Attachment 0007 MO AED REQUIREMENTS DATA.pdf
PDF 45 KB Posted
- Solicitation number
- W58RGZ-22-B-0011
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12/14/2021
M634-02PRID 145HS100-5Part Number
1650-01-516-6740NSN CH-47System
PUMP,AXIAL PISTONSNomenclature
YAdequate DMWR Available?
DMWR-55-4320-278DMWR ID
04/15/2016DMWR Date
DMWR Chg #
YPre-Award Survey Recommended?
NCorrelation Performance Study Required ? YPVA Recommended?
NCritical Safety Item?
There are no emerging airworthiness issues, no issues related to ECPs affecting the CSI status, and no concerns over reliability/durability for the CH-47 Hydraulic System at the time of this review.
Special Airworthiness Considerations
The Systems Readiness Directorate (SRD) Cargo Division has reviewed the subject request from an engineering and airworthiness perspective. Our research did not reveal any emerging airworthiness issues, new Engineering Change Proposals (ECPs) affecting Critical Safety Items (CSIs), and/or concerns over reliability, durability, etc. for the subject part.
Other Requirements / Comments
If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:
NSpecial Post-Contract Award Requirements?
FCDD-AMR-AM-Sustainment has verified through the ARISE CIM database on 30 August 2021 and the part is Non-CSI and Non-NST. DEM
Other Requirements / Comments (Part II)
The applicable DMWR contains detailed procedures regarding IUID requirements for this component. These procedures can be found in MEO(s) D1986, D1988, D1989.
Other Requirements / Comments (Part III)
NDoes QE-STD-2 Apply?
N
Additional CSI Requirements
CSI Contains CSI Replacement Parts? NEngineering Testing Required?
Identify Any Special Processes, Test Procedures, and/or Instructions
See DMWR 55-4320-278 paragraphs 3-15 through 3-20 for inspection measurement procedures and equipment.
Diagnostic and non-destructive tests such as magnetic particle, flourescent penetrant, radiographic and ultrasonic inspections shall be in accordance with referenced military specifications and ASTM E1444 and ASTM E1417 per DMWR 55-4320-278 pararaph 5-7.b.
The contractor Quality Assurance (QA) activity shall be responsible for ascertaining and certifying personnel skills, equipment and material to meet the requirements of the work to be accomplished. Unless otherwise specified in the contract or by the Procuring Activity (PA) or Commodity Manager (CM) representative, the contractor QA activity shall provide the PA/CM with statements or other evidence that specifications for such special processes as welding, nondestructive testing, plating and the like, have been complied with. Personnel performing magnetic particle and penetrant test shall be certified in accordance with AIA/NAS NAS 410 per DMWR 55-4320-278 paragraph 5-4.
TMDE shall be maintained and controlled in accordance with MIL-I-45607, ISO 10012, NCSL Z540.3, or AMCOM-R 702-7.
Calibration documents for all TMDE shall be traceable to the National Institute of Standards and Technology (NIST) per DMWR 55-4320-278 paragraph 5-3.
See DMWR 55-4320-278 paragraphs 4-3 through 4-6 for testing requirements.
RStatus
YTDPL?
Approved Date
M&O AED REQUIREMENTS DATA
Commerciality Determination
Commercial Item? N NBest Commercial Practice Acceptable?
12/14/2021
M634-02PRID 145HS100-5Part Number
1650-01-516-6740NSN CH-47System
D1986
D1988
D1989
D2053
D2172
See Tables 2-1 and 2-2 in DMWR 55-4320-278 for Special Tools and Equipment and Inspection and Test Equipment.
Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes
MEOs Required for Competitive Contract?
Special Post-Contract Award Requirements
Other Requirements / Comments (Part IV)
Other Requirements / Comments (Part V)
RStatus
Correlation Performance Study Requirements
File details come from the government source that posted it. Updated .