Attachment_01-Specifications_PR0040621670.pdf
PDF 4 MB Posted
- Solicitation number
- 140P6223Q0014
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P6223Q0014_Amd_0002.pdf | ||
| Sol_140P6223Q0014_Amd_0001.pdf | ||
| Attachment03-PastExperience_PR0040621670.docx | DOCX document | |
| Attachment_02_DOLWageRate_PR0040621670_.pdf | ||
| Sol_140P6223Q0014.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Div. 1 V. 2022-9-6 Page | 1
Buffalo National River
Yellville, AR
Repair and Repoint Chimneys on the Buffalo Point Cabin Office and Lodge
PMIS 332876
PROJECT SPECIFICATIONS
NATIONAL PARK SERVICE
April 12, 2023
Page | 2
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 10 00 - Division 01 Short Form General Requirements
DIVISION 04 – Masonry
Section 04 01 40.62 – Stone Repointing
DRAWINGS and PHOTOGRAPHS
Attachment A. Photos and Measurements added at the end of the document.
Attachment B. Building locations added at the end of the document.
Page | 3
SECTION 01 10 00
DIVISION 1 SHORT FORM GENERAL REQUIREMENTS
PART 1 – GENERAL
ITEM 1 - DESCRIPTION OF WORK
1.1 Background: The Buffalo Point Civilian Conservation Corps cabins lie in the Buffalo Point district at Buffalo National River. They were originally constructed as rustic lodging facilities for Buffalo River State Park in the late 1930s and early 1940s. The goal of this project is tuck point the masonry, line the interior of the chimney at the cabin office and replace the cap to help protect the structure.
1.2 Work Covered by the Contract Documents:
A. Project Location: Buffalo National River, 2261 Hwy 268E, Yellville, AR 72687 (See Attachment B)
B. Work consists of: The work for this project includes two buildings; the cabin office and the lodge.
The Cabin Office work will consist of tuck pointing all exterior stone surfaces (approx. 1,274 SF) to include walls, chimneys, and exposed foundations on all sides, install a new flexible 8” flue lining approximately 20 feet and repoint the inside of the fire box on all sides (approx.
150 SF) in the larger stone chimney, and replacing the chimney spark arrestor flue cap to include a drip edge made of stainless steel metal which will cover the entire top of the chimney to seal the new liner and extend past the masonry sides to ensure water falls away and not down the masonry sides. Please see Attachment A for photos and dimensions at the end of the document. The smaller chimney is capped and does not need a liner or repointed on the inside as there is no fire box attached to this chimney. Seal all masonry to wood locations with backer rod and flexible sealant as close as possible to the same color as the mortar used in the stone repointing.
The Lodge work for this project consists of tuck pointing all exterior stone surfaces (approx.
1,026 SF) to include walls, chimneys, and exposed foundations on all sides and tuck pointing interior stone surfaces surrounding the firebox on the two chimneys. Please see Attachment A photos and measurements at the end of the document. Seal all masonry to wood locations with backer rod and flexible sealant as close as possible to the same color as the mortar used in the stone repointing.
C. All work will be performed under a single contract.
D. Period of performance: Work shall be completed within 90 calendar days of the start date provided on the Notice to Proceed. The period of performance is inclusive of 10 weather days.
ITEM 2 – PROTECTING EXISTING UTILITIES
Page | 4
2.1 Protecting Existing Utilities: Notify Contracting Officer (CO), Contracting Officer’s Representative
(COR) and utility companies as required to request location services prior to and to coordinate any excavation/digging operations, and/or for demolition if within Scope of Work.
2.2 Contractor shall be responsible for locating and preventing damage to known utilities on site or indoors. If contractor damage occurs, alert CO and COR as soon as safely possible, and repair utility at no additional expense to the Government. If damage occurs to an unknown utility, contact CO and COR as soon as safely possible.
2.3 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated below:
A. Notify CO and COR not less than two business days in advance of proposed utility interruptions.
B. Hours for Utility Shutdowns: Shutdowns shall not exceed 2 to 3 hours. Temporary provisions will be needed by the Contractor for periods longer than stated allowance or if required for critical systems as determined by COR.
ITEM 3 - CONTRACTOR’S USE OF PREMISES
3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.
https://www.nps.gov/buff/learn/management/superintendent-s-compendium.htm
A. No signs or advertisements (except those specified herein and as required for safety) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
B. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.
C. Public Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public. Cabin office is occupied by concession staff.
3.2 On-site work hours: Work shall be generally performed during normal business working hours of
8 a.m. to 5 p.m., Monday through Thursday, except when otherwise indicated. Contractor will work with Park to schedule around cabin reservations that are already booked. Park will communicate with Concessioner to block Lodge units from being rented for the Contractor to conduct work on the building.
A. Work on Fridays, Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the CO and COR. Submit requests for work outside of the stated normal business hours to the CO and COR for approval at least 48 hours in advance of the work.
Page | 5
The following Federal holidays are observed by the National Park Service:
New Year Day Martin Luther King, Jr’s Birthday Washington’s Birthday Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day
B. Note: Any of the above holidays falling on a Saturday will be observed on the preceding
Friday; holidays falling on Sunday will be observed on the following Monday. The specific day that each holiday is recognized for each year can be found at the following site: Federal Holidays (opm.gov).
3.3 Contractor Use of Site:
A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to construction area as shown on site plan. Do not disturb portions of Project site beyond areas in which the Work is indicated. See Attachment B. Building locations.
B. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances.
C. Define site disturbance area, including earthwork and clearing of vegetation, to:
1. 10 feet beyond building perimeter
D. Utilities
1. General: Cost or use charges for temporary facilities shall be included in the Contract Sum as required.
2. Water Service: Water from existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Use resources wisely and minimize waste of water.
3. Electric Power Service: Electric power from existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Power may or may not meet your construction power tool requirements, provide generators if questionable. Use power in a resourceful manner and avoid excess power waste.
4. Waste Operation:
https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2022 https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2022
Page | 6
a. Toilets: Contractor provided for contracting personnel, sufficiently lighted and ventilated toilet facilities in weatherproof, sight proof, handicap accessible (if required), sturdy enclosures with privacy locks. Coordinate with COR for approved location.
b. Waste Removal / Recycling: Contractor is responsible for removing all waste created by the project. Contractor shall recycle to the highest degree possible and empty dumpsters as necessary to avoid debris on site. Coordinate with COR for approved location.
E. Security and Protection facilities:
1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with state and federal environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
2. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area.
Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.
3. Tree and Plant Protection: N/A.
4. Pest Control: Follow best practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at project completion. Perform control operations lawfully, using environmentally safe materials.
5. Temporary Enclosures: N/A
6. Site Enclosure Fence: N/A
7. Security Enclosure and Lockup: N/A
3.4 Storage - Staging Areas:
A. Limited area for confine storage of materials and equipment to the project staging area provided by COR at initial site visit after award of contract. Specific storage and staging area’s may be discussed at the preconstruction briefing.
3.5 Preservation of Natural Features: N/A.
3.6 Hauling Restrictions: Contractor to verify path to site and meet state and county road requirements and height restrictions for all park work/access.
3.7 Housekeeping:
A. Keep project neat, orderly, and in a safe condition at all times.
Page | 7
1. Dispose of waste materials and recycling legally outside the park. The contractor shall not use park dumpsters
2. Address Recycling: Government goal is to salvage and recycle as much nonhazardous construction waste as possible. Use sustainable methods to extent possible during this project, recycling material as is probable with local means. Maintain accurate documentary records for submittal of all recycled materials used including fly ash and slag cement.
3.8 Occupancy Requirements for Buildings:
A. Existing Buildings:
1. Full Government Occupancy: Government will occupy buildings that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.
a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO or COR.
b. Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.
c. The facility may be occupied by park visitors while the contractor works on the exterior of the building and the contractor will have to work with the COR to arrange to enter the facility to complete the interior work.
B. New /Existing Buildings Unoccupied: N/A
3.9 Photo Documentation:
A. Contractor must provide existing condition, progress, and completion photos. All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted electronically by email or via CD-R Archival Gold or DVD-R Archival Gold media with printed labels and 8 mega pixels minimum within 7 days from time of taken or as approved by COR.
B. Existing Condition Images:
1. Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc. that may be impacted by construction activity/traffic. Include existing items to remain or be salvaged from different vantage points and with context for location identification.
C. Construction Progress Images:
Page | 8
1. Document all sub-surface work/ trenches etc. prior to backfill with photos covering enough overall field view to show location and then zoom in for details. (Locations and dimensions shall also be noted on as built drawing set.)
2. Maintain organized index for photos with date, description, etc.
3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.
D. Completion Images:
1. Document all completed work within scope of work.
2. Maintain organized index for photos with date, description, etc..
3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.
3.10 Fire and Life Safety:
A. As a minimum, conduct one weekly 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the CO and COR within one day after the meeting and document the meetings on the daily reports.
B. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations). Take all necessary precautions to prevent fire during construction. Provide adequate ventilation during use of volatile or noxious substances.
C. Store and handle hazardous materials in accordance with manufacturers and OSHA 29CFR1926 Subpart D requirements 1926 | Occupational Safety and Health Administration (osha.gov). Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.
1. Immediately report all spills of hazardous materials to the CO, COR, and park.
2. Maintain a spill emergency response kit.
3. Train employees how to respond to a spill and use the emergency response kit.
3.11 Noise and Acoustics Management N/A
ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION
4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.
Contractor shall coordinate and incorporate long lead and delivery time items within the schedule.
ITEM 5 - EXAMINATION OF THE SITE
5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids.
Contractors will be accountable for understanding existing conditions. No cost changes for items viewable during site visit will be allowed.
ITEM 6 - ABBREVIATIONS
https://www.osha.gov/laws-regs/regulations/standardnumber/1926 https://www.osha.gov/laws-regs/regulations/standardnumber/1926
Page | 9
6.1 The list of abbreviations, standards and organizations which may be used in/referred within the Construction Specifications or Special Provisions, may be found linked from the listed page below. On the home page, follow the link under “Contracting and Procurement” labeled “NPS Reference Standards.” https://www.nps.gov/orgs/1671/do-business-with-us.htm
ITEM 7 - ACCIDENT PREVENTION
7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program (APP) and providing a safe environment for all personnel and visitors.
7.2 Submittals:
A. Accident Prevention (Safety) Plan (APP): Submit a site-specific accident prevention (safety) plan. The Plan shall be written to comply with OSHA and project requirements (a generic plan is not acceptable) including but not limited to the following:
1. Name and qualifications of responsible supervisor to carry out the program.
2. First aid and rescue procedures.
3. Training, both initial and continuing.
4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to provide for property protection and safety of the public, National Park Service personnel, and Contractor's employees. Identify the work included under each phase, with a Job Hazard Analysis (JHA)/Job Safety Analysis (JSA), etc. A sample JHA template may be provided upon request.
5. Planning for possible emergency situations, such as cave-ins, earthquake, explosions, fires, floods, power outages, slides, and windstorms. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.
6. Contractor to identify nearest location of medical facility for emergencies
7. Recognition that works will be performed in remote areas with limited communication or cell phone coverage if applicable.
8. Supplemental hazard specific plans may be required IAW 29 CFR 1926 or 1910.
B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute
"toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections to CO and COR within one day after the meeting and document the meetings on the daily reports.
7.3 Qualification of Employees:
A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. Provide operating instructions for all equipment.
B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
https://www.nps.gov/orgs/1671/do-business-with-us.htm
Page | 10
7.4 Accident Reporting: The Contractor shall report all accidents to the CO and COR as soon as safely possible and assist the CO and COR and other officials as required in the investigation of the accident.
7.5 First Aid Facilities: Provide access to facilities for the number of employees and appropriate to the hazards associated with the types of ongoing construction work at the site.
7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
7.7 Personal Protective Equipment (PPE): It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.
A. PPE must meet requirements of applicable ANSI standards. Selection shall conform to OSHA 29CFR 1926 Subpart E.
B. A hard hat use area shall be designated by the Contractor. The hard hat area shall be posted by the Contractor in a manner satisfactory to the Contracting Officer.
C. All PPE will be serviceable at all times. At a minimum, maintain 2 sets of PPE including hard hats and all other Accident Prevention Plan required equipment.
7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state, and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.
A. If a spill, leak, or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the local 911 Emergency Response, COR and or the National Park Service Emergency Dispatch.
ITEM 8 - PRECONSTRUCTION CONFERENCE
8.1 If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed. See Item 9.1C below.
ITEM 9 - SUBMITTALS
9.1 General Contracting Submittal Procedures:
A. General: Prepare and submit submittals required by individual Technical Specification Sections. Types of submittals are indicated in individual specific sections.
Page | 11
1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using National Park Service form CM-16 form. The form will be provided by the Contracting Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Submit completed CM-16 forms to the CO and the COR
B. Submittal List: administrative required submittals are listed below in 9.1.C and does not include technical section submittal requirements included in each technical section.
C. Preconstruction Conference Submittal: Satisfactory evidence of liability insurance coverage and workman’s compensation, and any applicable bonds, must be submitted within 10 calendar days of Notice of Award. The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed may not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued. Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference:
1. Letter designating Project Superintendent.
2. Construction Schedule. (Must include shop drawings, procurement time including long lead time items, mobilization, trade work progression and completion at minimum.)
3. A comprehensive breakdown of the Schedule of Values.
4. Accident Prevention (Safety) Plan (see section 7 of this document).
5. A list of Subcontractors for this project.
6. Written statements from subcontractors certifying compliance with applicable labor standard clauses (SF1413).
7. Quality Control Plan.
9.2 Project Shop Drawings, Product Data, and Samples: Contracting Officer will provide sample cover sheet and a list of required submittals is included in each technical specification or attached at the end of this document.
A. Shop Drawings: Indicate all coordinating materials and work impacting the installation coordination, connection details, anchorage requirements, hardware locations, and installation details and locations.
1. Submit Shop Drawings according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and two full size hardcopy documents to COR.
B. Product Data: Provide component construction and specification data sheets, anchorage requirements and any other product specific data.
1. Submit Product Data according to Part 9.1 of this section to include one digital file (.PDF or .TIF) to COR.
C. Samples: Submit 2 color samples 4” x 6” minimum in size for all color and product selections.
Paint samples shall be actual paint finish drawdown for all project colors.
Page | 12
1. Submit Samples CM-16 Transmittal Form according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and physical samples of actual material to COR.
D. For submittals specified above, forward submittals to Contracting Officer and COR at least 15 days before need for approval (depends on length of project).
E. After approving submittals, Contracting Officer and/or COR will return one copy to the Contractor. If submittals are not approved, Contracting Officer will return all copies to Contractor with reasons for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.
9.3 Approved Equals: If an item in this solicitation is identified as “brand name or equal” or lists more than 1 manufacturer, the description of the proposed item must reflect the characteristics and level of quality that will satisfy the Government’s needs as demonstrated by the salient physical, functional, or performance characteristics that “equal” products must meet and/or exceed that as specified in the solicitation or relevant specification.
A. For each item proposed as an “approved equal,” submit supporting data, including:
1. Drawings and samples as appropriate.
2. Comparison of the characteristics of the proposed item with that specified and with the salient characteristics provided.
3. Changes required in other elements of the work because of the substitution.
4. Name, address, and telephone number of vendor.
5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists.
Describe availability of maintenance service, and state source of replacement materials.
B. A request for approval constitutes a representation that Contractor:
1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
2. Will provide the same warranties for the proposed item as for the item specified.
3. Has determined that the proposed item is compatible with interfacing items.
4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
5. Waives all claims for additional expenses that may be incurred as a result of the substitution.
C. Approved Equals will be evaluated and approved/disapproved during the submittal process.
9.4 Schedule of Values: Submit the Schedule of Values a minimum of one week prior to the
Preconstruction Conference for COR review. Schedule of Values shall include defined work line items with cost break downs including labor, material, and equipment for COR approval.
9.5 Progress Reporting: The initial Construction Schedule and Schedule of Values are required a minimum of one week prior to the Preconstruction Conference. After the Notice to Proceed is issued and after on-site work begins, progress will be documented via daily logs and by providing an updated Construction Schedule and Schedule of Values when requested, but minimally with
Page | 13 each pay application. Submit digital copy electronically (PDF preferred) of all required documents.
Construction Schedules are normally in bar chart form and indicate estimated starting and completion dates for each part of the work. For a pay application to be reviewed and processed in a timely manner, the following information must either be submitted prior to or accompany submission of the pay application:
A. Daily/weekly progress reports during construction as part of the administration process.
B. Updated Schedule of Values: Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values. A sample Schedule of Values format may be provided upon request.
ITEM 10 – TEMPORARY SERVICES
10.1 It is the Contractor’s responsibility to provide temporary services, equipment, tools, and skilled labor as required for the chosen means and methods to perform the work in accomplishing this Contract.
ITEM 11 - PROJECT CLOSEOUT
11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures working toward Final Acceptance.
11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. Move attic stock to location coordinated with COR. At time of final inspection, project shall be thoroughly clean and ready for intended use. Inspector holds the right to reschedule if project is not ready for inspection.
11.3 Completion and Final Inspection: Contractor shall submit written certification of project completion and request a final inspection to the Contracting Officer and COR. The Contracting Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.
A. If the work is determined to be complete following the final inspection with minor comments, the COR will prepare and provide the Contractor a Punch List noting outstanding items to be addressed.
B. If the work is not determined to be complete following the final inspection, the Contracting Officer will notify Contractor in writing, stating reasons. Contractor, after completing the work according to the Contract Documents, shall resubmit completion and request a new final inspection. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.
C. Contractor shall complete the Punch List within 30 calendar days, or a time directed by the
CO.
Page | 14
D. Once Contractor completes all items of work on the Punch List and all contractually required items are accepted, Contracting Officer will issue Letter of Final Acceptance of Work and request the final pay application.
E. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.
F. Disposition of any permits and warranties required by the specifications in this section.
11.4 Final Acceptance of the Work: After all punch list deficiencies have been corrected, a Letter of
Final Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.
11.5 Warranties
A. Construction Warranty shall be based on date of final acceptance of the work and remain in effect for one year.
B. Provide all manufacturer warranty information of products installed organized by Division. All contact information, extent of coverage and conditions shall be clearly noted as well as date of overall final acceptance.
C. Information shall include operation and maintenance manuals for each warranted product.
PART 2 – PRODUCTS (NOT USED)
PART 3 – EXCUTION (NOT USED)
END OF SECTION
BUFF PMIS NUMBER: 332876 April 12, 2023
Div. 4 V. 2021-10-18 STONE REPOINTING 040140.62 Page | 1
SECTION 040140.62
STONE REPOINTING
PART 1 - GENERAL
1.1 SCOPE OF WORK
A. Project Location: Buffalo National River, 2261 Hwy 268 E, Yellville, AR 72687
B. Building(s) Name/Identifier: Historic Buffalo Point CCC Cabin 6 and the Lodge
1.2 SUMMARY
A. Section includes repointing joints with mortar.
1.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Samples: For each exposed product and for each color and texture specified.
C. Approved Mortar Mix Proportion Specification.
1.5 INFORMATIONAL SUBMITTALS
A. Quality-control program.
1.6 QUALITY ASSURANCE
A. Stone Repointing Specialist Qualifications: Engage an experienced stone repointing firm to perform work of this Section. Firm shall have completed work similar in material, design, and extent to that indicated for this Project with a record of successful in-service performance.
Experience in only installing standard unit masonry or new stone masonry is insufficient experience for stone repointing work.
B. Quality-Control Program: Prepare a written quality-control program for this Project to systematically demonstrate the ability of personnel to properly follow methods and use materials and tools without damaging stonework. Include provisions for supervising performance and preventing damage.
C. Temperature: Maintain wall temperature between 40 and 95 degrees F. To the extent possible, repoint in the shade, away from strong sunlight in order to slow the drying process.
D. Mockups: Prepare mockups of stone repointing to demonstrate aesthetic effects and to set quality standards for materials and execution.
Div. 4 V. 2021-10-18 STONE REPOINTING 040140.62 Page | 2
1. Repointing: Rake out joints in one area approximately 12 inches (300mm) high by 24 inches (600 mm) wide unless otherwise indicated for each type of repointing required, and repoint one of the areas.
2. Remove mortar with hand tools (chisel and hammer) in combination with assistance of power tools as follows:
a. Use of hand-held small pneumatic impact chisels and narrow rotary-grinder drills is allowed if done without damaging the existing stone units.
b. Use of angle grinder with a diamond-impregnated metal blade, for aligned horizontal joints only, is allowed if done without damaging the existing stone units.
Blades shall be half as narrow as the joint, cut made in the center of the joint, and final removal from the sides of the joint by hand.
PART 2 - PRODUCTS
2.1 MORTAR MATERIALS
A. Portland Cement: ASTM C150/C150M, Type I or Type II, white or gray, or both where required for color matching of mortar.
1. Provide cement containing not more than 0.60 percent total alkali when tested according to ASTM C114.
2. Hydrated Lime: ASTM C207, Type S.
B. Mortar Sand: ASTM C144.
1. Match size, texture, and gradation of existing mortar sand as closely as possible. Blend several sands if necessary to achieve suitable match.
2. Color: Natural sand or ground marble, granite, or other sound stone of color necessary to produce required mortar color.
C. Mortar Pigments: ASTM C979/C979M, compounded for use in mortar mixes, and having a record of satisfactory performance in stone mortars.
D. Use only synthetic mineral oxides, alkali-proof and sun-fast. Organic pigments are not allowable.
E. Water: Potable.
2.2 MORTAR MIXES
A. Measurement and Mixing: Measure cementitious materials and sand in a dry condition by volume or equivalent weight. Do not measure by shovel; use known measure. Mix materials in a clean, mechanical batch mixer.
1. Mixing Pointing Mortar: Thoroughly mix cementitious materials and sand together before adding any water. Then mix again, adding only enough water to produce a damp, unworkable mix that retains its form when pressed into a ball. Maintain mortar in this dampened condition for 15 to 30 minutes. Add remaining water in small portions until mortar reaches desired consistency. Use mortar within one hour of final mixing; do not retemper or use partially hardened material.
Div. 4 V. 2021-10-18 STONE REPOINTING 040140.62 Page | 3
B. Colored Mortar: Produce mortar of color required by using specified ingredients. Do not alter specified proportions without Contracting Officer’s Representative (COR) approval.
1. Mortar Pigments: Where mortar pigments are indicated, do not add pigment exceeding 10 percent by weight of the cementitious or binder materials, except for carbon black which is limited to 2 percent.
C. Do not use admixtures in mortar unless otherwise indicated.
D. Mixes: Mix mortar materials in the following proportions:
1. Pointing Mortar by Type: ASTM C270, Proportion Specification, Type N (750 psi) unless otherwise indicated; with cementitious material limited to Portland cement and lime. Add mortar pigments to produce mortar colors required.
2.3 REPLACEMENT STONE UNITS
A. Stone Matching Existing: Natural building stone of variety, color, texture, grain, veining, finish, size, and shape that match existing stone.
B. For existing stone that exhibits a range of colors, texture, grain, veining, finishes, sizes, or shapes, provide stone that proportionally matches that range rather than stone that matches an individual color, texture, grain, veining, finish, size, or shape within that range.
C. Cutting New Stone: Cut each new stone so that, when it is set in final position, the rift or natural bedding planes will match the rift orientation of existing stones.
PART 3 - EXECUTION
3.1 PROTECTION
A. Remove gutters and downspouts and associated hardware adjacent to stone and store during stone repointing. Reinstall when repointing is complete.
1. Provide temporary rain drainage during work to direct water away from building.
3.2 REPOINTING
A. Rake out and repoint joints to the following extent:
1. All joints in areas indicated.
B. Rake out joints as follows, according to procedures demonstrated in approved mockup:
1. Remove mortar from joints to depth of 2 times joint width and not less than that required to expose sound, un-weathered mortar. Do not remove unsound mortar more than half the masonry depth; consult COR for direction.
Div. 4 V. 2021-10-18 STONE REPOINTING 040140.62 Page | 4
2. Remove mortar from stone surfaces within raked-out joints to provide reveals with square backs and to expose stone for contact with pointing mortar. Brush, vacuum, or flush joints with clean, low pressure water spray to remove dirt and loose debris.
3. Do not spall edges of stone units or widen joints. Replace or patch damaged stone units as directed by COR.
a. Remove mortar from joints that abut area of stone removal to same depth as stone was removed. Remove loose mortar particles and other debris from surfaces to be bonded and surfaces of adjacent stone units that will receive mortar by cleaning with stiff-fiber brush.
b. Cut and trim partial replacement to accurately fit area where material was removed. Fabricate to size required to produce joints between partial replacement and adjacent stone to match joints existing joints.
c. Set replacement stone with rebuilding (setting) mortar and with completely filled bed, head and collar joints. Butter vertical joints for full width before setting and set units in full bed or mortar. If applicable, replace existing anchors with new anchors matching existing configuration.
C. Notify COR of unforeseen detrimental conditions including voids in mortar joints, cracks, loose stone, rotted wood, rusted metal, and other deteriorated items.
D. Pointing with Mortar:
1. Rinse joint surfaces with water to remove dust and mortar particles. Time rinsing application so, at time of pointing, joint surfaces are damp but free of standing water. If rinse water dries, dampen joint surfaces before pointing.
2. Apply pointing mortar first to areas where existing mortar was removed to depths greater than surrounding areas. Apply in layers not greater than 3/8 inch (9 mm) until a uniform depth is formed. Fully compact each layer, and allow it to become thumbprint hard before applying next layer.
3. After deep areas have been filled to same depth as remaining joints, point joints by placing mortar in layers not greater than 3/8 inch (9 mm). Fully compact each layer and allow to become thumbprint hard before applying next layer. Where existing stone has worn or rounded edges, slightly recess finished mortar surface below face of stone to avoid widened joint faces. Take care not to spread mortar beyond joint edges onto exposed stone surfaces or to featheredge the mortar.
4. When mortar is thumbprint hard, tool joints to match original appearance of joints as demonstrated in approved mockup. Remove excess mortar from edge of joint by brushing.
5. Cure mortar by maintaining in thoroughly damp condition for at least 72 consecutive hours. Coordinate mortar curing accordingly to avoid weekend and holiday work, unless approved by COR.
6. Hairline cracking within mortar or mortar separation at edge of a joint is unacceptable.
Completely remove such mortar and repoint.
Div. 4 V. 2021-10-18 STONE REPOINTING 040140.62 Page | 5
E. Where repointing work precedes cleaning of existing stone, allow mortar to harden at least 30 days before beginning cleaning work.
3.3 FINAL CLEANING OF REPOINTED MORTAR
A. If repointing work is carefully executed, there will be little need for cleaning other than to remove the small amount of mortar from the edge of the joint following tooling.
B. Remove excess repointing mortar from joint edge with a stiff natural bristle or nylon brush after the mortar as dried, but before it is initially set. Do not employ aggressive cleaning methods that could damage masonry surfaces or the mortar.
END OF SECTION
C
ER
T.
/L
A B
T
ES
T
R
EP
O R
T/ C
A
LC
O
R P
LA
N
M fg
. D A
TA
IN
ST
R U
C
TI
O N
S
SH
O
P D
R A
W
IN
G
SA
M
PL
E
M fg
. D A
TA
IN
ST
R U
C
TI
O N
S
040140.62 1.4A Product Data - Portland Cement X
040140.62 1.4A Product Data - Hydrated Lime X
040140.62 1.4A Product Data - Mortar Sand X
040140.62 1.4A Product Data - Mortar Pigments X
040140.62 1.4A Product Data -Joint Sealants X
040140.62 1.4B Mortar Sand X
040140.62 1.4C Mortar Mix Proportion Specification X
040140.62 1.6A Repointing Specialist Qualifications X
040140.62 1.6A Quality-Control Program X
040140.62 1.6D Mockup- Mortar Mix X
Sealant from Masonry to Wood X X X
Spark Arrestor X X X
Chimney Liner X X X
Chimney Cap and Dip Edge X X X
Crown/Drip Edge Material Specifications X X
Chimney Liner Material Specifications X X
SUBMITTAL LIST
Note: See tab below for Samples and Instructions. Attach to end of Specification Section 01 33 23 when complete.
Spec. Sec. Par. No. Description
INFORMATIONAL ACTION
BUFF/332876/Repair & Repoint Chimneys on the BP Cabin Office & Lodge
SUBMITTAL REQUIREMENTS (indicate with an "X")
Page | 15
Attachment A Lodge
East Side
Page | 16
West Side
Page | 17
South Side
Page | 18
North Side
Unit A Chimney
Unit D Chimney
Page | 19
Cabin Office
North Side
Page | 20
East Side
Page | 21
South Side
Page | 22
West Side
Example of chimney cap and dip edge made of stainless steel
Page | 23
Attachment B
Building Locations
Parking is limited and available in the red circles below
| Final Approved BUFF 332876 Division_01_ShortForm_GeneralRequirements_V 2022-09-06 |
| E. Security and Protection facilities: |
| 1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with state and federal environmental regulations and that minimize possible air, waterway, and subsoil contamina... |
| 2. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure... |
| 3. Tree and Plant Protection: N/A. |
| 4. Pest Control: Follow best practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at project co... |
| 5. Temporary Enclosures: N/A |
| 6. Site Enclosure Fence: N/A |
| 7. Security Enclosure and Lockup: N/A |
| 3.4 Storage - Staging Areas: |
| A. As a minimum, conduct one weekly 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the foll... |
| B. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations). Take all necessary precautions to prevent fire during construction. Provide adequate ventilation during use of volatile or n... |
| C. Store and handle hazardous materials in accordance with manufacturers and OSHA 29CFR1926 Subpart D requirements 1926 | Occupational Safety and Health Administration (osha.gov). Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for... |
| 1. Immediately report all spills of hazardous materials to the CO, COR, and park. |
| 2. Maintain a spill emergency response kit. |
| 3. Train employees how to respond to a spill and use the emergency response kit. |
| Final Approved BUFF 332876 Technical Specification Stone Repointing |
| PART 1 - GENERAL |
| 1.1 SCOPE OF WORK |
| A. Project Location: Buffalo National River, 2261 Hwy 268 E, Yellville, AR 72687 |
| B. Building(s) Name/Identifier: Historic Buffalo Point CCC Cabin 6 and the Lodge |
| 1.2 SUMMARY |
| A. Section includes repointing joints with mortar. |
| 1.3 PREINSTALLATION MEETINGS |
| A. Preinstallation Conference: Conduct conference at Project site. |
| 1.4 ACTION SUBMITTALS |
| A. Product Data: For each type of product. |
| B. Samples: For each exposed product and for each color and texture specified. |
| C. Approved Mortar Mix Proportion Specification. |
| 1.5 INFORMATIONAL SUBMITTALS |
| A. Quality-control program. |
| 1.6 QUALITY ASSURANCE |
| A. Stone Repointing Specialist Qualifications: Engage an experienced stone repointing firm to perform work of this Section. Firm shall have completed work similar in material, design, and extent to that indicated for this Project with a record of succ... |
| B. Quality-Control Program: Prepare a written quality-control program for this Project to systematically demonstrate the ability of personnel to properly follow methods and use materials and tools without damaging stonework. Include provisions for sup... |
| C. Temperature: Maintain wall temperature between 40 and 95 degrees F. To the extent possible, repoint in the shade, away from strong sunlight in order to slow the drying process. |
| D. Mockups: Prepare mockups of stone repointing to demonstrate aesthetic effects and to set quality standards for materials and execution. |
| 1. Repointing: Rake out joints in one area approximately 12 inches (300mm) high by 24 inches (600 mm) wide unless otherwise indicated for each type of repointing required, and repoint one of the areas. |
| 2. Remove mortar with hand tools (chisel and hammer) in combination with assistance of power tools as follows: |
| a. Use of hand-held small pneumatic impact chisels and narrow rotary-grinder drills is allowed if done without damaging the existing stone units. |
| b. Use of angle grinder with a diamond-impregnated metal blade, for aligned horizontal joints only, is allowed if done without damaging the existing stone units. Blades shall be half as narrow as the joint, cut made in the center of the joint, and fin... |
| PART 2 - PRODUCTS |
| 2.1 MORTAR MATERIALS |
| A. Portland Cement: ASTM C150/C150M, Type I or Type II, white or gray, or both where required for color matching of mortar. |
| 1. Provide cement containing not more than 0.60 percent total alkali when tested according to ASTM C114. |
| 2. Hydrated Lime: ASTM C207, Type S. |
| B. Mortar Sand: ASTM C144. |
| 1. Match size, texture, and gradation of existing mortar sand as closely as possible. Blend several sands if necessary to achieve suitable match. |
| 2. Color: Natural sand or ground marble, granite, or other sound stone of color necessary to produce required mortar color. |
| C. Mortar Pigments: ASTM C979/C979M, compounded for use in mortar mixes, and having a record of satisfactory performance in stone mortars. |
| D. Use only synthetic mineral oxides, alkali-proof and sun-fast. Organic pigments are not allowable. |
| E. Water: Potable. |
| 2.2 MORTAR MIXES |
| A. Measurement and Mixing: Measure cementitious materials and sand in a dry condition by volume or equivalent weight. Do not measure by shovel; use known measure. Mix materials in a clean, mechanical batch mixer. |
| 1. Mixing Pointing Mortar: Thoroughly mix cementitious materials and sand together before adding any water. Then mix again, adding only enough water to produce a damp, unworkable mix that retains its form when pressed into a ball. Maintain mortar in t... |
| B. Colored Mortar: Produce mortar of color required by using specified ingredients. Do not alter specified proportions without Contracting Officer’s Representative (COR) approval. |
| 1. Mortar Pigments: Where mortar pigments are indicated, do not add pigment exceeding 10 percent by weight of the cementitious or binder materials, except for carbon black which is limited to 2 percent. |
| C. Do not use admixtures in mortar unless otherwise indicated. |
| D. Mixes: Mix mortar materials in the following proportions: |
| 1. Pointing Mortar by Type: ASTM C270, Proportion Specification, Type N (750 psi) unless otherwise indicated; with cementitious material limited to Portland cement and lime. Add mortar pigments to produce mortar colors required. |
| 2.3 REPLACEMENT STONE UNITS |
| A. Stone Matching Existing: Natural building stone of variety, color, texture, grain, veining, finish, size, and shape that match existing stone. |
| B. For existing stone that exhibits a range of colors, texture, grain, veining, finishes, sizes, or shapes, provide stone that proportionally matches that range rather than stone that matches an individual color, texture, grain, veining, finish, size,... |
| C. Cutting New Stone: Cut each new stone so that, when it is set in final position, the rift or natural bedding planes will match the rift orientation of existing stones. |
| PART 3 - EXECUTION |
| 3.1 PROTECTION |
| A. Remove gutters and downspouts and associated hardware adjacent to stone and store during stone repointing. Reinstall when repointing is complete. |
| 1. Provide temporary rain drainage during work to direct water away from building. |
| 3.2 REPOINTING |
| A. Rake out and repoint joints to the following extent: |
| 1. All joints in areas indicated. |
| B. Rake out joints as follows, according to procedures demonstrated in approved mockup: |
| 1. Remove mortar from joints to depth of 2 times joint width and not less than that required to expose sound, un-weathered mortar. Do not remove unsound mortar more than half the masonry depth; consult COR for direction. |
| 2. Remove mortar from stone surfaces within raked-out joints to provide reveals with square backs and to expose stone for contact with pointing mortar. Brush, vacuum, or flush joints with clean, low pressure water spray to remove dirt and loose debris. |
| 3. Do not spall edges of stone units or widen joints. Replace or patch damaged stone units as directed by COR. |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .