Attachment 0009 - MO AED Requirements Data.pdf

PDF 5 KB Posted

Attached to
Solicitation for the Maintenance and Overhaul of the CH-47 Shock Strut Assembly
Solicitation number
W58RGZ-22-B-0046
Issued by

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

06/20/2022

M827PRID 114L2331-2Part Number

1620-00-869-2418NSN CH-47System

SHOCK STRUT ASSEMBLNomenclature

YAdequate DMWR Available?

DMWR-55-1620-225DMWR ID

09/09/2013DMWR Date

0DMWR Chg #

YPre-Award Survey Recommended?

NCorrelation Performance Study Required ? YPVA Recommended?

1.) The information found at https://www.avmc.army.mil/directorates/SRD/SAR shall be provided to the vendor for guidance on technical data development.

2.) Pre-award survey is recommended for new and unproven repair sources.

3.) All special processes required to complete the M&O process shall be provided in the M&O plan submission, as well any pertinent documentation associated.

4.) Perform NDI per ASTM E1444 & E1417. NDI level III inspector shall have reviewed and approved all technique sheets.

Personnel performing NDI shall be certified in accordance with AIA/NAS 410.

5.) IUID instructions are provided in the following MEOs: D2396, D2397, and D2398.

6.) Contact CH-47 PM IUID Office for any updates and/or waiver/deviation of IUID Contracting DFAR clauses on IUID requirements.

7.) Special processing specifications for components are listed in Table 3-5. Components that have had the plating or protective coating removed through wear or rework will be processed. See manufacturers drawings and Tables 3-6 and 3-7.

Identify Any Special Processes, Test Procedures, and/or Instructions

NCritical Safety Item?

There are no emerging airworthiness issues, no issues related to ECPs affecting the CSI status, and no concerns over reliability/durability for the CH-47 , Shock Strut Assembly at the time of this review.

Special Airworthiness Considerations

For locally built or fabricated inspection & test stand/equipments. The M&O source is responsible to demonstrate capability and to provide the release documentation of the stand/equipments for production. In addition, the M&O source will provide written documentation of the release procedures, and upon request, provided justification data for the release.

Other Requirements / Comments

If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:

NSpecial Post-Contract Award Requirements?

FCDD-AMR-SS Sustainment has verified through the ARISE CIM database on 5 May 2022 and the part is Non-CSI and Non-

NST. DEM

Other Requirements / Comments (Part II)

The applicable DMWR contains detailed procedures regarding IUID requirements for this component. These procedures can be found in MEO(s) D2396, D2397, and D2398.

Other Requirements / Comments (Part III)

FCDD-AMR-SS Quality Requirements Branch has reverified the CSI/NST status through ARISE CIM on 14 June 2022 and the part is still Non-CSI and Non-NST. There are no required changes.JC

Other Requirements / Comments (Part IV)

Other Requirements / Comments (Part V)

NDoes QE-STD-2 Apply?

N

Additional CSI Requirements

CSI Contains CSI Replacement Parts? NEngineering Testing Required?

The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:

1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.

RStatus

YTDPL?

Approved Date

M&O AED REQUIREMENTS DATA

Commerciality Determination

Commercial Item? N NBest Commercial Practice Acceptable?

06/20/2022

M827PRID 114L2331-2Part Number

1620-00-869-2418NSN CH-47System

C4598

C5309H

D1573

D1599A

D1600

D1650

D1707

D1780

D1784

D1791

D1838

D1847

D1852

D2153

D2189

D2396

D2397

D2398

D2519

T1356D

The critical tools and test/inspection equipment required are listed in Table 2-1. Special Tools and Eqiuipment and Table 2-2. Inspection and Test Equipment of DMWR 55-1620-225.

Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes

MEOs Required for Competitive Contract?

Special Post-Contract Award Requirements

RStatus

Correlation Performance Study Requirements

File details come from the government source that posted it. Updated .