Attachment 01-SOW-21QC025-CES Hoist.pdf
PDF 106 KB Posted
- Attached to
- Hoist and Trolley Repair Federal contract opportunity
- Solicitation number
- FA489721QC025
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit-Hoist and Trolley Pictures-21QC025-CES Hoist.pdf | ||
| Amendment 02-COMBO-21QC025-CES Hoist.pdf | ||
| Amendment 02-SOW-21QC025-CES Hoist.pdf | ||
| Amendment 02-Attachment 04-End Truck Motor Pictures-21QC025-CES Hoist.pdf | ||
| Amendment 01-COMBO-21QC025-CES Hoist.pdf | ||
| Attachment 03-Wage Determination-21QC025-CES Hoist.pdf | ||
| COMBO-21QC025-CES Hoist.pdf | ||
| Attachment 02-Base Access Procedures-21QC025-CES Hoist.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
6 July 2021
Work Task Project: FA489721QC025 Title: Remove/Install two, 2.5T hoist and trolleys Project Manager: Chuck Shoemaker Facility: 1339 265 15th Ave Mountain Home AFB, Id. 83648 Period of Performance: 30 Days Liquidated Damages: None Submittals: Hoist and trolley product data
Government Furnished Material: None
Requirements:
1. The contractor shall comply with applicable Occupational Safety and Health Administration (OSHA), federal, state, and local regulations and codes.
2. Contractor must field verify all hardware, components, and material for project.
3. Repair overhead hoist/crane back to fully safe and functional operating status by replacing hoist motors and trolleys.
4. Supply and install hook attachments specific for Engine Shop or hooks that comply with occupants lifting techniques (supply hook lifting apparatus that support engine shop).
5. Perform load test after new hoist motors are installed, provide load test certification.
6. Supply and install two new 2.5 ton hoist motors and trolleys, Mfg-Street Hoists or equivalent: (Must fit on existing girders)
a. DZX-1020 Hoist Model Code: ZX064-3SoNM7Z031-CRB09B1-46060U14. This item is cCSAus Approved.
b. Datasheet: DZX-1020
c. Hoist Model: ZX06
d. Hoist Type: CRB (DG Crab Trolley)
e. Gauge: 2' - 11.43"
f. Required SWL (Crane components selected based on required SWL): 2.5 US Ton
g. Max. Hoist SWL: 3 US Ton
h. Required HOL: 13'
i. Available HOL: 21' - 3.91"
j. Supply: 460V +10/-6% 3ph 60Hz
k. Control: 110V
l. Hoist Speed: 15.7/5.2 fpm
m. Hoist Power: 1 x 6.03/1.93 HP
n. Hoist Duty: Class E (M7 (H5))
o. Traverse Speed: 6.6 - 65.6 fpm
p. Traverse Power: 1 x 0.34 HP
q. Traverse Duty: Class E (M7 (H5))
r. Hoist Mass: 983.26 lbs
7. Standard Features or equivalent:
a. Ambient temperature range of 14°F to 104°F
b. Suitable for clean indoor use at an altitude less than 3280 ft above sea level
c. Atmosphere of normal humidity (5-95% non-condensing) free of contamination and harmful deposits.
d. IP54 protection to all motors & control equipment.
e. Heavy duty 2 Speed Hoist Motor with 3:1 ratio 60% ED rating.
f. Hoist motor complete with thermal protection and Class 'F' insulation.
g. Fully sealed compact hoist gearbox - oil bath lubricated.
h. In line hardened & ground helical gears for smooth & quiet operation.
i. Fail-safe DC disc brake with hand release mounted on hoist gearbox designed for ease of maintenance.
j. Overload cut-out device (rated capacity limiter)
k. Fully sealed direct drive trolley system.
l. Hoist upper and lower limit switches - roller plunger type.
m. Plug & socket connections for easy installation & maintenance.
n. Included Features:
o. 1.2 ZXOP39R Trolley Inverter, 6.6-66 ft/min, ramp and hold operation. This item is cCSAus Approved.
p. 1.3 ZXOP98D Hoist Direct on line 2 speed motor control. This item is cCSAus
Approved. Item No Part No Description
q. Item - Included Custom Hoist Extras
r. 20.1 COH-00001 Custom Gauge @ 6' 90.1 ZXOP04 Double Girder trolley
s. Wireless controls
8. Remove and dispose existing buss bars, hoists and trolleys. Support MHAFB’s recycling policy in accordance with Executive Order 13101.
8. ENVIRONMENTAL CONTROLS.
8.1 Hazardous Material Inventory and Safety Data Sheets: SDS are required as specified in the latest version of Federal Standard No. 313 for all potentially hazardous materials. SDSs must be submitted by the Contractor upon contract award to the Hazardous Materials Program Manager (366 FW/A7IE) at 208-828-1684/6351 for a determination of whether or not a product is a hazardous material (HAZMAT) and what additional requirements may be applicable/necessary. Approval is required before bringing any HAZMAT onto the installation. The government (HAZMART personnel) will inventory all chemicals that the
Contractor brings on to Mountain Home AFB or any property under the control of Mountain Home AFB. Any products that meet the criteria of “Hazardous Waste” must be bar coded and tracked until permanently removed from government property. The inventory will be performed prior to commencement of work. Criteria for identifying hazardous waste, is contained in Subpart C of 40 CFR, Part 261.
8.2. Material Storage and Use. The contractor shall follow manufacturer's guidelines and professional recommendations for control of humidity, temperature, cleanliness, and materials handling. This includes HAZMAT.
8.3. Notification of Environmental Spills. If a spill occurs, the person discovering the spill will make every effort to stop the product flow (if possible), warn personnel, shut off ignition sources, contain the spill, make notifications, and begin cleanup. If the spill is considered an emergency and there is a potential life, health, fire, or other safety hazard, the MHAFB Fire Department will be notified IMMEDIATELY. Responsible units/activities will clean up small spills safely and within their capabilities to do so. Generally, a spill of only a few gallons will be recovered by the responsible unit/activity using absorbent materials or a spill kit located by the site. Recovered product and contaminated materials will be packaged and staged for disposal in accordance with the installations hazardous waste procedures. Contact the Environmental Office (208-828-6351) for guidance. The liability for the spill or release of such substances rests solely with the contractor and its agent.
8.4. Waste. Identify, label, handle, store, and dispose of hazardous waste or debris in accordance with federal, state, and local regulations. Ensure all waste has undergone the appropriate hazardous waste determination and documentation is retained for these determinations. If hazardous wastes are generated, the contractor will be required to setup and maintain a hazardous waste accumulation point. All hazardous waste generated must be disposed of at a RCRA permitted treatment storage or disposal facility. Do not dispose of hazardous waste on Government property. Do not discharge any waste to a sanitary sewer, storm drain, or to surface waters or conduct waste treatment or disposal on Government property without written approval of the Contracting Officer and Environmental. Consult with the Hazardous Waste Program Manager (366 FW/A7IE) at 208-828-1684/6351 prior to disposal of any waste.
8.5. ASBESTOS. The Contractor shall comply with Section 29 CFR 1910.1001(j) (7) (iv). VTE may be located in facilities which contain Asbestos Containing Material (ACM) or Potential ACM. The Contractor (not the Government) shall determine if any exposure to ACM may result in performing work under the contract.
8.6. Historic Preservation. MHAFB houses numerous historic properties (buildings, structures, objects, archaeological sites) managed in compliance with the National Historic Preservation Act (NHPA), and its implementing regulations at 36 CFR 800. In order to avoid inadvertent adverse effects to historic properties, coordination with 366 FW/A7IE Cultural Resources Manager (828-8003/6351) is required prior to implementation.
File details come from the government source that posted it. Updated .