Attachment 01 - Schedule of Items - Sidnaw Creek AOP.pdf

PDF 197 KB Posted

Attached to
Sidnaw Creek Aquatic Organism Passage (AOP) Replacement - Ottawa National Forest
Solicitation number
12441923R0059
Issued by

About this file

This document is an attachment to a federal solicitation providing the schedule of items and pricing terms for the Sidnaw Creek Aquatic Organism Passage replacement project on the Ottawa National Forest. The Forest Service is seeking bids to complete construction survey and staking, soil erosion and pollution control, roadway excavation and embankment compaction, structure excavation, foundation fill, structural backfill, dewatering, placement of various classes of riprap and channel rock, aggregate surfacing, installation of a 20' span 10' rise precast concrete box culvert, placement of conserved topsoil and seeding, erosion control matting, temporary traffic control, and streambed simulation rock. Bidders are to provide unit pricing for each item. Upon award, payment will be made based on actual work performed as defined in clause 109.01 of FP-14, with bond premiums covered under the mobilization line item.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I - SCHEDULE OF ITEMS

SECTION B – SERVICES AND PRICES

Sidnaw Creek AOP

Kenton Ranger District Ottawa National Forest Houghton County, MI

B- 1 - SCHEDULE OF ITEMS

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101

Mobilization

Lump Sum 1

15201

Construction survey and staking, method I, tolerance A

15713

Soil erosion and pollution control

20301

Removal of structures and obstructions, disposal method A

20403

Roadway excavation and embankment, compaction placement method 2 Cubic Yard 198

20414

Conserved Top Soil

20426

Drainage Excavation

20801

Structure excavation

Cubic Yard 786

20802

Foundation fill including geotextile

Cubic Yard 108

20803

Structural backfill

Cubic Yard 618

20850 Dewatering Lump Sum 1 $________ $________

25101

Placed riprap, class 1

Cubic Yard 100

25151

Placed riprap, class 2

Cubic Yard 20

30101

Aggregate surface course, MDOT 23A, Compaction Method B

Cubic Yard 148

60205

20’ span, 10’ rise precast reinforced concrete box culvert

Foot 64

62451

Placing conserved topsoil Lump Sum 1

62551 Seeding, dry method Lump Sum 1 $________ $________

62951 Erosion control mat, type 3B biodegradable Lump Sum 1

63307

Object marker

Each 4

63501

Temporary traffic control

64801

Placed Streambed simulation rock, bed class 3, method A

Cubic Yard 260

64803

Placed channel rock, class 0, method C

Cubic Yard 10

64853

Placed channel rock, class 2, method A

Cubic Yard 220

Total $_________________

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.

File details come from the government source that posted it. Updated .