07/26/2022
M351-02PRID 173HS113-2Part Number
1650-01-119-3372NSN CH-47System
VALVE HOIST CONTROLNomenclature
YAdequate DMWR Available?
DMWR-55-1650-405DMWR ID
01/02/2015DMWR Date
0DMWR Chg #
YPre-Award Survey Recommended?
NCorrelation Performance Study Required ? YPVA Recommended?
Full compliance of the final test IAW DMWR requirement.
Identify Any Special Processes, Test Procedures, and/or Instructions
NCritical Safety Item?
The Systems Readiness Directorate (SRD), Cargo, Fixed Wing (FW), and Multiplatform Division has reviewed the subject request from an airworthiness and engineering perspective. The referenced ECP is in work and proposes a material change to the valve body (note however that the subject part is not classified as a CSI). The ECP would result in a part number change from current PN 173HS113-2 (vendor PN A23772-001) to new PN 173HS113-3 (vendor PN A23772-002).
Special Airworthiness Considerations
28 March 2022 - FCDD-AMR-SS (Sustainment)- Verified through the ARISE CIM database on 25 March 2022 and the part is Non-CSI and Non-NST. DEM
Other Requirements / Comments
If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:
YSpecial Post-Contract Award Requirements?
1) Pre-award survey is recommended for unproven first time contractor without previous overhuaul experience of the subject PN.
2) In-house or custom-build test equipment shall requires the additional submission: (a) Form 1379, Request for Deviation, (b) documentation showing the equipment has been certified to comply with DMWR testing procedure and has been approved/release for production. (c) documentation outlining the standard operating procedure (SOP) used to certify, approve/release in-house or custom-build test equipment for production.
Special Post-Contract Award Requirements
The applicable DMWR contains detailed procedures regarding IUID requirements for this component. These procedures can be found in MEO(s) D2434A, D2435A, and D2436A.
Other Requirements / Comments (Part II)
FCDD-AMR-SS Quality Requirements Branch has reverified the CSI/NST status through ARISE CIM on 14 June 2022 and the part is still Non-CSI and Non-NST. There are no required changes.JC
Other Requirements / Comments (Part III)
Other Requirements / Comments (Part IV)
Other Requirements / Comments (Part V)
NDoes QE-STD-2 Apply?
N
Additional CSI Requirements
CSI Contains CSI Replacement Parts? NEngineering Testing Required?
The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:
1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.
RStatus
YTDPL?
Approved Date
M&O AED REQUIREMENTS DATA
Correlation Performance Study Requirements
Commerciality Determination
Commercial Item? N NBest Commercial Practice Acceptable?
07/26/2022
M351-02PRID 173HS113-2Part Number
1650-01-119-3372NSN CH-47System
C4598
D1581
D2175
D2434A
D2435A
D2436A
D2467
All equipment and test/inspection equipment not specified in the DMWR.
Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes
MEOs Required for Competitive Contract?
RStatus