04/02/2020

M858PRID AE2152MK2Part Number

6115-01-137-9504NSN CH-47System

GENERATOR,ALTERNATINomenclature

YAdequate DMWR Available?

DMWR-55-6115-507DMWR ID

06/25/2013DMWR Date

DMWR Chg #

YPre-Award Survey Recommended?

NCorrelation Performance Study Required ? YPVA Recommended?

Nondestructive testing (NDT) procedures for magnetic particle and flourescent penetrant shall be in acccordance with ASTM E1444 and ASTM E1417 as per DMWR 55-6115-507 paragraph 5-7.b. All technique sheets shall be reviewed and approved by a certified Level III NDT Inspector. All personnel performing inspection tasks shall be certified in accordance with AIA/NAS 410.

The overhaul facility is responsible for acquisition, maintenance, calibration, and disposition of all Test, Measurement and Diagnostic Equipment (TMDE). TMDE shall be maintained and controlled in accordance with MIL-I-45607, ISO 10012, NCSL Z540.3, or AS9100/9110. Calibration documents for all TMDE shall be traceable to the National Institute of Standards of Technology (NIST).

See DMWR 55-6115-507 paragraphs 4-3.a through m for Final Performace Check Procedures.

Identify Any Special Processes, Test Procedures, and/or Instructions

NCritical Safety Item?

The Systems Readiness Directorate (SRD) Cargo Airworthiness Division has reviewed the subject request from an airworthiness and engineering point of view. Our research did not reveal any emerging airworthiness issues, new Engineering Change Proposals (ECPs) affecting Critical Safety Items (CSIs), and/or concerns over reliability, durability, etc. for the subject part.

Special Airworthiness Considerations

FCDD-AMA-M-Sustainment has verified the CSI/NST status through the ARISE CIM on 28 Feb 2020 and the NHA is Non-CSI and Non-NST. The subcomponents are Non-CSI and Non-NST. Engineering testing, Fatigue, Endurance, and Interchange are not required for overhaul. No changes made. DEM

Other Requirements / Comments

If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:

NSpecial Post-Contract Award Requirements?

FCDD-AMA-M-Sustainment has re-verified the CSI/NST status through the ARISE CIN database on 24 March 2020 and the part is Non-CSI and Non-NST. No changes made. DEM Currently on telework due to work building flooding. Can not access ICAPP to input AED 3 information. DEM

Other Requirements / Comments (Part II)

The applicable DMWR contains detailed procedures regarding IUID requirements for this component. These procedures can be found in MEO(s) D2341, D2342 and D2343.

Other Requirements / Comments (Part III)

Other Requirements / Comments (Part IV)

Other Requirements / Comments (Part V)

NDoes QE-STD-2 Apply?

N

Additional CSI Requirements

CSI Contains CSI Replacement Parts? NEngineering Testing Required?

The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:

1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.

RStatus

YTDPL?

Approved Date

M&O AED REQUIREMENTS DATA

Commerciality Determination

Commercial Item? N NBest Commercial Practice Acceptable?

04/02/2020

M858PRID AE2152MK2Part Number

6115-01-137-9504NSN CH-47System

D1099

D1102

D2341

D2342

D2343

D2678

See DMWR 55-6115-507 Tables 2-1 and 2-2 for critical tools and test/inspection equipment.

Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes

MEOs Required for Competitive Contract?

Special Post-Contract Award Requirements

RStatus

Correlation Performance Study Requirements