Attachment 01 - PWS - AFREP Cabin Pressure Indicator Repairs.pdf

PDF 154 KB Posted

Attached to
Cabin Pressure Indicator (CPI) Repairs - 18 MXG AFREP
Solicitation number
FA527026QB023
Issued by

About this file

This is a Performance Work Statement (PWS) for repair services of F15E aircraft cabin pressure indicator components at Kadena Air Base under the Air Force Repair Enhancement Program (AFREP), effective 17 February 2026.

The Service Provider must repair F15EX Cabin Pressure Indicators (NSN 6685-01-668-2966) to serviceable condition in accordance with Department of the Air Force Instruction 21-101 and applicable technical orders. The workload consists of 10 units per fiscal year over a five-year period (Fiscal Years 26-30), totaling 50 components. The Service Provider must possess an approved Source of Approved Repair (SAR) letter certified by the MAJCOM AFREP Manager. All repairs must meet original equipment manufacturer (OEM) acceptance test procedures and technical specifications, with repaired parts appearing cosmetically new. The Service Provider shall conduct inspections upon receipt and upon completion, documenting components tested, serial numbers, test procedures, and technical values. Standard repairs must be completed and physically received by the Government within 40 days of receipt; mission-critical parts designated as MICAP must be completed within 20 days. All shipping costs are included in the repair cost, with tracking numbers and shipping documentation required. The Service Provider must provide written certification that repaired products are safe and fully qualified for operational use on the F15E aircraft. All government-furnished property must be reported using the GFP Module at https://wawf.eb.mil, with training available at https://dodprocurementtoolbox.com. The Service Provider shall establish and maintain a Quality Control Plan addressing inspection procedures, defect prevention, and record-keeping. Invoicing is submitted via Wide Area Work Flow (WAWF) using Reparable Receiving Reports (RRR). The Service Provider shall report all labor hours (including subcontractor hours) through Service Contract Reporting (SCR) on SAM.gov by October 31 of each calendar year. Warranty coverage follows the Service Provider's standard commercial warranty terms. Repaired parts shall be returned to 18 MXG/MXQ (FA5270), Unit 5179 Box 10, APO, AP 96368.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Kadena Air Base

Performance Work Statement Cabin Pressure Indicator

Air Force Repair Enhancement Program (AFREP)

17 February 2026

Page | 2

Table of Contents

1. SCOPE

2. Description of Services/Introduction

3. Special Qualifications

4. Requirements

4.1. Inspections

4.2. Contractor Inspection Records

4.3. Record of Repairs………………………………………………………………………..…2

4.4 Repair/Shipment Timeframe

4.5 Products/Materials

4.6 Government Furnished Property

4.7 GFP Training………………………………………………………………………………..3

4.8 Quality Control Plan………………………………………………………………………...3

5. Invoicing

6. Warranty

7. Location

8. Manpower Reporting

9. Services Summary EXHIBIT A, Cabin Pressure Indicator

Page | 3

1. Scope: The work consists of furnishing all labor, tools, and equipment necessary to repair F15X parts to serviceable condition in support of the Air Force Enhancement Program (AFREP) and in accordance with technical orders (TO) and special qualifications identified elsewhere in this performance work statement (PWS).

Parts outlined in the performance work statement (PWS) exhibit(s) shall be furnished by 18 MXG/MXQ.

2. Description of Services/Introduction: Service Provider (SP) shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to repair F15E aircraft parts listed in Exhibit A.

3. Special Qualifications: IAW DAFI 21-101 Para 11.36 (ACC Supplement), the SP must have an approved Source of Approved Repair (SAR) letter certified by MAJCOM AFREP Manager.

4. Requirements: All repairs shall be conducted in accordance with Department of the Air Force Instruction (DAFI) 21-101, Air Combat Command Supplement, Paragraph 11.36 (available at www.e-Publishing.af.mil) and applicable technical orders. See Exhibit(s) for specific publications applicable to each part.

4.1. Inspections: SP shall perform and document an inspection/functional check upon receipt of part. If unable to repair the part, the SP must return the part at no cost to the Government. After parts have been repaired, an inspection/functional check shall be completed and documented.

4.2. Contractor Inspection Records: Records of inspections shall be kept and made available to the Government throughout the contract performance period and for the period after contract completion until final settlement of any claims under this contract.

4.3. Record of Repairs: Record of repair will consist of components tested, component serial number (S/N), test procedures used, and technical values compared to engineering specifications.

4.4 Repair/Shipment Timeframe: Standard repairs shall be repaired and returned (physically received by the Government) within 40 days of part receipt at the SP’s location. If a part is deemed mission critical, the part will be designated as Mission Incapable Awaiting Parts (MICAP) by the Contracting Officer (CO) and/or the Contracting Officer’s Representative (COR), the part shall be repaired and returned (physically received by the Government) within 20 days of part receipt at the SP’s location. Deviation from these standard timelines shall be approved by the Contracting Officer on a case-by-case basis.

4.4.1. The SP shall provide a shipment tracking number for the return shipment. All shipment costs shall be included in the repair cost, not an additional charge. Shipping documents shall accompany each shipment with the following minimum information:

4.4.1.1. Date shipped

4.4.1.2. List of part(s) by NSN or PN, serial number if applicable, and nomenclature

4.4.1.3. Address shipment to: 18 MXG/MXQ (FA5270)

Unit 5179 Box 10

APO, AP 96368

4.5. Products/Materials: All parts shall appear cosmetically new after repair. SP shall furnish the repaired product to the Government as the original equipment manufacturer (OEM) intended. The repaired product shall meet acceptance test procedures (ATPs) as intended by the OEM and be completed according to technical data. Prior to returning repaired parts to the Government, the SP shall provide certification that the repaired products are safe and fully qualified as an operational instrument on the F15E with a brief description http://www.e-publishing.af.mil/

Page | 4 of the repairs that were performed; certification may be provided electrically to both the CO and COR and shall be provided in writing.

4.6. Government Furnished Property (GFP): The parts supplied under this contract for repair are considered Government Furnished Property (GFP) IAW DFARS 245.107(1)(i). Therefore, the SP shall use the Property Transfer capability in the GFP Module to report receipt of all GFP. Use of the GFP Module is an acceptable property management system as required by DFARS clause 252.245-7003 and is considered mandatory under the terms of this contract. The GFP Module is available at the Procurement Integrated Enterprise Environment (PIEE) at https://wawf.eb.mil/xhtml/unauth/home/login.xhtml.

4.7. GFP Training: Training for the GFP Module is available at https://dodprocurementtoolbox.com/site-pages/gfp-training. Reviewing lessons titled “GFP Property Transfer for Contractors” and “GFP Property Transfer for Contractors- Extended Scenarios” are highly recommended.

4.8. Quality Control Plan: The Contractor shall establish and maintain a Quality Control (QC) Plan to ensure the requirements of the contract are provided as specified. The Contractor shall provide a QC Plan describing the inspection system for the requested services listed in the PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of unacceptable services. The Contractor shall update the plan as changes occur, and changes shall be submitted for review and acceptance by the CO. The Contractor’s QC Plan shall contain, as a minimum, the following items:

4.8.1. A description of the inspection system to cover all services. Description shall include specific details as to the areas to be inspected on a scheduled and unscheduled basis, frequency of inspections, and the title and organizational placement of the inspector(s).

4.8.2. A description of the methods to be used for identifying and preventing defects in the quality of service performed.

4.8.3. A description of how the records will be kept. Records must document all inspections and corrective or preventive actions taken.

5. Invoicing: IAW DFARS 252.232-7006, invoice and receiving reports shall be submitted via Wide Area Work Flow (WAWF) using the Reparable Receiving Report (RRR). This report also initiates the return process, which enables the association of the repair service with the GFP Inventory maintained in the GFP Module. To return parts from multiple task orders in one shipment, the line item from the GFP Inventory shall be populated on the RRR. When the Government accepts the RRR in WAWF, the GFP Inventory will automatically be updated to remove those parts that have been returned to the Government.

6. Warranty: SP’s standard commercial warranty.

7. Location: W ork is to be accomplished at the SP’s facility and returned to Kadena AB at the address indicated in paragraph 4.4.1.

8. Manpower Reporting: The SP shall report ALL SP labor hours (including sub-SP labor hours) required for performance of services provided under this contract via a secure data collection site. The SP is required to completely fill in all required data fields using Service Contract Reporting (SCR) on SAM.gov

8.1. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs from October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year.

SPs may direct questions to the help desk at SCR on SAM.gov.

https://wawf.eb.mil/xhtml/unauth/home/login.xhtml https://dodprocurementtoolbox.com/site-pages/gfp-training https://dodprocurementtoolbox.com/site-pages/gfp-training

Page | 5

9. SERVICES SUMMARY

SS# Performance Objective

PWS

Section Performance Threshold

Quality

Repaired part shall meet acceptance test procedures as intended by the OEM and technical data

4 All repairs must meet this performance objective

SP shall certify the repaired products are safe and fully qualified as an operational instrument on the F15E

SP shall provide written certification with every return shipment for all parts contained in the shipment

3 All parts shall appear cosmetically new after repair, as intended by the OEM

4 All parts shall appear cosmetically new after repair, as intended by the OEM

Accurate and routine use of the GFP Module Property Transfer capability to report receipt of GFP

All GFP transferred from the Government to the Service Provider must be reported using the GFP Module

Schedule

5 Timely repair and return of parts 4

Standard repairs completed and physically received by the Government within 40 days of receipt.

MICAPs (as designated by the COR) completed and physically received by the Government within 20 days of receipt

Management

Perform warranty repairs timely (40 days/20 days MICAPs) IAW SP’s standard commercial warranty

6 Warranty work completed accurately, on time and hassle-free

Other Areas

7 Documentation: Repair and Test 4 Record of repair and test results provided with the return of each part

8 Documentation: Shipping 4

SP provided shipping tracking number for return shipments and include the date shipped, list of items identified by NSN or part number and nomenclature and serial number

The Contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via SCR (SAM.gov)

The Contractor shall completely fill in all required data fields. All data shall be reported no later than October 31 of each calendar year

Page | 6

EXHIBIT A Cabin Pressure Indicator

1. Parts List: F15EX Cabin Pressure Indicator, NSN: 6685-01-668-2966

2. Applicable Publications: SP shall perform work IAW the following regulations. SP is required to furnish and maintain current publications.

a. Technical Order (T.O.) 1F-15EX-4-4

b. T.O. 2-1-111

c. Engineer Drawing ASI9122E CPA ICD

d. DAFI 21-101 Para 11.36 (ACC SUPP); available at www.e-Publishing.af.mil

3. Workload Data

NSN Description Timeframe Qty 6685-01-668-2966 Cabin Pressure Indicator Fiscal Year 26 10 6685-01-668-2966 Cabin Pressure Indicator Fiscal Year 27 10 6685-01-668-2966 Cabin Pressure Indicator Fiscal Year 28 10 6685-01-668-2966 Cabin Pressure Indicator Fiscal Year 29 10 6685-01-668-2966 Cabin Pressure Indicator Fiscal Year 30 10 http://www.e-publishing.af.mil/

9. SERVICES SUMMARY
EXHIBIT A Cabin Pressure Indicator

File details come from the government source that posted it. Updated .