Attachment 0009 - M_O AED Requirements Data.pdf
PDF 4 KB Posted
- Solicitation number
- W58RGZ-22-B-0020
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
03/29/2022
AI633-1PRID 3882820-1Part Number
2910-01-225-3966NSN AGPUSystem
FUEL CONTROL, STARTINGNomenclature
YAdequate DMWR Available?
DMWR-1-2835-213&PDMWR ID
09/30/2013DMWR Date
1DMWR Chg #
YPre-Award Survey Recommended?
NCorrelation Performance Study Required ? YPVA Recommended?
Calibration of Fuel Control Assembly per WP 0014 00
Identify Any Special Processes, Test Procedures, and/or Instructions
NCritical Safety Item?
There are no emerging airworthiness issues, no issues related to ECPs affecting the CSI status, and no concerns over reliability/durability for PN 3882820-1 at the time of this review.
Special Airworthiness Considerations
FCDD-AMR-MS Quality Requirements Branch has verified the CSI/NST status through the ARISE CIM on 11 February 2022 and the part is Non- CSI and Non-NST.JC
Other Requirements / Comments
If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:
NSpecial Post-Contract Award Requirements?
Special Post-Contract Award Requirements
DMWR 1-2835-213&P does not contain detailed IUID requirements for this component. The PM has not tasked SRD to update this DMWR to incorporate IUID detailed procedures. No PM IUID Office/POC is available for any updates and/or waiver/deviation of IUID Contracting DFAR clauses on the IUID marking of Starter Fuel Control, PN: 3882820-1, at the time of this review.
Other Requirements / Comments (Part II)
FCDD-AMR-MS Quality Requirements Branch has re-verified the CSI/NST status through the ARISE CIM on 21 March 2022 and the part is Non- CSI and Non-NST. DEM
Other Requirements / Comments (Part III)
Other Requirements / Comments (Part IV)
Other Requirements / Comments (Part V)
NDoes QE-STD-2 Apply?
N
Additional CSI Requirements
CSI Contains CSI Replacement Parts? NEngineering Testing Required?
The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:
1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.
RStatus
YTDPL?
Approved Date
M&O AED REQUIREMENTS DATA
Correlation Performance Study Requirements
Commerciality Determination
Commercial Item? N NBest Commercial Practice Acceptable?
03/29/2022
AI633-1PRID 3882820-1Part Number
2910-01-225-3966NSN AGPUSystem
C4598
P7185
S1373
S1501A
S1534A
T1356D
WP 0059 and WP 0063
Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes
MEOs Required for Competitive Contract?
RStatus
File details come from the government source that posted it. Updated .