees

· Port-a-johns

· Clean-up on each task order

· Costs associated with complying with environmental and safety laws

· Subcontractor overhead and profit

8.7 Project Schedules

The Contractor shall submit to the Government, as a pre-construction submittal, the project schedule within seven (7) days of the award notification from the KO. The Contractor shall prepare and submit a Project Schedule of Values to the Government for approval, as part of each pay request at no additional cost, broken down by the Construction Line Item Number (CLIN) structure described below. The schedule shall include all work activities, milestones, and clearly show the critical path of the job. Work activities include:

· Submittal approval

· Equipment commissioning

· Controls testing

· Project milestones, including any requested BOD’s

· As-built drawings

· Final clean up and inspection

· Correction of punch list items

· Final payroll submittal

· Operation and maintenance manuals

The schedule shall indicate the sequence in which the Contractor proposes to perform the work and dates on which the Contractor proposes to start and complete all scheduled activities. The Contractor shall schedule the entire project from the award date to the Legal Completion Date (LCD) as stipulated in the award letter from the KO. The Contractor shall use the approved project schedule to measure the progress of the work. All schedules received should utilize the Critical Path Method (CPM) so the KO can readily determine the conditions to which the contract duration would need to be extended.

All task orders are broken down by CLIN. Any schedule submitted would need to be broken down to reflect individual work durations for each CLIN included in the task order.

Revisions of the schedule shall be re-submitted with each modification proposal for approval. The revised TO schedule shall clearly reflect the added and/or deleted items of work; and, reflect the increase or decrease in time required to execute the project and the modification. The Contractor shall immediately contact the KO for further direction if a Government Representative requests a change to the SOW.

Construction project schedules shall be submitted electronically. The Contractor shall provide an approved electronic version, readable without providing a copy of the software, to the Government.

6.2

8.8 Time Extensions

Time extensions for TO changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. Time shall not be extended to correct insufficient progress prior to the modification. (FAR 52.211-13, Time Extensions)

8.9 Weather Related Time Extensions

A Contractor that is delayed by unusually severe weather is entitled to an uncompensated time extension. The key to time extensions for unusually severe weather is not the cause per se, i.e., the weather, but the effect of the unforeseen weather on the work being performed.

To determine whether a Contractor is entitled to a time extension for unusually severe weather certain facts must be established by the Contractor and criteria met:

1. Identification of the work controlling the overall completion of the contract

2. The controlling work was delayed by the weather

3. The weather was unforeseeable, i.e., unusually severe Unusually severe is defined as weather that is abnormal compared to the past weather at the same location for the same time of year. Since the weather causing the delay must be abnormal for the same time of year and location, the fact that a Contractor encounters even extremely harsh weather, which in fact prevents them from working, is alone insufficient for finding an excusable delay if such weather is normal for the contract site. Adverse weather which at the time of year in which it occurred is unusual for the place in which it occurred. No matter how severe or destructive, if the weather is not unusual for the particular time and place, or if a Contractor should have reasonable anticipated it, the Contractor is not entitled to relief. A mere showing that there was rain, high wind velocity, or other unsettled weather conditions which interfered and prevented performance of work is not sufficient to bring those weather conditions within the meaning of the terms "unusually severe" weather.

8.10 Liquidated Damages

The Contractor shall pay liquidated damages to the Government if the Contractor fails to complete the work within the time specified. The amount to be paid by the Contractor shall be determined at the TO level for each calendar day of delay until the work is completed or accepted.

9.0 TASK ORDER DOCUMENTS

The Contractor’s proposal will be reviewed by the Government for accuracy and completeness. The Government will discuss all items with the Contractor. A TO will then be issued by the KO using DD Form 1155, Order for Supplies or Services.

Some circumstances such as change in work or funding priorities may prohibit the Government from issuing a TO after the receipt of the Contractor's proposal. If such circumstances arise, the Government shall not be obligated to reimburse the Contractor for any costs incurred in the preparation of the proposal. The Government reserves the right to cancel a proposed TO before or after receipt of the Contractor’s proposal.

All TOs are subject to the terms and conditions of this contract. In the event of a conflict between a TO and this contract, this contract shall prevail. If the Contractor is awarded multiple TOs, the work shall be completed concurrently unless otherwise specified in a TO.

9.1 Task Order Work Files

The Contractor shall retain the working file on each TO for the duration of the contract period and shall make these files available for the KO's review. All forms submitted shall be accurately filled out. The Contractor shall retain copies of any material including, but not limited to, receipts, TOs, sales slips, and invoices relating to the TO. The Contractor shall provide the KO access to the Contractor maintained files during the term of the contract.

9.2 Notice of Completion of Task Order

The Contractor shall notify the KO and COR upon completion of each individual TO. The Contractor shall give the Government five (5) calendar days’ minimum advance notice of the date the work will be fully completed and ready for final inspection.

9.3 BUILDER Sustainment Management System (SMS)

Contractor shall provide a list, including salient data, on all replaced components/systems (e.g. description of component/system, Manufacturer, Model Number, Serial Number, Voltage, CFM, RPM, etc.).

Contractor shall provide a list, including salient data, on all newly installed components/systems (e.g. description of component/system, Manufacturer, Model Number, Serial Number, Voltage, CFM, RPM, etc.).

Contractor shall physically tag all newly installed component/equipment/systems. Tagging shall state the Model Number, Serial Number, and installation date.

10.0 PERSONNEL

The Contractor shall provide the necessary personnel to accomplish all work within the time frames specified for each TO. The Contractor’s staff shall meet or exceed the position requirements as stated in the TO. The Contractor shall provide experienced and knowledgeable personnel in civil, structural, architectural, mechanical, and electrical engineering disciplines. The replacement and alternate staff shall meet or exceed the same minimum qualifications as stated in the TO. The Contractor’s staff shall be able to understand, speak, read, and write the English language fluently. Contractor will not be permitted to conduct work activities if Key Personnel are not approved by the KO/COR.

10.1 Key Personnel

Key personnel include the Program Manager (PM), Superintendent, Site Safety Health Officer (SSHO) and Quality Control Manager (QCM). The Contractor shall provide key personnel resumes to the KO for review and acceptance. The Contractor shall designate these individuals in writing and provide cell phone numbers to the KO prior to performance. The Government has the right to reject the Contractor’s choice of key personnel for failure to meet the qualification standards incorporated into the contract. Any changes to the working status of key personnel shall be transmitted in writing to the COR for approval within fourteen (14) calendar days of the proposed change. Key personnel shall not be added or removed without express acknowledgement of the COR and any replacement personnel shall be at least equal in skills, education, and experience to the predecessor.

10.1.1 Program Manager (PM)

The Contractor shall provide a PM with a minimum of five (5) years of experience supervising Commercial or Federal construction projects similar to those required by this contract (i.e. more than ten (10) projects working simultaneously). Additionally, the PM must demonstrate past experience in managing Federal contracts similar in scope to this JOC. An alternate PM shall be designated when work is being performed at hours other than as listed above or during absences such as illness, vacation, etc. The PM or their alternate shall be readily available (physically, telephonically, or online) except on Federal Government holidays, during the hours from 0700 – 1600, Monday through Friday. They shall have full authority to act for the Contractor on all contracting, construction, scheduling, resourcing, and/or personnel matters and issues brought to attention by the Government and provide answers or decisions within the limits of the Contract and Job Order specifications.

10.1.2 Superintendent

The Contractor shall provide a qualified on-site Superintendent and shall be designated in writing (listing name, address, and 24 hour telephone number) to the COR. The Superintendent shall have a minimum of five (5) years of experience supervising and managing Commercial or Federal construction projects similar in scope to those that will be required by this contract (i.e. – more than 5 projects simultaneously). The Superintendent shall be responsible for the overall performance, management, and coordination of the TO and shall be the central point of contact with the DPW for the performance of all work under each TO.