Attachment 004 CLIN DETAIL 091026.pdf

PDF 121 KB Posted

Attached to
SPRRA226R0701 BRADLEY-LIMITED SOURCE-NSN: 6130016818278/ PN: 12571107
Solicitation number
SPRRA226R0701
Issued by

About this file

This document is a Contract Line Item (CLIN) Detail specification for a Defense Logistics Agency (DLA) solicitation (SPRRA226R0701 and SPRRA226R0023) for Circuit Card Assembly components.

The primary requirement is for 50 units of Circuit Card Assembly (NSN: 6130-01-681-8278, Manufacturer Part Number: 12571107, CAGE Code: 32865) with estimated annual demand of 50 units in 2027, and range quantities of 25-49 units (RQ1), 50-75 units (RQ2), and 76-100 units (RQ3) for future years. Delivery shall commence 360 days after receipt of the delivery order at a rate of 50 units per month. The components must be packaged and marked in accordance with MIL-STD-129, with military-level preservation and Level B packing. All wood packaging material must comply with ISPM-15 standards. Inspection and acceptance occur at the origin, with FOB point at destination, and delivery directed to DLA Aviation at Huntsville, Alabama (Redstone Arsenal). The contract includes a First Article Test (FAT) requirement for one unit, which must be tested at a mutually agreed-upon date with 30 days' advance notice to the Contracting Officer. The First Article Test Report is due 15 days after FAT completion and must be submitted electronically to DLAHSVPOSTAWARDTEAM@DLA.MIL, with government approval/disapproval within 45 days. The FAT unit is part of the total production quantity and shall not be retained as a manufacturing standard. Range pricing is requested for cost evaluation purposes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPRRA226R0701 CLIN DETAIL

CUI / SOURCE SELECTION INFORMATION - SEE FAR 2.101 & 3.104 1

0001 CIRCUIT CARD ASSY

NSN: 6130-01-681-8278

Mfr CAGE: 32865 Mfr Part Number: 12571107

0001AA PRODUCTION QUANTITY 50 (E) EA $ (RANGE PRICING REQUESTED, SEE CLIN DETAIL TABLE)

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 012

LEVEL PRESERVATION: Military

LEVEL PACKING: B

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND SIZE (INCHES):

WT [2.9]

LN [10.7]

WD [7.4]

DP [2.7]

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15 COMPLIANT.

MIL-STD-2073-1 CODES, APPENDIX J:

JI/A/MP [GX]

JII/CD [1]

JIII/PM [00]

JIV/WM [K3]

JV/CD [LT]

JVI/CT [B]

JVII/UC [ZZ]

JVII/IC [ED]

JIX/A/PK [AAA]

JX/SM [00]

JVIIIA/OPI [M]

SUPPLEMENTAL

INSTRUCTIONS-

BAG B9 IN BOX

ED

(End of narrative D001)

INSPECTION: Origin | ACCEPTANCE: Origin | FOB POINT: Destination DELIVERIES SHALL COMMENCE 360 DAYS AFTER RECEIPT OF DELIVERY ORDER AT A RATE OF 50 EACH FOR ONE MONTH.

(End of narrative F001)

0001TF CONTRACTOR TESTED FIRST ARTICLE 1 LO $

CLIN PROPOSED COST IS FOR FIRST ARTICLE TEST ONLY.

FIRST ARTICLE TEST UNIT TO BE TESTED IS A PART OF THE TOTAL PRODUCTION QUANTITY.

UNIT TO BE TESTED IS 1 EACH. FIRST ARTICLE TEST SHALL BEGIN ON A MUTUALLY AGREED UPON DATE BETWEEN THE GOVERNMENT AND THE CONTRACTOR. THE DATE SHALL OCCUR WITH ENOUGH TIME IN ADVANCE TO BEGIN SCHEDULED DELIVERIES. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IN WRITING 30 DAYS PRIOR TO THE PROPOSED DATE OF FIRST

ARTICLE TESTING.

THE FIRST ARTICLE TEST UNIT SHALL NOT BE RETAINED BY THE CONTRACTOR AS A MANUFACTURING STANDARD.

FAR 52.209-3 ALTERNATE I IS INCLUDED UNDER WHICH THE CONTRACTOR IS REQUIRED TO PRODUCE THE FIRST ARTICLE AND THE PRODUCTION QUANTITY AT THE SAME FACILITY.

FAT CLIN IS NOT RESTRICTED TO A SPECIFIC ORDERING PERIOD AND MAY BE IMPLEMENTED WITH ANY ORDER DURING THE DURATION OF THE CONTRACT AT THE DISCRETION OF THE QUALITY ADMINISTRATOR IN ACCORDANCE WITH FAR SUBPART 9.3. THIS IN NO WAY PRECLUDES THE CONTRACTOR’S RIGHT TO SUBMIT A REQUEST FOR WAIVER OF THE FAT, ALTHOUGH A

WAIVER IS NOT GUARANTEED.

(End of narrative B001)

INSPECTION: Origin | ACCEPTANCE: Origin

0001TR CONTRACTOR FIRST ARTICLE TEST REPORT 1 EA $ ** NSP * * $ ** NSP **

THE FIRST ARTICLE TEST REPORT IS DUE 15 DAYS AFTER FAT. FAT REPORT SHALL BE SUBMITTED IN ENGLISH. THE FIRST ARTICLE TEST REPORT WILL BE SENT ELECTRONICALLY TO:

DLAHSVPOSTAWARDTEAM@DLA.MIL. IF THE FILE IS TOO LARGE OR ENCRYPTION IS NEEDED, A DOD SAFE LINK WILL BE SENT TO YOU FOR UPLOAD USING HTTPS://SAFE.APPS.MIL/. PLEASE USE THE DLAHSVPOSTAWARDTEAM@DLA.MIL EMAIL ADDRESS TO REQUEST THE LINK. THE GOVERNMENT HAS 45 DAYS TO APPROVE/DISAPPROVE THE TEST REPORT.

(End of narrative B001)

INSPECTION: Origin | ACCEPTANCE: Destination | FOB POINT: Destination

SHIP TO: (SPRRA2) DLA AVIATION AT HUNTSVILLE, AL

DLR PROCUREMENT OPERATIONS (AH)

5201 MARTIN ROAD

REDSTONE ARSENAL,AL,35898-734

mailto:DLAHSVPOSTAWARDTEAM@DLA.MIL https://safe.apps.mil/ mailto:DLAHSVPOSTAWARDTEAM@DLA.MIL

SPRRA226R0023 CLIN DETAIL

CUI / SOURCE SELECTION INFORMATION - SEE FAR 2.101 & 3.104 2

CLIN

NSN

P/N

NOMENCLATURE

ESTIMATED ANNUAL

DEMAND (EAD)

RANGE QUANTITIES (RQ)

RQ 1

RQ 2

RQ 3

0001AA 6130-01-681-8278

12571107

Circuit Card Assy

NA

NA 25-49 50-75 76-100

0001 CIRCUIT CARD ASSY
Mfr CAGE: 32865

File details come from the government source that posted it. Updated .