10/25/2021

M555PRID 414L2410-1Part Number

1620-01-350-4882NSN CH-47System

STEERING UNITNomenclature

YAdequate DMWR Available?

DMWR-55-1620-224DMWR ID

02/06/2015DMWR Date

DMWR Chg #

YPre-Award Survey Recommended?

NCorrelation Performance Study Required ? YPVA Recommended?

Approved source(s) will identify all inspection measurement procedures and equipment, including nondestructive testing (NDT) procedures, if required, to perform overhaul.

The overhaul facility is responsible for acquisitions, maintenance, calibration, and disposition of all Test, Measurement, and Diagnostic Equipment (TMDE). TMDE shall be maintained and controlled in accordance with MIL-I-45607, ISO10012, NCSL Z540.3, or AMCOM-R 702-7. Calibration documents for all TMDE shall be traceable to the National Institute of Standards and Technology (NIST).

Identify Any Special Processes, Test Procedures, and/or Instructions

NCritical Safety Item?

No recent AED review of issues impacting airworthiness. However, historical AED review did not identify any airworthiness issues, or concerns of reliability or durability.

Special Airworthiness Considerations

FCDD-AMR-AM Sustainment verified the CSI/NST status through the ARISE CIM database on 24 November 2020 and the part is Non-CSI and Non-NST. JC

Other Requirements / Comments

If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:

YSpecial Post-Contract Award Requirements?

The Prime or OEM is required to submit an M&O plan to the Maintenance Engineering Division, FCDD-AMR-AM, for review and approval 30-days after contract award.

Special Post-Contract Award Requirements

The applicable DMWR contains detailed procedures regarding IUID requirements for this component. These procedures can be found in MEOs D1919, D1920, and D1921.

Other Requirements / Comments (Part II)

AMR-AM Sustainment has reverified the CSI/NST status through the ARISE CIM and the part is still Non-CSI and Non-NST, There are no required changes. DEM

Other Requirements / Comments (Part III)

FCDD-AMR-MS Quality Requirements Branch has reverified the CSI/NST status through the ARISE CIM on 20 October 2021 and the part is still Non-CSI and Non-NST. There were no required changes.JC

Other Requirements / Comments (Part IV)

Other Requirements / Comments (Part V)

NDoes QE-STD-2 Apply?

N

Additional CSI Requirements

CSI Contains CSI Replacement Parts? NEngineering Testing Required?

The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:

1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.

RStatus

YTDPL?

Approved Date

M&O AED REQUIREMENTS DATA

Correlation Performance Study Requirements

Commerciality Determination

Commercial Item? N NBest Commercial Practice Acceptable?

10/25/2021

M555PRID 414L2410-1Part Number

1620-01-350-4882NSN CH-47System

C4598

D1642B

D1657A

D1919

D1920

D1921

Approved Source(s) will identify critical tools and test/inspection equipment required to perform overhaul.

Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes

MEOs Required for Competitive Contract?

RStatus

File details come from the government source that posted it. Updated .