Attachment 0009 - M_O AED Requirements Data.pdf

PDF 4 KB Posted

Attached to
Solicitation for the Overhaul of the AGPU Fuel Control, Starting
Solicitation number
W58RGZ-22-B-0020
Issued by

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

03/29/2022

AI633-1PRID 3882820-1Part Number

2910-01-225-3966NSN AGPUSystem

FUEL CONTROL, STARTINGNomenclature

YAdequate DMWR Available?

DMWR-1-2835-213&PDMWR ID

09/30/2013DMWR Date

1DMWR Chg #

YPre-Award Survey Recommended?

NCorrelation Performance Study Required ? YPVA Recommended?

Calibration of Fuel Control Assembly per WP 0014 00

Identify Any Special Processes, Test Procedures, and/or Instructions

NCritical Safety Item?

There are no emerging airworthiness issues, no issues related to ECPs affecting the CSI status, and no concerns over reliability/durability for PN 3882820-1 at the time of this review.

Special Airworthiness Considerations

FCDD-AMR-MS Quality Requirements Branch has verified the CSI/NST status through the ARISE CIM on 11 February 2022 and the part is Non- CSI and Non-NST.JC

Other Requirements / Comments

If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:

NSpecial Post-Contract Award Requirements?

Special Post-Contract Award Requirements

DMWR 1-2835-213&P does not contain detailed IUID requirements for this component. The PM has not tasked SRD to update this DMWR to incorporate IUID detailed procedures. No PM IUID Office/POC is available for any updates and/or waiver/deviation of IUID Contracting DFAR clauses on the IUID marking of Starter Fuel Control, PN: 3882820-1, at the time of this review.

Other Requirements / Comments (Part II)

FCDD-AMR-MS Quality Requirements Branch has re-verified the CSI/NST status through the ARISE CIM on 21 March 2022 and the part is Non- CSI and Non-NST. DEM

Other Requirements / Comments (Part III)

Other Requirements / Comments (Part IV)

Other Requirements / Comments (Part V)

NDoes QE-STD-2 Apply?

N

Additional CSI Requirements

CSI Contains CSI Replacement Parts? NEngineering Testing Required?

The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:

1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.

RStatus

YTDPL?

Approved Date

M&O AED REQUIREMENTS DATA

Correlation Performance Study Requirements

Commerciality Determination

Commercial Item? N NBest Commercial Practice Acceptable?

03/29/2022

AI633-1PRID 3882820-1Part Number

2910-01-225-3966NSN AGPUSystem

C4598

P7185

S1373

S1501A

S1534A

T1356D

WP 0059 and WP 0063

Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes

MEOs Required for Competitive Contract?

RStatus

File details come from the government source that posted it. Updated .